CN101670985A - Electric transmission line iron tower erection tower crane with flexible base and flexible adhesion - Google Patents
Electric transmission line iron tower erection tower crane with flexible base and flexible adhesion Download PDFInfo
- Publication number
- CN101670985A CN101670985A CN200910091384A CN200910091384A CN101670985A CN 101670985 A CN101670985 A CN 101670985A CN 200910091384 A CN200910091384 A CN 200910091384A CN 200910091384 A CN200910091384 A CN 200910091384A CN 101670985 A CN101670985 A CN 101670985A
- Authority
- CN
- China
- Prior art keywords
- crane
- tower
- foundation
- flexible
- iron tower
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Jib Cranes (AREA)
Abstract
本发明涉及一种用于输电线路铁塔组立施工的具有柔性基础和柔性附着的输电线路铁塔组立塔式起重机。起重机的底部坐于铁塔中央的简易基础上,通过基础拉线连接铁塔的四个基础,基础拉线与水平面成40°~50°角。简易底座与基础拉线共同构成起重机的柔性基础。在铁塔组立到一定的高度后,通过附着拉线将铁塔的各侧主材与起重机的塔身连接,构成起重机的柔性附着。根据铁塔的高度和起重机的附着间距确定附着的数量。简易底座一般由砂石上铺设道木构成,基础拉线与附着拉线由钢丝绳滑轮组构成。
The invention relates to a transmission line iron tower erection tower crane with a flexible foundation and flexible attachment, which is used for the erection and construction of the iron tower of the transmission line. The bottom of the crane sits on the simple foundation in the center of the tower, and connects the four foundations of the tower through the foundation stay wires, which form an angle of 40° to 50° with the horizontal plane. The simple base and the basic guy wire together constitute the flexible foundation of the crane. After the iron tower is erected to a certain height, the main materials on each side of the iron tower are connected to the tower body of the crane through the attached stay wires to form the flexible attachment of the crane. The number of attachments is determined according to the height of the tower and the attachment spacing of the cranes. The simple base is generally composed of road logs laid on sand and gravel, and the basic guy wires and attached guy wires are made of wire rope pulley blocks.
Description
技术领域 technical field
本发明涉及输电线路施工技术领域,具体地说是涉及一种用于输电线路铁塔组立施工的具有柔性基础和柔性附着的输电线路铁塔组立塔式起重机。The invention relates to the technical field of power transmission line construction, in particular to a power transmission line iron tower erection tower crane with flexible foundation and flexible attachment, which is used for the erection and construction of electric transmission line iron towers.
背景技术 Background technique
目前,国内输电线路施工铁塔组立施工主要采用抱杆施工,而国内普遍施工的塔式起重机均采用刚性混凝土基础及刚性撑杆附着,先有的固定基础及刚性附着加工制作费用高,且不可重复使用。例如与本发明相同申请人的中国专利申请200810114263.X公开了一种动臂式组塔专用塔式起重机,其内容在此引入一并用于说明解释本发明的其他部件,该申请使用的依然是固定的刚性混凝土基础及刚性撑杆附着,具有安装复杂、困难,施工强度大,效率不高等缺点。针对铁塔施工的特点,需要具有柔性基础和柔性附着的铁塔组立塔式起重机更适合铁塔组立施工的要求。At present, domestic transmission line construction iron tower construction mainly adopts pole-holding construction, while the tower cranes commonly constructed in China use rigid concrete foundations and rigid support rods for attachment. The previous fixed foundations and rigid attachments are expensive to manufacture and cannot reuse. For example, the Chinese patent application 200810114263.X of the same applicant as the present invention discloses a special-purpose tower crane for arranging towers with a movable arm type, and its content is introduced here to illustrate and explain other parts of the present invention. What this application uses is still The fixed rigid concrete foundation and rigid strut attachment have the disadvantages of complicated and difficult installation, high construction strength and low efficiency. According to the characteristics of iron tower construction, the tower crane with flexible foundation and flexible attachment is more suitable for the requirements of iron tower erection construction.
