CN101644140A - CO* flooding single string multi-zone separate injection technical string - Google Patents

CO* flooding single string multi-zone separate injection technical string Download PDF

Info

Publication number
CN101644140A
CN101644140A CN200910072773A CN200910072773A CN101644140A CN 101644140 A CN101644140 A CN 101644140A CN 200910072773 A CN200910072773 A CN 200910072773A CN 200910072773 A CN200910072773 A CN 200910072773A CN 101644140 A CN101644140 A CN 101644140A
Authority
CN
China
Prior art keywords
string
injection
packer
technical
flooding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN200910072773A
Other languages
Chinese (zh)
Inventor
刘合
周万富
张书进
王金友
潘卫国
王浩
赵骊川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daqing Oilfield Co Ltd
Original Assignee
Daqing Oilfield Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daqing Oilfield Co Ltd filed Critical Daqing Oilfield Co Ltd
Priority to CN200910072773A priority Critical patent/CN101644140A/en
Publication of CN101644140A publication Critical patent/CN101644140A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention relates to the technical field of oilfield tertiary oil recovery and belongs to a CO2 flooding single string multi-zone separate injection downhole technical string. The invention provides the technical string which can realize CO2 multi-zone separate injection under the condition of a set of injection pipe network on the ground and has good sealing effect and CO2 corrosion resistance. The technical string mainly comprises a regulator 3 for alternating injection, a packer 4 and an injection allocator 5, wherein, the lower end of an oil pipe 1 is sequentially connected with the regulator 3 for alternating injection, the packer 4 and the injection allocator 5, and a plurality of unit bodies which are formed by connecting the packer 4 and the injection allocator 5 are connectedbelow the injection allocator 5. The technical string is used for carrying out the downhole multi-zone separation injection and has the advantages of simple construction technology, low cost of the string, reliable sealing performance of the string, CO2 corrosion resistance and the like.

Description

CO 2Flooding single string multi-zone separate injection technical string
Technical field:
The present invention relates to technical field of oilfield tertiary oil recovery, belong to a kind of CO 2Flooding single string multi dispensing down-hole process pipe string.
Background technology:
Daqing oil field CO 2Displacement of reservoir oil block injects the well down-hole and is fit to annotate CO 2The stratum 3-5 layer is arranged, injection mode is general the injection.Because there is permeability contrast in the stratum, causes some layer notes not entered, interlayer contradiction is outstanding, and injection efficiency is not high.And the injection string of field use is the individual layer injection string at present, can only realize that the individual well individual layer injects, and injection string also exists problems such as sealing effectiveness is poor, corrosion-resistant simultaneously, can not satisfy the production needs.
Summary of the invention:
The purpose of this invention is to provide under a kind of condition of injecting pipe network at ground one cover and realize CO 2Depositing, good sealing effect and anti-CO 2The CO of corrosion 2Flooding single string multi-zone separate injection technical string.
The present invention includes oil pipe, sleeve pipe, and oil pipe places in the sleeve pipe, it also comprises alternately injects adjuster, packer and injection allocation device, wherein the oil pipe lower end connects successively and alternately injects adjuster, packer, injection allocation device, injection allocation device below connects a plurality of cell cubes that are connected to form by packer and injection allocation device, and alternately injects between adjuster, packer and the injection allocation device and all connect by oil pipe.
Packer is a drillable Y443 type.Oil pipe is handled through the nickel plating phosphor coating.
Compared with the prior art the present invention has the following advantages:
One cover injects under the pipe network condition on ground, can realize CO 2The drive injection well depositing.And can realize down-hole gaseous state CO 2The allotment of the test of zonal flow rate, pressure and laminated distributor under well flow.Anti-CO 2Corrode and carry the Y443 packer of setting mechanism, the one-trip string construction can realize setting, giving up of multiple-string packer, and construction technology is simple, and the tubing string cost is low, and the tubing string sealing performance is reliable.
Description of drawings:
Fig. 1 is a structure diagram of the present invention.
The specific embodiment:
Shown in accompanying drawing, the present invention includes oil pipe 1, sleeve pipe 2, and oil pipe 1 places in the sleeve pipe 2, it also comprises alternately injects adjuster 3, packer 4 and injection allocation device 5, wherein oil pipe 1 lower end connects successively and alternately injects adjuster 3, packer 4, injection allocation device 5, injection allocation device 5 belows connect a plurality of cell cubes that are connected to form by packer 4 and injection allocation device 5, and alternately inject between adjuster 3, packer 4 and the injection allocation device 5 and all connect by oil pipe.
Packer 3 is a drillable Y443 type.Oil pipe 2 is handled through the nickel plating phosphor coating.
During site operation, when under this tubing string in the sleeve pipe behind the precalculated position, oil pipe 1 is suppressed to 15-20MPa, what packer 4 carried hydraulic pressure sets the system compresses packing element, one-trip string is finished setting of multiple-string packer 4, and injection allocation device 5 corresponding implanted layers, valve are realized the layering injection.When needing to adjust injection rate, adopt wire Launching and Bailing injection allocation blanking plug, change valve on ground.In the time of need carrying out zonal flow rate, pressure test, adopt wire Launching and Bailing injection allocation blanking plug, be lowered to the test blanking plug.In the time of need carrying out anti-cycle operation, suppress, alternately inject adjuster 3 and can be communicated with the oil jacket space from sleeve pipe.

