CN101667731A - Method for solving difficulties of peak load regulation of power grid, installation and electricity and coal deficiency - Google Patents

Method for solving difficulties of peak load regulation of power grid, installation and electricity and coal deficiency Download PDF

Info

Publication number
CN101667731A
CN101667731A CN200810129066A CN200810129066A CN101667731A CN 101667731 A CN101667731 A CN 101667731A CN 200810129066 A CN200810129066 A CN 200810129066A CN 200810129066 A CN200810129066 A CN 200810129066A CN 101667731 A CN101667731 A CN 101667731A
Authority
CN
China
Prior art keywords
present
power
electrical network
peak
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN200810129066A
Other languages
Chinese (zh)
Inventor
梁志业
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN200810129066A priority Critical patent/CN101667731A/en
Publication of CN101667731A publication Critical patent/CN101667731A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector

Landscapes

  • Other Liquid Machine Or Engine Such As Wave Power Use (AREA)

Abstract

The invention provides a method for solving difficulties of peak load regulation of a power grid, installation, benefit, coal, fuel, water and electricity, and belongs to the field of power systems. China has 86.4 thousands of reservoirs, and has tens to hundreds of million kw local hydropower installation, the method installs time-sharing metering electric energy meters in each internet gateway of each local hydraulic power generation plant, 2 to 8 hours of local hydraulic power can be bought at high price every day is used for peak load regulation of the power grid during the peak of the power grid so as to solve the problem that dozens to hundreds days each year, and tens to hundreds of million kw every day are required for peak load regulation of the power grid and valley filling. Fortwenty years of grid access, the method creates extra economic benefit of thousands of billion yuan for the power grid and the local hydraulic powder because 1, the installed capacity of hydraulic power is hundred of millions to billions kw; 2, hydraulic power of the power grid is promoted to generate extra 800 to 2,000 utilization hours each year; and hydraulic power can be generated by 1 and 2 without coal, so electricity coal can be saved hundreds of million tons every year compared with the prior art of the same power and price (0.2 to 0.4 yuan/kw.h on average). The method solves the problems of difficulties in power grid installation, electricity coal deficiency, fuel deficiency, accident standby, peak regulation, valley filling, frequency regulation, black start, power environmentalprotection and sustainable development.