发明内容 Contents of the invention
因此,本发明的目的是克服现有技术具有安装复杂、困难,施工强度大,效率不高的不足,提供一种具有柔性基础和柔性附着的输电线路铁塔组立塔式起重机,该铁塔组立塔式起重机的钢丝绳滑轮组为施工现场常见的施工工具,可重复使用,施工方法方便简单,效率大大提高,并可节省使用成本。Therefore, the purpose of the present invention is to overcome the shortcomings of the prior art that installation is complex and difficult, the construction strength is high, and the efficiency is not high, and to provide a tower crane with flexible foundation and flexible attachment for the erection of iron towers for transmission lines. The wire rope pulley block of the tower crane is a common construction tool on the construction site, which can be used repeatedly. The construction method is convenient and simple, the efficiency is greatly improved, and the use cost can be saved.
为实现上述目的,本发明采取以下技术方案:To achieve the above object, the present invention takes the following technical solutions:
一种具有柔性基础和柔性附着的输电线路铁塔组立塔式起重机,该起重机用于输电线路铁塔的组立施工,其特征在于该起重机包括简易基础1、基础拉线2、塔身3、附着拉线4、顶升机构5、起升机构6、回转机构7、回转转盘8、吊臂9、塔帽10和变幅机构11,所述塔身3、回转转盘8、吊臂9和塔帽10通过销轴连接,所述顶升机构5和起升机构6安装在塔身3上,所述回转机构7和变幅机构11安装在所述回转转盘8上。A transmission line iron tower erection tower crane with a flexible foundation and flexible attachment, the crane is used for the erection construction of the transmission line iron tower, characterized in that the crane includes a
其中,所述简易基础1由砂石上铺设道木构成,所述基础拉线2由钢丝绳滑轮组构成,所述简易基础1与基础拉线2共同构成起重机的柔性基础,采用所述附着拉线4将铁塔主材12与起重机的塔身3相连,构成了起重机的柔性附着,其中所述附着拉线4由钢丝绳滑轮组构成。Wherein, the
其中,所述回转机构7包括带有齿轮的减速电机。Wherein, the
其中,所述顶升机构包括液压油缸及其配套的上下十字梁架。Wherein, the jacking mechanism includes a hydraulic oil cylinder and its supporting upper and lower cross beams.
本发明还提供了一种使用上述起重机组立输电线路铁塔的施工方法,包括以下步骤:The present invention also provides a construction method for erecting transmission line iron towers using the above-mentioned crane, comprising the following steps:
(1)浇筑输电线路的铁塔基础13,并预制简易基础1;(1) pouring the
(2)安装起重机的下部结构,塔身3的底部直接座于简易基础1上,并且塔身3通过四根基础拉线2与铁塔的四个基础13连接并张紧,基础拉线2与水平面成40°~50°角,简易基础1与四根基础拉线2共同构成起重机的柔性基础,起重机的下部结构安装完成后,再将起重机的上部结构:顶升机构5、起升机构6、回转机构7、回转转盘8、吊臂9、塔帽10和变幅机构11安装完成,然后使用起重机的顶升机构5向上顶升起重器的上部结构,使起重机上升到起重机的最大自立高度;(2) The lower structure of the crane is installed, the bottom of the
(3)使用起重机的起升机构6、回转机构7、变幅机构11组立铁塔,直到起重机的起升高度不能满足铁塔组立施工的需要,通过附着拉线4将铁塔各侧主材10与起重机的塔身3连接,构成起重机的第一道柔性附着,通过起重机的顶升机构5再次向上顶升安装起重机直到起重机允许的高度,继续组立安装铁塔,当起重机的起升高度不能满足铁塔组立的需要时,重复步骤(3),通过增加的附着拉线4将铁塔各侧主材10与起重机的塔身3连接,构成起重机的第n道柔性附着,其中n为自然数,直至铁塔组立安装完成,所述设置的柔性附着的数量n根据铁塔的高度和起重机的附着间距确定;(3) Use the
(4)在铁塔安装、检查完毕后,拆除起重机。(4) After the tower is installed and inspected, remove the crane.
