CN101667269A - Component materials management apparatus of elevator and materials management method - Google Patents

Component materials management apparatus of elevator and materials management method Download PDF

Info

Publication number
CN101667269A
CN101667269A CN200910168647A CN200910168647A CN101667269A CN 101667269 A CN101667269 A CN 101667269A CN 200910168647 A CN200910168647 A CN 200910168647A CN 200910168647 A CN200910168647 A CN 200910168647A CN 101667269 A CN101667269 A CN 101667269A
Authority
CN
China
Prior art keywords
parts
information
mentioned
component
component materials
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN200910168647A
Other languages
Chinese (zh)
Inventor
平田昭彦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Elevator and Building Systems Corp
Original Assignee
Toshiba Elevator Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Elevator Co Ltd filed Critical Toshiba Elevator Co Ltd
Publication of CN101667269A publication Critical patent/CN101667269A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • General Factory Administration (AREA)
  • Indicating And Signalling Devices For Elevators (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention provides a component materials management apparatus of an elevator, component material information is stored in the component material information storage section in advance according toeach component and each index number. Structural material information of a handing in component is readout and displayed in the storage section, and according to the description content of the displayed structural material information and the description contents of the handing in component and the material inspection certificate, structural material of the handing in component is checked. Aftercheck of the structural material, information of the material confirmation experimental results of a registered handing in component corresponding to the component and the index number is used as material related information of the handing in component. Then, the information stored in the storage section and related to the material of the component is changed into the expected information (e.g., bar code), and is pasted at the delivering component, after the bar code is read and displayed, material related information of the component can be recognized exteriorly.

