CN101646209A - Service data processing method for semi-persistent scheduling and base station - Google Patents

Service data processing method for semi-persistent scheduling and base station Download PDF

Info

Publication number
CN101646209A
CN101646209A CN 200810117802 CN200810117802A CN101646209A CN 101646209 A CN101646209 A CN 101646209A CN 200810117802 CN200810117802 CN 200810117802 CN 200810117802 A CN200810117802 A CN 200810117802A CN 101646209 A CN101646209 A CN 101646209A
Authority
CN
China
Prior art keywords
cycle
data packet
resource allocation
packet
business data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200810117802
Other languages
Chinese (zh)
Other versions
CN101646209B (en
Inventor
李国庆
谌丽
高卓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Academy of Telecommunications Technology CATT
Datang Mobile Communications Equipment Co Ltd
Original Assignee
Datang Mobile Communications Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Datang Mobile Communications Equipment Co Ltd filed Critical Datang Mobile Communications Equipment Co Ltd
Priority to CN 200810117802 priority Critical patent/CN101646209B/en
Priority to PCT/CN2009/073059 priority patent/WO2010015186A1/en
Publication of CN101646209A publication Critical patent/CN101646209A/en
Application granted granted Critical
Publication of CN101646209B publication Critical patent/CN101646209B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/04Wireless resource allocation

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

The invention provides a service data processing method for semi-persistent scheduling and a base station. The method is used in a mobile communication system in which uplink and downlink subframes appear at different time and comprises: determining to use a semi-persistent scheduling mechanism to transmit a service data packet according to the characteristics of the service data packet; when thearrival period of the service data packet is not equal to a positive integral multiple of the switching point period of system frames of a mobile communication system, setting a resource allocation period of the semi-persistent scheduling mechanism as a positive integral multiple of the switching point period; and transmitting the service data packet by using a subframe determined by the resourceallocation period. The method can perform correct semi-persistent scheduling of a mobile communication system in which uplink and downlink subframes appear at different time, even if the arrival period of the service data packet is not equal to a positive integral multiple of the switching point period of system frames of the mobile communication system.