本发明的有益效果在于:采用了柔性基础和柔性附着的铁塔组立塔式起重机,充分利用了铁塔的特点,更适合输电线路铁塔组立的需要。原有的固定基础及刚性附着加工制作费用高,且不可重复使用。而柔性基础和柔性附着由钢丝绳滑轮组构成,钢丝绳滑轮组为施工现场常见的施工工具,可重复使用,施工方便简单,效率大大提高。采用柔性基础和柔性附着可为施工单位节省较大的施工费用。The beneficial effect of the present invention is that: the flexible foundation and the flexible attached steel tower erection tower crane are adopted, the characteristics of the iron tower are fully utilized, and it is more suitable for the needs of the transmission line iron tower erection. The original fixed foundation and rigid attachment processing cost are high and cannot be reused. The flexible foundation and flexible attachment are composed of a wire rope pulley block. The wire rope pulley block is a common construction tool on the construction site. It can be reused, the construction is convenient and simple, and the efficiency is greatly improved. The use of flexible foundation and flexible attachment can save a large construction cost for the construction unit.
附图说明 Description of drawings
图1-3为本发明的起重机的整体结构和组立安装铁塔的各个施工阶段的示意图;Fig. 1-3 is the overall structure of the crane of the present invention and the schematic diagram of each construction stage of erecting and installing iron tower;
图4是本发明的起重机的回转转盘的局部放大示意图;Fig. 4 is the partially enlarged schematic view of the rotary turntable of the crane of the present invention;
图5是本发明的起重机的顶升机构的局部放大示意图。Fig. 5 is a partially enlarged schematic view of the jacking mechanism of the crane of the present invention.
其中各数字代表:1简易基础 2基础拉线 3起重机塔身 4附着拉线 5顶升机构 6起升机构 7回转机构 8回转转盘 9吊臂 10塔帽 11变幅机构 12铁塔主材 13铁塔基础。The numbers represent: 1
具体实施方式 Detailed ways
如图1-3所示为本发明的具有柔性基础和柔性附着的输电线路铁塔组立塔式起重机的整体结构和组立安装铁塔的各个施工阶段的示意图,该起重机由简易基础1、基础拉线2、起重机塔身3、附着拉线4、顶升机构5、起升机构6、回转机构7、回转转盘8、吊臂9、塔帽10、变幅机构11等部分组成。对于并非本发明发明点的部分公知的组件,在此忽略不再进行详细的描述,具体的部分部件请参考与本发明相同申请人的中国专利申请200810114263.X的描述,其内容在此引入一并用于说明解释本发明的部件。As shown in Fig. 1-3, it is the schematic diagram of the overall structure and the various construction stages of erecting and installing the iron tower of the transmission line iron tower erecting tower crane with flexible foundation and flexible attachment of the present invention, and this crane is made up of
起重机塔身3为多节塔身节组成,包括休息平台和梯子等附属件。塔身节通过销轴连接。起重机塔身能承受很大的抗扭曲、抗挤压力。顶升机构5主要包括液压顶升油缸、上、下十字梁。通过顶升液压油缸的伸缩及塔身节的安装实现起重机塔身3的加(减)塔身节,从而实现起重机工作所需要的高度。起升机构6作为塔机吊重提升(下降)的动力系统,该系统可根据吊重大小提供不同的提升(下降)速度。回转机构7主要由回转电机构成,可实现回转转盘8上部结构的转动,从而实现吊臂9及吊重围绕起重机塔身3的转动。回转转盘8通过销轴连接起重机塔身3、吊臂9和塔帽10,回转机构7和变幅机构11也安装其上。吊臂9是由高强度钢管焊接而成的多节臂节通过销轴连接而成。塔帽10为钢结构焊接件,通过销轴连接在回转转盘8上,并装有变幅滑轮组和吊臂缓冲装置。变幅机构11用于实现吊臂的仰俯,以满足不同的回转半径要求。The
在施工时,塔身3的底部直接座于简易基础1上,通过四根基础拉线2将铁塔的四个基础13与起重机的塔身3连接并张紧,拉线与水平面成40°~50°角。简易基础1与基础拉线2共同构成起重机的柔性基础。在铁塔组立到一定的高度后,通过附着拉线4将铁塔主材12与起重机的塔身3连接,构成起重机的柔性附着。简易基础1由砂石上铺设道木构成,基础拉线2和附着拉线4由钢丝绳滑轮组构成。在完成起重机下部安装后,可通过顶升机构5向上顶升安装起重机到起重机允许安装高度。起重机通过起升机构6、回转机构7、变幅机构11实现铁塔的安装。During construction, the bottom of the
起重机铁塔的施工步骤为:The construction steps of the crane tower are as follows:
(1)浇筑输电线路的铁塔基础13,并预制简易基础1;(1) pouring the
(2)安装起重机的下部结构,塔身3的底部直接座于简易基础1上,并且塔身3通过四根基础拉线2与铁塔的四个基础13连接并张紧,基础拉线2与水平面成40°~50°角,简易基础1与四根基础拉线2共同构成起重机的柔性基础,起重机的下部结构安装完成后,再将起重机的上部结构:顶升机构5、起升机构6、回转机构7、回转转盘8、吊臂9、塔帽10和变幅机构11安装完成,然后使用起重机的顶升机构5向上顶升起重器的上部结构,使起重机上升到起重机的最大自立高度;(2) The lower structure of the crane is installed, the bottom of the
(3)使用起重机的起升机构6、回转机构7、变幅机构11组立铁塔,直到起重机的起升高度不能满足铁塔组立施工的需要,通过附着拉线4将铁塔各侧主材10与起重机的塔身3连接,构成起重机的第一道柔性附着,通过起重机的顶升机构5再次向上顶升安装起重机直到起重机允许的高度,继续组立安装铁塔,当起重机的起升高度不能满足铁塔组立的需要时,重复步骤(3),通过增加的附着拉线4将铁塔各侧主材10与起重机的塔身3连接,构成起重机的第n道柔性附着,其中n为自然数,直至铁塔组立安装完成,所述设置的柔性附着的数量n根据铁塔的高度和起重机的附着间距确定;(3) Use the