Description

The component materials management devices of elevator and store keeping method thereof
Technical field
The present invention relates to the component materials management devices and the store keeping method thereof of elevator that the information relevant with the material etc. of employed various parts in the elevator is managed.
Background technology
In elevator, use diversified parts.From viewpoints such as Personal Safety, component life and part replacement, must confirm these elevator components which kind of material are made of.
Usually, about elevator components, all be by as the elevator company of parts order party based on arranging document, provide the production design drawing to the factory that is entrusted the side of manufacturinging or our company, entrust the parts of manufacturing based on certain standard.One produces vicarial parts in the factory that is entrusted manufacturing side or our company, just as shown in Figure 6, when parts are delivered goods, elevator components 53 and arrangement document (copy) 51, material inspection certificate 52 is delivered goods to parts order party company together.
As the elevator company of parts order party our company's keeping is checked the structured material (materials used) of affirmation elevator components 53 with producing the material classification put down in writing among design Figure 54 and material specification and the elevator components 53 of being delivered goods and material inspection certificate 52.Then, after the structured material of having confirmed elevator components 53, utilize mint-mark etc.,, when for example Maintenance and Repair etc., become the state of the structured material that can grasp elevator components 53 etc. at the number 55 of the facial display material Inspection Certificate book 52 of this elevator components 53.
In addition, the existing miscellaneous part store keeping method of material as the management component parts is made the file that is used for from entrusting the side of manufacturinging to receive information and provide as the elevator company of parts order party, and is sent to parts trust manufacturing side.Parts entrust manufacturing side to put down in writing the weight of each material of the weight of parts of manufacturing and component parts in this document, and return to the parts order party.For example, known to Japanese publication communique---the spy opens in the 2004-110568 communique (below be called patent documentation 1) and discloses a kind of method, promptly, the error of the weight sum of the weight of the parts that the calculating of parts order party is received and each material of component parts, when the anomalous differences of certain value is arranged, handle as mistake.
Thereby, in aforesaid component materials management method, the former management method is when confirming component materials, for each elevator components 53, from production design Figure 54 of huge kind, find out and confirm required production design Figure 54, confirm the content of material classification and material specification by comparing its production design Figure 54 and material inspection certificate 52, but to from many design drawings, find out the production design Figure 54 that confirms usefulness, need for a long time, cause the material acknowledging time elongated, the cost that parts are confirmed is very big.
In addition, the affirmation work of component materials is only limited to the content of material inspection certificate 52 except the parts of material object are confirmed, therefore, about the information of other expectations, all needs in addition corresponding at every turn.
In the latter's component materials confirmation method, the relation of each material weight of sample work piece weight and component parts, and do not confirm the information relevant with the material of employed many parts in the elevator.
Summary of the invention
The present invention in view of the above problems, its purpose is, a kind of component materials management devices and store keeping method thereof of elevator are provided, can manage the various information relevant one-dimensionally, and be shown as the relevant information of the material with parts that to confirm expectation in the outside short time with the material of employed many parts in the elevator.
In order to address the above problem, the component materials management devices of the elevator that the present invention relates to, the information relevant with the material of employed diversified parts in the elevator is managed, have: the component materials information memory cell, in advance by each parts and each retrieval number memory unit material information; Component materials collation process unit, when paying the parts of manufacturing, according to the structured material information of paying parts of from said memory cells, reading and showing and this pays parts and this pays the testimonial record content of material inspection of parts, carry out checking of this structured material of paying parts; And material is confirmed processing unit, after checking the above-mentioned structured material of paying parts, append registration accordingly this pays the material validation test result's of parts information with above-mentioned parts and the retrieval number paid, comprise that the conduct of above-mentioned component materials information and this pay the relevant information of material of parts.
In addition, structure of the present invention also can also be provided with material identification information and generate output unit in said structure, this material identification information generates output unit and becomes the information of expectation to export the information conversion relevant with materials above-mentioned each parts that preserved in the said memory cells, and is installed on the above-mentioned corresponding component with the state that can discern.