Description

The business data processing method of semi-continuous scheduling and base station
Technical field
The present invention relates to the business data processing method and the base station of the scheduling of resource of mobile comm message base station, particularly a kind of semi-continuous scheduling.
Background technology
LTE (Long Term Evolution, Long Term Evolution) system is based on the system of scheduling, carries data by the base station assigns running time-frequency resource, and terminal receives or send data according to the control channel information of base station.
Simultaneously, the LTE system has also introduced the semi-persistent scheduling mechanism of using at particular traffic data bag (as the voice packets of VoIP business), wherein, the allocation of packets that specific transactions is given in the base station is running time-frequency resource and specify the constant transmissions form fixedly, and the packet of this specific transactions sends with appointment constant transmissions form in the allocated resource position, promptly on the predefine resource, send, need not dispatch in the predefine mode.The difference of semi-continuous scheduling and dynamic dispatching is that initial HARQ transmission does not take the control channel resource, can save the control signaling consumption.
The distribution of semi-continuous scheduling cycle and resource is decided by the business data packet characteristics that are scheduled, and this business data packet has the fixing and relatively-stationary characteristics of packet size of packet arrival cycle.
The VoIP voice packets that with speed is 12.2kbit/s is an example, and its coding back packet size is 40byte substantially, and the packet arrival cycle is fixed as 20ms.Therefore, as long as the base station pre-dispense cycle is the resource that 20ms can transmit the 40byte data, can when not taking the dispatch resource, initial HARQ transmission guarantee the timely transmission of VoIP voice packets.
The business data packet of carrying out semi-continuous scheduling has the different cycles characteristic separately, and the arrival cycle that has is the integral multiple of 10ms, and as the VoIP business, the cycle is 20ms.The arrival cycle that has for the integral multiple of 5ms or 10ms, as some video traffic, does not carry out with the speed of per second 15 (64ms cycle) frame or 30 frames (32ms cycle).
In the prior art, in time transmit for guaranteeing business datum, the half-persistence scheduling resources assignment period equals business data packet and arrives the cycle, and the time point of semi-continuous scheduling cycle appointment is the time location of service data transmission bag.To LTE FDD (Frequency Division Duplexing, Frequency Division Duplexing (FDD)) this ascending-descending subframes exists simultaneously, the system that the up-downgoing transmission is carried out simultaneously, it is all no problem how many resource allocation cycle is, but to LTE TDD (Time Division Duplexing, time division duplex) system, if resource allocation cycle is not the integral multiple in ascending-descending subframes transfer point cycle, it is the integral multiple of 5ms or 10ms, the predefine resource location that distributes by the business arrival cycle may be positioned on the subframe of different transmission directions, causes transfer of data normally not carry out.
LTE TDD is a kind of tdd systems, its frame structure such as mistake! Do not find Reference source.Shown in, each radio frames is made of two fields (Half-Frame), and each field length is 5ms.Each field comprises that 8 length are the time slot of 0.5ms (slot); and three special time slot: DwPTS (Downlink Pilot Time Slot; descending pilot frequency time slot), GP (protection at interval) and UpPTS (UplinkPilot Time Slot, uplink pilot time slot).The length of DwPTS and UpPTS is configurable, and the total length of DwPTS, GP and UpPTS equals 1ms.Subframe 1 and subframe 6 comprise DwPTS, GP and UpPTS, and every other subframe comprises two adjacent time slots, and wherein i subframe constitutes with 2i+1 time slot by 2i.
Subframe 0 and subframe 5 and DwPTS are reserved as downlink transfer forever.
Support the switching point cycle of 5ms and 10ms, under 5ms switching cycle situation, UpPTS, subframe 2 and subframe 7 are reserved as uplink, under 10ms switching cycle situation, DwPTS exists in two fields, but GP and UpPTS only exist in first field, and the DwPTS length in second field is 1ms.UpPTS and subframe 2 are reserved as uplink.
According to ascending-descending subframes transfer point difference, can realize different ascending-descending subframes configurations, standard determines that the ascending-descending subframes configuration of supporting is as shown in the table at present, wherein dispose 0~2nd, 5ms ascending-descending subframes transfer point, configuration 3~6th, 10ms subframe transfer point, wherein D, U represent descending sub frame and sub-frame of uplink respectively.
Figure G2008101178025D00021
Figure G2008101178025D00031
Based on the characteristics of LTE tdd frame structure, if the business data packet arrival cycle is the integral multiple of 10ms, as cycle of VoIP business be 20ms, its half-persistence scheduling resources distributes as mistake! Do not find Reference source.Shown in, each packet all sends on subframe X.Because 10ms is the integral multiple in switching point cycle, by suitable resource allocation, can satisfy all subframe X all is a direction, promptly all is up or all is descending.
But arriving the cycle for business data packet be the situation of 10ms integral multiple, if according to business data packet arrival period allocated predefine resource then data direction can occur and the inconsistent situation of resource direction.With 32ms cycle business is example, as mistake! Do not find Reference source.Shown in, what suppose the needs scheduling is downlink business, first packet sends at descending sub frame X, and then second, the 3rd, the 4th packet respectively need be in subframe (X+2) mod10, (X+4) mod10, the last transmission of (X+6) mod10, and these subframes are descending sub frame not necessarily.Be example specifically to dispose 1, if X=0 (first packet sends in subframe 0), second, the 3rd, the 4th subframe that data are responsible for assigning is respectively subframe 2,4,6, the table of comparisons 1, subframe 2 is sub-frame of uplink, impossible transmitting downlink data, subframe 6 is special subframes, whether can transmitting downlink data depend on that the length of DwPTS disposes.
Therefore, there is following shortcoming in prior art, owing to arrive the period allocated half-persistence scheduling resources by business data packet, replace the system that occurs for this ascending-descending subframes of LTE TDD, the subframe transmission direction of predefine resource location and the situation that the business datum direction is not inconsistent can occur, finally cause transfer of data normally not carry out.
Summary of the invention
The business data processing method and the base station that the purpose of this invention is to provide a kind of semi-continuous scheduling, being used for ascending-descending subframes is not the mobile communication system that occurs simultaneously, makes to use the business data packet that semi-persistent scheduling mechanism is transmitted can both carry out correct transmission.