(4)在铁塔安装、检查完毕后,拆除起重机。(4) After the tower is installed and inspected, remove the crane.
最后应当说明的是:以上实施例仅用以说明本发明的技术方案而非对其限制,尽管参照上述实施例对本发明进行了详细的说明,所属领域的普通技术人员应当理解:依然可以对本发明的具体实施方式进行修改或者等同替换,而未脱离本发明精神和范围的任何修改或者等同替换,其均应涵盖在本发明的权利要求范围当中。Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention and not to limit them. Although the present invention has been described in detail with reference to the above embodiments, those of ordinary skill in the art should understand that: the present invention can still be Any modification or equivalent replacement that does not depart from the spirit and scope of the present invention shall be covered by the scope of the claims of the present invention.
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 200910091384 CN101670985B (en) | 2009-08-21 | 2009-08-21 | Electric transmission line iron tower erection tower crane with flexible base and flexible adhesion |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 200910091384 CN101670985B (en) | 2009-08-21 | 2009-08-21 | Electric transmission line iron tower erection tower crane with flexible base and flexible adhesion |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN101670985A true CN101670985A (en) | 2010-03-17 |
| CN101670985B CN101670985B (en) | 2013-05-22 |
Family
ID=42018447
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN 200910091384 Active CN101670985B (en) | 2009-08-21 | 2009-08-21 | Electric transmission line iron tower erection tower crane with flexible base and flexible adhesion |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN101670985B (en) |
Cited By (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101920916A (en) * | 2010-09-02 | 2010-12-22 | 山东富友有限公司 | Flexible attachment of tower crane |
| CN102108801A (en) * | 2011-01-17 | 2011-06-29 | 中国电力科学研究院 | Guide rail system for use on end part of cross arms of helicopter-assembled power transmission line iron tower |
| CN102127987A (en) * | 2011-01-17 | 2011-07-20 | 中国电力科学研究院 | Guide rail system for assembling flange connection tower sections of power transmission line iron tower through helicopter |
| CN102134932A (en) * | 2011-01-17 | 2011-07-27 | 中国电力科学研究院 | Guide rail system for assembling single-limb main material tower sections in power transmission line iron tower through a helicopter |
| CN104358272A (en) * | 2014-11-28 | 2015-02-18 | 中国电力工程顾问集团西北电力设计院有限公司 | Basic structure for extra-high-voltage single-column guyed tower V-shaped stayguys |
| WO2015042945A1 (en) * | 2013-09-29 | 2015-04-02 | 国家电网公司 | An assembled tower type crane with movable counter-weight system |
| CN104925673A (en) * | 2015-05-21 | 2015-09-23 | 中国矿业大学 | Auxiliary hoisting device and method for multi-crane combined operation |
| CN110485792A (en) * | 2019-09-10 | 2019-11-22 | 国网山东省电力公司东营供电公司 | A safe construction method for erection of transmission line iron towers |
Family Cites Families (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN201010459Y (en) * | 2006-12-31 | 2008-01-23 | 湖南江麓机械集团有限公司 | Flexible attaching device used for tower crane body |
| CN101357739B (en) * | 2008-06-02 | 2011-07-27 | 中国电力科学研究院 | Column crane special for movable arm type group tower |
-
2009
- 2009-08-21 CN CN 200910091384 patent/CN101670985B/en active Active