In addition, the component materials management method as the elevator that the present invention relates to has: storing step, in advance in the regulation table of component materials information memory cell, by each parts and each retrieval number memory unit material information; Component materials collation process step, when paying the parts of manufacturing, from the table of said memory cells, read and show the structured material information of paying parts, the structured material information of paying parts that this is shown and above-mentionedly pay parts and this testimonial record content of material inspection of paying parts compares, the checking of structured material that row is above-mentioned pays parts; Material is confirmed treatment step, after checking the above-mentioned structured material of paying parts, pay parts and retrieval number with on the above-mentioned table this and append registration accordingly this pays the material validation test result's of parts information, comprise the structured material information conduct information relevant of above-mentioned parts with the material of parts; And material identification information generates the output step, and the information conversion relevant with materials above-mentioned each parts that preserved in the above-mentioned table become the information of expectation, and exports with the state that can be installed on the above-mentioned corresponding component.
The invention effect
According to the present invention, a kind of component materials management devices and store keeping method thereof of elevator can be provided, can manage one-dimensionally with elevator in the relevant information of employed many component materials, can be shown as the relevant information of the material with parts that can confirm expectation in the outside short time.
Description of drawings
Fig. 1 is the structural drawing of an embodiment that the component materials management devices of elevator of the present invention is shown.
Fig. 2 be material shown in Figure 1 confirm and the retrieval process main part in functional structure chart.
Fig. 3 is the key diagram of flow process that is used to illustrate a series of processing of the work of component materials management devices and store keeping method.
Fig. 4 is the figure that the flow process of processing has been represented on pattern ground.
Fig. 5 is the example of the information relevant with the materials used of these parts is read in explanation from parts figure.
Fig. 6 is the mode chart of the affirmation of the explanation information relevant with the materials used of existing parts.
The explanation of Reference numeral
1... input part, 2... material is confirmed and the retrieval process main part, 2A... component materials collation process unit, 2B... material is confirmed processing unit, 2C... material identification information generates output unit, 3... component materials information storage part, 3a... component materials information table, 4... display part, 5... data fetch device, 6... identifier, 7...IC chip, 8... parts, 11... retrieval number, 12... material inspection certificate, 13... materials used information, 14... the testimonial number of material inspection, 15... material validation test result data.
Embodiment
Fig. 1 is the structural drawing of an embodiment that the component materials management devices of elevator of the present invention is shown.
The component materials management devices by make as the elevator of parts order party installation company and elevator service company all, use multi-purpose computer (PC) etc. usually, but also can be the management isolated plant of for example special component materials.
In the component materials management devices, be provided with: keyboard and indicator input parts 1 such as (pointing device); The material that is made of CPU is confirmed and retrieval process main part 2, the information that registration process is relevant with various component materials, and read and handle the information of relevant component materials from each parts; Component materials information storage part 3, the information of relevant each component materials of storage; Display part 4; Data fetch device 5 as required, is confirmed to be connected with retrieval process main part 2 with mode removably and material.
Above-mentioned input part 1 has following function: the material information of importing employed various parts in the elevator in advance (for example, the retrieval number of each parts, material classification, material specification etc.), register on the component materials information storage part 3 among the formed component materials information table 3a, with structured material information as the basis, in addition, when paying the parts of manufacturing etc. under the situation, import the information of relevant other required materials accordingly with this structured material information of paying parts, and append in above-mentioned table 3a.Below, comprise the structured material information on basis and the information of the material of registering accordingly with this structured material information etc., be generically and collectively referred to as the information of relevant component materials.
As shown in Figure 2, material is confirmed and retrieval process main part 2 is provided with: component materials collation process unit 2A, check the structured material information of the parts of delivering goods when parts are delivered goods; Material is confirmed processing unit 2B, and the result of the material validation test after this is checked appends and is registered among the component materials information table 3a; Material identification information generates output unit 2C, information with the relevant component materials preserved among the component materials information table 3a, be transformed into identifier 6 such as bar code and QR code for example and/or can be written to information in the small IC chip 7, the information that can discern from the outside (bar code, can IC chip registration) can be installed on these parts 8 it.
Component materials information storage part 3 can be an internal storage device, perhaps also can be external memories such as disk.
As data fetch device 5, there is mode with optics to read the imaged image of identifier 6 of bar code etc. and the image that is transformed into digital code information reads scanner, and for example data fetch device etc. that reads the information of the relevant component materials that is write in the small information chip (IC chip) 7 by wireless mode.
Below, with reference to Fig. 3 and Fig. 4, about the effect of the component materials management devices of the elevator of formation and the series of processing steps of store keeping method thereof describe as described above.Fig. 3 is the key diagram of a series of treatment schemees of illustrative material management method, and Fig. 4 is the figure that action has been represented to handle in pattern ground.