Description

Solve the method for peak load regulation network, installation, short of electricity coal difficulty
(1) technical field;
The present invention is applied to the dynamical system field
(2) background technology
Hydroelectric plant's major part of existing technical operation is streaming hydroelectric plants, river rising in Ningxia and flowing into central Shaanxi, and thermoelectricity comprehensively transfers the honeybee ability only (to see that China Electricity Power Newspaper 2002.2.25 " improves Central China Power Grid for 20-30% ... ").China's thermoelectricity installation accounts for national total installed capacity and (sees that China Electricity Power Newspaper 2000.3.25 " adjusts the energy more than 76% ... "), (seeing 25 pages of Chinese electric industry 92 years 2 phases " peak load regulation network constitutes with installation ") (sees China Electricity Power Newspaper 2005.5.31 " East China ... " honeybee paddy differs from 2318.18 ten thousand KW).China had 24 province's shorts of electricity (to see China Electricity Power Newspaper 2004.5.30 " short of electricity in this year in 2004 ... "), the existing technology hydroelectric plant's rate for incorporation into the power network height that builds up of repaying capital with interest (is seen 94 years 8 phases, 8 pages of " the water power payment for goods of Chinese electric industry ... " table one shows), China now plans, can develop 5.41 hundred million KW in the hydroelectric plant that builds, moves, and is (to see Guangming Daily 2001.3.10 " solution water what the right parts of 1.35 trillion tons of water yields stream calculated installation, operation ... "); Wet season electrical network and local hydroelectric plant can issue additional 3/4 electric weight simultaneously, lack peak load during the electrical network peak; During the electrical network low ebb, because user power utilization reduces half, electric power does not have the warehouse, and general nothing is regulated storage capacity, add that local several thousand to several ten thousand hydroelectric plants are millions of to several hundred million KW load, online without restrictions, the electrical network low ebb is filled out the paddy difficulty, adds that the river luffing is big, so it is many to cause province's one-level electrical network hydroelectric plant peak regulation to abandon water, the Guo electricity is many, each hydroelectric plant's dam site of electrical network for many years all the river rising in Ningxia and flowing into central Shaanxi flow generate electricity half, abandon water half.
(3) summary of the invention
The objective of the invention is to invent that a kind of method solves that peak load regulation network is filled out the paddy difficulty, installation is difficult, synergy is difficult, economize on electricity coal difficulty, economize on electricity oil is difficult, power grid accident is standby less, the frequency modulation difficulty, black start difficult, rate for incorporation into the power network is high, sustainable development is difficult, improves the goal of the invention of grid power environmental protection key technology.8.64 ten thousand reservoirs (seeing the 98.9.25 of People's Daily "--write on 98 flood fightings triumph when ") are now had in China, and local reservoir accounts for 99.8% of sum.Existing total installed capacity of hydropower capacity 100,000,000 kw of China (see China Electricity Power Newspaper 2004.12.28 " Three Gorges ...>"; whole nation water power all generates electricity now and 2917 to 3070 utilizes hour, has 5800 hours every year shutting down not generate electricity and (sees Workers Daily 2000.11.1 " dam ... ".Claim in the present invention's one literary composition that economizing the above electric power system of one-level is electrical network, every profession and trade reservoir, hydroelectric plant beyond the electrical network are commonly referred to as local reservoir, local hydroelectric plant.China had 4300 local hydroelectric plants in 2000, and installed capacity reaches 2,300 ten thousand kw.44552 local hydroelectric plants were arranged in 2006, total installed capacity has 3,852 ten thousand kw, account for 33.1% of national water power total installed capacity, be distributed in more than 1600 county, the whole nation, network operation on the major part (seeing the 2000.6.18 of southern part of the country morning newspaper) (seeing China Electricity Power Newspaper 2006.6.27 " splendidness between blue mountains and green waters ").During existing technology society's every day peak of power consumption, each hydroelectric plant, county is for user separately, and charge is own separately takes in.In each county based on the lamp electricity, several hours one mistakes of electric consumption on lighting every day, local thousands of up to ten thousand hydroelectric plants, several ten million to several hundred million KW water power load, circuit by networking is loaded for low ebb to electrical network, do not participate in peak load regulation network, (see 90 years 7 phases of Chinese electric industry, 3 pages of " Sichuan electric power to mains supply without restrictions ... "), because existing technology electric power does not have the warehouse, the electrical network hydroelectric plant does not generally have adjusting storage capacity, customer charge reduces half to 2 times than peak customer charge again during the electrical network low ebb, reach 2,318 ten thousand KW as the East China Power Grid peak-valley difference, the comprehensive peak modulation capacity of thermoelectricity only 20~30%, low ebb has taken for the load thermoelectricity of electrical network water power band, local water power has been taken, so, electrical network hydroelectric plant low ebb is just being abandoned water in a large number, the local water power in province, south accounts for the whole province's total installed capacity of hydropower 30 to 50%, so, local water power low ebb online is many more, electrical network hydroelectric plant low ebb must be abandoned water and fill out Gu Yueduo, and electrical network hydroelectric plant low ebb not on-load does not have electric weight and just do not have income, so cause 8,576 hundred million yuan of assets of national grid only to obtain 41.6 hundred million yuan of profits every year.Electric power does not have money just can't install and to produce, with foreign capitals, raise funds to build power plant and cause the high shortcoming of rate for incorporation into the power network again.Difference of the present invention is to install the peak valley electric energy meter additional at the place, critical point of local water power online, the high ebb electricity volume of strict differentiation, and the present invention needs the time consistent by setting local water power peak surf time and electrical network peak, and rents electrical network and sell.The present invention offers high prices for the millions of extremely several hundred million KW peak loads of local water power and comes to peak load regulation network in 2 to 8 hour time on the electrical network peak, because procurement price height, interests are big, local hydroelectric plant will be in the present invention offers high prices for peak workload period, multiple simultaneously, completely send out millions of desperately and come the power supply network peak regulation to use to several hundred million KW peak loads, which day the peak online in 1 year 365 days of local hydroelectric plant all meets requirement of the present invention, because procurement price height, the water yield of the local one day 24 hours Fa Jihe in hydroelectric plant of existing technology, become and send out 3 to 12 days peak load power supply network peak regulation usefulness of the present invention, the present invention has just creatively realized making the electrical network peak to increase by tens to the hundreds of sky every year, increase millions of peak loads to several hundred million KW 2 to 8 hours every days during the peak, solved the peak load regulation network difficulty, saves the goal of the invention of a large amount of peak regulation fuel oils.The present invention has overcome existing technology peak load of grid and has reached 5,000 ten thousand KW, and all raising every year, and existing technology electrical network is difficult to satisfy the deficiency of national air-conditioning peak modernization life Household Appliance peak requirements and (sees that Chinese science and technology reports 2005.6.17 " summer air-conditioning peak ... ").
Behind local a large amount of supply peak load of grid, require electric load what if to supply the electricity consumption of local peak to electrical network again? electrical network is powered to them with now technology is the same, (because the place does not have the power plant, electrical network can both be powered to them).Purpose of the present invention wants the place to utilize oneself to have the long low ebb retaining of 8.6 ten thousand reservoirs few generating of not generating electricity exactly; completely send out again during second day peak; multiple and allow the multiple electricity of the electrical network water power low ebb capacity factors that improve water resourcess more; not allowing water yield low ebb in the great rivers that have the power station flow away does not in vain generate electricity; because there are thousands of up to ten thousand reservoirs in the place; local hydroelectric plant want multiple tens days of annual peak to the hundreds of sky many interests; electrical network of the present invention is offered high prices for during the peak; do not purchase during the electrical network low ebb; add that the local low ebb rate for incorporation into the power network of existing technology is low; the load shedding shutdown retaining outside the present invention offers high prices for the time so local water power just is bound to; just can reach annual multiple tens days to the hundreds of sky peak power purposes that get interests more; because the low ebb retaining of local hydroelectric plant is shut down load shedding several ten million to several hundred million KW low ebbs load; the invention solves the goal of the invention of filling out paddy for electrical network; the present invention has just promoted the annual low ebb pilosity of electrical network supplies tens days to the hundreds of sky more; 16 to 22 hours millions of extremely several hundred million KW water of pilosity every day; the thermoelectricity load; multiple energy output; overcharge and obtained economic interests; the present invention has realized the electrical network commercialization; the marketing shifts in technology has improved economic interests.The present invention has reduced existing technology electrical network hydroelectric plant low ebb peak regulation significantly and has abandoned the many deficiencies of water, the present invention has improved the utilance of water resources generating in the wet season river, electrical network hydroelectric plant significantly than existing technology, a large amount of electric coals have been saved, solved the china natural resources problem of shortage, the present invention offers high prices for local water, electricity comes peak regulation, in offering high prices for expense, local water power will be paid half and give electrical network, make rent and selling charges, local hydroelectric plant is annual by improving annual income with the annual multiple high quality and favourable price of several more than thousand ten thousand reservoir regulating pondages peak electricity; The electrical network hydroelectric plant is not by improving electricity price, by improving multinomial water resources capacity factor, by multiple electric weight, improve annual income by receiving rent, increase installation, dilatation installation by self-fund and continue to produce again, because increase is installed, the present invention has improved water resources capacity factor in the river significantly.Because the present invention increases installation, need not provide a loan, also principal and interest, without foreign capitals and fund-raising, need not develop at a progressive speed, so the 1.7 minutes/KW.h of hydroelectric plant's cost of electricity-generating that cost of electricity-generating of the present invention and plan age build is suitable, multiple spot price rise factor, so the present invention has reduced one of electricity price, purchase local water power duration of load application weak point every day of the present invention, electric weight is few, the present invention compared with the online of valency whole day with electricity with hydroelectric plant's pay back period that existing technology is built, the present invention surfed the Net on a peak 2 to 8 hours at high price, and the present invention gives hydroelectric plant's pilosity of low electricity price online beyond the peak, and the present invention has reduced two of electricity price.The present invention offers high prices for local water power and comes out to be peak load regulation network several hours, the electrical network thermoelectricity peak regulation unit peak regulation of need not starting shooting, saved electric coal, the low ebb load of electrical network of not accounting for because thermoelectricity peak regulation unit is not started shooting, the present invention can promote not only the multiple energy output of electrical network water power but also save electric coal, and the present invention has overcome existing technology peak load regulation network like this and filled out the paddy coal and burn in the same old way, and water is abandoned in the same old way, the user is short of electricity in the same old way, and the whole nation is the deficiency of short of electricity coal in the same old way.Each big rivers of existing technology China have all been built the step hydropower station, and in same rivers step hydropower station, flow one reduces in the river, and all same rivers step hydropower stations are generating less all.The present invention advances the storehouse flow in the step hydropower station few, and when sending out the installed capacity of discontented full factory, in rivers, the upstream, the local water of purchase, electricity, agricultural water conservation, rain making are to call the operation of surging in the following text in the control area of step hydropower station
(see Science and Technology Daily 2003.8.30 " Hubei aircraft rain making ... ") (Science and Technology Daily 2004.7.20 " rain making ... ") come peak regulation, generate electricity, the present invention surges the water yield of operation through one-level, secondary ... plant generator, multiple through what to tens grades of power stations, many peak regulations, the present invention has increased the province of energy output and peak load supply short of electricity significantly than existing technology, the present invention has improved the water resources capacity factor significantly than existing technology, on average the multiple electric weight sum of energy output is divided by total (height) cost of the operation of surging for many years than existing technology with power stations at different levels in the present invention, and the present invention has realized reducing three of electricity price.Pilosity of the present invention energy output, reduced after the electricity price, resupply the user, fetch the electricity charge operation of surging again on one's body from the user, repetitive cycling is carried out sustainable development every year.Water is 6,000,000,000,000 tons about the annual all skies of existing technology China, there are 2.7 trillion tons to become river rising in Ningxia and flowing into central Shaanxi, rivers and lakes stream, wherein, flow in the right water yield that flows through the power station, only can utilize half to generate electricity, abandon water half, just can flow a right part in 1.35 trillion tons of water yields and generate electricity, install, the present invention's operation of surging comes multiple with the step hydropower station, fall the method for electricity price, the present invention has 18.65 trillion tons of water yield potentiality to dig than existing technology more more.Just can be multiple.The present invention just can overcome the deficiency that existing technology only can utilize average for many years river rising in Ningxia and flowing into central Shaanxi stream to install and move, because the present invention purchases water power, the water yield is in 6,000,000,000,000 tons of water, is not contained in 2.7 trillion tons of water.The present invention presses electrical network water power total installation of generating capacity every year by 0.08 hundred million to 0.12 hundred million KW.h/ ten thousand KW, every day by purchased local water in 2 to 8 hours, electricity comes peak regulation, the present invention has improved the capacity factor of multinomial water resources than existing technology, the present invention has improved electrical network water power 800 to 2000 than existing technology and has utilized hour, multiple water power amount has been saved a large amount of electric coals.The present invention offers high prices for the same high electricity price purchase of hydroelectric plant's pay back period that local water power comes peak regulation and existing technology to repay capital with interest to build up, equally high electricity price online, the same 20 years of pay back period are compared, and it is several trillion yuan that the present invention first 20 years creates economic interests for China's electrical network and local water power more.The present invention's 20 annuals are annual to be 41.6 hundred million yuan tens times of existing National Electricity Co. profit perannums for make profits nearly hundred billion yuan of benefits of electrical network and local water power more, by 2500 yuan of project cost to 5000 yuan/KW, the present invention several hundred million KW to tens hundred million KW hydroelectric plants that can install.The present invention can improve existing technology electrical network total installed capacity of hydropower 100,000,000 KW, year multiple electricity 2000 utilizes hour, just quite economize on coal 100,000,000 tons, the present invention has overcome the deficiency of 8,000 ten thousand tons in existing technology China electrical network thermoelectricity short of electricity coal, several ten million KW because the annual new operation thermoelectricity of existing technology is installed, what if is the short of electricity coal? the present invention 20 years is new clothes water power several hundred million to tens KW also, the water power not electricity consumption coal that generates electricity, and year economizes on coal several to tens tons.The present invention comes to this and has solved the goal of the invention of China's electrical network electricity coal deficiency, the present invention has overcome existing technology electrical network thermoelectricity installation and has accounted for national total installed capacity 80%, and thermoelectricity installation in annual 8760 hours is many, generating is many, burn the deficiency how electric coal just just causes national short of electricity coal.
The existing technology electrical network hydroelectric plant's the highest rate for incorporation into the power network of pay back period built up of repaying capital with interest is 1.46 yuan/kw.h.1. the present invention with 1.46 yuan to 1.5 yuan/kw.h be technical measures to offer high prices for that local water power load came in 4 hours every day be peak load regulation network and online, substitute electrical network water, the thermoelectricity peak regulation unit tape base lotus that comes out to occur; 2. implement the present invention and make that the electrical network water power is annual to be utilized hour than the multiple electricity 800 to 2000 of the average for many years energy output of existing technology, 0.05 yuan of always electric old valency is surfed the Net to 0.20 yuan/kw.h; 3. implemented the present invention 20 years, the present invention can increase total installed capacity of hydropower several hundred million to tens kw, because the present invention is self-fund installation, also principal and interest, so rate for incorporation into the power network be 5 minutes to 0.20 yuan/kw.h, the present invention with the purchase water power and 1., 2., 3. on average the whole day rate for incorporation into the power network is: (1.5 yuan/kw.h * 4 hours+20 hours * 5 minutes to 0.2 yuan/kw.h) 24 hours=0.21 to 0.42 yuan/kw.h of ÷.On average surf the Net to 0.42 yuan/kw.h with 0.20 yuan every day of the present invention.What the present invention was significantly different with existing technology is that the invention process time is long more, and self-fund is many more, and installation is more and more, and the energy output that need not repay capital with interest is many more, and average rate for incorporation into the power network is low year by year.
The present invention offers high prices for 4.8 ten thousand the local reservoir water power in upstream, power station, the Yangtze River Gorges and comes to be peak load regulation network, and the present invention can promote annual multiple electricity 40,000,000,000 to 70,000,000,000 kw.h in this power station, the 175 meters water levels in this power station, 113 meters at head, electrical generation water consumption 2.8m 3/ kw.h, the low general electrical generation water of local water power head consumes 20 to 50m 3/ kw.h, so the local water power 1kw.h of the every purchase of the present invention comes peak regulation, the water yield that flows down after the local water power generating, just can promote this power station and other step hydropower station multiple several to tens kw.h water power amounts, 2111.46 hundred million tons in water is now all abandoned in this power station every year, annual multiple 40,000,000,000 to 70,000,000,000 kw.h in this power station that promote of the present invention promptly multiple 800 to 2000 utilize hour, and the generating water consumption is 410.9 hundred million to 1026.48 hundred million tons.Promote this power station pilosity 800 to 2000 to utilize hour so the present invention is annual.This power plant abandons the water yield and all toos many or too much for use for 2111.46 hundred million tons.