To achieve these goals, the embodiment of the invention provides a kind of business data processing method of semi-continuous scheduling, and being used for ascending-descending subframes is not the mobile communication system that occurs simultaneously, comprising:
Determine to use semi-persistent scheduling mechanism to transmit described business data packet according to the characteristics of business data packet;
When the arrival cycle of described business data packet is not equal to the positive integer times in switching point cycle of system-frame of described mobile communication system, the resource allocation cycle that described semi-persistent scheduling mechanism is set be the described switching point cycle positive integer doubly;
Utilize the determined subframe of described resource allocation cycle to carry out the transmission of described business data packet.
Above-mentioned method, wherein, described resource allocation cycle is less than the arrival cycle of described business data packet.
Above-mentioned method wherein, also comprises:
Use to other business or subscriber equipment the residue sub-frame allocation in the determined subframe of described resource allocation cycle.
Above-mentioned method, wherein, described resource allocation cycle is less than the maximum in the time series in arrival cycle of described business data packet in the positive integer time series doubly in switching point cycle of system-frame of described mobile communication system.
Above-mentioned method, wherein, described resource allocation cycle is greater than the arrival cycle of described business data packet.
Above-mentioned method wherein, also comprises:
During arriving, next packet do not have half-persistence scheduling resources to coming in current data packet, for described current data packet dynamic assignment resource is transmitted.
Above-mentioned method, wherein, described resource allocation cycle is greater than the minimum value in the time series in arrival cycle of described business data packet in the positive integer time series doubly in switching point cycle of system-frame of described mobile communication system.
To achieve these goals, the embodiment of the invention also provides a kind of base station, and being used for ascending-descending subframes is not the mobile communication system that occurs simultaneously, wherein, comprising:
The scheduling mechanism determination module is used for determining to use the transmission mechanism of semi-persistent scheduling mechanism as satisfactory business data packet;
Resource allocation cycle is provided with module, when the arrival cycle of described business data packet is not equal to the positive integer times in switching point cycle of system-frame of described mobile communication system, the resource allocation cycle that semi-persistent scheduling mechanism is set be the switching point cycle positive integer doubly;
Transport module is used for predefine and utilizes the determined subframe of described resource allocation cycle to carry out the transmission of described business data packet.
Above-mentioned base station, wherein, described resource allocation cycle is less than the arrival cycle of described business data packet, and described resource allocation cycle is less than the maximum in the time series in arrival cycle of described business data packet in the positive integer time series doubly in switching point cycle of system-frame of described mobile communication system.
Above-mentioned base station wherein, also comprises:
First scheduler is used for using to other business or subscriber equipment the residue sub-frame allocation of the determined subframe of described resource allocation cycle.
Above-mentioned base station, wherein, described resource allocation cycle is greater than the arrival cycle of described business data packet, and described resource allocation cycle is greater than the minimum value in the time series in arrival cycle of described business data packet in the positive integer time series doubly in switching point cycle of system-frame of described mobile communication system.
Above-mentioned base station wherein, also comprises:
Second scheduler is used for when there is not half-persistence scheduling resources in current data packet during coming next packet arrival, for described current data packet dynamic assignment resource is transmitted.
The embodiment of the invention has following beneficial effect:
The method of the embodiment of the invention and base station, when the arrival cycle of described business data packet is not equal to the positive integer times in switching point cycle of system-frame of described mobile communication system, by the chosen in advance transmission direction subframe X consistent with the transmission direction of packet waiting for transmission, and be provided with resource allocation cycle be the switching point cycle positive integer doubly, because above setting, all half-persistence scheduling resources all are subframe X, direction is all consistent with the transmission direction of packet waiting for transmission, so all data to be transmitted bags can both be by correct transmission, and the situation that can't transmit owing to the inconsistent packet that causes of half-persistence scheduling resources transmission direction in the prior art can not appear.
Description of drawings
Fig. 1 is the schematic diagram of the frame structure of existing TDD LTE;
Half-persistence scheduling resources when Fig. 2 is 20ms for the business data packet arrival cycle in the prior art distributes schematic diagram;
Half-persistence scheduling resources when Fig. 3 is 32ms for the business data packet arrival cycle in the prior art distributes schematic diagram;
Fig. 4 is the schematic flow sheet of business data processing method of the semi-continuous scheduling of the embodiment of the invention;
Fig. 5 is 32ms for the business data packet arrival cycle in the embodiment of the invention, and the half-persistence scheduling resources of resource allocation cycle when being 20ms distributes schematic diagram;
Fig. 6 is 32ms for the business data packet arrival cycle in the embodiment of the invention, and the half-persistence scheduling resources of resource allocation cycle when being 30ms distributes schematic diagram;
Fig. 7 is 32ms for the business data packet arrival cycle in the embodiment of the invention, and the half-persistence scheduling resources of resource allocation cycle when being 40ms distributes schematic diagram;
Fig. 8 is 32ms for the business data packet arrival cycle in the embodiment of the invention, and the half-persistence scheduling resources of resource allocation cycle when being 160ms distributes schematic diagram.
Embodiment
In the business data processing method and base station of the semi-continuous scheduling of the embodiment of the invention, resource allocation cycle no longer is the arrival cycle of traffic data packets, and the positive integer that is set to the switching point cycle doubly, and then make traffic data packets can both be distributed on the subframe with equidirectional, can both correctly transmit to guarantee traffic data packets.
The business data processing method of the semi-continuous scheduling of the embodiment of the invention, being used for ascending-descending subframes is not the mobile communication system that occurs simultaneously, as shown in Figure 4, comprising:
Step 41 determines whether to use semi-persistent scheduling mechanism to transmit described business data packet according to the characteristics of business data packet, if enter step 42, otherwise adopts the transmission mechanism outside the semi-persistent scheduling mechanism to handle;
In this step, can use the business data packet of semi-persistent scheduling mechanism transmission to have the fixing and relatively-stationary characteristics of packet size of packet arrival cycle.
Step 42, when the arrival cycle of described business data packet is not equal to the positive integer times in switching point cycle of system-frame, the resource allocation cycle that semi-persistent scheduling mechanism is set be the switching point cycle positive integer doubly;
Step 43 with predefined format, utilizes the determined subframe of resource allocation cycle to carry out the transmission of described business data packet.
The transmission direction of the determined subframe of described resource allocation cycle is identical with the transmission direction of described business data packet.
The base station of the embodiment of the invention, being used for ascending-descending subframes is not the mobile communication system that occurs simultaneously, comprising:
The scheduling mechanism determination module is used for determining to use the transmission mechanism of semi-persistent scheduling mechanism as business data packet;
Resource allocation cycle is provided with module, when the arrival cycle of described business data packet is not equal to the positive integer times in switching point cycle of system-frame of described mobile communication system, the resource allocation cycle that semi-persistent scheduling mechanism is set be the switching point cycle positive integer doubly;
Transport module is used for predefined format, utilizes the determined subframe of resource allocation cycle to carry out the transmission of described business data packet;
The transmission direction of the determined subframe of described resource allocation cycle is identical with the transmission direction of described business data packet.
Certainly, above-mentioned business data packet has the fixing arrival cycle, and described business data packet has relatively-stationary size.
<the first embodiment 〉
In the first embodiment of the present invention, resource allocation cycle be the switching point cycle positive integer doubly, and less than the arrival cycle of traffic data packets be that example describes.
In first embodiment, the arrival cycle of supposing traffic data packets is 32ms, and the switching point cycle is 10ms, and resource allocation cycle is 20ms, below above-mentioned situation is elaborated.
As shown in Figure 5, data fetch packet N~packet N+5 is that example describes.
The resource (i.e. the 1st subframe X) that the due in of tentation data bag N is just in time identical with the transmission direction of packet N with direction is alignd in time, then packet N utilizes the 1st subframe X to transmit, and packet N+1~packet N+4 does not all have corresponding resource at due in, then this packet N+1~packet N+4 is constantly sending on the immediate half-persistence scheduling resources with data packet arrival subsequently, as shown in Figure 4, i.e. packet N+1, packet N+2, packet N+3 and packet N+4 are respectively at the 3rd subframe X, the 5th subframe X, the 6th subframe X, send processing on the 8th the subframe X.
Receive N+5 packet subsequently, the resource (i.e. the 9th subframe X) that its due in is just in time identical with the transmission direction of packet N+6 with direction is alignd in time, and at this moment, the transmission that utilizes the 9th subframe X to carry out N+5 packet gets final product.
Can find that from above-mentioned description whole transmission course is the continuous repetition of the transmission course of packet N~packet N+4.
The subframe X that the chosen in advance transmission direction is consistent with the transmission direction of packet waiting for transmission, since resource allocation cycle be the switching point cycle positive integer doubly, so all half-persistence scheduling resources all are subframe X, direction is all consistent with the transmission direction of packet waiting for transmission, so all data to be transmitted bags can both be by correct transmission, and the situation that can't transmit owing to the inconsistent packet that causes of half-persistence scheduling resources transmission direction in the prior art can not appear.
Yet, can find from above-mentioned description, wherein also have the 2nd, the 4th and the 7th subframe X to be not used in the transmission of data, in specific embodiments of the invention, the surplus resources of semi-continuous distribution is distributed to other business by dynamic dispatching or subscriber equipment uses temporarily by scheduler.
<the second embodiment 〉
In the second embodiment of the present invention, resource allocation cycle be the switching point cycle positive integer doubly, and less than the arrival cycle of traffic data packets be that example describes.
In first embodiment, the arrival cycle of supposing traffic data packets is 32ms, and the switching point cycle is 10ms, and resource allocation cycle is 20ms, is that 30ms is that example describes below with the resource allocation cycle.
As shown in Figure 6, data fetch packet N~packet N+5 is that example describes.
The resource (i.e. the 1st subframe X) that the due in of tentation data bag N is just in time identical with the transmission direction of packet N with direction is alignd in time, then packet N utilizes the 1st subframe X to transmit, and packet N+1~packet N+4 does not all have corresponding resource at due in, this packet N+1 then, packet N+2, packet N+14 is constantly sending on the immediate half-persistence scheduling resources with data packet arrival subsequently, (N+5 wherein only is shown) as shown in Figure 6, i.e. this packet N+1, packet N+2, packet N+14 is respectively at the 3rd subframe X, the 4th subframe X, send processing on the 16th the subframe X.
Receive N+15 packet subsequently, the resource (being the 17th not shown subframe X) that its due in is just in time identical with the transmission direction of packet N+15 with direction is alignd in time, at this moment, the transmission that utilizes the 17th subframe X to carry out N+15 packet gets final product.
Can find that from above-mentioned description whole transmission course is the continuous repetition of the transmission course of packet N~packet N+14.
The subframe X that the chosen in advance transmission direction is consistent with the transmission direction of packet waiting for transmission, since resource allocation cycle be the switching point cycle positive integer doubly, so all half-persistence scheduling resources all are subframe X, direction is all consistent with the transmission direction of packet waiting for transmission, so all data to be transmitted bags can both be by correct transmission, and the situation that can't transmit owing to the inconsistent packet that causes of half-persistence scheduling resources transmission direction in the prior art can not appear.
Yet, can find from above-mentioned description, wherein also have the 2nd subframe X to be not used in the transmission of data, in specific embodiments of the invention, the surplus resources of semi-continuous distribution is distributed to other business or subscriber equipment use by dynamic dispatching temporarily by scheduler.