At first, when entrusting manufacturing side or factory of our company to accept the delivery of parts of manufacturing from parts, one receives from make the parts 8 of retrieval number (copy) 11, material inspection certificate 12 and the manufacturing of installation company and/or the prompting of elevator service company as the elevator of order party, just import the retrieval number 11 of copy from input part 1, one input display command, material affirmation and retrieval process main part 2 are with regard to execution unit material collation process unit (being equivalent to the component materials collation process step in the component materials management method) 2A.Having, as retrieval number 11, as long as can determine that parts just can be any one, for example can be to produce the design drawing number again.
Component materials collation process unit 2A is according to retrieval number 11, from the table 3a of component materials information storage part 3, read the structured material information 13 of paying parts 8 corresponding and be presented at (S1, S2) in the display part 4, pay the checking of structured material of parts 8 with retrieving number 11.
Structured material information shown in the display part 4 13 and the record content of paying parts 8 and material inspection certificate 12 in kind compared check, carry out checking of this structured material of paying parts 8.
Have, the relevant information of parts that structured material information 13 is and selects according to retrieval number 11 for example, preferably with according to producing design drawing satisfies the relevant information of material of for example physical characteristics of this part requirement again.As the project of structured material information 13, consider to have material classification, material specification, the strength of materials, hardness, surfaceness, tint etc.As concrete example, if steel are exactly steel grade class SS (Stain Steel) 400, SPHC (Steel Plateto Hot rolled steel) etc., if steel plate is exactly a thickness of slab, if shaped steel is exactly the dimensions of shaped steel, the applied code of each material etc.
After the collation process of having finished component materials as described above, judged whether to import the number 14 (S3) of material inspection certificate 12, under the situation of not input, urge 14 (S4) that Enter Number as required, under the situation of the number 14 of having imported material inspection certificate 12, in material inspection certificate project hurdle, with delivery parts the retrieval number write number 14 (S5) accordingly.
Then, material is confirmed and retrieval process main part 2 is carried out materials and confirmed processing units (being equivalent to the material affirmation treatment step in the component materials management method) 2B, appends the result data 15 (S6) that writes the material validation test accordingly with the number 14 of above-mentioned material Inspection Certificate book.
Under the situation that the affirmation of carrying out material is checked, implement the material validation test.As concrete example, be that intensity in the tensile test is confirmed (tensile strength, yield point, length growth rate), hardness test, constituent analysis etc., from the result 15 of input part 1 input material validation test, append accordingly in the project hurdle that registers to material validation test result (S6) with the number 14 of above-mentioned material inspection certificate 12.
Having, in the material confirmation method, except above-mentioned concrete example, also can be the method for the determining film thickness of for example relevant UT (Ultrasonic Testing) various characteristic, that check in the parts manufacture process, coating that can evaluating material again.
In addition, also can be as required, registration and the above-mentioned relevant information 16 of project in addition in component materials information table 3a are as the information relevant with the structured material of parts.For example, also can be the delivery day, manufacturer's name, steel manufacturer name etc. of parts any information about material and product.
Behind the material of having confirmed parts, carry out material identification information and generate output unit (the material identification information that is equivalent in the component materials management method generates the output step) 2C.
Material identification information generates the generation order (S7) of output unit 2C according to the material display message, the information 17 that the structured material of preserving among the component materials information table 3a with these parts 8 is relevant, be transformed into the barcode information that shows as identifier 6, perhaps be transformed into data mode that can be stored in the IC chip 7 etc., the information that generation can externally be discerned (S8), and be stored in the suitable storage unit.
Then, material identification information generates output unit 2C according to the output control indication (S9) from input part 1, identifier 7 by output is represented with bar code perhaps is written to (S10) in the IC chip 7, just can be installed on these parts 8 as the information that can discern.
Have again, to parts 8 can identifying information installation method except pasting, also have and utilize the coating of tinting, filling etc.
In addition, have the identifier 6 of the information that can discern and/or each parts 3 of IC chip 7 have been installed, as shown in Figure 5, after in being assembled to elevator, when part replacement or during Maintenance and Repair etc., material confirm with retrieval process main part 2 in releasably be connected data fetch device 5, read in bar code that identifier 6 showed and/or the IC chip 7 institute's canned data and analyze, according to this retrieval number that reads, the relevant information 17 of material with these parts 8 of preserving among the searching part material information table 3a is presented in the display part 4.
Thereby, according to aforesaid embodiment, no matter when and where, as long as with data fetch device 5 close identifier 6 or the IC chips 7 that are installed on the parts 8, just can in the shortest time, read the information 17 of relevant component materials, in addition, owing to can in display part 4, show a lot of information, therefore, just can confirm the various information relevant at short notice with the necessary material of parts.
In addition, the present invention is not limited to above-mentioned embodiment, can implement various distortion in the scope that does not break away from its purport.

