CN101649625A - Drilling pouring pile hole bottom slurry sampler and calculating and sampling method thereof - Google Patents

Drilling pouring pile hole bottom slurry sampler and calculating and sampling method thereof Download PDF

Info

Publication number
CN101649625A
CN101649625A CN200910070411A CN200910070411A CN101649625A CN 101649625 A CN101649625 A CN 101649625A CN 200910070411 A CN200910070411 A CN 200910070411A CN 200910070411 A CN200910070411 A CN 200910070411A CN 101649625 A CN101649625 A CN 101649625A
Authority
CN
China
Prior art keywords
sample bucket
sampler
hole
seal cover
mud
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN200910070411A
Other languages
Chinese (zh)
Other versions
CN101649625B (en
Inventor
焦文秀
李耀珠
邵栓增
张俊红
郑侬侬
马凤如
任连海
周相国
黄艳萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN GEO-ENGINEERING INVESTIGATION INSTITUTE
TIANJIN GEOLOGICAL BASED ENGINEERING Co Ltd
Original Assignee
TIANJIN GEO-ENGINEERING INVESTIGATION INSTITUTE
TIANJIN GEOLOGICAL BASED ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN GEO-ENGINEERING INVESTIGATION INSTITUTE, TIANJIN GEOLOGICAL BASED ENGINEERING Co Ltd filed Critical TIANJIN GEO-ENGINEERING INVESTIGATION INSTITUTE
Priority to CN2009100704117A priority Critical patent/CN101649625B/en
Publication of CN101649625A publication Critical patent/CN101649625A/en
Application granted granted Critical
Publication of CN101649625B publication Critical patent/CN101649625B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sampling And Sample Adjustment (AREA)

Abstract

The invention relates to a drilling pouring pile hole bottom slurry sampler and a calculating and sampling method thereof, which are characterized in that a limiting column is fixed on a base; one endof each of two guide rods and the base are fixed together, and the other end of each of the two guide rods and a seal cover are fixed together after respectively penetrating through four guide ringsfixed on the outer side of a sampling barrel; a seal ring is bonded on one end surface of the seal cover, two lifting lugs are symmetrically fixed on the outer side surface of the sampling barrel respectively, and two lifting rings are movably connected with the lifting lugs respectively. The invention has the advantages of simple and clear sampler principle, convenient manufacture, local materialacquisition, low cost, safe operation, simple use method and favorable effect and can be applied to the slurry sampling in a slurry protecting wall drilling pouring pile in any hole diameter with hole depth not exceeding 100m.

