CN101644632A - 相似模型试验中无充填型溶洞或岩溶管道系统及埋设方法 - Google Patents

相似模型试验中无充填型溶洞或岩溶管道系统及埋设方法 Download PDF

Info

Publication number
CN101644632A
CN101644632A CN200910017562A CN200910017562A CN101644632A CN 101644632 A CN101644632 A CN 101644632A CN 200910017562 A CN200910017562 A CN 200910017562A CN 200910017562 A CN200910017562 A CN 200910017562A CN 101644632 A CN101644632 A CN 101644632A
Authority
CN
China
Prior art keywords
karst
filling
test
karst cave
cave
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN200910017562A
Other languages
English (en)
Other versions
CN101644632B (zh
Inventor
许振浩
李利平
李术才
李树忱
冯现大
袁超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University
Original Assignee
Shandong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University filed Critical Shandong University
Priority to CN2009100175626A priority Critical patent/CN101644632B/zh
Publication of CN101644632A publication Critical patent/CN101644632A/zh
Application granted granted Critical
Publication of CN101644632B publication Critical patent/CN101644632B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

本发明涉及一种相似模型试验中无充填型溶洞或岩溶管道系统,包括试验台架,试验台架内铺设有若干层相似材料,相似材料中开挖有隧道,相似材料中设置有无充填型溶洞或岩溶管道,无充填型溶洞或岩溶管道中有不透水树脂膜袋,不透水树脂膜袋通过进出水管与试验台架外部的水泵连接。同时本发明还公开了所述系统的埋设方法。本发明研究了模型试验中无充填型溶洞或岩溶管道系统及埋设方法,解决了无充填型溶洞或岩溶管道的埋设和模拟问题。将无充填型溶洞或岩溶管道埋入模型试验相似材料中,与前人研究相比,与工程实践更接近,所得出的地质力学形似模型试验研究成果适用范围更广。