Claims (5)

1, a kind of component materials management devices of elevator manages the information relevant with the material of employed diversified parts in the elevator, it is characterized in that having:
The component materials information memory cell is in advance by each parts and each retrieval number memory unit material information;
Component materials collation process unit, when paying the parts of manufacturing, according to the structured material information of paying parts of from said memory cells, reading and showing and this pays parts and this pays the testimonial record content of material inspection of parts, carry out checking of this structured material of paying parts; And
Material is confirmed processing unit, after checking the above-mentioned structured material of paying parts, append registration accordingly this pays the material validation test result's of parts information with above-mentioned parts and the retrieval number paid, comprise that the conduct of above-mentioned component materials information and this pay the relevant information of material of parts.
2, the component materials management devices of elevator according to claim 1 is characterized in that,
Also be provided with material identification information and generate output unit, this material identification information generates output unit and becomes the information of expectation to export the information conversion relevant with materials above-mentioned each parts that preserved in the said memory cells, and is installed on the above-mentioned corresponding component with the state that can discern.
3, the component materials management devices of elevator according to claim 2 is characterized in that,
The unit that is installed on the above-mentioned parts with the state that can discern becomes the stripe shape code data with the information conversion relevant with the material of above-mentioned parts, and as identifier the face that is presented at above-mentioned corresponding component is installed,
Utilize the data fetch device that releasably is installed in the above-mentioned component materials management devices, read the identifier that is presented on this corresponding component is installed, can the visual identification information relevant with the material of above-mentioned corresponding component.
4, the component materials management devices of elevator according to claim 2 is characterized in that,
From said memory cells, read the information relevant with the unit that the state that can discern is installed on the above-mentioned parts, and be registered in the small information chip, above-mentioned small information chip is installed on above-mentioned corresponding component with the material of parts,
Read the information relevant that registered in the small information chip that is installed on the above-mentioned corresponding component by wireless mode by above-mentioned data fetch device with materials parts, can the visual identification information relevant with the material of above-mentioned corresponding component.
5, a kind of component materials management method of elevator manages the information relevant with the material of employed diversified parts in the elevator, it is characterized in that having:
Storing step is in advance in the regulation table of component materials information memory cell, by each parts and each retrieval number memory unit material information;
Component materials collation process step, when paying the parts of manufacturing, from the table of said memory cells, read and show the structured material information of paying parts, the structured material information of paying parts that this is shown and above-mentionedly pay parts and this testimonial record content of material inspection of paying parts compares is carried out checking of the above-mentioned structured material of paying parts;
Material is confirmed treatment step, after checking the above-mentioned structured material of paying parts, pay parts and retrieval number with on the above-mentioned table this and append registration accordingly this pays the material validation test result's of parts information, comprise the structured material information conduct information relevant of above-mentioned parts with the material of parts; And
Material identification information generates the output step, and the information conversion relevant with materials above-mentioned each parts that preserved in the above-mentioned table become the information of expectation, and exports with the state that can be installed on the above-mentioned corresponding component.
CN200910168647A 2008-09-03 2009-09-02 Component materials management apparatus of elevator and materials management method Pending CN101667269A (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2008226189A JP4657333B2 (en) 2008-09-03 2008-09-03 Elevator parts material management apparatus and material management method therefor
JP226189/2008 2008-09-03

Publications (1)

Publication Number Publication Date
CN101667269A true CN101667269A (en) 2010-03-10

Family

ID=41803884

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200910168647A Pending CN101667269A (en) 2008-09-03 2009-09-02 Component materials management apparatus of elevator and materials management method

Country Status (2)

Country Link
JP (1) JP4657333B2 (en)
CN (1) CN101667269A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102682321A (en) * 2011-12-06 2012-09-19 江苏美佳电梯有限公司 Method for coding and identifying elevator parts
CN105426854A (en) * 2015-11-24 2016-03-23 大连楼兰科技股份有限公司 Vehicle identification number and part code-based vehicle part identification and display method as well as intelligent glasses for realizing method
CN106829657A (en) * 2017-03-14 2017-06-13 广州广日电梯工业有限公司 A kind of elevator automatic capture system and its application process