Can find by contrasting the first above-mentioned embodiment and second embodiment, under the situation of resource allocation cycle (be switching point cycle positive integer doubly) less than the arrival cycle of traffic data packets, resource allocation cycle is big more, the number of subframe X of transmission that is not used in data is few more, therefore, under the situation of resource allocation cycle (be switching point cycle positive integer doubly) less than the arrival cycle of traffic data packets, get wherein positive integer near switching point cycle in arrival cycle of traffic data packets doubly as final resource allocation cycle.
Illustrate as followsly, the arrival cycle of supposing traffic data packets is 32ms, and the switching point cycle is 10ms, at this moment, according to the method for the embodiment of the invention, resource allocation cycle can be 10ms, 20ms and 30ms, and selects 30ms can significantly reduce the workload of scheduler.
<the three embodiment 〉
In the third embodiment of the present invention, resource allocation cycle be the switching point cycle positive integer doubly, and greater than the arrival cycle of traffic data packets be that example describes.
In the 3rd embodiment, the arrival cycle of supposing traffic data packets is 32ms, and the switching point cycle is 10ms, and resource allocation cycle is 40ms, below above-mentioned situation is elaborated.
As shown in Figure 7, data fetch packet N~packet N+6 is that example describes.
The resource (i.e. the 1st subframe X) that the due in of tentation data bag N is just in time identical with the transmission direction of packet N with direction is alignd in time, then packet N utilizes the 1st subframe X to transmit, and packet N+1~packet N+5 does not all have corresponding resource at due in, then this packet N+1~packet N+5 is constantly sending on the immediate half-persistence scheduling resources with data packet arrival subsequently, as shown in Figure 7, i.e. packet N+1, packet N+2 and packet N+3 are respectively at the 2nd subframe X, the 3rd subframe X, send processing on the 4th the subframe X.
Can find that from Fig. 7 do not have half-persistence scheduling resources to coming during N+5 packet arrives at N+4 packet, at this moment, the embodiment of the invention is that N+4 the interim dynamic assignment resource of packet transmitted by scheduler.
Receive N+5 packet subsequently, the resource (i.e. the 5th subframe X) that its due in is just in time identical with the transmission direction of packet N+5 with direction is alignd in time, and at this moment, the transmission that utilizes the 5th subframe X to carry out N+5 packet gets final product.
Can find that from above-mentioned description whole transmission course is the continuous repetition of the transmission course of packet N~packet N+4.
The subframe X that the chosen in advance transmission direction is consistent with the transmission direction of packet waiting for transmission, since resource allocation cycle be the switching point cycle positive integer doubly, so all half-persistence scheduling resources all are subframe X, direction is all consistent with the transmission direction of packet waiting for transmission, so all data to be transmitted bags can both be by correct transmission, and the situation that can't transmit owing to the inconsistent packet that causes of half-persistence scheduling resources transmission direction in the prior art can not appear.
<the four embodiment 〉
In the fourth embodiment of the present invention, resource allocation cycle be the switching point cycle positive integer doubly, and greater than the arrival cycle of traffic data packets be that example describes.
In the 3rd embodiment, the arrival cycle of supposing traffic data packets is 32ms, and the switching point cycle is 10ms, and resource allocation cycle is 160ms, below above-mentioned situation is elaborated.
As shown in Figure 8, data fetch packet N~packet N+5 is that example describes.
The resource (i.e. the 1st subframe X) that the due in of tentation data bag N is just in time identical with the transmission direction of packet N with direction is alignd in time, then packet N utilizes the 1st subframe X to transmit, and packet N+1~packet N+4 does not all have corresponding resource at due in, during arriving, N+5 packet do not have half-persistence scheduling resources to coming at N+1 packet, at this moment, the embodiment of the invention is that the interim dynamic assignment resource of packet N+1~packet N+4 is transmitted by scheduler.
Receive N+5 packet subsequently, the resource (i.e. the 2nd subframe X) that its due in is just in time identical with the transmission direction of packet N+5 with direction is alignd in time, and at this moment, the transmission that utilizes the 5th subframe X to carry out N+5 packet gets final product.
Can find that from above-mentioned description whole transmission course is the continuous repetition of the transmission course of packet N~packet N+4.
The subframe X that the chosen in advance transmission direction is consistent with the transmission direction of packet waiting for transmission, since resource allocation cycle be the switching point cycle positive integer doubly, so all half-persistence scheduling resources all are subframe X, direction is all consistent with the transmission direction of packet waiting for transmission, so all data to be transmitted bags can both be by correct transmission, and the situation that can't transmit owing to the inconsistent packet that causes of half-persistence scheduling resources transmission direction in the prior art can not appear.
Can find by contrasting the 3rd above-mentioned embodiment and the 4th embodiment, under the situation of resource allocation cycle (be switching point cycle positive integer doubly) greater than the arrival cycle of traffic data packets, resource allocation cycle is more little, there do not have half-persistence scheduling resources to be used for the situation of transmits data packets to be few more, therefore, under the situation of resource allocation cycle (be switching point cycle positive integer doubly) greater than the arrival cycle of traffic data packets, get wherein positive integer near switching point cycle in arrival cycle of traffic data packets doubly as final resource allocation cycle.
Illustrate as followsly, the arrival cycle of supposing traffic data packets is 32ms, and the switching point cycle is 10ms, at this moment, according to the method for the embodiment of the invention, resource allocation cycle can for 40ms, 50ms, 60ms ..., and select 40ms can significantly reduce the workload of scheduler.
Certainly, in the above-described embodiment, be that the arrival cycle with traffic data packets is 32ms, the switching point cycle is that 10ms is the explanation that example is carried out, but also can be other miscellaneous service packet simultaneously, also can be other tdd frame structure.
The above only is a preferred implementation of the present invention; should be pointed out that for those skilled in the art, under the prerequisite that does not break away from the principle of the invention; can also make some improvements and modifications, these improvements and modifications also should be considered as protection scope of the present invention.

