CN101629470B - 干处嵌岩钻孔桩钻孔施工方法 - Google Patents
干处嵌岩钻孔桩钻孔施工方法 Download PDFInfo
- Publication number
- CN101629470B CN101629470B CN2008100484042A CN200810048404A CN101629470B CN 101629470 B CN101629470 B CN 101629470B CN 2008100484042 A CN2008100484042 A CN 2008100484042A CN 200810048404 A CN200810048404 A CN 200810048404A CN 101629470 B CN101629470 B CN 101629470B
- Authority
- CN
- China
- Prior art keywords
- pile
- construction
- drilling
- hole
- rig
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
本发明公开了一种干处嵌岩钻孔桩钻孔施工方法,先用人工挖孔施工导桩,对导桩以下的嵌岩桩采取增大泥浆浓度冲击钻进,每循环用掏渣筒将孔内泥浆和钻渣清理干净,再循环加土造浆钻进,直到钻孔达到设计深度,钻孔完毕后将孔内浆渣掏尽可以象挖孔桩一样在空气环境中浇筑混凝土。本发明可以减少钻机反复冲击钻渣,施工效率提高2~3倍,施工速度为人工挖孔的2倍以上,同时减少孔桩的超挖造成的混凝土浇筑量,简化施工工艺,提高施工质量,大大降低成本。
Description
[技术领域]
本发明涉及一种干处嵌岩钻孔桩钻孔施工方法。
[背景技术]
常规的干处嵌岩桩基施工都是采用人工挖孔施工,在少数情况下也有采用常规的钻孔桩施工的。人工挖孔桩施工具有进度慢,安全性差和超挖回填量大等缺点。人工挖孔桩作业中爆破作业对基岩的稳定性也会产生一定的不利影响。钻孔桩施工一般都是采用泥浆正循环排碴,采取泥浆泵输送泥浆至孔底,通过泥浆的浮力和流动将孔底石碴带出。在施工中常常由于泥浆比重太小(注:比重太大,泥浆泵不能正常工作)和孔桩太深,排渣效果较差,又由于进尺缓慢,提升钢丝绳在一个部位长期磨损和弯曲疲劳,容易断裂而发生掉锤事故。
[发明内容]
本发明的目的是克服人工挖孔施工和常规的钻孔施工技术中的不足,提供一种干处嵌岩钻孔桩钻孔施工方法。
本发明的目的是这样实现的:一种干处嵌岩钻孔桩钻孔施工方法,包括以下步骤:
1、导桩挖孔施工。采用人工挖孔桩施工方法,导桩施工深度需根据地质情况而定,一般要求导桩深度不小于2米,同时嵌入完整的基岩不少于2米。
2、钻机就位。选用冲击钻钻孔施工。根据桩径确定钻头重量,在钻机前部1米范围浇筑10cm厚混凝土并将钻机安装区平整夯实,待混凝土达到7天龄期导桩开挖完毕后进行钻机安装,钻机安装必须平稳牢靠,不晃动。
3、造浆钻进
钻孔造浆选用黏土分次往孔内投放,同时往孔内注水,开动钻机冲击造浆钻进。开始时钻机冲程控制在1.5-2.0米,随着造浆量的增加冲程也跟着按每小时0.8-1.2米的高度均匀增加。
4、正常钻进
正常钻进冲程控制在4-6米内。钻进时浆液比重控制在1.3-1.5g/CM3左右。
5、钻孔进尺达到1.5-3.0米后即可开始掏渣清孔。清孔前将钻头提到高出孔口约2.5米,然后启动副卷扬机提升掏渣筒掏渣。掏渣筒直径约为桩径的一半,底部设有阀门,阀门开启是利用掏渣筒的重量形成的地基支撑反力顶开。
测量钻孔进尺,钻孔未达到设计深度,重复步骤3、4、5,直到达到设计深度。
6、清孔验收
钻孔达到设计深度清渣完毕后利用水管将孔壁冲洗干净,然后用掏渣筒再次清理即可报验。
本发明具有以下优点,采取每一循环将孔内浆渣掏尽,可以减少钻机反复冲击钻渣,施工效率提高2~3倍,施工速度为人工挖孔的2倍以上;钻孔风险小,遇到卡钻或钻头脱落可以随时将孔内清干处理,且不需要泥浆泵,设备损耗少;由于钻孔可以将桩基形成光滑的壁面,减少桩孔的超挖,可以节约混凝土用量;采用钻孔施工可以避免人工进入深孔开挖作业,提高了作业的安全性;可以象人工挖孔桩一样采用干处振捣浇筑混凝土,施工风险小,质量易保证,且可以节约水泥约三分之一。
[附图说明]
下面结合附图和实施例对本实用新型做进一步说明。
图1是本发明的工艺流程图。
图1兼作摘要附图。
[具体实施方式]
如图所示,一种干处嵌岩钻孔桩钻孔施工方法,包括以下步骤:
1、导桩挖孔施工。采用人工挖孔桩施工方法,导桩施工深度需根据地质情况而定,一般要求导桩深度不小于2米,同时嵌入完整的基岩不少于2米。
2、钻机就位。选用冲击钻钻孔施工。根据桩径确定钻头重量,在钻机前部1米范围浇筑10cm厚混凝土并将钻机安装区平整夯实,待混凝土达到7天龄期导桩开挖完毕后进行钻机安装,钻机安装必须平稳牢靠,不晃动。
3、造浆钻进
钻孔造浆选用黏土分次往孔内投放,同时往孔内注水,开动钻机冲击造浆钻进。开始时钻机冲程控制在2米左右,随着造浆量的增加冲程也跟着按每小时1米的高度均匀增加。
4、正常钻进
正常钻进冲程控制在4-6米内。钻进时浆液比重控制在1.4g/CM3左右。
5、钻孔进尺达到2.5米左右后即可开始掏渣清孔。清孔前将钻头提到高出孔口约2.5米,然后启动副卷扬机提升掏渣筒掏渣。掏渣筒直径约为桩径的一半,底部设有阀门,阀门开启是利用掏渣筒的重量形成的地基支撑反力顶开。
测量钻孔进尺,钻孔未达到设计深度,重复步骤3、4、5,直到达到设计深度。
6、清孔验收