Description

Drilling pouring pile hole bottom slurry sampler and calculating thereof, sampling method
Technical field
The present invention relates to a kind of mud sampler, particularly a kind of drilling pouring pile hole bottom slurry sampler and calculating thereof, sampling method.
Background technology
" technical code for building pile foundation " requires: before the concrete perfusion, 500mm should be less than 1.25 with interior mud relative density at the bottom of the hole; Sand content must not be greater than 8%; Viscosity must not be greater than 28s.Difficulty is all felt by domestic construction pile foundation construction unit when implementing, carrying out this clause content.
How 500mm sampling at the bottom of the hole does not have method, does not have ready-made instrument.So just issue and implement a period of time in standard, many units in charge of construction all seek help to the supervising engineer at scene.When checking and accepting this clause content generally speaking, with management and the following processing of Party A building site masterpiece: the mud circulation pump is opened, allow mud circulation in the hole, determine the mud circulation time in the hole according to aperture, hole depth, generally be 15--20min, under the situation that does not stop mud circulation, get mobile mud in the aperture and measure then, think that the mud in aperture this moment is approaching or the same substantially with the situation at the bottom of the hole.Even the reality cyclic process, the mud density at the bottom of the hole, sand factor, viscosity and aperture also variant; The mud on ground is static at the bottom of the preceding hole of concrete spouting in addition, and the suspended state of mud particle, the performance of mud and cyclic process are widely different.
Summary of the invention
Deficiency in view of prior art exists the invention provides a kind of drilling pouring pile hole bottom slurry sampler.
The present invention for achieving the above object, the technical scheme of being taked is: a kind of drilling pouring pile hole bottom slurry sampler is characterized in that; Comprise base, limited post, guide peg, sample bucket, carry ear, guide collar, drop handle, sealing ring, seal cover, fixed limit post on the described base, two described guide peg one ends and base are fixed, the other end passes four guide collar and the seal cover that are fixed on the sample bucket outside respectively and fixes, described sealing ring is bonded on the end face of seal cover, two described carry ear respectively symmetry be fixed on the sample bucket lateral surface, two described drop handles respectively with carry ear and flexibly connect.
Drilling pouring pile hole bottom slurry sampler calculates, sampling method, it is characterized in that: described calculating, sampling method step are as follows: step 1,1., at first set mud balance scope in institute's gaging hole;
2., determine sample bucket deadweight, its design formulas is: G=ρ gV promptly: G is that sample bucket weight=ρ is that sample bucket density g is the volume of sample bucket steel pipe for acceleration of gravity v;
3., determine sample bucket suffered maximum buoyancy in the hole; Its design formulas is: F=ρ gV promptly: F is that sample bucket suffered maximum buoyancy=ρ in the hole is the volume of sample bucket for acceleration of gravity v for mud density g;
4., comparative result; G>F;
5., slurry sampler can operate as normal;
Orderly being wrapped on the special-purpose turntable of lifting lining rope of step 2, slurry sampler that assembling is connected is positioned over aperture to be measured to turntable, and sampler is vertically slowly put into the hole, the lining rope that at the uniform velocity veers away, and the 2m place will slowly transfer at the bottom of the distance hole;
After step 3, sampler arrive at the bottom of the hole, suitably discharging 80mm~100mm lining rope, sample bucket can continue to sink to separating with seal cover, seal cover is opened, and mud enters sample bucket;