Claims (12)

1. the business data processing method of a semi-continuous scheduling, being used for ascending-descending subframes is not the mobile communication system that occurs simultaneously, comprising:
Determine to use semi-persistent scheduling mechanism to transmit described business data packet according to the characteristics of business data packet;
When the arrival cycle of described business data packet is not equal to the positive integer times in switching point cycle of system-frame of described mobile communication system, the resource allocation cycle that described semi-persistent scheduling mechanism is set be the described switching point cycle positive integer doubly;
Utilize the determined subframe of described resource allocation cycle to carry out the transmission of described business data packet.
2. method according to claim 1 is characterized in that, described resource allocation cycle is less than the arrival cycle of described business data packet.
3. method according to claim 2 is characterized in that, also comprises:
Use to other business or subscriber equipment the residue sub-frame allocation in the determined subframe of described resource allocation cycle.
4. according to claim 2 or 3 described methods, it is characterized in that described resource allocation cycle is less than the maximum in the time series in arrival cycle of described business data packet in the positive integer time series doubly in switching point cycle of system-frame of described mobile communication system.
5. method according to claim 1 is characterized in that, described resource allocation cycle is greater than the arrival cycle of described business data packet.
6. method according to claim 5 is characterized in that, also comprises:
During arriving, next packet do not have half-persistence scheduling resources to coming in current data packet, for described current data packet dynamic assignment resource is transmitted.
7. according to claim 5 or 6 described methods, it is characterized in that described resource allocation cycle is greater than the minimum value in the time series in arrival cycle of described business data packet in the positive integer time series doubly in switching point cycle of system-frame of described mobile communication system.
8. base station, being used for ascending-descending subframes is not the mobile communication system that occurs simultaneously, it is characterized in that, comprising:
The scheduling mechanism determination module is used for determining to use the transmission mechanism of semi-persistent scheduling mechanism as business data packet;
Resource allocation cycle is provided with module, when the arrival cycle of described business data packet is not equal to the positive integer times in switching point cycle of system-frame of described mobile communication system, the resource allocation cycle that semi-persistent scheduling mechanism is set be the switching point cycle positive integer doubly;
Transport module is used for predefine and utilizes the determined subframe of described resource allocation cycle to carry out the transmission of described business data packet.
9. base station according to claim 8, it is characterized in that, described resource allocation cycle is less than the arrival cycle of described business data packet, and described resource allocation cycle is less than the maximum in the time series in arrival cycle of described business data packet in the positive integer time series doubly in switching point cycle of system-frame of described mobile communication system.
10. base station according to claim 9 is characterized in that, also comprises:
First scheduler is used for using to other business or subscriber equipment the residue sub-frame allocation of the determined subframe of described resource allocation cycle.
11. base station according to claim 8, it is characterized in that, described resource allocation cycle is greater than the arrival cycle of described business data packet, and described resource allocation cycle is greater than the minimum value in the time series in arrival cycle of described business data packet in the positive integer time series doubly in switching point cycle of system-frame of described mobile communication system.
12. base station according to claim 11 is characterized in that, also comprises:
Second scheduler is used for when there is not half-persistence scheduling resources in current data packet during coming next packet arrival, for described current data packet dynamic assignment resource is transmitted.
CN 200810117802 2008-08-04 2008-08-04 Service data processing method for semi-persistent scheduling and base station Active CN101646209B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN 200810117802 CN101646209B (en) 2008-08-04 2008-08-04 Service data processing method for semi-persistent scheduling and base station
PCT/CN2009/073059 WO2010015186A1 (en) 2008-08-04 2009-08-03 Method for disposing service data of semi-durative scheduling, and base station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200810117802 CN101646209B (en) 2008-08-04 2008-08-04 Service data processing method for semi-persistent scheduling and base station

