CN101635463B - 变电站电容器组容量的无功配置方法 - Google Patents

变电站电容器组容量的无功配置方法 Download PDF

Info

Publication number
CN101635463B
CN101635463B CN 200910053613 CN200910053613A CN101635463B CN 101635463 B CN101635463 B CN 101635463B CN 200910053613 CN200910053613 CN 200910053613 CN 200910053613 A CN200910053613 A CN 200910053613A CN 101635463 B CN101635463 B CN 101635463B
Authority
CN
China
Prior art keywords
capacitor
group
configuration
capacity
transformer station
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN 200910053613
Other languages
English (en)
Other versions
CN101635463A (zh
Inventor
李昌
陈毅
秦虹
周敏
王鹏
王兆雄
陆昱
钱军
李晔
刘颉
纪文珺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Great Energy Technology Co.,Ltd.
Original Assignee
SHANGHAI SUNRISE POWER TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI SUNRISE POWER TECHNOLOGY Co Ltd filed Critical SHANGHAI SUNRISE POWER TECHNOLOGY Co Ltd
Priority to CN 200910053613 priority Critical patent/CN101635463B/zh
Publication of CN101635463A publication Critical patent/CN101635463A/zh
Application granted granted Critical
Publication of CN101635463B publication Critical patent/CN101635463B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/30Reactive power compensation

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

一种变电站电容器组容量的无功配置方法,涉及电力系统无功配置技术领域,所解决的是提高无功优化效果及缩小历史样本残差放大效应的技术问题。该方法的具体步骤如下:先得到变电站电容器的组数及最大片数及配置电容器组的各种配置方式的集合;再划分时间段,设置每天的时间点数目;然后取一个需要进行配置的时间段,获取对应历史时间段数据;然后再将各种配置方式的总无功补偿值与历史时间段数据进行条件极值计算;最后求取各条件极值代数和中的最小值,得到各电容器组的配置容量,并以此结果对所取时间段的变电站电容器组进行配置改造。本发明提供的方法,能提高整个网络的无功优化效果,有效缩小历史样本残差放大效应。