Cited By (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101920916A (en) * | 2010-09-02 | 2010-12-22 | 山东富友有限公司 | Flexible attachment of tower crane |
| CN101920916B (en) * | 2010-09-02 | 2012-07-25 | 山东富友有限公司 | Flexible attachment of tower crane |
| CN102108801A (en) * | 2011-01-17 | 2011-06-29 | 中国电力科学研究院 | Guide rail system for use on end part of cross arms of helicopter-assembled power transmission line iron tower |
| CN102127987A (en) * | 2011-01-17 | 2011-07-20 | 中国电力科学研究院 | Guide rail system for assembling flange connection tower sections of power transmission line iron tower through helicopter |
| CN102134932A (en) * | 2011-01-17 | 2011-07-27 | 中国电力科学研究院 | Guide rail system for assembling single-limb main material tower sections in power transmission line iron tower through a helicopter |
| CN102134932B (en) * | 2011-01-17 | 2014-03-12 | 中国电力科学研究院 | Guide rail system for assembling single-limb main material tower sections in power transmission line iron tower through helicopter |
| CN102127987B (en) * | 2011-01-17 | 2014-03-12 | 中国电力科学研究院 | Guide rail system for assembling flange connection tower sections of power transmission line iron tower through helicopter |
| WO2015042945A1 (en) * | 2013-09-29 | 2015-04-02 | 国家电网公司 | An assembled tower type crane with movable counter-weight system |
| CN104358272A (en) * | 2014-11-28 | 2015-02-18 | 中国电力工程顾问集团西北电力设计院有限公司 | Basic structure for extra-high-voltage single-column guyed tower V-shaped stayguys |
| CN104358272B (en) * | 2014-11-28 | 2015-12-30 | 中国电力工程顾问集团西北电力设计院有限公司 | A kind of extra-high voltage single-column Guywire tower V-type bracing wire foundation structure |
| CN104925673A (en) * | 2015-05-21 | 2015-09-23 | 中国矿业大学 | Auxiliary hoisting device and method for multi-crane combined operation |
| CN110485792A (en) * | 2019-09-10 | 2019-11-22 | 国网山东省电力公司东营供电公司 | A safe construction method for erection of transmission line iron towers |
Also Published As
| Publication number | Publication date |
|---|---|
| CN101670985B (en) | 2013-05-22 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN101670985B (en) | Electric transmission line iron tower erection tower crane with flexible base and flexible adhesion | |
| CN206278848U (en) | A kind of dynamic Ding many loop wheel machine pedestal operation platforms of Sheng rotation types of overall Zi | |
| CN205772984U (en) | A kind of hanging apparatus of monolithic steel truss | |
| CN104276514B (en) | Installation method of ground self-balancing pole | |
| CN206692235U (en) | A kind of steel structure dome lifts by crane erecting device | |
| CN103832933B (en) | A kind of group tower tower crane with auxiliary | |
| CN102251486A (en) | Jacking bracket system for segmented mounting of bridge tower and construction process thereof | |
| CN214882985U (en) | Bridge assembled rapid construction platform | |
| CN104925672B (en) | The all-hydraulic self-crawling type two-sided tower crane of suspension | |
| CN104787690A (en) | Single-action arm ground lifting pole with flowing water counterweight system | |
| CN109236012B (en) | Method for hoisting power transmission line T-shaped guyed tower | |
| CN203728443U (en) | Combined tower crane with main and auxiliary boom structure | |
| CN201437492U (en) | Transmission line iron tower erection tower crane with flexible foundation and flexible attachment | |
| CN101362577A (en) | Full hydraulic truck tower crane | |