Publications (2)

Publication Number Publication Date
CN101646209A true CN101646209A (en) 2010-02-10
CN101646209B CN101646209B (en) 2011-12-07

Family

ID=41657872

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200810117802 Active CN101646209B (en) 2008-08-04 2008-08-04 Service data processing method for semi-persistent scheduling and base station

Country Status (2)

Country Link
CN (1) CN101646209B (en)
WO (1) WO2010015186A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017167074A1 (en) * 2016-03-30 2017-10-05 电信科学技术研究院 Scheduling method, device and apparatus
CN110351032A (en) * 2018-04-02 2019-10-18 华为技术有限公司 Resource allocation method and device

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018229713A1 (en) * 2017-06-16 2018-12-20 Nokia Technologies Oy Method and apparatus for persistent scheduling adaptation
CN109392171B (en) * 2017-08-11 2022-04-15 中国移动通信有限公司研究院 Semi-persistent scheduling data transmission method, communication device and storage medium

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4178552B2 (en) * 2003-07-24 2008-11-12 株式会社安川電機 Master-slave synchronous communication method
US7990905B2 (en) * 2003-12-30 2011-08-02 Nokia Corporation Communication system using relay base stations with asymmetric data links
KR101347404B1 (en) * 2006-10-05 2014-01-02 엘지전자 주식회사 Method for transmitting voice packet in wireless communication system
CN101222309B (en) * 2008-01-25 2013-06-05 中兴通讯股份有限公司 Configuration method and device for LTE TDD system ascending HARQ course