Step 4, sampler leave standstill at the bottom of the hole and can at the uniform velocity promote in 10~15 seconds, and the 2m place will slowly promote in the distance aperture, and sampler is extracted out from the aperture together with mud sample;
The sample of step 5, taking-up carries out analyzing and testing on request.
The invention has the beneficial effects as follows: the sampler principle is simple and clear, and is easy to make, can gather materials on the spot, with low cost, and handling safety, and using method is simple, and is respond well.Can be applicable to hole depth and be no more than mud sampling in the holing with slurry wall protection castinplace pile in 100 meters any apertures.
Description of drawings
Fig. 1 is for structural representation of the present invention and as Figure of abstract.
The specific embodiment
As shown in Figure 1, drilling pouring pile hole bottom slurry sampler comprises base 1, limited post 2, guide peg 3, sample bucket 4, carries ear 5, guide collar 6, drop handle 7, sealing ring 8, seal cover 9.
At first at an end threading of two guide pegs 3; Symmetry is bored saturating two holes on the face of circular seal lid 9; On seal cover 9 other ends, paste sealing ring 8; Radially weld four guide collar 6 in sample bucket 4 outside symmetries; Carry ear 5 in 6 two vertical of the radial symmetric welding of sample bucket 4 and guide collar; At cup dolly 1 circle centre position welded limiting post 2.
Two guide peg 3 one ends and base 1 welding are fixing, the other end (end of band screw thread) passes four guide collar 6 that are fixed on sample bucket 4 outsides respectively, its sample bucket 4 and two guide pegs 3 are slidingly matched, be screwed into respectively on the screw thread of two guide pegs 3 with two nuts 10, seal cover 9 in the one side that will be pasted with close circle 8 is gone on the guide peg 3 by two borehole jacks on its face, with two nuts 10 seal cover 9 is fixed on the guide peg 3, the end that two drop handles, 7 band circles are colluded colludes two respectively and proposes flexible connection in the ear 5 at last again.
Sampling method:
To promote that lining rope one end and two drop handle 7 one ends hitch or hitch two and carry behind the ear 5 again and promote lining rope one end and fasten and connect with one section lining rope, orderly being wrapped on the special-purpose turntable of the lining rope other end will be promoted, turntable is positioned over aperture to be measured, sampler is vertically slowly put into the hole lining rope that at the uniform velocity veers away, and sampler 2m place at the bottom of the distance hole will slowly transfer.After sampler arrives at the bottom of the hole, suitably discharging 80mm~100mm lining rope, it is that seal cover 9 is opened that its sample bucket 4 can continue to sink to separating with seal cover 9, and mud enters sample bucket 4; Sampler leaves standstill at the bottom of the hole and can at the uniform velocity promote in 10~15 seconds, and sampler will slowly promote at 2m place, distance aperture; Sampler is left standstill on the platform, lay down the nut on the seal cover 9, with seal cover 9 remove mud weight indicator can be put into that sample bucket 4 is measured or with sample bucket 4 by extracting out on the lead 3, pour mud in the tube into mud balance, funnel viscometer, sand content apparatus etc. and carry out proportion, viscosity, sand factor and measure.
The sampler computational methods:
Suppose in institute's gaging hole the mud balance scope between 1.05~1.5, under the situation of our computation of mud sampler, the suffered buoyancy maximum of sample bucket, can sampler operate as normal:
Sample bucket deadweight G=ρ g.V; ρ: sample bucket density 7.8 * 10 3Kg/m 3G:9.8N/Kg v: the volume of sample bucket steel pipe; V=π D.h. δ (π=3.14, D=50mm, h=300mm, δ=3mm)
Like this: G=7.8 * 10 3Kg/m 3* 9.8N/Kg * 3.14 * 50 * 10 -3M * 300 * 10 -3M * 3 * 10 -3M=10.8N;
Sample bucket is suffered maximum buoyancy F=ρ g.V ρ in the hole: mud density 1.5 * 10 3Kg/m 3G:9.8N/Kgv: the volume v=π of sample bucket. (D 2/ 4) .h (π=3.14, D=50mm, h=300mm);
Like this: F=1.5 * 10 3Kg/m 3* 9.8N/Kg * 3.14 * [(50 * 10 -3M) 2/ 4] * 30 * 10 -2M=8.65N;
Comparative result: 10.8N>8.65N is promptly: G>F;
So: slurry sampler can operate as normal.