Existing technology generating water is not spent, is why the present invention offers high prices for local water power come peak regulation? 1. the present invention offers high prices for local water power and comes peak regulation, local water power also can only be on electrical network peak 2 to 8 hours every day, the present invention offers high prices for to surf the Net in the time and could get high price, online can not get high interests At All Other Times, and every day the peak in 2 to 8 hour time the electricity consumption of user peak than valley power consumption mostly to 2 times of loads, everybody can both confess electrical network, local generating online load, can not make the electrical network water power and abandon water in a large number, it is big to fill out the paddy economic loss.The online 24 hours every days of the local water power of existing technology just causes electrical network water power dam site equal river rising in Ningxia and flowing into central Shaanxi flow for many years, generate electricity half abandon water half, economic interests are impaired greatly.2. from economic angle, the present invention offers high prices for local water power and comes peak regulation, and every kw.h electrical network gets half income, and electrical network can not suffered a loss, and it is tens times of existing technology that electrical network gets interests.3. show the technology peak load regulation network, electrical network can not improve electricity price, and electrical network can not get any benefit.Be to increase device damage on the contrary, increase the peak regulation fuel oil, increase cost of electricity-generating, electrical network comes peak regulation with the increase installed capacity, and electrical network also can not get economic interests.4. electrical network can check whether local hydroelectric plant peak load and energy output be true from the local hydroelectric plant energy output over the years and the generation load of online.If find that 5. local hydroelectric plant electricity volume and peak load are untrue, electrical network can go education or not implement the present invention to it.So electrical network is not worried the electrical network economy benefit damage and is lost.
The present invention is that algorithm is different not improving user's electricity price self-fund increase installation 3.89 hundred million to 7.8 hundred million kw on the basis of surfing the Net with valency with electricity with increasing by tens kw total installed capacity of hydropower.In 20 years once, the present invention can increase the installation 3.89 hundred million to 7.8 hundred million kw.If once in 5 years, remove to purchase local water power again by new, old installation sum again and come peak regulation, whether the present invention can be China water power increases installation tens kw, had tens kw water power to have the water generating how to install and why not the technology that show has same (the separate case application provides).
The present invention is by existing total installed capacity of hydropower 100,000,000 kw of China, and year additional issue 2000 utilizes a hour meter, economizes on coal every year of the present invention 100,000,000 tons.The present invention increases water power 3.89 to 7.8 hundred million kw, year generating 3000 to 6000 hours, and year is economized on coal 5.5 to 1,100,000,000 tons.China's several hundred million kw thermoelectricitys, and annual newly-increased installation several ten million kw, the electricity coal produces, supplies, transports the speed that can not adapt to installation, China electricity coal is more than 10 hundred million tons of demands now, all economize on coal 5.5 to 1,100,000,000 tons every year of the present invention, the present invention has reduced the annual total amount with coal of China, and electric coal produces after China so the present invention has just solved, for the difficulty of, fortune.The present invention has overcome existing technology thermoelectricity and has accounted for national total installation of generating capacity 80%, and coal resources in China only can satisfy the deficiency in 50 to 70 years of generating, the present invention several hundred million was to tens kw water power years generating 3000 to 6000 hours, send out 200 to 300 days every year, send out every day hundred million to tens kw peak loads several and satisfy the needs of people's modernization life, all the other times with coals, use gas ... solve.The present invention is annual to be 6,732 ten thousand tons of peak load regulation network joint peak regulation fuel oils with 100,000,000 kw water power.The present invention is China's peak load regulation network, frequency modulation, the black startup with several hundred million to tens kw water power, solves grid loss load several ten million to several hundred million kw emergency duties, and the present invention just can solve with 1~5 minute.And without fuel oil.Be obstructed when the war Imported oil takes place, the thermoelectricity of existing technology several hundred million kw of China just can't be started shooting, and the present invention several hundred million to tens kw water power generatings, peak regulation, frequency modulation, blackly start, emergency duty just not do not had oily no coal power generation national security and is not on the hazard.The present invention compares with the existing technology thermoelectricity generating with capacity with 3.89 hundred million to 7.8 hundred million kw water power, the present invention economizes on coal 5.5 hundred million to 1,100,000,000 tons for China every year, several ten million to several hundred million tons of fuel-economizing, water power generating of the present invention is arranged 29.95 hundred million tons of pollutions such as carbon dioxide in the air annual lacking to China than the thermoelectricity generating.The present invention has reduced the annual usefulness of existing technology coal, has used oil, has used the gas total amount.The present invention can only utilize existing technology coal, the natural gas resource in 30 to 70 years to prolong the centuries for the descendants.
Existing technology electrical network solves with building hydroenergy storage station in order to solve peaking problem.It is a kind of significant wastage that pumped storage power plant can not utilize the water in the great rivers to generate electricity, and China is the big country of 1,300,000,000 populations of a scarce energy.Electrical network of the present invention is offered high prices for during the peak, low ebb is not purchased, local water power utilizes several ten thousand reservoir low ebbs not generate electricity water is held, completely send out several again during second day peak ten million to several hundred million kw water power be peak load regulation network, the present invention has just promoted 16 to 20 hours several ten million to several hundred million kw loads of electrical network water power low ebb pilosity every day.The present invention build several hundred million on the great rivers in, and ground generating 24 hours every days and peak regulation supply lack the people of 1,300,000,000 populations of the energy in large quantities to tens kw hydroelectric plant wet seasons, China air-conditioning peak is in summer, and multiple electricity of water power wet season is also in summer, lack several ten million problems to several hundred million kw of peak load so the present invention very solves China's electrical network like a cork, pumped storage power plant is unable to handle.The present invention has overcome existing technology hydroelectric plant dam site all the river rising in Ningxia and flowing into central Shaanxi flow has generated electricity for many years that half abandons half deficiency of water.
The present invention economize to implement 5 years at certain, every year economizes local water power for certain and electrical network increases income tens yuan, 5 annual rates for incorporation into the power network are more than 2 jiaos/kw.h, the present invention promotes this province's electrical network water power head 5 years annual than electric tens kw.h of existing technology pilosity, be equivalent to the energy output that existing technology drops into millions of kw hydroelectric plant, the present invention can be the millions of kw of this water-saving Denso machine 5 year every year, 5 years millions of kw of total installed capacity of hydropower altogether, annual increase increases peak load tens every day to millions of kw to the hundreds of sky in tens days; It is that electrical network is filled out paddy to millions of kw water power that the electrical network low ebb reduces tens.The present invention has promoted this province water power annual multiple 800 to 2000 to utilize hour, annual multiple water power amount tens kw.h, and the present invention has promoted the development of existing technology.
Hydroelectric station, two beaches 3,300,000 kw of reservoir upstream, the Yangtze River Gorges, 242 meters of heights of dam, standard electrical generation water consumption 2.43m 3/ kw.h, power station, Three Gorges standard electrical generation water consumption 2.82m 3/ kw.h comes the peak regulation water yield by 0.75 yuan/10 tons when the present invention offers high prices for thousands of up to ten thousand the reservoir water power in upstream, and the water yield reaches the 7.68kw.h/ ton, 9.76 minutes/kw.h of the average cost of electricity-generating of the present invention through the two-stage plant generator.The water yield that the local water power of the present invention's purchase flows down is many more through the step hydropower station, and energy output is many more, and average electricity price is low more.
Existing technology electrical network peak-valley difference for a long time is difficult to solve, and reaches 2318.18 ten thousand kw as the East China Power Grid peak-valley difference, and adorn the peak valley electric energy meter to several ten million users and solve the peak-valley difference problem millions of, the one, investment is big, waste is big, and the 2nd, the effort of taking a lot of work is many, is difficult to carry out.Difference of the present invention is only at tens to several thousand local hydroelectric plant online place dress time-sharing measurement electric energy meters inside the province, the one, invest little, waste is little, two laborsaving, savings of labor, enforcement is finished easily.Three can promote the multiple electricity 800 to 2000 of electrical network water power to utilize hour.Four can improve the utilance of water, coal, oily resource.
The present invention purchases local water power and comes peak regulation and agricultural production not to have contradiction, and which day the peak online in a year 365 days of local reservoir is all right, without limits, all meets requirement of the present invention.Existing technology is the same with the present invention, the agricultural irrigation online of generating electricity simultaneously while local reservoir discharges water.Different is that local water power generating online just can obtain high electricity price income when every day, the present invention of electrical network peak offered high prices for.
Advantage of the present invention:
1, the present invention is at thousands of up to ten thousand local hydroelectric plants place, online critical point dress time-sharing measurement electric energy meter, the present invention offered high prices for 2 to 8 hours local water power and loaded to peak load regulation network during the electrical network peak every day, because electricity price height, local water power will be risked one's life to generate electricity when the present invention offers high prices for and be surfed the Net, because the present invention has brought into play the effect of 8.6 ten thousand local reservoir regulating pondages than existing technology, so, the present invention impels local water power annual multiple tens to the hundreds of sky than existing technology, and every day multiple several ten million to several hundred million kw, local water power load was peak load regulation network.The invention solves the goal of the invention of peak load regulation network difficulty.(see Chinese science and technology report 2005.6.17 " ... the peak electricity consumption is equivalent to power station, three Three Gorges "), (see that China Electricity Power Newspaper 2002.2.25 " improves Central China Power Grid ... " the comprehensive peak modulation capacity of thermoelectricity is 20~30%).
2, by the above, low ebb of the present invention is not purchased, and local the utilization ownly has the length of 8.6 ten thousand reservoirs than electrical network more, and low ebb is shut down, subtracted the generation load retaining, and multiple fuller sending out asked interests during second day peak.Because it is that electrical network has been filled out paddy that local water power low ebb is shut down load shedding several ten million to several hundred million kw.The present invention has promoted electrical network water power, thermoelectricity pilosity every day 16 to 22 hours of existing technology, annual multiple tens days to the hundreds of sky, per hour multiple several ten million to several hundred million kw low ebbs load, the present invention utilizes hour than existing technology electrical network water power annual multiple 800 to 2000, now water power 100,000,000 kw multiple 2000 utilize hour, be equivalent to power station, multiple 2.4 Yangtze River Gorges energy output of the whole year, it is many that the present invention has overcome streaming hydroelectric plant, existing technology electrical network river rising in Ningxia and flowing into central Shaanxi, low ebb is filled out paddy, and to abandon water many, and all the river rising in Ningxia and flowing into central Shaanxi flow generates electricity electrical network hydroelectric plant dam site for many years that half abandons half deficiency of water.All 4,500 hundred million tons 2388.54 hundred million tons flow in the river rising in Ningxia and flowing into central Shaanxi for many years to account for dam site as power station, Yangtze River Gorges annual energy output 84700000000 kw.h generating water consumption, abandon 2111.46 hundred million tons of the water yields, the present invention promotes the annual multiple electricity 2000 in Three Gorges to utilize hour, reduces Three Gorges and abandons 1026.48 hundred million tons of the water yields.Solution China short of electricity coal, oil starvation, short of electricity, the scarce energy there are significant meaning (China Electricity Power Newspaper 2005.3.15 " what is the renewable energy resources ", 2005.3.3 " energy scarcity ... ") the present invention overcome the big deficiency of existing technology electrical network peak-valley difference and (seen China Electricity Power Newspaper 2005.5.31 " East China Power Grid ... " East China Power Grid peak-valley difference 2318.8 ten thousand kw) (see that Chinese workman reports the 1992.1.9 " Yangtze River Gorges ... ").(seeing 25 pages of Chinese electric industry 92 years 2 phases " electrical network constitutes with installation ").
3, the present invention is repaid capital with interest with existing technology, and the same high electricity price is purchased, online, and the same 20 years are compared, and the present invention can be China's electrical network in 20 years and local water power is created 19,440 hundred million yuan of economic interests more.Can be make profits 97,200,000,000 yuan of benefits of China's electrical network and local water power average 20 year every year, is make profits every year 41.6 hundred million yuan 23.37 times of profits of existing national grid.By 5000 yuan/kw, but the present invention's total installed capacity of hydropower 3.89 hundred million kw, but water power dilatation 7.8 hundred million kw.If built up water power once by per 5 years, remove to purchase local water power by new, old capacity then and come peak regulation, but 20 years total installed capacity of hydropower 2,200,000,000 to 4,400,000,000 kw of the present invention.(see China Electricity Power Newspaper 2004.2.11 " state electricity last year ... moisten 41.6 hundred million yuan "), the present invention has overcome China's liberation only can build 100,000,000 kw over 69 years total installed capacity of hydropower capacity very little, the deficiency that can not adapt to the building of the four modernizations demand, the present invention just can build water power tens kw in 20 years, and the generating rate for incorporation into the power network only is that the generating of 0.20 to 0.40 yuan/kw.h water power need not be burnt coal, to solving the scarce energy of China huge benefit is arranged.(see China Electricity Power Newspaper 2004.4.6 " Chinese hydroelectric development ... ").
4, the present invention is that technical measures are offered high prices for local water power every day and come to peak load regulation network 2 to 8 hours with 1.50 yuan/kw.h.1. substitute and the peak regulation unit occurs and came tape base lotus pilosity every day 16 to 22 hours; 2. implementing the present invention can improve electrical network water power annual multiple 800 to 2000 and utilize hour.1. 2. be that 0.05 yuan of the old valency of old electricity is to 0.20 yuan/kw.h; But 3. the present invention total installed capacity of hydropower several hundred million to tens kw because the present invention is self-fund, also principal and interest, thus rate for incorporation into the power network of the present invention be 0.05 yuan to 0.20 yuan/kw.h.The comprehensive average electricity price online of the present invention is 0.20 to 0.40 yuan/kw.h, and 1.46 yuan/kw.h of hydroelectric plant's pay back period rate for incorporation into the power network that the present invention builds up than repaying capital with interest has reduced electricity price.The present invention has overcome hydroelectric plant's rate for incorporation into the power network height that existing technology is repaid capital with interest and built up.(see 94 years 8 phases of Chinese electric industry, 8 pages of " water power loans ... " table one show every one kw.h electric weight rate for incorporation into the power network hydroelectric plant's decades built up of repaying capital with interest all be 1.46 yuan/kw.h) (" expenses of taxation are too high to see China Electricity Power Newspaper 2000.7.15 ... ", 0.80 yuan of the power station rate for incorporation into the power network of repaying capital with interest/kw.h).
5, the present invention is annual is China's peak load regulation network, generating with several hundred million to tens kw water power, and water power is regenerated resources, can utilize every year, is not subjected to China to lack the threat of coal, oil starvation, deficency.The every usefulness 100,000,000 kw water power of the present invention are peak load regulation network, 6,732 ten thousand tons of annual arthrolith oil (see that 90 years 10 phases of Chinese electric industry, 21 pages of " simple analysis of thermoelectricity peak regulation economy " 300,000 kw fired power generating unit peak regulation fuel oils 187 restrain/kw.h) (China Electricity Power Newspaper 2004.12.28 " No. 7 units in Three Gorges ... " Chinese total installed capacity of hydropower 100,000,000 kw), when taking place, the war Imported oil is obstructed, the existing thermoelectricity installation of China accounts for total installed capacity 81%, does not have the oily generating of just can't starting shooting.Thermoelectricity does not have coal and just can't generate electricity after 70 years, and national security just is on the hazard.Without coal and oil, the present invention is than existing advanced technology with the generating of several hundred million to tens water power in the present invention.(see China Electricity Power Newspaper 2005.3.3 " energy scarcity ... ") (see China Electricity Power Newspaper 2004.4.6 " Chinese water power ... ").(see the 2003.9.26 of southern part of the country morning newspaper " in, day, Russia ... " China's Imported oil spends 1,500 hundred million dollars.)
6, by the above, the present invention is with existing China 100,000,000 kw total installed capacity of hydropower, the present invention utilizes local water power to come peak regulation, can improve the multiple electricity 800 to 2000 of electrical network water power utilizes hour, be equivalent to the short of electricity coal problem of year economizing on coal 100,000,000 tons and just can solve existing electrical network, the present invention compares with the generating of the thermoelectricity of 3.89 hundred million to 7.8 hundred million kw water power and as much, and water, thermoelectricity utilize hour with generating 3000 to 6000.Every year is economized on coal 5.5 hundred million to 1,100,000,000 tons in water power generating of the present invention.The water power generating is annual discharges pollutions such as 14.99 hundred million to 29.97 hundred million tons of carbon dioxide in the air less to China.The present invention generates electricity with several hundred million to tens kw water power, has reduced tens tons of coal total amounts of China, and the present invention just can only utilize coal in China, the existing technology of natural gas 30 to 70 years and prolong the centuries, for the descendants benefits.(China Electricity Power Newspaper 2004.4.6 " Chinese water power ... " 2004.4.13 " electric power development ... ".1,300,000,000 tons of coal in China production capacity, it is very big to increase production 200,000,000 tons of difficulties again, electrical network thermoelectricity installation 3,700 ten thousand kw that go into operation every year on average, electric coal does not solve, and installation is many again can only to become ornaments.(China Electricity Power Newspaper 2004.8.15 " ... electric power ... development " national generator installation ... reach 6.6 hundred million kw ...) (see the China Electricity Power Newspaper 2005.3.16 whole nation " coal, electricity, oil, fortune ... " 8,000 ten thousand tons of 2005 years electric coal breach).