Description

变电站电容器组容量的无功配置方法
技术领域
本发明涉及电力系统无功配置的技术,特别是涉及一种用于输配电网的变电站电容器组容量的无功配置方法的技术。
背景技术
在新建变电站时,变电站电容器组容量的无功配置一般都参照经验数据,通过主变容量与经验数据的对照按比例进行简单计算得到,这种计算很难准确预测到该变电站未来负荷的变化情况,在投运以后经常出现无功补充过量或者不足。
无功优化是能量管理系统(Energy Management System,EMS)的重要组成部分,其功能是在当前输配电网结构上,采用一定的方法优化配置当前网络中的无功资源,使网络中的无功尽量就地平衡,减少系统电能损耗,提高配电网用户侧电压水平。
目前的无功优化方法集中于对已有的多个厂站的电容器组的优化组合,并不修改电容器组的容量,通过投切电容器对当前电网进行无功优化,从而达到降低网损的目的。这种优化组合的方法会导致某些变电站的电容器容量对本区域来说并不是最优的配置,从而影响了整个网络的无功优化效果。另外,这种优化组合的方法通常都对目标函数采用最小二乘法,从而容易造成历史样本的残差放大效应。
发明内容
针对上述现有技术中存在的缺陷,本发明所要解决的技术问题是提供一种能提高整个网络的无功优化效果,有效缩小历史样本残差放大效应的变电站电容器组容量的无功配置方法。
为了解决上述技术问题,本发明所提供的一种变电站电容器组容量的无功配置方法,其特征在于,具体步骤如下:
1)根据变电站的电容器模型,得到电容器的组数G,以及每组电容器的最大片数Wmax
2)以排列组合方式对变电站的电容器组进行容量配置,得到各种配置方式的集合;
3)根据电网设备巡检周期划分时间段,设置每天的时间点数目;
4)取一个需要进行配置的时间段,并根据该时间段获取变电站在历史时间段中每个时间点的数据,计算出该历史时间段的无功负荷需求数值D(T),及该历史时间段中各时间点的无功负荷需求数值D(t);
其中,T为该历史时间段的天数,t为该历史时间段中的时间点,其取值范围为[0,n*T],其中n为每天的时间点数目;
5)取一个未计算过的配置方式,得到采用该配置后变电站的总无功补偿值为:
Q ( C i , j W i ) = Σ i = 1 G C i , j W i B i ;
其中,G为变电站的电容器组数,Wi为第i组电容器组的电容器片数,Ci,j为第i组电容器组中第j片电容器的容量值,Ci,jWi为第i组电容器组投入Wi片电容后的无功容量值,Bi为第i组电容器组的投运系数;
其中,Wi∈[1,Wimax],Bi∈[0,1],Ci,j为常数;
其中,Bi的值为1时为投运,为0时为不投运;
6)将步骤5所得到的变电站的总无功补偿值与历史时间段中每个时间点的无功负荷需求数值D(t)进行条件极值计算,得到:
Q ( C i , j W i , t ) = min ( Q ( C i , j W i ) - D ( t ) ) ifQ ( C i , j W i ) - D ( t ) < 1 ( min ( Q ( C i , j W i ) - D ( t ) ) ) ifQ ( C i , j W i ) - D ( t ) &GreaterEqual; 1 ;
7)计算历史时间段中各条件极值的代数和,得到:
F ( C i , j W i ) = &Sigma; i = 1 t Q ( C i , j W i , t ) ;
其中,该式中t=n*T;
8)重复步骤5至步骤7,直至所有的配置方式都计算完毕;
9)求取各条件极值代数和中的最小值,得到各电容器组的配置容量Ci,jWi,并以此结果对所取时间段的变电站电容器组进行配置改造。
进一步的,在步骤3中根据电网设备巡检周期按月划分时间段,并设置每天的时间点数目为1440个。
本发明提供的变电站电容器组容量的无功配置方法,根据历史时间段的历史数据,通过条件极值计算方式计算出变电站电容器组的最优容量配置,并根据计算结果对对应时间段的变电站电容器组进行配置改造,从而达到优化变电站的无功配置,提高功率因数,降低网损的目的;该无功配置方法计算简单且数值解稳定,不存在收敛性问题,能提高整个网络的无功优化效果,有效缩小历史样本残差放大效应。
附图说明
图1是本发明实施例变电站电容器组容量的无功配置方法的配置流程图。
具体实施方式
以下结合附图说明对本发明的实施例作进一步详细描述,但本实施例并不用于限制本发明,凡是采用本发明的相似结构及其相似变化,均应列入本发明的保护范围。
如图1所示,本发明实施例所提供的一种变电站电容器组容量的无功配置方法,其特征在于,具体步骤如下:
1)根据变电站的电容器模型,得到电容器的组数G,以及每组电容器的最大片数Wmax
2)以排列组合方式对变电站的电容器组进行容量配置,得到各种配置方式的集合;
3)根据电网设备巡检周期划分时间段,设置每天的时间点数目;
4)取一个需要进行配置的时间段,并根据该时间段获取变电站在历史时间段中每个时间点的数据,计算出该历史时间段的无功负荷需求数值D(T),及该历史时间段中各时间点的无功负荷需求数值D(t);
其中,T为该历史时间段的天数,t为该历史时间段中的时间点,其取值范围为[0,n*T],其中n为每天的时间点数目;
5)取一个未计算过的配置方式,得到采用该配置后变电站的总无功补偿值为:
Q ( C i , j W i ) = &Sigma; i = 1 G C i , j W i B i ;
其中,G为变电站的电容器组数,Wi为第i组电容器组的电容器片数,Ci,j为第i组电容器组中第j片电容器的容量值,Ci,jWi为第i组电容器组投入Wi片电容后的无功容量值,Bi为第i组电容器组的投运系数;
其中,Wi∈[1,Wimax],Bi∈[0,1],Ci,j为常数;
其中,Bi的值为1时为投运,为0时为不投运;
6)将步骤5所得到的变电站的总无功补偿值与历史时间段中每个时间点的无功负荷需求数值D(t)进行条件极值计算,得到:
Q ( C i , j W i , t ) = min ( Q ( C i , j W i ) - D ( t ) ) ifQ ( C i , j W i ) - D ( t ) < 1 ( min ( Q ( C i , j W i ) - D ( t ) ) ) ifQ ( C i , j W i ) - D ( t ) &GreaterEqual; 1 ;
7)计算历史时间段中各条件极值的代数和,得到:
F ( C i , j W i ) = &Sigma; i = 1 t Q ( C i , j W i , t ) ;
其中,该式中t=n*T;
8)重复步骤5至步骤7,直至所有的配置方式都计算完毕;
9)求取各条件极值代数和中的最小值,得到各电容器组的配置容量Ci,jWi,并以此结果对所取时间段的变电站电容器组进行配置改造。
本发明实施例中的步骤3中,根据电网设备巡检周期按月划分时间段,并设置每天的时间点数目为1440个。