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6566776B2 (en) * 2015-08-10 2019-08-28 日立造船株式会社 Traceability management system
JP6763579B2 (en) * 2016-03-30 2020-09-30 株式会社日立ハイテク Trading support systems, methods, and programs
KR101838739B1 (en) * 2016-11-25 2018-03-14 주식회사 엠디에스코리아 Apparatus and method for generating material data sheets of a plurality of manufacturer
WO2024161626A1 (en) * 2023-02-03 2024-08-08 三菱電機ビルソリューションズ株式会社 Electronic device managing system and elevator

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001171935A (en) * 1999-12-16 2001-06-26 Hitachi Building Systems Co Ltd Maintenance work management device
JP2002302255A (en) * 2001-04-05 2002-10-18 Mitsubishi Materials Corp Delivery goods inspection system
JP2003271216A (en) * 2002-03-14 2003-09-26 Toppan Printing Co Ltd Process control method using non-contact ic tag
JP2003295934A (en) * 2002-04-05 2003-10-17 Denso Corp Inspection system
JP4458981B2 (en) * 2004-08-04 2010-04-28 Ntn株式会社 Quality control method for machine element products
JP2006192449A (en) * 2005-01-12 2006-07-27 Hitachi Ltd Managing system for welding material

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102682321A (en) * 2011-12-06 2012-09-19 江苏美佳电梯有限公司 Method for coding and identifying elevator parts
CN105426854A (en) * 2015-11-24 2016-03-23 大连楼兰科技股份有限公司 Vehicle identification number and part code-based vehicle part identification and display method as well as intelligent glasses for realizing method
CN106829657A (en) * 2017-03-14 2017-06-13 广州广日电梯工业有限公司 A kind of elevator automatic capture system and its application process
CN106829657B (en) * 2017-03-14 2019-10-01 广州广日电梯工业有限公司 A kind of elevator automatic capture system and its application method

Also Published As

Publication number Publication date
JP4657333B2 (en) 2011-03-23
JP2010061379A (en) 2010-03-18

Similar Documents

Publication Publication Date Title
CN101667269A (en) Component materials management apparatus of elevator and materials management method
CN111915323B (en) Structured server access to an article based on scanning of an encoded image
CN109767214B (en) Method, device, equipment and medium for controlling supply flow of financing of incorporated bill
CN103093323B (en) Based on special equipment inspection and the management system of Quick Response Code
US20080306761A1 (en) System and Method of Performing Remote Verification of a Prescription in Combination with a Patient Access Terminal
CN103971192A (en) Intelligent lab managing system
US20130198104A1 (en) Systems and methods for managing electronic contracts and data
EP3438911A1 (en) Transaction assist system, method, and program
CN104008450B (en) ERP management method for detection mechanism
Abreu et al. Using Six Sigma to improve complaints handling
Borthick Designing continuous auditing for a highly automated procure-to-pay process
CN110717754A (en) Commodity transaction method, server, user side, laboratory side and system
Abdul-Malak et al. Classification and analysis of notice requirements for construction contract administration
CN115619091A (en) Medicine industry material inspection release control method and device and storage medium
TWI439830B (en) Quality control record and data processing system for creating and maintaining same
JP2005316826A (en) Traceability management data formation method, traceability management data formation device, and traceability management data formation program
CN108710926A (en) Based on the anti-buying for tearing electronic tag and IC card in plant area's vehicle flow system
JP4646248B2 (en) Program inspection item generation system and method, program test system and method, and program
CN114926232B (en) Material purchasing system, method, controller and storage medium
US20240095689A1 (en) Recycling management system and method
US20210374667A1 (en) Method and system for generating bill of materials for a product
CN113781007A (en) Data verification system and method
CN113793120A (en) Material management system and method
Kar Literature review of supplier selection criteria
CN112908459A (en) Medical consumable supply management method, system, terminal and readable storage medium

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Open date: 20100310