7, existing technology electrical network peak-valley difference is big, and as described in the specification beginning, existing technology water, thermoelectricity all are not suitable for peak regulation, solve peak-valley difference greatly at several necessarily extremely several hundred million user sides dress peak valley electric energy meters.1. greatly 2. workload is big in investment, is difficult to carry out, so peak-valley difference is the difficult problem of existing technology electrical network for a long time greatly always.There are 8.6 ten thousand reservoirs in China, and several ten million to several hundred million kw local total installed capacity of hydropower are arranged, and there are tens to several thousand local hydroelectric plants and reservoir in each province.The present invention is at each place, online critical point, local hydroelectric plant (net) dress peak valley electric energy meter, and each province only adorns tens to several thousand time-sharing measurement electric energy meters, and the present invention implements easily.Concerning the whole nation the present invention not only can peak regulation, fill out paddy several ten million to several hundred million kw, annual for local water power and electrical network bring 97,200,000,000 yuan of economic interests simultaneously, be 23.37 times of 41.6 hundred million yuan of national grid annual returns.(see that China Electricity Power Newspaper 2002.2.25 " improves Central China ... ", 2005.5.31 " East China ... " peak valley peak, East China 2318.18 ten thousand kw) (Chinese electric industry 92 years 2 phases 25 pages " electrical network constitutes with installation "), (China Electricity Power Newspaper 2004.2.11 " state's electricity last year ... moisten 41.6 hundred million yuan ") (seeing China Electricity Power Newspaper 2006.6.27 " splendidness between blue mountains and green waters ") (China Electricity Power Newspaper 2003.4.6 " Hunan ... small power station ... ").
8, the present invention can be the new installation of China's water power 3.89 hundred million to 4,400,000,000 kw in 20 years.Network in the existing technology whole nation, when national black startup, peak regulation, frequency modulation, several ten million electrical network major break downs to several hundred million kw of moving steady and national loss load take place.Thermoelectricity starts will be with tens hours, and nuclear power will start a week, and water power of the present invention only needs one minute, just can be the whole nation and leave and be with several at full capacity necessarily extremely several hundred million kw to address the above problem for load to the arbitrary electrical network in the whole nation.(see China Electricity Power Newspaper 2003.10.9 " water power and electrical network ", the present invention starts several hundred million to tens kw water power, made power system restoration normal in 1 to 5 minute, the present invention recovers big several hundred million to tens kw of electrical network normal duty than the U.S., speed (sees that China Electricity Power Newspaper 2003.9.11 " strengthens power grid security for fast 348 to 1740 times ... ", U.S. power grid accident loss load 6,180 ten thousand kw want 29 hours ability to recover normal).(see that " water is abandoned in Sichuan to China Electricity Power Newspaper 2005.10.24 ... " thermoelectricity from cold machine to send electricity want 10 surplus hour ...)
9, the present invention purchases local water power and comes peak regulation, what is multiple to tens grades of power stations just to promote same rivers, the present invention offers high prices for local water power in ertan hydropower station upstream, Sichuan and comes peak regulation, 2.43 tons/kw.h of two beach standard electrical generation water consumptions, 2.88 tons/the kw.h in power station, Three Gorges, when 10 tons of water yields of purchase through the two-stage power stations 7.6kw.h that just can generate electricity.(" water is abandoned in Sichuan to China Electricity Power Newspaper 2005.10.24 ... ") (Workers Daily 1992.1.9 " Yangtze River Gorges ... " the general head of local water power is low, the electrical generation water consumption is at 20~50 tons/kw.h, and power station, Three Gorges and power station, two Weihe River normal water level productive head reach more than 113 meters, the electrical generation water consumption is at 2.43 to 2.88 tons/kw.h, so whenever offering high prices for the local water power of a kw.h, the present invention comes peak regulation, the same rivers of water yield process of 20~50 tons/kw.h that flows down after the local water power generating what to tens grades of plant generators, the present invention can send several energy output to tens kw.h, so the present invention can multiple electricity and fallen electricity price,, the present invention come peak regulation just can promote technology electrical network water power year pilosity 800 to 2000 utilizations now hour so offering high prices for local water power.(see Guangxi power industry will (the 15th to 16 page of hydraulic and electric engineering publishing house " two Yu Jiang planning ".205 meters head electrical generation water consumptions of natural bridge primary power station are 1.84 tons/kw.h, and bridge consolidates the 25.4 meters heads in hydroelectric station, standard electrical generation water consumption 15.55m3/kw.h) the head height, the electrical generation water consumption is just few.(189 meters of ertan hydropower station maximum heads, 113 meters of power station, Three Gorges maximum heads.See that 8 pages of Guangxi power technology 2002 1 phases are " to Long Tan ... ") (see China Electricity Power Newspaper 2003.6.3 " Three Gorges ... " 113 at head).
10, China's coal, oil, gas resource only account for world average level 60,10,5%, the efficient of China's mark coal per ton output only is European Union 16%, 10% (Guangxi daily paper 2004.12.17 " China of Japan ... energy-consuming big country ", the stream generating of the average for many years river rising in Ningxia and flowing into central Shaanxi of each water power dam site of China's electrical network half, abandon water half, as 4,500 hundred million tons of water yields of Three Gorges power plant, 2388.54 hundred million tons of year generating water consumptions are abandoned 2111.4 hundred million tons of the water yields, and the existing technology of China is a shortage of resources, waste is big, and efficient is extremely low again.China 80% is thermoelectricity, and annual 3700 ten thousand KW of the not enough installation of risking one's life of electricity go into operation, and not enough burning of coal dug again desperately, and the coal of descendants's generation has all been burnt up, and the coal in the whole nation will go up in smoke after 50 years.The present invention is different from existing technology: do not invest, fund-raising, foreign capitals develop at a progressive speed, the same electricity price online of the present invention with existing technology, just can develop 3.8 to 4,400,000,000 KW water power in 20 years comes out, and can improve the annual multiple water power amount 800 to 2000 of existing technology electrical network water power utilizes hour, because water power is regenerated resources, can both reuse 3.8 to 4,400,000,000 KW water power, so the efficient that the present invention has overcome existing technology output only is 10~16% deficiency of European Union and Japan every year.Every year of the present invention is with water power several hundred million to tens kw that generate electricity, be equivalent to economize on coal several hundred million to tens tons, several hundred million tons of fuel-economizings, the present invention can prolong the centuries to electric coal, oil, the gas that the generating in 50 years of existing technology burns up, and the present invention has overcome that the shortage of existing technology china natural resources, efficient are not only low, consumption but also many deficiencies.(see China Electricity Power Newspaper 2004.4.6 " Chinese hydroelectric development ... ") (China Electricity Power Newspaper 2004.8.15 " ... the electric power sustainable development ").The great part that Here it is builds socialism with Chinese characteristics country.
Solve same peak load regulation network problem, difference of the present invention is on average whenever to offer high prices for local water power 1,000,000 kw every day to come out to be peak load regulation network several hours, electrical network just has 1,000,000 kw thermoelectricity peak regulation units to start shooting to have saved electric coal, owing to there is not account for electrical network low ebb load of 700,000 kw thermoelectricity peak regulation units, so the present invention can promote 24 hours energy output of 700,000 kw water power multiple electricity every day again, has saved electric coal again.The present invention has overcome like this that existing technology coal burns in the same old way, water is abandoned in the same old way, user's short of electricity in the same old way, and the whole nation is the deficiency of short of electricity coal in the same old way.(see Chinese electric industry 92 years 2 phases 25 pages " formation of electrical network and installation ").(see China Electricity Power Newspaper 2004.8.28 " how electric coal price lattice link ".) the comprehensive peak modulation capacity of water power is 100
Figure A20081012906600261
Be with 1,000,000 kw when being the electrical network peak, drop to 0 during low ebb; And the comprehensive peak modulation capacity of thermoelectricity is 30%, is with 1,000,000 kw during the peak, is with 700,000 kw during low ebb.
11, existing technology electric network peak accounts for 15~25%, and electric weight accounts for 3~7%, and waist peak load accounts for 15~20%, and energy output accounts for 12~17%.Hour (see that " pain of water is abandoned in Sichuan to China Electricity Power Newspaper 2005.10.24 surplus start wants 10 during the cold machine of existing thermoelectricity ... "), the comprehensive peak modulation capacity of thermoelectricity only is 20~30% and (sees that China Electricity Power Newspaper 2002.2.5 " improves Central China ... ") since existing technology electrical network the most scarce be peak load 4 hours every days, economizing certain day evening peak as certain needs to raising 2,000,000 kw peak loads, come out peak regulation 4 hours of the thermoelectricity peak regulation unit that existing technology need be left 2,000,000 kw.Because these 1,400,000 kw peak regulation thermoelectricitys that stop by the generating of 1,400,000 kw electrical network water power of 20 hours 1,400,000 kw peak regulation thermoelectricitys generation load that accounted for does not have the user power utilization electrical network can only abandon water 1,400,000 kw again in one day.Existing technology thermoelectricity coal burns in the same old way with regard to causing, water power is abandoned water, user short of electricity and the whole nation present situation of short of electricity coal (seeing 25 pages of Chinese electric industry 92 years 2 phases " electrical network constitutes with installation ") in the same old way in the same old way in the same old way.Difference of the present invention is: offer high prices for local water power every day and come peak regulation; one past of peak load every day; local water power shutdown is filled out paddy for electrical network; local utilize own (there is hundreds of in a province to several thousand) reservoir low ebb retaining, completely sending out several again during second day peak hour is peak load regulation network, and all move like this whole year; because every day of the present invention is with 2,000,000 kw; local water power is a peak load regulation network, and 2,000,000 kw water power drop to 00,000 kw during low ebb, and start is taken 2,000,000 kw to from 0 and only needed 1 to 5 minute.Electrical network thermoelectricity peak regulation unit 2,000,000 kw just need not start shooting and save fire coal, do not account for behind the low ebb load of electrical network because thermoelectricity peak regulation unit is not started shooting, and the present invention has promoted electrical network 1,400,000 kw water power multiple 24 hours water power amounts every day, and the water power generating need not be coal-fired.The present invention has saved electric coal several hundred million to tens tons for China's electrical network every year like this, solve China electrical network short of electricity coal, lacked the deficiency of peak load, reduce simultaneously the equal for many years river rising in Ningxia and flowing into central Shaanxi of each hydroelectric plant's dam site of China's electrical network stream significantly and generated electricity half, abandon water half abandon the water yield, improve the utilance of China's electrical network hydroelectric resources generating and (seen Chinese science and technology newspaper " summer air-conditioning peak on June 17th, 2005 ... the summer air-conditioning peak reaches 5,000 ten thousand KW, and loads year by year in rising ").(see the Workers Daily 92.1.9 " Yangtze River Gorges ... " year 2388.54 hundred million tons of waters of generating, year is abandoned 2111.46 hundred million tons of the water yields), (see China Electricity Power Newspaper " electric power development ... " the scarce coal in the whole nation.)
(see China Electricity Power Newspaper 2006.6.27 " blue mountains and green waters ... " local water power 3,852 ten thousand kw of China, account for national water power total installed capacity 33.1%, energy output account for national water power gross generation 30.6%).
(4) description of drawings
AB, AX peak are the electrical network peak-valley difference in the accompanying drawing, and province's peak-valley difference of this figure is 300 to 6,000,000 kw. The East China Power Grid peak-valley difference is that 2318.18 ten thousand kw (see China Electricity Power Newspaper 2005.5.31 " East China ... ". Among the figure The abcd dotted line is depicted as to be offered high prices for local hydropower 2 to 8 hours load every day of the present invention and comes to show for peak load regulation network Intention, what particularly point out among this figure is in the time, electrical network extreme misery peak regulation unit and Ben Fa in the abcd dotted line The local hydropower load of bright purchase comes to be peak load regulation network jointly. Rather than do not give the peak regulation unit generation of electrical network. (see among 92 years 2 phases of Chinese electric industry, 25 pages of " electrical network consists of with installation " BC and describe in detail) is because existing technology electrical network See that abcd period electrical network unit extremely is difficult to peak regulation among the figure, and be user's peak of power consumption every day, every day electrical network The load that peak BC, XC show, the load that shows than low ebb AO is twice to two times, so height of the present invention Valency purchase local hydropower load several ten million to several hundred million kw solves in electrical network and the people's lives negative to peak period The requirement of lotus. Shown in abcd among the figure, (see Chinese science and technology daily paper 2005.6.17 " summer air-conditioning peak electricity consumption phase When in three pipe of reinforced concrete at Three Gorges Power Stations "). Owing to only offer high prices for local hydropower and come to peak load regulation network 2 to 8 every day of the present invention Hour, show that such as figure abcd all the other time the present invention do not purchase, 8.6 ten thousand of oneself having of local hydropower utilization The length of reservoir is held the time outside the abcd among the figure to water, and second day peak in the drawings abcd shows the period Multiple full sending out because local reservoir water power is not generate electricity the abcd period, lacked generating again, so the present invention is short Advance multiple electric 16 to 22 hours of every day of electrical network water power, annually sent out many tens to the hundreds of sky, annual multiple electricity 800 to 2000 utilize hour, and the present invention has overcome for many years all river rising in Ningxia and flowing into central Shaanxi flow generatings of existing technology electrical network hydroelectric power plant dam site Half abandons half deficiency of water. The present invention contributes for existing technology.
Scheme two only needs in the drawings to offer high prices for local hydropower among the eBf and this curve of exf every day of the present invention and transfers Peak 2 to 8 hours, all the other time the present invention do not purchase, and local hydropower utilizes several ten thousand reservoirs to hold low ebb water Amount is not sent out and is generated less second day and completely send out again electricity multiple in eBf and this period of exf. Because local hydropower stops at low ebb Paddy is filled out in the machine retaining; Since local hydropower on eBf and this peak of exf multiple electricity transferred the peak for electrical network, and electrical network Existing technology thermoelectricity peak regulation unit just need not be started shooting, and electrical network thermoelectricity peak regulation compressor emergency shutdown has been saved electric coal, the present invention Just promoted electrical network several ten million to several hundred million kw hydroelectric power plant every days multiple 24 hours water power, saved again electricity Coal, the present invention had improved the generating profit of water resource in the river like this to the hundreds of sky in annual multiple tens days Use rate, solved that China's electrical network coal burns in the same old way, water is abandoned in the same old way, in the same old way short of electricity of user, the whole nation in the same old way the short of electricity coal, The deficiency of short of electricity oil foot, scarce natural gas. (see that China Electricity Power Newspaper " improved Central China electricity on February 25th, 2002 Net ... " the comprehensive peak modulation capacity of thermoelectricity is only 20~30%).
(5) embodiment:
Example one: certain economizes electrical network total installed capacity of hydropower 3,290,000 kw, local total installed capacity of hydropower 3,000,000 kw, and totally 4632 places, the present invention is installed the peak valley electric energy meter additional at place, local hydroelectric plant (net) online critical point.Annual 365 days, local that day, the peak online all met requirement of the present invention, and the present invention presses electrical network total installed capacity of hydropower capacity 0.08 hundred million kw.h/ ten thousand kw, offers high prices for local water power and comes peak regulation, shown in abcd among the figure, the peak purchase, low ebb is not purchased, and local water power utilizes the retaining of 10,000 reservoir low ebbs, because it is local for multiple peak high price, the low ebb load shedding is filled out paddy, so the present invention is annual to promote the multiple electricity 800 to 2000 of electrical network to utilize hour.3,290,000 kw * 0.08 hundred million kw.h/, ten thousand kw=26.32, hundred million kw.h, 3,290,000 kw * 2000 utilize hour=65.8 hundred million kw.h.Ask 5 years every average rates for incorporation into the power network, and increase installation and economize on electricity coal situation?
26.32 hundred million yuan of hundred million kw.h * 1.50 yuan/kw.h=39.48
(1)
Ten thousand tons of economize on electricity coal 65.8 * 64935.06=42.73
39.48 3500 yuan/kw of hundred million yuan of ÷ * 4000 utilizes hour=112.80 ten thousand kw * 4000 hour=45.12 hundred million kw.h
Economize on electricity ten thousand tons of coal: 156.04 * 64935.06=1013.25 of (2) three years (39.48 hundred million yuan+45.12 * 2 * 0.05 yuan/kw.h+65.8, hundred million kw.h * 0.10 yuan/kw.h+50, hundred million kw.h * 0.25 yuan/kw.h * 2) ÷ (26.32+90.24+65.8)=0.33 yuan/kw.h
(3) four years
A, [39.48 hundred million yuan+(45.12 * 4 * 0.05 yuan/kw.h)+65.8 * 0.10 yuan/and kw.h] ÷ (26.32+180.48+65.8)=0.20 yuan/kw.h
B, [39.48 hundred million yuan+(45.12 * 4 * 0.05/kw.h)+65.8 * 0.20 yuan/kw.h] ÷ (26.32+180.48+65.8)=0.23 yuan/kw.h
Ten thousand tons of economize on electricity coal: 246.28 * 64935.06=1599.22
(4) five years
A, [39.48 hundred million yuan+(45.12 * 5 * 0.05/kw.h)+65.8 * 0.10 yuan/kw.h] ÷ (26.32+180.48+65.8)=0.18 yuan/kw.h
Ten thousand tons of economize on electricity coal: 291.4 * 64935.06=1892.21
B, (57.18+6.58) ÷ 272.6=21.03 unit/kw.h
Five annual electricity prices: (0.34+0.33+0.20+0.18) ÷ 4=1.05/4=0.262 unit/kw.h