Claims (2)

1.一种变电站电容器组容量的无功配置方法,其特征在于,具体步骤如下:
1)根据变电站的电容器模型,得到电容器的组数G,以及每组电容器的最大片数Wmax
2)以排列组合方式对变电站的电容器组进行容量配置,得到各种配置方式的集合;
3)根据电网设备巡检周期划分时间段,设置每天的时间点数目;
4)取一个需要进行配置的时间段,并根据该时间段获取变电站在历史时间段中每个时间点的数据,计算出该历史时间段的无功负荷需求数值D(T),及该历史时间段中各时间点的无功负荷需求数值D(t);
其中,T为该历史时间段的天数,t为该历史时间段中的时间点,其取值范围为[0,n*T],其中n为每天的时间点数目;
5)取一个未计算过的配置方式,得到采用该配置后变电站的总无功补偿值为:
Q ( C i , j W i ) = &Sigma; i = 1 G C i , j W i B i ;
其中,G为变电站的电容器组数,Wi为第i组电容器组的电容器片数,Ci,j为第i组电容器组中第j片电容器的容量值,Ci,jWi为第i组电容器组投入Wi片电容后的无功容量值,Bi为第i组电容器组的投运系数;
其中,Wi∈[1,Wimax],Bi∈[0,1],Ci,j为常数,Wimax为第i组电容器的最大片数;
其中,Bi的值为1时为投运,为0时为不投运;
6)将步骤5所得到的变电站的总无功补偿值与历史时间段中每个时间点的无功负荷需求数值D(t)进行条件极值计算,得到:
Q ( C i , j W i , t ) = min ( Q ( C i , j W i ) - D ( t ) ) ifQ ( C i , j W i ) - D ( t ) < 1 ( min ( Q ( C i , j W i ) - D ( t ) ) ) ifQ ( C i , j W i ) - D ( t ) &GreaterEqual; 1 ;
7)计算历史时间段中各条件极值的代数和,得到:
F ( C i , j W i ) = &Sigma; i = 1 t Q ( C i , j W i , t ) ;
其中,该式中t=n*T;
8)重复步骤5至步骤7,直至所有的配置方式都计算完毕;
9)求取各条件极值代数和中的最小值,得到各电容器组的配置容量Ci,jWi,并以此结果对所取时间段的变电站电容器组进行配置改造。
2.根据权利要求1所述的方法,其特征在于:在步骤3中根据电网设备巡检周期按月划分时间段,并设置每天的时间点数目为1440个。
CN 200910053613 2009-06-23 2009-06-23 变电站电容器组容量的无功配置方法 Active CN101635463B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200910053613 CN101635463B (zh) 2009-06-23 2009-06-23 变电站电容器组容量的无功配置方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200910053613 CN101635463B (zh) 2009-06-23 2009-06-23 变电站电容器组容量的无功配置方法

Publications (2)

Publication Number Publication Date
CN101635463A CN101635463A (zh) 2010-01-27
CN101635463B true CN101635463B (zh) 2013-07-10

Family

ID=41594561

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200910053613 Active CN101635463B (zh) 2009-06-23 2009-06-23 变电站电容器组容量的无功配置方法

Country Status (1)

Country Link
CN (1) CN101635463B (zh)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101931237B (zh) * 2010-09-06 2012-07-25 余杭供电局 一种高压配电网电压无功配置与运行状态的评估方法
CN102055196B (zh) * 2010-12-20 2012-11-28 南京软核科技有限公司 一种电力系统中10kv配电网的无功补偿优化方法
CN102270849B (zh) * 2011-07-28 2013-04-03 重庆大学 变压器中线电流抑制方法
CN103245850B (zh) * 2013-03-29 2015-10-28 上海申瑞继保电气有限公司 配电变压器的馈线最大负荷预估方法
CN105591390B (zh) * 2015-12-22 2017-11-07 云南电网有限责任公司电力科学研究院 一种改善含小水电配电网电压质量的方法
CN108280537A (zh) * 2017-12-29 2018-07-13 国网北京市电力公司 配电线路的无功配置方法和装置