Claims (2)

1, a kind of drilling pouring pile hole bottom slurry sampler, it is characterized in that: comprise base (1), limited post (2), guide peg (3), sample bucket (4), carry ear (5), guide collar (6), drop handle (7), sealing ring (8), seal cover (9), described base (1) is gone up fixed limit post (2), two described guide peg (3) one ends and base (1) are fixing, the other end passes four guide collar (6) that are fixed on sample bucket (4) outside respectively and fixes with seal cover (9), described sealing ring (8) is bonded on the end face of seal cover (9), two described carry ear (5) respectively symmetry be fixed on sample bucket (4) lateral surface, two described drop handles (7) are carried ear (5) and are flexibly connected with two respectively.
2, a kind of drilling pouring pile hole bottom slurry sampler calculate, sampling method, it is characterized in that: described calculating, sampling method step are as follows:
Step 1,1., at first set mud balance scope in institute's gaging hole;
2., determine sample bucket deadweight, its design formulas is: G=ρ gV promptly: G is that sample bucket weight ρ is that sample bucket density g is the volume of sample bucket steel pipe for acceleration of gravity v;
3., determine sample bucket suffered maximum buoyancy in the hole; Its design formulas is: F=ρ gV promptly: F is that sample bucket suffered maximum buoyancy ρ in the hole is the volume of sample bucket for acceleration of gravity v for mud density g;
4., comparative result; G>F;
5., slurry sampler can operate as normal;
Orderly being wrapped on the special-purpose turntable of lifting lining rope of step 2, slurry sampler that assembling is connected is positioned over aperture to be measured to turntable, and sampler is vertically slowly put into the hole, the lining rope that at the uniform velocity veers away, and the 2m place will slowly transfer at the bottom of the distance hole;
After step 3, sampler arrive at the bottom of the hole, suitably discharging 80mm~100mm lining rope, sample bucket can continue to sink to separating with seal cover, seal cover is opened, and mud enters sample bucket;
Step 4, sampler leave standstill at the bottom of the hole and can at the uniform velocity promote in 10~15 seconds, and the 2m place will slowly promote in the distance aperture, and sampler is extracted out from the aperture together with mud sample;
The sample of step 5, taking-up carries out analyzing and testing on request.
CN2009100704117A 2009-09-11 2009-09-11 Drilling pouring pile hole bottom slurry sampler and calculating and sampling method thereof Expired - Fee Related CN101649625B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009100704117A CN101649625B (en) 2009-09-11 2009-09-11 Drilling pouring pile hole bottom slurry sampler and calculating and sampling method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009100704117A CN101649625B (en) 2009-09-11 2009-09-11 Drilling pouring pile hole bottom slurry sampler and calculating and sampling method thereof

Publications (2)

Publication Number Publication Date
CN101649625A true CN101649625A (en) 2010-02-17
CN101649625B CN101649625B (en) 2011-03-30

Family

ID=41671942

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009100704117A Expired - Fee Related CN101649625B (en) 2009-09-11 2009-09-11 Drilling pouring pile hole bottom slurry sampler and calculating and sampling method thereof

Country Status (1)

Country Link
CN (1) CN101649625B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104612188A (en) * 2015-02-02 2015-05-13 上海市建筑科学研究院 Slurry extractor and extraction method thereof
CN106087971A (en) * 2016-06-27 2016-11-09 上海市基础工程集团有限公司 Underground continuous wall groove segment mud takes paste-making method
CN106120712A (en) * 2016-06-27 2016-11-16 上海市基础工程集团有限公司 Underground continuous wall groove segment mud takes sizing device
CN106337448A (en) * 2016-10-26 2017-01-18 佛山市禅城区建设工程质量安全检测站 Extracting method for test engineering piles
CN109374347A (en) * 2018-12-17 2019-02-22 宁波市政工程建设集团股份有限公司 A kind of cast-in-situ bored pile deep layer slurry sampler and sampling method
CN111501758A (en) * 2020-04-13 2020-08-07 中建三局集团有限公司 Pile hole bottom slurry taking device with adjustable balance weight
CN108193687B (en) * 2017-12-18 2020-10-09 上海市基础工程集团有限公司 Electric slurry taking device and method for slurry in groove section of underground diaphragm wall

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE8716463U1 (en) * 1987-12-12 1988-02-11 Silo-Wolff Kg, 3471 Lauenfoerde, De
US5950741A (en) * 1996-08-20 1999-09-14 Geophyta, Inc. Extended soil sampling head
DE29908077U1 (en) * 1999-05-06 1999-07-29 Schulze Light soil sampling device
CN2583678Y (en) * 2002-12-07 2003-10-29 胜利石油管理局地质录井公司 Well drilling slurry on line sampler
CN100592062C (en) * 2007-10-09 2010-02-24 水利部交通部电力工业部南京水利科学研究院 Water pressure type thin-wall sampler used for soft soil
CN100535583C (en) * 2008-02-22 2009-09-02 江苏华东建设基础工程总公司 Project pile underwater concrete sampler and sampling method in construction
CN201464224U (en) * 2009-09-11 2010-05-12 天津市地质基础工程公司 Hole bottom slurry sampler of drilling cast-in-place pile