(1) 2 years borrow 0.30 yuan/kw.h of 5,000,000,000 kw.h to come the ordinary telegram valency to electrical network in the formula, 2 years put into formula by 0.05 yuan/kw.h, 0.25 yuan/kw.h of debt pays off in (2) formula.The present invention's 5 years annual 49.22 ten thousand tons of peak regulation fuel oils of saving.2 to 8 hour come be peak load regulation network by offering high prices for local water power every day of the present invention, shows as abcd among the figure.Because system peak load accounts for 15~25% of electrical network total load, energy output only accounts for 3~7%, and waist peak load accounts for 15~20%, and energy output only accounts for 12~17%, and data (are seen 92 years 2 phases 25 pages of " electrical network and the installations of Chinese electric industry ... ").The place utilizes 10,000 reservoirs to come regulating pondage, the present invention be every year multiple tens days of this province to the hundreds of sky, load than existing technology pilosity peak load 500,000 to 3,000,000 kw every day.During the electrical network low ebb, because the present invention do not purchase, local water power rate for incorporation into the power network is low, and local water power is shut down 50 to 3,000,000 kw load, local water power utilizes 10,000 reservoirs to come retaining, and the present invention has solved the deficiency that peak load regulation network is filled out the paddy difficulty for this province's electrical network.The present invention 5 years promotes annual multiple water power 65.8 hundred million kw.h of this electrical network, and the present invention's 5 annual electricity price are that 0.26 yuan/kw.h Internet user can bear, and are suitable with Three Gorges power plant rate for incorporation into the power network.Because existing technology is not brought into play the regulating action of local 10,000 reservoirs, so, existing technology electrical network 3,290,000 kw water power dam sites for many years all the river rising in Ningxia and flowing into central Shaanxi flow generate electricity half abandon water half.The present invention has improved the utilance of water resources generating for this province's water power, and annual the installation with the self-fund of acquisition of the present invention need not be gone back principal and interest in the formula of (2) (3) (4), so the present invention comes the ordinary telegram valency by 5 minutes/kw.h of cost of electricity-generating.Purchasing local water power by the installed capacity of 7,800,000 kw in 5 to 10 years comes peak regulation shown in figure abcd, calculated once in all the other per 5 years, method is identical, so offering high prices for local water power on the basis of surfing the Net with valency with electricity, the present invention come peak regulation many more, interests are big more, along with installing year by year, the present invention increases, energy output is many more, the electricity price of online is more and more lower, the present invention oneself obtains economic interests and 5 years is this water-saving Denso machine 5,640,000 kw, the present invention makes a profit 39.48 hundred million yuan for this province 5 years every year, can be this water-saving Denso machine 112.8 ten thousand kw every year, 3500 yuan/kw of every kw project cost is because of the present invention's dilatation in existing hydroelectric plant is about 2500 yuan/kw, 5000 yuan/kw of total installed capacity of hydropower, two kinds of average about 3500 yuan/kw.So the present invention has solved the difficult goal of the invention of installation for China's electrical network.The local water power annual energy output of existing this province of technology is 10,000,000,000 kw.h, and the present invention only purchases 26.32 hundred million kw.h 5 year every year, if local water power is 39.48 hundred million yuan by existing technology with 0.30 yuan/kw.h5,26.32 hundred million kw.h incomes.
1.5 yuan/kw.h of the present invention purchases local water power and comes peak regulation, 5 years deserved purchase expense incomes of local water power head are hundred million yuan of 39.48 ÷, 2 * 5=98.7, the present invention 5 years annual installation 112.8 ten thousand kw, in installing 112.8 ten thousand kw water power every year, contain in the interests of giving 98.7 hundred million yuan, per 5 years meters of the present invention total installed capacity of hydropower is built up once, then, press the new and old installation sum of electrical network, purchasing local water power peak load with 0.08 hundred million to 0.12 hundred million kw.h/ ten thousand kw again comes to peak load regulation network, because the present invention is this water-saving Denso machine several ten million kw, because water power only needs 1 to 5 minute at full capacity from zero to band, because there are 10,000 reservoirs in this province, so the present invention solves this province's peak-clipping and valley-filling, synergy, power grid accident is standby, frequency modulation, the black difficulty that starts, the rate for incorporation into the power network height, sustainable development, the power environment protection technology, grid loss several ten million kw that load, existing technology electrical network is difficult to solve, and the present invention only needs the hydroelectric plant just can be with completely several ten million kw to load in 1 to 5 minute to address the above problem.The present invention is by 300,000 kw and the average gross coal consumption rate 370 gram/kw.h of 12.5 ten thousand kw units, with raw coal 4000 kilocalorie/kilograms, one ton of coal power generation 1544.4kw.h, 100,000,000 kw.h water power amounts economize on electricity coal is 64935.06 tons, the present invention such as above calculating, the present invention first, 2 years annual multiple water power 65.8 hundred million kw.h, 42.73 ten thousand tons in economize on electricity coal, the present invention in the 3rd year has increased the total installed capacity of hydropower pilosity newly water power amount 15,600,000,000 kw.h, the economize on electricity coal is 1013.25 ten thousand tons, the 4th year multiple water power amount 246.28 hundred million kw, 1599.22 ten thousand tons in economize on electricity coal, the 5th year multiple water power amount 291.4 hundred million kw, 1892.21 ten thousand tons in economize on electricity coal.30 provinces in the whole nation, the most of province all is to implement the present invention like this, the present invention just can solve the deficiency of national short of electricity coal.
Pressed and transferred generating online in rush hour in given a day in the electric power local hydroelectric plant every day.Transfer institute to assign once to local hydroelectric plant in the electric power by every month rush hour, season, the year of same period last year, content is when to surf the Net every day to be only the rush hour of electrical network, and the present invention that Here it is sets hundreds of to several thousand local water power generating online and electrical network peak needs corresponding to measure.
The present invention's beneficial situation of making a profit: first, second year annual the profit 46.06 hundred million yuan, wherein should give 19.74 hundred million yuan of local water power peak purchase expenses, the 3rd year is 50.58 hundred million yuan, 19.74 hundred million yuan of wherein local water power, A was 52.84 hundred million yuan in the 4th year, B is 61.68 hundred million yuan, wherein contains local water power peak and takes 19.74 hundred million yuan.A was 55.10 hundred million yuan in the 5th year, and B is 63.94 hundred million yuan, wherein contained to give 19.74 hundred million yuan of local water power purchase expenses.
Know by aforementioned calculation, taking for the purchase of local water power peak should give better in the 4th year, also to make a concerted effort to build the hydroelectric plant because of enforcement the first three years and equal the expense of offering high prices for, the user could accept electricity price of the present invention, certainly build power plant and also can build in the place of local water power, but annual give local water power half promptly 19.74 hundred million yuan be fixed.
In this example, the present invention 5 year every year can both the total installed capacity of hydropower generating, good as if too fast, state in the literary composition of the present invention, if built meter once in 20 years, the present invention 3.8 hundred million KW that can install, if built meter once in per 5 years, the present invention can total installed capacity of hydropower 4,400,000,000 KW.
Example two: the energy output of 1/4 total installation of generating capacity on average only can be sent out in the electrical network hydroelectric station in general dry season, and Three Gorges every year 5 to October is for the 145 meters operations in flood prevention or control precipitation position, electrical generation water consumption 10m 3Annual premium on currency position to the 175 meter operation in dry season in October to May of/kw.h.Electrical generation water consumption 2.82m/kw.h.Be both 10m 3Water is sent out a kw.h, and can send out 3.5kw.h in the time of 175 meter in the time of 145 meters.When annual water level rose to 175 meters water levels, the local water power that the present invention offers high prices for 4.8 ten thousand reservoirs in upstream, Three Gorges came to peak load regulation network, shown in abcd in the accompanying drawing.Annual the present invention now designs energy output 84,700,000,000 kw.h than power station, existing technology Three Gorges can multiple 40,000,000,000 to 70,000,000,000 kw.h.If electrical network step hydropower station, each province Joint Implementation the present invention in 4.8 ten thousand the reservoir scopes in upstream, the Yangtze River Gorges, annual the present invention is than several times of tens times of energy output of multiple 40,000,000,000 to 70,000,000,000 kw.h of existing technology energy, and can be the energy output in dry season of very good sale with electricity with the valency online.Annual additional issue 800~2000 utilizes hour in the power station, Three Gorges in the present invention, and the generating water consumption is 410.59 hundred million to 1026.48 hundred million tons.Be ready the water power peak regulation bought in empty 4.8 ten thousand the local reservoirs of the annual purchase of the present invention, shown in abcd among the figure, the present invention in flood season is with 4.8 ten thousand reservoirs, manys than the technology of showing 50,000,000,000 to 110,000,000,000 tons of flood discharges are held the usefulness of generating.Not only can improve Three Gorges power plant hundreds of to several hundred billion tons of water resources capacity factors by implementing the present invention.And are 5 to 8 times of 22,200,000,000 tons of existing technology Three Gorges Reservoir flood controls flood season of the present invention 4.8 ten thousand pondages.The equal for many years river rising in Ningxia and flowing into central Shaanxi of Three Gorges power plant dam site is flowed 4,500 hundred million tons, 84,700,000,000 kw.h that generate electricity, and 2388.54 hundred million tons of water consumptions are all abandoned 2111.46 hundred million tons of the water yields for many years.The low electrical generation water consumption of general local small power station head reaches 20~50 tons/kw.h, and the 175 meters water level heads in power station, Three Gorges reach 113 meters, 2.82 tons/kw.h of electrical generation water consumption.Come peak regulation so the present invention offers high prices for the local water power of each kw in the Three Gorges Reservoir upstream, the water yield that flows down after the local water power generating just can promote several energy output to tens kw.h of the multiple electricity in power station, Three Gorges and step hydropower station, electrical network the Changjiang river.The difference of the present invention and existing technology energy output is that annual annual energy output 84,700,000,000 kw.h in Three Gorges that guarantee of the present invention normally come the energy output insufficient section in water time to be supplied by the present invention.Multiple electric weight is exactly an energy output of the present invention, the cost of the newly-increased installation of the present invention energy output, offer high prices for the purchase expense of local water power, and the energy output that promotes the electrical network pilosity contain the expenses such as energy output of step hydropower station pilosity average after, be only rate for incorporation into the power network of the present invention, the present invention with power stations at different levels than all multiple for many years electric sum of existing technology divided by the operation of surging.The present invention is the multiple Yangtze River Water electric weight of energy just, can fall the goal of the invention of electricity price again.
Example three: the present invention purchases local water, electricity comes the peak regulation benefit calculation as follows:
Whole nation total installed capacity of hydropower 7,700 ten thousand KW (see China Electricity Power Newspaper 2001.02.03 " total installed capacity of hydropower ... ") whole nation water power 2,300 ten thousand KW (seeing the 2000.06.18 of southern part of the country morning newspaper) that occupy a narrow space
7700-2300=5400 ten thousand KW (nationwide integrated power grid), the present invention collect with 0.12 hundred million KW/, ten thousand KW and purchase
Figure A20081012906600341
Figure A20081012906600342
Figure A20081012906600343
Figure A20081012906600344
1 to 20 year wound benefit:
Hundred million yuan of hundred million yuan of 972 * 20=19440 of 4,860 hundred million yuan of ÷ 5=972
(4860+11589.23+27635.85+65900.87=109985.95 hundred million yuan)
But by 5000 yuan/KW total installed capacity of hydropower:
109985.95 5000 yuan/KW=2199719000KW of hundred million yuan of ÷ ≈, 2,200,000,000 KW
By 2500 yuan/KW dilatation total installed capacity of hydropower:
109985.95 2500 yuan/KW=44 of hundred million yuan of ÷, hundred million KW
Annotate: (see 96 years 9 phases of Chinese electric industry, 4 pages of " Cost for Electric Power Engineering for 5900 yuan/KW ... "
Disregard the principal and interest people and invest 19,500,000,000 yuan/3,300,000 KW)
5000 yuan/KW (" people from Three Gorges why to see China Electricity Power Newspaper 2003.02.25 ... ")
2500 yuan/KW (be dilatation water power of the present invention do not build reservoir, without the reservoir region immigration, need not build project cost such as reservoir dam, road and bridge)
Example four: existing technology electrical network situation: spike accounts for 15~25%, and electric weight accounts for 3~7%; Waist peak load accounts for 15~20%, and electric weight accounts for 12~17%, and basic lotus accounts for 60~70%, and basic carrying capacity accounts for 75~80%.(seeing 25 pages of Chinese electric industry 92 years 2 phases " electrical network constitutes with installation ")
The existing every province of technology electrical network is for peak regulation, needs to raising 2,000,000 kw peak loads as late peak, and electrical network need be left the 2000000 kw fired power generating unit peak regulation that comes out.Because the existing comprehensive peak modulation capacity of technology fired power generating unit only is 20~30%.Because what existing technology electrical network was the most scarce is peak load 4 hours every days; as eBf among the figure and exf; because hour ability band at full capacity surplus start reached 10 during the cold machine of existing technology fired power generating unit; and the start of large electric power plant unit will be thrown tens tons of diesel oil and be entered and could leave band to fired power generating unit at full capacity; so the thermoelectricity of 2,000,000 kw only be for 4 hours every days peak regulation need leave, all the other 20 hours electrical networks do not need thermoelectricity 2,000,000 kw to shut down, and give the water power on-load.Thermoelectricity not only burns coal power generation, and should give the load of water power band of electrical network and thermoelectricity cannot stop and taken, and just causes electrical network water power 1,400,000 kw can only not abandon water because of thermoelectricity can stop any more the electricity consumption of electrical network no user.In sum, existing technology electrical network coal burns in the same old way, and water is abandoned in the same old way, and user's short of electricity in the same old way, the whole nation is the present situation of short of electricity coal in the same old way.
Difference of the present invention is that to offer high prices for local water power 2,000,000 kw every day be electrical network to raising 4 hours peak loads.As scheme eBf and exf shows.One past of peak load of grid, 4 hours every days.Local water power 2,000,000 kw shut down 20 hours; for electrical network is filled out paddy; the place utilizes each to economize hundreds of to the retaining of several thousand reservoir low ebbs; completely send out 4 hours again during second day peak; annual to send out the peak electricity; local water power was sent out 24 hours basic lotus water yields in one day and is become and send out the present invention's peak regulation 6 day 4 hours every day load, and local water can be than the annual pilosity of existing technology tens days to the hundreds of sky.Because be peak load regulation network 4 hour with local water power every day of the present invention, the electrical network 2,000,000 kw thermoelectricitys peak regulation of just need not starting shooting need not fire coal, has saved electric coal; Thermoelectricity does not account for low ebb and loads behind the 1400000 kw water power, and the present invention just can promote electrical network water power multiple 24 hours energy output 1,400,000 kw every day every day, and the water power generating need not be coal-fired, and thermoelectricity shuts down that do not generate electricity need not be coal-fired, has saved electric coal; Come to be peak load regulation network 4 hours that the present invention just can promote existing technology electrical network 3,400,000 kw units need not burn coal, has saved electric coal so only need offer high prices for the local water power of 2,000,000 kw every day of the present invention.The present invention is that electric coal several hundred million is saved to 1,000,000,000 tons of youngsters in the whole nation every year.The present invention comes to this and has solved national electric coal deficiency, lacks the difficulty of peak load.Pilosity of the present invention water power reduced significantly electrical network hydroelectric plant dam site for many years all the generating of river rising in Ningxia and flowing into central Shaanxi stream half abandon water half abandon the water yield, improved the water resources capacity factor.The present invention has overcome existing technology electrical network peak regulation every day coal and has burnt in the same old way, and water is abandoned in the same old way, and the user is short of electricity in the same old way, and nationwide integrated power grid is the deficiency of short of electricity coal in the same old way.
Example five: certain water-saving Denso machine 3,290,000 kw, the present invention 5 years offer high prices for local water power by 0.08 hundred million kw.h/, ten thousand kw and come to be peak load regulation network, and electrical network water power annual multiple 2000 is utilized hour, ask the annual rate for incorporation into the power network of five annuals?
Hundred million yuan of 3,290,000 kw * 0.08 hundred million kw.h/, ten thousand kw=26.32, hundred million kw.h * 1.50 yuan/kw.h=39.48
3,290,000 kw * 2000 utilize hour=hundred million yuan of 65.8 hundred million kw.h * 0.10 yuan/kw.h=6.58
1 year: (39.48 hundred million yuan+6.58 hundred million yuan) ÷ (26.32+65.8)=(46.06 hundred million yuan-2,000,000,000 yuan) ÷ 92.12 hundred million kw.h=0.28 unit/kw.h
Subtracting 2,000,000,000 yuan in the formula is exactly not put into rate for incorporation into the power network to 2,000,000,000 yuan earlier, and the 4th puts into average electricity price again.
39.48 3500 yuan/kw of hundred million yuan of ÷ * 4000 utilizes hour=45.12 hundred million kw.h
45.12 hundred million yuan of hundred million kw.h * 0.05 yuan/kw.h=2.26
2 years: (39.48 hundred million yuan+6.58 hundred million yuan+2.26 hundred million yuan) ÷ (26.32+65.8+45.12)=0.35 yuan/kw.h
3 years: (39.48 hundred million yuan+6.58 hundred million yuan+2.26 hundred million yuan * 2) ÷ (26.32+65.8+45.12 * 2)=0.28 yuan/kw.h
4 years: (hundred million yuan of 39.48 hundred million yuan+6.58 hundred million yuan+2.26 hundred million yuan * 3+10) ÷ (26.32+65.8+45.12 * 3)=0.28 yuan/kw.h
Go into electricity price on average owing to put in 2,000,000,000 yuan for the first time 1,000,000,000 yuan in the formula.
5 years: (hundred million yuan of 39.48 hundred million yuan+6.58 hundred million yuan+2.26 hundred million yuan * 4+10) ÷ (26.32+65.8+45.12 * 4)=0.24 yuan/kw.h
It is average to put into electricity price to 1,000,000,000 yuan that owed in 1 year in the formula.
(0.28+0.35+0.28+0.28+0.24) ÷ 5=0.29 unit/kw.h
Answer: rate for incorporation into the power network was 0.28 yuan/kw.h in 1 year, deduct 2,000,000,000 yuan the 4th, the 5th year in the formula and refill, and 1 year 0.35 yuan/kw.h, third and fourth year is 0.28 yuan/kw.h, the 5th year is 0.24 yuan/kw.h online.In this example, electrical network 5,000,000,000 kw.h electric weight do not come average high price electric weight, and other is identical with example one.This example five annual rate for incorporation into the power network are 0.29 yuan/kw.h, and one five annual rate for incorporation into the power network of example is 0.262 yuan/kw.h.The present invention wherein contained to 19.74 hundred million yuan of local water power peak purchase expenses for electrical network and local water power increase income 4,600,000,000 yuan in 1 year, and 1 year is 48.32 hundred million yuan (19.74 hundred million yuan) ... the 5th year is 55.1 hundred million yuan (19.74 hundred million yuan).