Description

相似模型试验中无充填型溶洞或岩溶管道系统及埋设方法
技术领域
本发明涉及一种地质力学技术,尤其是一种相似模型试验中无充填型溶洞或岩溶管道系统及埋设方法。
背景技术
我国岩溶分布面积广,在岩溶地区修建地下隧道工程或开挖巷道,施工中极易诱导大规模、突发性的突水灾害。我国学者开展了大量的模型试验研究工作,但也存在明显的弱点,在做地质力学相似模型试验的基本模型时,一般使用均一材料,简化的铺设岩土层。实际工程中,受地质构造和溶蚀作用等因素影响,工程岩土体中往往存在着很多的不良地质体,如无充填型溶洞或岩溶管道。
发明内容
本发明的目的是为克服上述现有技术的不足,提供一种结构简单,模拟逼真,可用于模拟开挖或其他因素影响下的隧(巷)施工过程,采集塌方前兆信息,研究施工过程力学、塌方和围岩变形规律,有利于实际工程的安全施工与灾害预警的相似模型试验中无充填型溶洞或岩溶管道系统及埋设方法。
为实现上述目的,本发明采用下述技术方案:
一种相似模型试验中无充填型溶洞或岩溶管道系统,包括试验台架,试验台架内铺设有若干层相似材料,相似材料中开挖有隧道,相似材料中设置有无充填型溶洞或岩溶管道,无充填型溶洞或岩溶管道中有不透水树脂膜袋,不透水树脂膜袋通过进出水管与试验台架外部的水泵连接。
所述试验台架为刚性透明台架。
一种相似模型试验中无充填型溶洞或岩溶管道系统的埋设方法,包括以下步骤:
A.铺设相似材料,将相似材料依据工程背景中岩土体强度在试验台架中分层铺设,且可按实际岩土层倾角铺设;
B.埋入盐岩预制体,当相似材料铺设到无充填型溶洞或岩溶管道所在位置时,将最外层为密封的不透水树脂膜袋的由可溶盐岩预制而成预定形状的无充填型溶洞或岩溶管道埋入相似材料中,然后继续铺设上覆岩土相似材料层直至到达预定位置;
C.隧道的开挖,隧道所在位置先按正常岩土相似材料层铺设,在后期试验过程中开挖;
D.无充填型溶洞或岩溶管道的制备,后期通过水泵向不透水树脂膜袋内注水溶解可溶盐岩预制体,并抽出溶解后溶液,并产生负压,使不透水树脂膜袋与相似材料脱离,即可形成无充填型溶洞或岩溶管道,可保证在相似材料夯实过程中,不在无充填型溶洞或岩溶管道处产生塌方,溶液抽出后空洞内部仅存一个重量和体积可忽略树脂膜袋,不影响相似模型试验结论。
本发明中的相似材料和不透水树脂膜袋均为现有东西,在此不再赘述。
本发明按照实际工程中的无充填型溶洞或岩溶管道形状,通过相似比换算后,用可溶性好的盐岩预制无充填型溶洞或岩溶管道,并在外层包裹密封的不透水树脂膜袋;相似材料铺设时,将盐岩预制体和膜袋一起埋入实际工程中的无充填型溶洞或岩溶管道相应位置;材料铺设完毕后,注水溶解盐岩预制体,并抽出盐岩溶液,并产生负压,使树脂膜袋与相似材料脱离,从而成功构造了模型试验中无充填型溶洞或岩溶管道。
本发明研究了模型试验中无充填型溶洞或岩溶管道系统及埋设方法,解决了无充填型溶洞或岩溶管道的埋设和模拟问题。将无充填型溶洞或岩溶管道埋入模型试验相似材料中,与前人研究相比,与工程实践更接近,所得出的地质力学形似模型试验研究成果适用范围更广。
本发明解决了模型试验中无充填型溶洞或岩溶管道构造和埋设问题,具有以下优点:
1、能成功的将无充填型溶洞或岩溶管道埋入相似模型;
2、盐岩溶解后,抽出溶液,洞壁膜袋会与相似材料脱离,从而形成与实际工程中洞壁吻合的无充填型溶洞或岩溶管道;
3、能保证相似材料成功铺设,材料铺设过程中,不至于在无充填型溶洞或岩溶管道处产生塌方,以致不能在相似模型中形成无充填型溶洞或岩溶管道。
4、可以模拟开挖或其他因素影响下无充填型溶洞或岩溶管道施工过程力学反应和变形规律等。
附图说明
图1是本发明结构示意图;
其中1.相似材料顶面;2.进出水管;3.试验台架;4.隧(巷)道;5.相似材料;6.水泵,7.无充填型溶洞或岩溶管道。
具体实施方式
下面结合附图和实施例对本发明进一步说明。
图1中,一种相似模型试验中无充填型溶洞或岩溶管道系统,包括试验台架3,试验台架3内铺设有若干层相似材料5,相似材料5中开挖有隧道4,相似材料5中设置有无充填型溶洞或岩溶管道7,无充填型溶洞或岩溶管道7中有不透水树脂膜袋,不透水树脂膜袋通过进出水管2与试验台架3外部的水泵6连接。
所述试验台架3为刚性透明台架。
一种相似模型试验中无充填型溶洞或岩溶管道系统的埋设方法,包括以下步骤:
A.铺设相似材料5,将相似材料5依据工程背景中岩土体强度在试验台架3中分层铺设,且可按实际岩土层倾角铺设;
B.埋入盐岩预制体,当相似材料5铺设到无充填型溶洞或岩溶管道7所在位置时,将最外层为密封的不透水树脂膜袋的由可溶盐岩预制而成预定形状的无充填型溶洞或岩溶管道7埋入相似材料中,然后继续铺设上覆岩土相似材料层直至到达预定相似材料顶面1位置;
C.隧道4的开挖,隧道4所在位置先按正常岩土相似材料层铺设,在后期试验过程中开挖;
D.无充填型溶洞或岩溶管道7的制备,后期通过水泵6向不透水树脂膜袋内注水溶解可溶盐岩预制体,并抽出溶解后溶液,并产生负压,使不透水树脂膜袋与相似材料5脱离,即可形成无充填型溶洞或岩溶管道7,可保证在相似材料5夯实过程中,不在无充填型溶洞或岩溶管道7处产生塌方,溶液抽出后空洞内部仅存一个重量和体积可忽略树脂膜袋,不影响相似模型试验结论。

Claims (3)