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017167074A1 (en) * 2016-03-30 2017-10-05 电信科学技术研究院 Scheduling method, device and apparatus
CN107295643A (en) * 2016-03-30 2017-10-24 电信科学技术研究院 A kind of dispatching method, device and equipment
CN107295643B (en) * 2016-03-30 2019-12-13 电信科学技术研究院 Scheduling method, device and equipment
CN110351032A (en) * 2018-04-02 2019-10-18 华为技术有限公司 Resource allocation method and device
CN110351032B (en) * 2018-04-02 2022-04-26 华为技术有限公司 Resource allocation method and device

Also Published As

Publication number Publication date
CN101646209B (en) 2011-12-07
WO2010015186A1 (en) 2010-02-11

Similar Documents

Publication Publication Date Title
CN101971684B (en) Ul/dl scheduling for full bandwidth utilization
CN102143596B (en) Wireless resource scheduling method and wireless resource scheduling system
CN101800991B (en) Method, system and device for data transmission
CN101426267B (en) Resource scheduling method and apparatus
CN103582008A (en) Method for transmitting HARQ-ACK feedback information in service flow self-adaption type TDD system
CN106413106B (en) A kind of transmission method and device of upstream data
CN102415014A (en) Method and system for dynamic adjustment of downlink/uplink allocation ratio in lte/tdd systems
WO2009115027A1 (en) A system and method for indicating the uplink resource
CN102594438A (en) Data transmission method, device and system
CN103001749A (en) Data transmission method, equipment for Internet of things and network side equipment
CN105099633A (en) Physical downlink shared channel transmission method and device
CN101459965B (en) Method, device and communication system for resource scheduling
CN101500311A (en) Allocation method, system and apparatus for continuous scheduling resource
CN101730245B (en) Method, system and device for activating SPS under condition of losing PDSSH
CN101499895B (en) Uplink scheduling method in time division duplex system
CN107040952A (en) A kind of ascending transmission method and device
CN106357372A (en) Method and device for avoiding feedback message resource conflict as well as base station and terminal
CN101646209B (en) Service data processing method for semi-persistent scheduling and base station
CN105763305B (en) A kind of data transmission method and device
CN101459581A (en) Resource scheduling method, device and a communication system
WO2017206740A1 (en) Subframe type notification and determination methods and device
CN101635964B (en) Control information management and transmission method, control information transmission method
CN106576352A (en) Method and device for determining data transmission
CN103095435A (en) Method for confirming hybrid automatic repeat request (HARQ) mode and method and device of uplink data transmission
CN108024317A (en) A kind of control information transmission method, base station and terminal

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: INST OF TELECOMMUNICATION SCIENCE AND TECHNOLGOY

Free format text: FORMER OWNER: DATANG MOBILE COMMUNICATION EQUIPMENT CO., LTD.

Effective date: 20110427

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 100083 NO. 29, XUEYUAN ROAD, HAIDIAN DISTRICT, BEIJING TO: 100191 NO. 40, XUEYUAN ROAD, HAIDIAN DISTRICT, BEIJING

TA01 Transfer of patent application right

Effective date of registration: 20110427

Address after: 100191 Haidian District, Xueyuan Road, No. 40,

Applicant after: CHINA ACADEMY OF TELECOMMUNICATIONS TECHNOLOGY

Address before: 100083 Haidian District, Xueyuan Road, No. 29,

Applicant before: DATANG MOBILE COMMUNICATIONS EQUIPMENT Co.,Ltd.

C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 100191 No. 40, Haidian District, Beijing, Xueyuan Road

Patentee after: CHINA ACADEMY OF TELECOMMUNICATIONS TECHNOLOGY

Address before: 100191 No. 40, Haidian District, Beijing, Xueyuan Road

Patentee before: CHINA ACADEMY OF TELECOMMUNICATIONS TECHNOLOGY

CP01 Change in the name or title of a patent holder
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210616

Address after: 100085 1st floor, building 1, yard 5, Shangdi East Road, Haidian District, Beijing

Patentee after: DATANG MOBILE COMMUNICATIONS EQUIPMENT Co.,Ltd.

Address before: 100191 No. 40, Haidian District, Beijing, Xueyuan Road

Patentee before: CHINA ACADEMY OF TELECOMMUNICATIONS TECHNOLOGY