Claims (10)

1, the present invention is applied to the dynamical system field, hydroelectric plant's major part of existing technical operation is that the river rising in Ningxia and flowing into central Shaanxi streaming does not have the power plant that regulates storage capacity, and the existing thermoelectricity of China accounts for more than 76% of national total installed capacity, and the comprehensive peak modulation capacity of thermoelectricity is 20~30%, when showing technology electrical network peak, lack peak load; During the electrical network low ebb; because user power utilization reduces half to two times; electric power does not have the warehouse; the hydroelectric plant does not generally have adjusting storage capacity; local several ten million does not have constraint to several hundred million KW water power surfs the Net; add that the river luffing is big; cause the average for many years river rising in Ningxia and flowing into central Shaanxi of province's one-level electrical network hydroelectric plant dam site flow to generate electricity half; abandon water half; there were 24 province's shorts of electricity in China in 2004; several hundred million tons of the present annual Imported oils of China; electric power is one of five big key industrys of oil consumption; hydroelectric plant's project cost height that existing technology is repaid capital with interest and built up; the rate for incorporation into the power network height; the average annual generating 2917 in hydroelectric plant, the whole nation utilizes hour; it is characterized in that: there are 8.64 ten thousand reservoirs in China; wherein local reservoir accounts for 99%; there is 20,000,000,000,000 tons of carbonated drinks amounts overhead every year on China land; 6,000,000,000,000 tons of existing annual precipitation; there are 2.7 trillion tons to form river rising in Ningxia and flowing into central Shaanxi, rivers and lakes stream; the existing water power of China 5.4 hundred million KW that can install; be to calculate the installation operation 1.35 trillion tons of right parts of water yield stream; there are every year 18.65 trillion tons of potentiality to dig; China has total installed capacity of hydropower 7,700 ten thousand KW to 9,217 ten thousand KW now; hour do not generate electricity surplus having 5000 every year in waste; this paper claims that the above electric power system of province's one-level is an electrical network; every profession and trade reservoir beyond the electrical network; the hydroelectric plant is commonly referred to as local reservoir; local hydroelectric plant; there were 4300 local hydroelectric plants in China before 2000; local total installed capacity of hydropower capacity reaches 2,300 ten thousand KW; there were 44552 in 2006; total installed capacity has 3,852 ten thousand KW; account for 33% of national water power total installed capacity; be distributed in more than 1600 county, the whole nation, network operation on the major part is when showing technology society's every day peak of power consumption; each hydroelectric plant, county supplies separately, and the user is main; collect charges for electricity separately, oneself take in interests, mainly be based on the lamp electricity in each county; the past several hours one of electric consumption on lighting every day; local several thousand; several ten thousand several necessarily extremely several hundred million KW in hydroelectric plant loads supply 18 to 20 hours low ebbs to load by the circuits of networking to electrical network, without restrictions to mains supply, are just abandoning water in a large number because existing technology electrical network hydroelectric plant low ebb is filled out paddy; the local total installed capacity of hydropower in province, south accounts for the whole province's water power total installation of generating capacity 30 to 50%; so local water power low ebb online is many more, electrical network hydroelectric plant low ebb must be abdicated electricity market, and it is many more that the shutdown load shedding is abandoned water; because low ebb grant market shares, electrical network hydroelectric plant peak regulation; low ebb not on-load does not just have electric weight; do not have income,, need invest tens to several hundred billion yuan because existing technology is built a large power plant so cause 8,576 hundred million yuan of assets of national grid only to obtain the deficiency of 41.6 hundred million yuan of profits every year; the electrical network profit is few; power industry does not just have money installation production again, with fund-raising; borrow money; foreign capitals are installed and are just caused rate for incorporation into the power network up to 0.8 to 1.46 yuan/KW.h, and the present invention just can overcome above-mentioned shortcoming; difference of the present invention is to install the peak valley electric energy meter additional at place, local hydroelectric plant (net) online critical point; the high ebb electricity volume of strict differentiation, the present invention needs the time consistent by setting local water power peak load surf time and electrical network peak, and rents electrical network and sell; the present invention offers high prices for the millions of extremely several hundred million KW peak loads in local hydroelectric plant and comes the power supply network peak regulation to use in 2 to 8 hour time on electrical network peak every day; because procurement price height; interests are big, and local hydroelectric plant will offer high prices in the time multiple simultaneously on the electrical network peak; completely send out millions of desperately and come the power supply network peak regulation to use to several hundred million kw peak loads; which day the peak online in 1 year 365 days of local hydroelectric plant all meets requirement of the present invention, the agricultural irrigation on one side of local hydroelectric plant, and power generation peak adjusting is increased income on one side simultaneously; the present invention has just creatively realized making electrical network to increase by tens to the hundreds of sky than existing technology is annual; increasing during the peak 2 to 8 hours every days and millions ofly solve the goal of the invention of peak load regulation network difficulty to the peak load of several hundred million KW, is electrical network given local local electricity consumption after a large amount of online of local county water power peak load? give! Local water power has thousands of up to ten thousand reservoirs, when local hydroelectric plant wants annual electrical network peak multiple tens days to the hundreds of sky, add that the local rate for incorporation into the power network of existing technology is low, every day is outside 2 to the 8 hour time that the present invention offers high prices for, be bound to shut down load shedding and come retaining, just can reach annual multiple tens days more to the hundreds of sky peak load purposes that get economic interests with thousands of up to ten thousand reservoirs; Because local several thousand, several ten thousand reservoirs, hydroelectric plant's low ebb retaining, the few generating, having reduced millions of extremely several hundred million KW loads for low ebb to electrical network, the present invention has realized filling out the millions of goals of the invention to several hundred million KW of paddy for electrical network, the present invention has just creatively promoted several necessarily extremely several hundred million KW hydroelectric plants of electrical network pilosity tens in every year to the hundreds of sky, Duo for several ten million to several hundred million KW low ebbs 16 to 22 hour water power load than existing technology pilosity every day, the present invention has overcome existing technology electrical network hydroelectric plant low ebb significantly and has filled out paddy to abandon water many, all the river rising in Ningxia and flowing into central Shaanxi flow generates electricity electrical network hydroelectric plant dam site for many years that half abandons half deficiency of water, the present invention has creatively improved water resources capacity factor in the river, electrical network hydroelectric plant than existing technology, only purchase 2 to 8 hours local water every day of the present invention, electricity comes peak regulation, because it is short that the present invention offers high prices for the time, electric weight is few, and the present invention can promote existing technology electrical network water in large quantities, the thermal power plant low ebb at a low price power plant's pilosity electric weight, the ratio of the present invention power plant of repaying capital with interest has reduced one of rate for incorporation into the power network, the present invention offers high prices for local water power and comes peak regulation, in offering high prices for expense, the place will be paid half and be made rent to electrical network, selling charges, local hydroelectric plant is annual by with 8.6 ten thousand reservoir regulating pondages, and annual multiple high quality and favourable price peak electricity improves annual income; The electrical network hydroelectric plant is not by improving electricity price, by improving the next multiple electric weight of water resources capacity factor in the river, increasing annual income by receipts rent, selling charges, electrical network is by self-fund, increase benefit and increase the installation enlarged reproduction, because the present invention is also principal and interest of self-fund installation, without foreign capitals, fund-raising, need not develop at a progressive speed, so the 1.7 minutes/Kw.h of generating of hydroelectric plant that cost of electricity-generating of the present invention and plan age build is suitable, multiple spot price rise factor, the hydroelectric plant that builds up than the repayment of principal has reduced two of rate for incorporation into the power network so the present invention installs; The present invention substitutes the thermoelectricity peak regulation with hydroelectric peak, substitute water outlet, thermoelectricity peak regulation unit comes the tape base lotus, not only a large amount of fuel-economizing peak regulations, and every day of the present invention is than 16 to 20 hours energy output of existing technology pilosity, being equivalent to the present invention has increased the new installation of electrical network and has generated electricity, the present invention has increased energy output supply society in large quantities, each big rivers of existing technology China have all had the step hydropower station, in same rivers step hydropower station, flow one reduces in the river, all same rivers step hydropower stations are generating less all, the present invention in, upstream electrical stands in into the storehouse flow and sends out less when discontented, offer high prices for local water,, the agricultural water conservation generating is paid, rain making is generated electricity to call the operation of surging in the following text, peak regulation, the water yield that the present invention increases is through the another level of one-level plant generator, through what to tens grades of power stations multiple electric many peak regulations, the present invention has increased energy output supply society significantly, after average for many years energy output is finished in each step hydropower station, multiple electric weight is exactly an energy output of the present invention, the present invention with each step hydropower station than the multiple electric weight sum of the average for many years energy output of existing technology divided by the operation of surging (expensive) total cost, the present invention has just realized multiple electric weight, many raising water resources capacity factors can reduce the goal of the invention of electricity price again, pilosity of the present invention the water power amount resupply the user after having reduced electricity price again, fetch the electricity charge operation of surging again on one's body from the user, repetitive cycling, the present invention has just realized every year electric power of producing more, the eucyclic purpose of sustainable development every year, the present invention purchases local water by 0.08 hundred million to 0.12 hundred million kw.h/ ten thousand kw every year by electrical network water power total installation of generating capacity, electricity comes peak regulation, the present invention has waved thousands of up to ten thousand local reservoirs than existing technology pilosity, the effect of lake regulating pondage, improved the utilance of multinomial water resources generating than existing technology, the present invention every year than existing technology electrical network hydroelectric plant more increases generating 800 to 2000 utilizations hour, the present invention offers high prices for the same high rate for incorporation into the power network purchase of hydroelectric plant's pay back period that local water power comes peak regulation and existing technology to repay capital with interest to build up, equally high electricity price online, the same 20 years of pay back period are compared, the present invention 20 years creates several trillion yuan of economic interests for China's electrical network and local water power more, create nearly hundred billion yuan of benefits for electrical network and local water power every year on average more, be tens times of 41.6 hundred million yuan of existing State Grid Corporation of China annual returns, the present invention can be China's total installed capacity of hydropower and dilatation several hundred million to tens KW, the present invention can improve 100,000,000 tons in multiple electricity 2000 utilizations of existing technology electrical network hydroelectric plant's year hour just suitable economize on electricity coal, the present invention has overcome the deficiency of 8,000 ten thousand tons in existing China electrical network short of electricity coal, several ten million kw because the annual new operation thermoelectricity of existing technology is installed, the present invention also newly installed water power several hundred million in 20 years to tens kw, water power is regenerated resources, the water power generating need not be fired electric coal, the present invention is all economized on electricity coal several hundred million year to tens tons, the present invention has solved the difficulty of China's electrical network electricity coal deficiency like this, when electrical network is wanted peak regulation, when electrical network generation frequency modulation, large-area power-cuts several ten million is to several hundred million kw, moving steady, emergency duty is few, during black the startup, the present invention only needs from several hundred million to tens kw hydroelectric plants to start unit, with once to five minutes can for electrical network completely send out several ten million to tens kw water power load to the national arbitrary mains supply that has an accident, the present invention has overcome existing technology cold start, nuclear power is wanted 7, surplus thermoelectricity wants 10 hour, the ability oepration at full load, recover the deficiency of the normal operation of electrical network, existing technology total installed capacity of hydropower is difficult to deal with the needs of several hundred million kw power grid accidents very little
2, described by 1, it is characterized in that: the existing electrical network hydroelectric station the highest rate for incorporation into the power network of building up of pay back period of repaying capital with interest is 1.46 yuan/Kw.h, 1. the present invention with 1.46 yuan to 1.5 yuan/Kw.h be technical measures, offering high prices for that local water power load came in 4 hours every day is peak load regulation network and online, substitute electrical network water appears, thermoelectricity peak regulation unit comes the tape base lotus; 2. implement the present invention existing technology electrical network water power annual multiple 800 to 2000 is utilized hour, the old valency of old electricity 5 minutes is surfed the Net to 0.20 yuan/Kw.h; 3. implemented the present invention 20 years, the present invention can increase total installed capacity of hydropower several hundred million to tens KW, because also principal and interest of the present invention's installation, so rate for incorporation into the power network be 5 minutes to 0.20 yuan/Kw.h, the whole day of the present invention meter of on average surfing the Net: (1.50 yuan/Kw.h * 4 hours+20 hours * 5 minutes to 0.20 yuan/Kw.h) 24 hours=0.21 to 0.42 yuan/Kw.h of ÷, on average surf the Net with 0.21 to 0.42 yuan/Kw.h every day of the present invention, what the present invention was significantly different with existing technology is that the invention process time fund of long more oneself's accumulation is many more, installation is more and more, low electricity price energy output is many more, average rate for incorporation into the power network is more and more lower, the present invention overcomes existing technology every 1kw.h energy output power plant's decades of repaying capital with interest, the deficiency that rate for incorporation into the power network is all equally high
3, by 1,2 is described, it is characterized in that: dry season, 1/4 total installation of generating capacity on average only can completely be sent out by general hydroelectric plant, certain power station every year 5 to October is for the 145 meters operations in precipitation position of controlling flood, annual premium on currency position to 175 meter operation in dry season in October to May, be 10 cubic metres the water yield equally, send out 1Kw.h during 145 meters water levels, 3.55Kw.h can generate electricity during 175 meters water level operations, difference of the present invention is: annual when water level rises to 175 meters operations, the present invention offers high prices for the water power amount of these 4.8 ten thousand reservoirs in upstream, power station and comes peak regulation, the present invention is than the multiple electricity of this power station annual energy output of existing technology 84,700,000,000 Kw.h energy 40,000,000,000 to 70,000,000,000 Kw.h, and can promote that the multiple water power summation in the interior electrical network step hydropower station, each province of 4.8 ten thousand reservoir scopes of same rivers is several times to tens times of 40,000,000,000 to 70,000,000,000 Kw.h, and can reduce rate for incorporation into the power network, it is the energy output in the dry season of very good sale, the present invention has overcome existing technology each province wet season water power abundance, and this factory supplies a large amount of electric power to them continuously, and each province's water power generating in dry season is few, and this factory can not be to the deficiency of each province's power supply, the present invention to the each province for 400 to the 70000000000 kw.h water power amount in dry season that extremely needs of each province just, be ready to betray water power in empty 4.8 ten thousand reservoirs of the annual purchase of the present invention and come peak regulation, the present invention in flood season abandons the water yield to 500~1,100 hundred million tons with 4.8 ten thousand reservoirs and holds generating, not only can flow hundred million to several hundred billion cubic metres of water resources capacity factors of 4,500 hundred million tons of raising hundreds ofs by implementing the present invention than the equal for many years river rising in Ningxia and flowing into central Shaanxi of this factory's dam site, the water power that the present invention purchases 4.8 ten thousand reservoirs comes the peak regulation water yield to be contained in 6,000,000,000,000 tons, rather than be contained in 2.7 trillion tons river rising in Ningxia and flowing into central Shaanxi, the rivers and lakes stream, can increase the millions of peak loads of electrical network every year to several hundred million Kw, and flood season of the present invention, flood control capacity was 2 to 5 times of this 22,200,000,000 tons of storage capacity of factory, it is the flood control Gospel of each province, downstream 900,000,000 populations, general local hydroelectric station head is low, the electrical generation water consumption reaches 20~50 tons/Kw.h, and this factory's head is 113 meters, the electrical generation water consumption is 2.88 tons/Kw.h, so the present invention whenever purchases the local water power amount of 1Kw.h in the upstream, the water yield that local water power generating flows down is used to generating again, the present invention just can make this power station and several energy output to tens Kw.h of the multiple electricity of each step, the average back of the present invention rate for incorporation into the power network is not high, the difference of the present invention and this factory's energy output is: annual this factory's annual energy output 84700000000 Kw.h that guarantee, or by the average for many years energy output of this factory by normally coming the water time to protect this factory's annual energy output, not enough electric weight is supplied by the present invention, 4,500 hundred million tons of average for many years river rising in Ningxia and flowing into central Shaanxi, existing this power station of technology flows, it is 2,389 hundred million tons that year is sent out 84,700,000,000 Kw.h energy output water consumptions, it is 2111.46 hundred million tons that year is abandoned the water yield, annual additional issue 800 to 2000 utilizes hour multiple 400 to 70,000,000,000 kw.h in this power station in the present invention, year generating water consumption is 410.59 to 1026.48 hundred million tons, the present invention is by the multiple electricity of 4.8 ten thousand the reservoir regulating pondages in this upstream, power station 40,000,000,000 to 70,000,000,000 kw.h, this factory abandons 2111.46 tons of the water yields every year, the present invention only utilizes 410.59 hundred million to 1026.48 hundred million tons to issue additional