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101106277A (zh) * 2007-06-19 2008-01-16 保定学峰实业有限公司 一种10kv配电网络单元线路无功优化补偿方法
CN201038773Y (zh) * 2007-04-25 2008-03-19 沈阳华腾电器设备有限公司 一种电容编组器

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3457476B2 (ja) * 1996-08-12 2003-10-20 松下電器産業株式会社 無効電力調整装置

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201038773Y (zh) * 2007-04-25 2008-03-19 沈阳华腾电器设备有限公司 一种电容编组器
CN101106277A (zh) * 2007-06-19 2008-01-16 保定学峰实业有限公司 一种10kv配电网络单元线路无功优化补偿方法

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
110kV变电站并联电容器的配置;孙海新;《河北电力技术》;20060228;第25卷(第1期);20-22 *
JP特开平10-66262A 1998.03.06
孙海新.110kV变电站并联电容器的配置.《河北电力技术》.2006,第25卷(第1期),20-22.
忻俊慧.无功补偿配置技术原则及无功电压问题探讨.《湖北电力》.2006,第30卷(第4期),1-3.
无功补偿配置技术原则及无功电压问题探讨;忻俊慧;《湖北电力》;20060831;第30卷(第4期);1-3 *

Also Published As

Publication number Publication date
CN101635463A (zh) 2010-01-27

Similar Documents

Publication Publication Date Title
CN101635463B (zh) 变电站电容器组容量的无功配置方法
CN102055191B (zh) 一种考虑外网等值的静态电压稳定广域切负荷控制方法
Balasubramaniam et al. Energy management system for enhanced resiliency of microgrids during islanded operation
CN104463701B (zh) 一种配电系统与电动汽车充电网络的协调规划方法
Li et al. Optimum integration of solar energy with battery energy storage systems
CN105958519B (zh) 一种基于主动管理与成本效益分析的配电网储能系统配置方法
CN102244384B (zh) 一种基于经济当量分析的主变压器优化运行方法
Narimani et al. Energy storage control methods for demand charge reduction and PV utilization improvement
CN105244889A (zh) 一种配电网无功补偿规划的方法
García-Plaza et al. Peak shaving algorithm with dynamic minimum voltage tracking for battery storage systems in microgrid applications
CN104600695A (zh) 基于在线状态估计和实时调度计划的趋势潮流计算方法
CN104156893A (zh) 一种基于虚拟储能技术的峰谷时段计算方法
CN107944680A (zh) 一种基于智能电能表的变电站电能量平衡监测方法
CN104836243A (zh) 计及负荷时序特性的配电网无功补偿方法
Astero et al. Improvement of RES hosting capacity using a central energy storage system
CN103198222A (zh) 一种用于综合停电检修计划的平衡优化方法
CN113859018A (zh) 大规模电动汽车群的分级充放电优化控制方法、计算机装置及计算机可读存储介质
Wang et al. Active and reactive power support of MV distribution systems using battery energy storage
CN103018611A (zh) 一种基于电流分解的非侵入式负载监测方法及系统
Tran et al. Optimal energy management strategies of microgrids
CN109558628A (zh) 一种实时发电计划的协调优化方法及系统
CN109829599A (zh) 基于高比例可再生能源的配电网的集群划分方法及装置
CN104809543A (zh) 基于月度输变电设备检修计划的电网运行方式生成方法
Moslemi et al. A machine learning based demand charge management solution
CN102542360B (zh) 一种未建模机组在母线负荷预测中的处理方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: SHANGHAI SUNRISE PROTECTIVE RELAY ELECTRIC CO.,LTD

Free format text: FORMER OWNER: SHANGHAI SUNRISE POWER AUTOMATION CO., LTD.

Effective date: 20130216

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20130216

Address after: 200233 Guiping Road, Xuhui District, No. 470, building 12, building 5, building

Applicant after: Shanghai Sunrise Power Technology Co., Ltd.

Address before: 200233 Shanghai City, Xuhui District Road No. 159 15 Tianzhou room unit 1301

Applicant before: Shanghai Sunrise Power Automation Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20170213

Address after: 518063 Guangdong, Shenzhen Province, science and technology, South Road, No. twelve Changhong science and technology building, building 9, unit 01-02, unit 18

Patentee after: Shenzhen Great Energy Technology Co.,Ltd.

Address before: 200233 Guiping Road, Xuhui District, No. 470, building 12, building 5, building

Patentee before: Shanghai Sunrise Power Technology Co., Ltd.