1.一种相似模型试验中无充填型溶洞或岩溶管道系统,包括试验台架,其特征在于:试验台架内铺设有若干层相似材料,相似材料中开挖有隧道,相似材料中设置有无充填型溶洞或岩溶管道,无充填型溶洞或岩溶管道中有不透水树脂膜袋,不透水树脂膜袋通过进出水管与试验台架外部的水泵连接。
2.根据权利要求1所述的相似模型试验中无充填型溶洞或岩溶管道系统,其特征在于:所述试验台架为刚性透明台架。
3.一种相似模型试验中无充填型溶洞或岩溶管道系统的埋设方法,其特征在于,包括以下步骤:
A.铺设相似材料,将相似材料依据工程背景中岩土体强度在试验台架中分层铺设,且可按实际岩土层倾角铺设;
B.埋入盐岩预制体,当相似材料铺设到无充填型溶洞或岩溶管道所在位置时,将最外层为密封的不透水树脂膜袋的由可溶盐岩预制而成预定形状的无充填型溶洞或岩溶管道埋入相似材料中,然后继续铺设上覆岩土相似材料层直至到达预定位置;
C.隧道的开挖,隧道所在位置先按正常岩土相似材料层铺设,在后期试验过程中开挖;
D.无充填型溶洞或岩溶管道的制备,后期通过水泵向不透水树脂膜袋内注水溶解可溶盐岩预制体,并抽出溶解后溶液,并产生负压,使不透水树脂膜袋与相似材料脱离,即可形成无充填型溶洞或岩溶管道,可保证在相似材料夯实过程中,不在无充填型溶洞或岩溶管道处产生塌方,溶液抽出后空洞内部仅存一个重量和体积可忽略树脂膜袋,不影响相似模型试验结论。
CN2009100175626A 2009-08-05 2009-08-05 相似模型试验中无充填型溶洞或岩溶管道系统及埋设方法 Expired - Fee Related CN101644632B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009100175626A CN101644632B (zh) 2009-08-05 2009-08-05 相似模型试验中无充填型溶洞或岩溶管道系统及埋设方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009100175626A CN101644632B (zh) 2009-08-05 2009-08-05 相似模型试验中无充填型溶洞或岩溶管道系统及埋设方法

Publications (2)

Publication Number Publication Date
CN101644632A true CN101644632A (zh) 2010-02-10
CN101644632B CN101644632B (zh) 2011-04-13

Family

ID=41656611

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009100175626A Expired - Fee Related CN101644632B (zh) 2009-08-05 2009-08-05 相似模型试验中无充填型溶洞或岩溶管道系统及埋设方法

Country Status (1)

Country Link
CN (1) CN101644632B (zh)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101950504A (zh) * 2010-10-11 2011-01-19 山东大学 地质力学模型分层压实风干制作与切槽埋设测试仪器方法
CN104215425A (zh) * 2014-08-22 2014-12-17 山东大学 一种充填型岩溶管道系统、其制作方法及再填充方法
CN104792966A (zh) * 2015-04-08 2015-07-22 西南交通大学 一种模拟地铁盾构隧道施工引发地层空洞的试验装置及方法
CN106498965A (zh) * 2016-12-05 2017-03-15 广西大学 一种岩溶地区止水加固施工方法
CN106525540A (zh) * 2017-01-13 2017-03-22 山东大学 一种用于隧道及地下工程模型试验新型溶腔制作装置及方法
CN107144471A (zh) * 2017-05-19 2017-09-08 山东大学 一种用于模型试验的承压溶洞水压加载密封装置及方法
CN108166538A (zh) * 2017-12-20 2018-06-15 河北建设勘察研究院有限公司 穿越串珠状溶洞基桩模型的极限承载力模型试验系统及试验方法
CN109000598A (zh) * 2018-09-28 2018-12-14 山东大学 针对封闭式干溶洞的体积测量系统及方法
CN110500993A (zh) * 2019-08-07 2019-11-26 浙江科技学院 用于溶洞沼气地层多重运营荷载诱发地面沉降的模拟方法
CN111739397A (zh) * 2020-07-31 2020-10-02 湖北工业大学 一种多溶洞地质模型制备方法
CN111896357A (zh) * 2020-07-31 2020-11-06 湖北工业大学 一种利用反向自平衡法测试岩溶桩基承载力的模型试验装置及其制备方法
CN113776774A (zh) * 2021-08-31 2021-12-10 中交一公局第八工程有限公司 一种模拟岩溶与隧道相互作用的模型装置

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102006009246B3 (de) * 2006-02-28 2007-08-02 GeoForschungsZentrum Potsdam Stiftung des öffentlichen Rechts Verfahren und Vorrichtung zur Vorauserkundung beim Tunnelbau
CN100390357C (zh) * 2006-09-29 2008-05-28 北京交通大学 隧道结构、围岩及地下水相互作用的模拟试验台
CN201464277U (zh) * 2009-08-05 2010-05-12 山东大学 相似模型试验中无充填型溶洞或岩溶管道系统