4, by 1,2,3 is described, the present invention of its feature is when the electrical network peak, offer high prices for local water, electricity comes peak regulation, existing technology need not be spent with the river generating, why to spend high price to remove to purchase local water power and come peak regulation? this is that electrical network is worried the problem that economic electric weight is impaired for a long time most: 1. from electricity market, offer high prices for local water every day of the present invention, electricity comes peak regulation, local water power also can only be on electrical network peak 2 to 8 hours every day, the present invention offers high prices for the many benefits of online ability in the time, offer high prices for and equally with the technology of showing beyond the time can not get high interests, in 2 to 8 hour rush hour be every day the user power utilization peak rise half to 2 times than low ebb load, electrical network and local water power peak TV university man can both confess, can not cause the electrical network hydroelectric plant to shut down load shedding, abandon water and waste half, electrical network economy can not suffered a loss, and existing technology electrical network can't require local water power to participate in peak load regulation network, so do not bring into play the effect of 8.64 ten thousand local reservoir regulating pondages; Local total installed capacity of hydropower is many, reasons such as few, the difficult control of capacity; The local water of existing technology, electricity participate in peak load regulation network and also can not get high interests, during the electrical network low ebb, because the user power utilization load reduces half to 2 times, electric power does not have the warehouse, it is many that the multiple electricity online of the local water power low ebb of existing technology just causes electrical network hydroelectric plant low ebb to abandon water, cause local water power to confess, the electrical network water power can not supply, and it is very great that the electrical network electricity can not sent out economic loss at a discount; 2. from economic angle, the present invention offers high prices for local water, electricity comes peak regulation, and electrical network gets 1/2 and offers high prices for expense income, and it is more than 10 times of existing technology that electrical network gets economic interests, can both confess when electrical network and local peak, does not cause electrical network to abandon water again; 3. now the policies laws of technology is the old valency of old electricity, the new valency of new electricity, peak load regulation network does not bring any interests to electrical network, increase a large amount of startup-shutdown peak regulation fuel oils on the contrary, increase device damage, increase cost of electricity-generating, and the electricity price of supplying with the user can not improve, so every day, peak regulation was disadvantageous to the electrical network economy interests, so it is many more that the present invention impels local water power to surf the Net when the electrical network peak, the unit of electrical network just can reduce band peak regulation load, reduces low ebb and abandons water, many tape bases lotus, reduce electrical network start peak regulation fuel oil, the minimizing electrical network is made peaking power source increase project cost with the increase installed capacity and is caused the rate for incorporation into the power network height, and the present invention is to the electrical network interests, and is extremely favourable to reducing user's electricity price; 4. electrical network can be on the local hydroelectric plant energy output over the years and generation load of online, check to find whether authenticity of peak, local hydroelectric plant online load and energy output, example: certain local hydroelectric plant installation has several years to decades, it is matters of public knowledge that how many ten thousand kw are arranged, no matter whether implement the present invention, it is little that energy output over the years and the highest generation load change, if but there are several to several thousand reservoirs upstream, local hydroelectric plant, after local hydroelectric plant implements the present invention, because interests height, can go to purchase other reservoir water yield comes power generation peak adjusting to increase the peak electric weight to obtain high interests and be fine, or local the utilization has reservoir expansion installed capacity now, every day multiple peak regulation electric weight and peak generation load, this is feasible; If 5. find hydroelectric plant, somewhere electricity volume, it is untrue to load, electrical network sends someone to investigate education, until not participating in enforcement the present invention to it, when during the online of local water power peak, pinpointing the problems, electrical network is taken out the staff and is gone to the hydroelectric plant of each place online to observe, supervision, local hydroelectric plant is many again, total worker not as electrical network is many, existing technology electrical network is that the equal for many years river rising in Ningxia and flowing into central Shaanxi of hydroelectric plant's dam site stream generates electricity half on one side, abandon water half, also have 18.65 trillion tons of water resources potentiality to dig, on one side be that electrical network need not 8.5 ten thousand reservoirs, local water power 2,300 ten thousand kw extremely several hundred million kw come regulating pondage, implementing the present invention can make existing electrical network hydroelectric station on average improve generating 800 to 2000 to utilize hour, increase multinomial water resources capacity factor; Can be the 6.94 hundred million kw dilatations of now can installing tens kw, average year generating 2500 to 4000 utilizes hour, average rate for incorporation into the power network be 0.21 yuan to 0.42 yuan/kw.h; ;20、1000;41.6;kw;;;;;;
5, by 1,2 is described, the present invention is on the basis of not improving user's electricity price, oneself's fund increases installation several hundred million to tens Kw water power, it is the algorithm difference, if multiply by the present invention 20 years in 9,217 ten thousand Kw, the present invention 3.89 to 7.8 hundred million Kw that can install, if built up the hydroelectric plant once by per 5 years in 9,217 ten thousand Kw, then by new, old installed capacity sum is removed to purchase local water power again and is come the peak regulation meter, the present invention can be China increases total installed capacity of hydropower 22 to 4,400,000,000 Kw, annual total installed capacity of hydropower 1.1 hundred million to 2.2 hundred million kw.h of 20 annuals, the present invention overcame China's liberation over 69 years, total installed capacity of hydropower 100,000,000 kw deficiency very little only, the present invention compares with the existing technology thermoelectricity generating with capacity with 3.89 to 7.8 hundred million Kw water power, water power of the present invention generates electricity, and not electricity consumption coal is annual to be economize on electricity 5.5 hundred million to 1,100,000,000 tons in coal of China, water power generating of the present invention is discharged 29.95 hundred million tons of pollutions such as carbon dioxide in the air annual lacking to China than the thermoelectricity generating, the annual China of existing technology 1,300,000,000 tons in coal of power generation, all economize on coal 5.5 to 1,100,000,000 tons every year of the present invention, the present invention has overcome the annual electric coal production of existing technology China, transportation, the deficiency of supply bottleneck
6, by 1,3,5 is described, it is characterized in that: the present invention is by existing total installed capacity of hydropower 100,000,000 Kw of China, year additional issue 2000 utilizes a hour meter, 100,000,000 tons in the annual economize on electricity of the present invention coal, increase water power several hundred million to tens Kw by the present invention, year generating 2000 to 4000 utilizes hour, year economizes on coal several to tens tons, annual 8760 hours, the present invention is in line with water power when generating arranged the whole year, everybody all comes the whole nation with several hundred million to tens Kw water power 2000 to 4000 hours, the annual remaining time is used thermoelectricity, nuclear power waits and generates electricity, multiple electric 61,600,000,000 to the 1540 hundred million Kw.h water power amounts of the existing technology electrical network water power of the annual in addition promotion of the present invention are economized on coal and are not counted interior, the present invention has overcome existing technology thermoelectricity and has accounted for 70~80% of national total installation of generating capacity several hundred million Kw, and coal in China only can be utilized the deficiency in 70 years of generating, the present invention can only utilize existing technology China thermoelectricity the coal in 70 years to prolong the centuries for the descendants, the present invention is annual to be 6,732 ten thousand tons of peak load regulation network joint peak regulation fuel oils with 100,000,000 Kw water power, when taking place, the war Imported oil is obstructed, existing technology China several hundred million Kw thermoelectricitys just can't be started shooting, and the present invention several hundred million is not just had the threat of the no coal power generation peak regulation of oil to the generating of tens Kw water power, national security economic construction, people's modernization life is just guaranteed
7, described by 1,2,5, it is characterized in that: existing technology electrical network is in order to solve peaking problem, solve with the method for building hydroenergy storage station, pumped storage power plant does not build on the big rivers, pumped storage power plant can not utilize the water resources of big rivers to come generating 24 hours every days, inconsistent with the present situation of China scarce energy country of 1,300,000,000 populations, the method that the present invention comes peak regulation with the local water power of purchase, utilize local thousands of up to ten thousand reservoirs to come regulating pondage, the present invention purchases local water power several ten million to several hundred million Kw water power and loads and be peak load regulation network during the electrical network peak; During the electrical network low ebb; thousands of up to ten thousand the local reservoirs of the present invention are shut down load shedding several ten thousand to several hundred million Kw load; with thousands of up to ten thousand reservoir fillings; the full again pilosity of sending out during second day peak; because local water power low ebb retaining load shedding several ten thousand to several hundred million Kw load; the present invention has promoted multiple water power several ten thousand to several hundred million Kw of existing technology electrical network low ebb water power; this is an one; it two is in the wet season; the present invention utilizes that millions of to utilize water resources in a large number to tens Kw Hydropower Unit multiple; solve China's 1,300,000,000 population energy deficiency problems; pumped storage power plant is unable to handle; network in the existing whole nation; air-conditioning peak every day in summer, the existing technology whole nation reaches 5,000 ten thousand Kw; and annual peak load is raising successively; existing electrical network is difficult to solve; when several ten million to several hundred million Kw load of nationwide integrated power grid accidents happened loss; the thermoelectricity of existing technology; water power; the nuclear power pumped storage power plant utmost point is difficult to resolve determines; and the present invention only need from reservoir emit several hydroelectric plants to tens frequency modulation of the water yield several hundred million to tens Kw Hydropower Unit in a few minutes full sending out load to the arbitrary mains supply in the whole nation; the invention solves the existing technology electrical network in the whole nation and can't overcome loss load several ten million to several hundred million kw; peak regulation; frequency modulation; black starting and emergency duty; required is several necessarily to several hundred million Kw load problem; the problem that pumped storage power plant is difficult to accomplish
8, described by 1,2, it is characterized in that: certain economizes existing technology water power 3,000,000 Kw that occupy a narrow space, 10,000 reservoirs are arranged, 260 billion cubic meter storage capacity are arranged, flood control 35 billion cubic meters, the present invention is when electrical network peak every day, offer high prices for local 100 to 3,000,000 Kw load and be peak load regulation network, because there are 10,000 reservoir regulating pondages in the place, the present invention makes this electrical network increase by tens to the hundreds of sky every year, and every day, the peak increased by 100 to 3,000,000 Kw; Low ebb reduces 100 to 3,000,000 Kw load, solved the peak-clipping and valley-filling difficulty, the present invention has not only promoted the annual additional issue 800 to 2000 of this province electrical network water power to utilize hour, and overcome the equal for many years river rising in Ningxia and flowing into central Shaanxi of existing technology electrical network hydroelectric plant dam site stream and generated electricity half, abandon half deficiency of water, simultaneously, the present invention can also be on the basis of surfing the Net with valency with electricity, increasing by tens yuan for this province is annual is the benign cycle that electrical network and local water power increase installation, the purchase in dry season, and flood storage in flood season water tens to hundreds of comes power generation peak adjusting for hundred million tons, be several times of existing 3,500,000,000 tons of flood controls, the present invention has overcome this and has economized 100,000,000 tons of floods of 86 years excess, causes the deficiency of the super historical water level of downstream several province rivers
9; by 1; 2; 5 is described; it is characterized in that: the present invention makes certain power station, upstream, power station 3,300,000 Kw head high 189 meters; and 1,820 ten thousand Kw heads at the corresponding levels are high 113 meters; all in specified water level operation; when offering high prices for thousands of up to ten thousand the reservoir water power in upstream, the present invention come the peak regulation water yield to reach the 7.6Kw.h/10 cubic meter through two-stage plant generator amount by 0.75 yuan/10 cubic metres water yields; the present invention's operation cost of electricity-generating of on average surging is 1 jiao/Kw.h; so; just can promote the multiple electric weight in each step hydropower station of electrical network and reduce rate for incorporation into the power network by implementing the present invention; described by claim 1; the thermoelectricity installation of existing technology China accounts for national total installed capacity more than 80%; existing technology electric network peak every day accounts for 15~25%; electric weight accounts for 3~7%; waist peak load accounts for 15~20%; electric weight accounts for 12~17%; because what existing technology electrical network was the most scarce is peak load 4 hours every days; economizing certain day evening peak as certain needs to raising 2,000,000 KW; the fired power generating unit that existing technology need the be left 2,000,000 KW peak regulation that comes out; the fired power generating unit of 2,000,000 KW only for every day peak regulation left in 4 hours; and 20 hours electrical networks do not need in one day; because electrical network peak in evening and peak morning; it is several to tens hours early to be separated by between peak and the late peak; thermoelectricity one is shut down start again in second day; not only to burn tens tons of oil; and will with several to tens hours could be at full capacity the unit band; therefore; existing technology thermoelectricity one is left; not that machine is bad; electrical network generally all is reluctant to shut down; so cause existing technology electrical network water power 1,400,000 KW can only not abandon water because of thermoelectricity can stop any more the electricity consumption of electrical network no user; existing technology such one year tens days is to the hundreds of sky; economize the millions of extremely several ten million tons of electric coals of waste in a year for one; 30 provinces and cities in the whole nation; it is this situation that more than 20 province arranged; annual several to about tens tons with regard to the electricity wasting coal; so just cause the present situation of China's electrical network electricity coal deficiency; difference of the present invention is to offer high prices for local water power to come every day to raising 4 hours electrical network 2,000,000 KW peak loads; 4 hours peak loads one in the past; local water power 2,000,000 KW water power are shut down and were filled out paddy for electrical network in 20 hours; the place utilizes oneself province hundreds of to be arranged to the retaining of several thousand reservoir low ebbs; completely send out 4 hours peak loads during second day peak again; because be peak load regulation network 4 hour with local water power every day of the present invention; the electrical network 2,000,000 KW thermoelectricity peak regulation units peak regulation of just need not starting shooting; saved electric coal; the do not account for low ebb of electrical network is not loaded behind 1,400,000 KW because thermoelectricity peak regulation unit is not started shooting; the present invention just can promote electrical network water power 1,400,000 KW pilositys every day 24 hours every day; come to be peak load regulation network 4 hours so only need offer high prices for the local water power of 2,000,000 KW every day of the present invention; just can promote that the electrical network 3,400,000 KW generating sets of existing technology need not be coal-fired; the present invention saves electric coal several hundred million to tens tons for China every year; and solved China's electrical network short of electricity coal; the difficulty that lacks peak load
10, by 1,2 is described, it is characterized in that: now the peak-valley difference of technology electrical network several ten million to several hundred million Kw is difficult to solve for a long time, to adorn the peak valley electric energy meter several necessarily extremely several hundred million users, the one, investment is big, the 2nd, take a lot of work effort and effect are little, be difficult to carry out, the present invention is only installed the time-sharing measurement electric energy meter additional at place, online critical point, tens to several thousand local hydroelectric plants (net) inside the province at each, saving of labor not only, save time, the investment-saving, and implement easily, the present invention adorns tens to several thousand electric energy meters in local hydroelectric plant's online place and implements easily to have Duoed than adorn several necessarily extremely several hundred million pieces at user side, and China is the country of a shortage of resources, coal, oil, gas only accounts for 60 of world average level, 10,5%; China is a country that output efficiency is extremely low, and the efficient of mark coal output per ton only is 10~16% of developed country; China is waste country greatly, only generate electricity half as the equal for many years river rising in Ningxia and flowing into central Shaanxi of each hydroelectric plant's dam site of China's electrical network flow, abandon water half, as 4,500 hundred million tons of the average for many years river rising in Ningxia and flowing into central Shaanxi of the hydroelectric plant's dam site flows maximum in the whole nation of building, only 2,389 hundred million tons of existing technology year generating waters, abandoning the water yield is 2111.46 hundred million tons, China 80% all is thermoelectricity, existing annual operation thermoelectricity several ten million kw, and the coal of China only can satisfy the usefulness of generating in 50 years, the present invention is on the basis of surfing the Net with valency with electricity, do not want any investment, foreign capitals, self-development 20 years is China's total installed capacity of hydropower 3.8 hundred million to 4,400,000,000 kw, and water power is regenerated resources, all can generate electricity every year and utilize 3.8 to 4,400,000,000 kw, the present invention comes to this and has overcome the existing technical resource shortage of China, output efficiency is low, waste is big, and existing technology thermoelectricity installation accounts for the national total installed capacity of electricity 80%, and the thermoelectricity installation is many, it is many to fire electric coal, fuel oil is many, causes national electric coal to produce, fortune is difficult, causes the deficiency of several hundred million tons of national annual Imported oils.
CN200810129066A 2008-06-20 2008-06-20 Method for solving difficulties of peak load regulation of power grid, installation and electricity and coal deficiency Pending CN101667731A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200810129066A CN101667731A (en) 2008-06-20 2008-06-20 Method for solving difficulties of peak load regulation of power grid, installation and electricity and coal deficiency