| CN107010551B (en) | A kind of restricted clearance construction method for hanging | |
| CN204281116U (en) | Wind power generation stepped leap self-crawling type translation loop wheel machine | |
| CN209276035U (en) | A kind of self-supporting superelevation Lift-on/Lift-off System | |
| CN107487724B (en) | Non-crane-assisted large floating crane arm support mounting device and mounting method | |
| CN105584938A (en) | Mast crane applied to river network area | |
| CN213015693U (en) | Self-lifting vertical tower device based on semi-rigid composite tower crane | |
| CN101429827B (en) | Leaning tower self-stabilization upside-down mounting assembling apparatus and method thereof | |
| CN201195670Y (en) | Full-hydraulic automobile tower crane | |
| JPH10205429A (en) | Construction method of wind power generator | |
| CN110143531A (en) | Self-climbing cranes and wind power maintenance equipment | |
| CN2761563Y (en) | Special crane for extra-high, banding, autolifting type wind power generator |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| ASS | Succession or assignment of patent right |
Owner name: STATE ELECTRIC NET CROP. Effective date: 20130130 |
|
| C41 | Transfer of patent application or patent right or utility model | ||
| TA01 | Transfer of patent application right |
Effective date of registration: 20130130 Address after: 100192 Beijing city Haidian District Qinghe small Camp Road No. 15 Applicant after: China Electric Power Research Institute Applicant after: State Grid Corporation of China Address before: 100192 Beijing city Haidian District Qinghe small Camp Road No. 15 Applicant before: China Electric Power Research Institute |
|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CP03 | Change of name, title or address |
Address after: 100192 Beijing city Haidian District Qinghe small Camp Road No. 15 Patentee after: China Electric Power Research Institute Country or region after: China Patentee after: STATE GRID CORPORATION OF CHINA Address before: 100192 Beijing city Haidian District Qinghe small Camp Road No. 15 Patentee before: China Electric Power Research Institute Country or region before: China Patentee before: State Grid Corporation of China |
|
| CP03 | Change of name, title or address | ||
| CP03 | Change of name, title or address |
Address after: 100192 Beijing city Haidian District Qinghe small Camp Road No. 15 Patentee after: CHINA ELECTRIC POWER RESEARCH INSTITUTE Co.,Ltd. Country or region after: China Patentee after: STATE GRID CORPORATION OF CHINA Address before: 100192 Beijing city Haidian District Qinghe small Camp Road No. 15 Patentee before: China Electric Power Research Institute Country or region before: China Patentee before: STATE GRID CORPORATION OF CHINA |
|
| CP03 | Change of name, title or address | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20260114 Address after: 100100 Beijing City Fengtai District Kaiyang Road No. 8 5th floor 501 room D501 Patentee after: State Grid Electric Power Engineering Research Institute Co.,Ltd. Country or region after: China Patentee after: STATE GRID CORPORATION OF CHINA Address before: 100192 Beijing city Haidian District Qinghe small Camp Road No. 15 Patentee before: CHINA ELECTRIC POWER RESEARCH INSTITUTE Co.,Ltd. Country or region before: China Patentee before: STATE GRID CORPORATION OF CHINA |
|
| TR01 | Transfer of patent right |