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101950504B (zh) * 2010-10-11 2011-10-19 山东大学 地质力学模型分层压实风干制作与切槽埋设测试仪器方法
CN101950504A (zh) * 2010-10-11 2011-01-19 山东大学 地质力学模型分层压实风干制作与切槽埋设测试仪器方法
CN104215425A (zh) * 2014-08-22 2014-12-17 山东大学 一种充填型岩溶管道系统、其制作方法及再填充方法
CN104215425B (zh) * 2014-08-22 2016-08-31 山东大学 一种充填型岩溶管道系统的再填充方法
CN104792966A (zh) * 2015-04-08 2015-07-22 西南交通大学 一种模拟地铁盾构隧道施工引发地层空洞的试验装置及方法
CN106498965A (zh) * 2016-12-05 2017-03-15 广西大学 一种岩溶地区止水加固施工方法
CN106525540B (zh) * 2017-01-13 2019-06-14 山东大学 一种用于隧道及地下工程模型试验新型溶腔制作装置及方法
CN106525540A (zh) * 2017-01-13 2017-03-22 山东大学 一种用于隧道及地下工程模型试验新型溶腔制作装置及方法
CN107144471A (zh) * 2017-05-19 2017-09-08 山东大学 一种用于模型试验的承压溶洞水压加载密封装置及方法
CN108166538A (zh) * 2017-12-20 2018-06-15 河北建设勘察研究院有限公司 穿越串珠状溶洞基桩模型的极限承载力模型试验系统及试验方法
CN109000598A (zh) * 2018-09-28 2018-12-14 山东大学 针对封闭式干溶洞的体积测量系统及方法
CN110500993A (zh) * 2019-08-07 2019-11-26 浙江科技学院 用于溶洞沼气地层多重运营荷载诱发地面沉降的模拟方法
CN110500993B (zh) * 2019-08-07 2022-03-18 浙江科技学院 用于溶洞沼气地层多重运营荷载诱发地面沉降的模拟方法
CN111739397A (zh) * 2020-07-31 2020-10-02 湖北工业大学 一种多溶洞地质模型制备方法
CN111896357A (zh) * 2020-07-31 2020-11-06 湖北工业大学 一种利用反向自平衡法测试岩溶桩基承载力的模型试验装置及其制备方法
CN113776774A (zh) * 2021-08-31 2021-12-10 中交一公局第八工程有限公司 一种模拟岩溶与隧道相互作用的模型装置

Also Published As

Publication number Publication date
CN101644632B (zh) 2011-04-13

Similar Documents

Publication Publication Date Title
CN101644632B (zh) 相似模型试验中无充填型溶洞或岩溶管道系统及埋设方法
CN101625289B (zh) 相似模型试验中隐伏水体或充水岩溶管道系统及埋设方法
CN201464277U (zh) 相似模型试验中无充填型溶洞或岩溶管道系统
CN103995097B (zh) 一种模拟顶管施工引发地层变形的试验方法及装置
CN105242028B (zh) 一种由高层建筑荷载和地下水抽灌引起土体分层沉降模型试验装置及试验方法
CN103000068B (zh) 一种隧道施工过程模拟试验方法
CN109709308B (zh) 一种采水型地裂缝物理模型试验装置及试验方法
CN101906991B (zh) 一种治理地下采空区或空洞的施工方法
CN104005363A (zh) 一种三维地下承压水流-地铁隧道结构相互作用模拟装置
CN105912798A (zh) 基于超深基坑抽水的地面沉降智能预警方法及监测系统
CN105386474B (zh) 确定基坑开挖面上方止水帷幕渗漏对周边环境影响的方法
CN103924602A (zh) 深厚软土基坑施工方法
CN107796926A (zh) 滑坡作用下大尺度埋地输气管道破坏模拟试验装置及方法
CN111206932A (zh) 一种盾构施工对场地扰动的模拟装置与方法
CN106284446B (zh) 一种强降雨诱发岩质滑坡野外模型试验装置
CN108362856B (zh) 模拟城市高密集区地面长期沉降的模型实验装置
Huang et al. The external water pressure on a deep buried tunnel in fractured rock
CN104215425B (zh) 一种充填型岩溶管道系统的再填充方法
CN103176220A (zh) 一种隧道水压力模型试验方法
CN201464275U (zh) 相似模型试验中隐伏水体或充水岩溶管道系统
CN106353482A (zh) 一种隧道施工对侧方土体扰动的测试系统及方法
CN103628487B (zh) 圆形深基坑护壁逆作施工方法
CN209690208U (zh) 富水粉细砂地层冻结法施工效果模拟系统
CN201464276U (zh) 相似模型试验中含水层内部水力边界条件控制系统
CN206625238U (zh) 一种圆形基坑的装配式波形钢衬板支护结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110413

Termination date: 20130805