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200810129066A CN101667731A (en) 2008-06-20 2008-06-20 Method for solving difficulties of peak load regulation of power grid, installation and electricity and coal deficiency

Publications (1)

Publication Number Publication Date
CN101667731A true CN101667731A (en) 2010-03-10

Family

ID=41804218

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200810129066A Pending CN101667731A (en) 2008-06-20 2008-06-20 Method for solving difficulties of peak load regulation of power grid, installation and electricity and coal deficiency

Country Status (1)

Country Link
CN (1) CN101667731A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106026810A (en) * 2016-05-12 2016-10-12 国家电网公司 Black start control system and method for excitation system of pumped storage power station
CN106026811A (en) * 2016-05-12 2016-10-12 国家电网公司 Black start control system and method for excitation system of pumped storage power station
CN106026809A (en) * 2016-05-12 2016-10-12 国家电网公司 Pumped storage power station excitation system black start control circuit and control method thereof
CN108695851A (en) * 2018-06-28 2018-10-23 国网湖南省电力有限公司 A kind of generation optimization dispatching method based on overloaded partition electricity price

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106026810A (en) * 2016-05-12 2016-10-12 国家电网公司 Black start control system and method for excitation system of pumped storage power station
CN106026811A (en) * 2016-05-12 2016-10-12 国家电网公司 Black start control system and method for excitation system of pumped storage power station
CN106026809A (en) * 2016-05-12 2016-10-12 国家电网公司 Pumped storage power station excitation system black start control circuit and control method thereof
CN106026810B (en) * 2016-05-12 2018-06-26 国家电网公司 Excitation System on Pumped Storage Power Stations black starting-up control system and its control method
CN106026809B (en) * 2016-05-12 2018-06-26 国家电网公司 Excitation System on Pumped Storage Power Stations black starting-up control loop and its control method
CN106026811B (en) * 2016-05-12 2018-06-26 国家电网公司 Excitation System on Pumped Storage Power Stations black starting-up control device and its control method
CN108695851A (en) * 2018-06-28 2018-10-23 国网湖南省电力有限公司 A kind of generation optimization dispatching method based on overloaded partition electricity price

Similar Documents

Publication Publication Date Title
Poullikkas et al. A review of net metering mechanism for electricity renewable energy sources
Chen et al. An optimization on an integrated energy system of combined heat and power, carbon capture system and power to gas by considering flexible load
He et al. Dynamic subsidy model of photovoltaic distributed generation in China
Crampes et al. Pumped storage and cost saving
Zhang et al. The evolving policy regime for pumped storage hydroelectricity in China: A key support for low-carbon energy
CN102800032A (en) Cost benefit analysis method of renewable energy source distributed generation operation mode
CN102799952A (en) Optimization method of renewable energy source distribution type power generation operation mode
CN106127364A (en) A kind of generation of electricity by new energy and the performance evaluation method of desert treatment comprehensive development
Sgobba et al. On-site renewable electricity production and self consumption for manufacturing industry in Ireland: Sensitivity to techno-economic conditions
CN101667731A (en) Method for solving difficulties of peak load regulation of power grid, installation and electricity and coal deficiency
Bhattacharyya An overview of problems and prospects for the Indian power sector
Guan et al. A method of selecting cold and heat sources for enterprises in an industrial park with combined cooling, heating, and power
Reddy et al. Karnataka's power sector: some revelations
Fan et al. Multi-stage time sequence planning model of integrated energy system considering extreme scenarios and uncertainty
CN103955773A (en) Hydropower water release and additional issue transaction management method and system
Mulongoti et al. Determining the effects of load-shedding on residential electricity consumption using meter data—A case study of Kitwe, Zambia
Wang A review of renewable energy legislation and policies in China
Bellarmine et al. Energy Management techniques to meet power shortage problems in India
Asano et al. After Fukushima: the evolution of Japanese electricity market
Tieman The electricity sector in FYR Macedonia
Krane An expensive diversion: Abu Dhabi’s renewable energy investments amid a context of challenging demand
Consalo Let the Sun Shine: Methods for Expansion of Small-Scale Solar Electricity toReduce Fossil Fuel Dependence, Ease Financial Energy Burdens, andEnhance Community Resiliency
Karanina et al. Industrial microgrids in Russia: regional systemic effects of its implementation
Madlener et al. Impacts of market liberalization on the electricity supply sector: a comparison of the experience in Austria and Germany
Carbaugh et al. Electric Utilities: How Electricity is Priced

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 546138, the Guangxi Zhuang Autonomous Region Laibin Power Plant second living area (eight acres of land 50) one unit, the first floor of the East

Applicant after: Liang Zhiye

Address before: 546138, the Guangxi Zhuang Autonomous Region Laibin Power Plant Trading Co., Ltd. Gui Gui guard

Applicant before: Liang Zhiye

C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20100310