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104612188A (en) * 2015-02-02 2015-05-13 上海市建筑科学研究院 Slurry extractor and extraction method thereof
CN106087971A (en) * 2016-06-27 2016-11-09 上海市基础工程集团有限公司 Underground continuous wall groove segment mud takes paste-making method
CN106120712A (en) * 2016-06-27 2016-11-16 上海市基础工程集团有限公司 Underground continuous wall groove segment mud takes sizing device
CN106120712B (en) * 2016-06-27 2018-05-04 上海市基础工程集团有限公司 Underground continuous wall groove segment mud takes sizing device
CN106337448A (en) * 2016-10-26 2017-01-18 佛山市禅城区建设工程质量安全检测站 Extracting method for test engineering piles
CN106337448B (en) * 2016-10-26 2018-05-04 佛山市禅城区建设工程质量安全检测站 A kind of abstracting method of experiment engineering pile
CN108193687B (en) * 2017-12-18 2020-10-09 上海市基础工程集团有限公司 Electric slurry taking device and method for slurry in groove section of underground diaphragm wall
CN109374347A (en) * 2018-12-17 2019-02-22 宁波市政工程建设集团股份有限公司 A kind of cast-in-situ bored pile deep layer slurry sampler and sampling method
CN109374347B (en) * 2018-12-17 2023-10-13 宁波市政工程建设集团股份有限公司 Deep mud sampler for bored pile
CN111501758A (en) * 2020-04-13 2020-08-07 中建三局集团有限公司 Pile hole bottom slurry taking device with adjustable balance weight

Also Published As

Publication number Publication date
CN101649625B (en) 2011-03-30

Similar Documents

Publication Publication Date Title
CN101649625B (en) Drilling pouring pile hole bottom slurry sampler and calculating and sampling method thereof
CN106638719B (en) Bored pile piling quality automatic monitoring controller and method
CN113445498A (en) Construction process of karst hole pile foundation in complex geology
CN201464224U (en) Hole bottom slurry sampler of drilling cast-in-place pile
CN104328810B (en) Prefabricated tubular pile single pile foundation bearing capacity detection improvement method
CN108547331B (en) Cast-in-place pile concrete elevation measurement and over-grouting control method
CN202194162U (en) Unchoking device for acoustic pipe for drilled pile
CN102535527A (en) Testing device and method of breast wall slurry pressure during pore-forming construction of cast-in-situ bored pile
CN204919631U (en) Automatic monitoring underwater concrete fills device of elevation
CN201180515Y (en) Automatic continuous grouting apparatus for pulling out of hole in oil field well drilling
CN105155545B (en) A kind of A/C device is used to carry out the method that conduit is fixing in antiseepage wall chase section casting process
CN212001106U (en) Hole cleaning system for cast-in-place pile
CN105424485A (en) Concrete filled steel tube arch grouting test system and test method
CN205954712U (en) A quality detection device for holing construction of bored concrete pile pore -forming
CN208293631U (en) A kind of device carrying out pile foundation preloading using self-balancing static load
CN111236234A (en) Hole cleaning system and hole cleaning method for cast-in-place pile
CN205175830U (en) Steel pipe concrete bow member fills testing system
CN204356820U (en) For the free-falling hammer hammering device of Large strain method pile measurement
CN107190788B (en) A kind of pile foundation self-balanced static-load testing displacement observation device
CN104790369A (en) Device and method for monitoring dam foundation stress
CN202099794U (en) Compacting settlement volume detecting system for dynamic compaction machine
CN107764733A (en) The high-rise pumping method of pipe friction test device and concrete
CN210049299U (en) Civil engineering static test is with intelligent ballast device
CN207894401U (en) A kind of monitoring system of riverbed vertical deformation
CN202194161U (en) Detecting device for concrete at top of drilled pile

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110330

Termination date: 20210911

CF01 Termination of patent right due to non-payment of annual fee