Claims (3)

1, CO 2Flooding single string multi-zone separate injection technical string, it comprises oil pipe (1), sleeve pipe (2), and oil pipe (1) places in the sleeve pipe (2), it is characterized in that: it also comprises alternately injects adjuster (3), packer (4) and injection allocation device (5), wherein oil pipe (1) lower end connects successively and alternately injects adjuster (3), packer (4), injection allocation device (5), injection allocation device (5) below connects a plurality of cell cubes that are connected to form by packer (4) and injection allocation device (5), and alternately injects between adjuster (3), packer (4) and the injection allocation device (5) and all connect by oil pipe (1).
2, CO according to claim 1 2Flooding single string multi-zone separate injection technical string is characterized in that: packer (3) is a drillable Y443 type.
3, CO according to claim 1 2Flooding single string multi-zone separate injection technical string is characterized in that: oil pipe (1) is handled through the nickel plating phosphor coating.
CN200910072773A 2009-08-28 2009-08-28 CO* flooding single string multi-zone separate injection technical string Pending CN101644140A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200910072773A CN101644140A (en) 2009-08-28 2009-08-28 CO* flooding single string multi-zone separate injection technical string

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200910072773A CN101644140A (en) 2009-08-28 2009-08-28 CO* flooding single string multi-zone separate injection technical string

Publications (1)

Publication Number Publication Date
CN101644140A true CN101644140A (en) 2010-02-10

Family

ID=41656180

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200910072773A Pending CN101644140A (en) 2009-08-28 2009-08-28 CO* flooding single string multi-zone separate injection technical string

Country Status (1)

Country Link
CN (1) CN101644140A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105545264A (en) * 2016-01-05 2016-05-04 沈阳华威石油机械制造有限公司 Carbon dioxide wheel injection oil displacement single-tube double-layer injection process tubular column
CN105545272A (en) * 2015-12-31 2016-05-04 中国石油天然气股份有限公司 Oil extraction method for ultra-low permeability water-sensitive reservoir/compact reservoir
CN111119811A (en) * 2019-12-25 2020-05-08 中国石油天然气股份有限公司 Dual-medium dispenser, dispensing string, and method for operating dispensing string

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105545272A (en) * 2015-12-31 2016-05-04 中国石油天然气股份有限公司 Oil extraction method for ultra-low permeability water-sensitive reservoir/compact reservoir
CN105545264A (en) * 2016-01-05 2016-05-04 沈阳华威石油机械制造有限公司 Carbon dioxide wheel injection oil displacement single-tube double-layer injection process tubular column
CN105545264B (en) * 2016-01-05 2018-02-13 沈阳华威石油机械制造有限公司 A kind of carbon dioxide alternate water injection displacement of reservoir oil single-tube double-layer injection technology tubing string
CN111119811A (en) * 2019-12-25 2020-05-08 中国石油天然气股份有限公司 Dual-medium dispenser, dispensing string, and method for operating dispensing string

Similar Documents

Publication Publication Date Title
CN106194131B (en) It is spaced CO between multistage fracturing horizontal well seam2Oil flooding method
CN201539215U (en) CO2 displacement concentric double-tube injection technique tubing string
CN105822276B (en) Interval while water injection oil extraction method between multistage fracturing horizontal well seam
CN102410009B (en) Controlled-valve placed well-cementing staged-fracturing well-completion string and hydraulically-controlled switch string
CN105507865A (en) Re-fracturing method for oil, gas and water wells
CN101705812A (en) Large-discharge single pipe layered polymer injection and injection allocation method and device
CN205936557U (en) Water injection and oil production pipe column
CN110295879A (en) A kind of staged fracturing horizontal well in segments period note adopts dual string
CN101644140A (en) CO* flooding single string multi-zone separate injection technical string
CN107905776B (en) Gas well fracturing liquid drainage system and method
CN101906954A (en) Layering sand-control layering oil production integrated pipe column
CN102278101B (en) Subdivided layer watered oil extraction pipe column
CN102953716A (en) Parallel double-tube separate layer water injection string
CN102242614A (en) Coaxial double-layer gas injection well mouth device
CN112127855A (en) Full latus rectum sand control double-stage mechanism to staged fracturing pit shaft
CN202832439U (en) Oil field in-situ subdivision water injection process pipe string
CN109281641B (en) Layered gas production pipe column assembly and gas production device with same
CN204082116U (en) Oil well horizontal well oil jacket is with note formula two envelope single deck tape-recorder volume fracturing tubing string
CN213869755U (en) Unlimited-level full-drift-diameter staged fracturing sand control pipe column
CN204252980U (en) Layered water injection string
CN204212753U (en) Upper-layer layered polymer-injection lower-layer general water injection process pipe column
CN112127802A (en) Infinite grade full-bore staged fracturing sand control pipe column and production method thereof
CN101319605B (en) Multi-zone production rate regulating column tool for oil-submersible electric pump well and its multi-zone production rate regulating method
CN201202457Y (en) Double-tube water injecting system of water injection well
RU2549946C1 (en) Pump packer system for multiple-zone well

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20100210