钻孔达到设计深度清渣完毕后利用水管将孔壁冲洗干净,然后用掏渣筒再次清理即可报验。
本发明在云南元磨高速公路K311+424特大桥2#墩桩基得到了成功应用,元磨高速公路K311+424特大桥2#墩位于磨黑岸一侧半山坡的一平台上,山体坡度约55°,设计为6根φ200cm长46米深的嵌岩桩,地质构造为上部15米厚碎石土,6~7米厚强风化岩层,以下24~25米为石英砂岩与泥岩互层结构,本桩处于地下水位以上,为干孔桩。施工中采用本技术,进度快、作业安全、保证了施工质量,也节约了施工成本。实践证明,本发明尤其适用于交通较方便、嵌岩较深、工程量较集中、数量较大、渗水每分钟小于10L的圆桩基施工。
Claims (1)
1.一种干处嵌岩钻孔桩钻孔施工方法,包括以下步骤:
1)、导桩挖孔施工:采用人工挖孔桩施工方法,导桩施工深度需根据地质情况而定,要求导桩深度不小于2米,同时嵌入完整的基岩不少于2米;
2)、钻机就位:选用冲击钻钻孔施工,根据桩径确定钻头重量,在钻机前部1米范围浇筑10cm厚混凝土并将钻机安装区平整夯实,待混凝土达到7天龄期导桩开挖完毕后进行钻机安装,钻机安装必须平稳牢靠,不晃动;
3)、造浆钻进:钻孔造浆选用黏土分次往孔内投放,同时往孔内注水,开动钻机冲击造浆钻进,开始时钻机冲程控制在1.5-2.0米,随着造浆量的增加冲程也跟着按每小时0.8-1.2米的高度均匀增加;
4)、正常钻进:正常钻进冲程控制在4-6米内,钻进时浆液比重控制在1.3-1.5g/CM3;
5)、掏渣:钻孔进尺达到1.5-3.0米后即可开始掏渣清孔,清孔前将钻头提到高出孔口约2.5米,然后启动副卷扬机提升掏渣筒掏渣,掏渣筒直径约为桩径的一半,底部设有阀门,阀门开启是利用掏渣筒的重量形成的地基支撑反力顶开;
测量钻孔进尺,钻孔未达到设计深度,重复步骤3)、4)、5),直到达到设计深度;
6)、清孔验收:钻孔达到设计深度清渣完毕后利用水管将孔壁冲洗干净,然后用掏渣筒再次清理即可报验。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2008100484042A CN101629470B (zh) | 2008-07-15 | 2008-07-15 | 干处嵌岩钻孔桩钻孔施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2008100484042A CN101629470B (zh) | 2008-07-15 | 2008-07-15 | 干处嵌岩钻孔桩钻孔施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101629470A CN101629470A (zh) | 2010-01-20 |
CN101629470B true CN101629470B (zh) | 2012-11-07 |
Family
ID=41574733
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2008100484042A Expired - Fee Related CN101629470B (zh) | 2008-07-15 | 2008-07-15 | 干处嵌岩钻孔桩钻孔施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101629470B (zh) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102995631A (zh) * | 2011-09-09 | 2013-03-27 | 五冶集团上海有限公司 | 灌注桩套孔成孔施工方法 |
CN104047543B (zh) * | 2014-05-30 | 2016-11-09 | 中铁隧道集团有限公司 | 一种在高强度岩石地层中大直径钻孔桩成孔的施工方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1164606A (zh) * | 1996-05-07 | 1997-11-12 | 邹宗煊 | 建筑基础冲、钻孔灌注桩微差控制无损爆破嵌岩工艺 |
US5908268A (en) * | 1988-12-29 | 1999-06-01 | Takechi Engineering Co., Ltd. | Method of making a hole for a foundation pile |
CN1370893A (zh) * | 2002-04-04 | 2002-09-25 | 中国建筑科学研究院 | 长螺旋钻孔灌注桩、cfg桩的桩端预压浆施工方法及装置 |
CN101100858A (zh) * | 2006-07-03 | 2008-01-09 | 翟向滨 | 钻具中心泵送砼后压浆砼灌注桩的施工方法及其施工装置 |
-
2008
- 2008-07-15 CN CN2008100484042A patent/CN101629470B/zh not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5908268A (en) * | 1988-12-29 | 1999-06-01 | Takechi Engineering Co., Ltd. | Method of making a hole for a foundation pile |
CN1164606A (zh) * | 1996-05-07 | 1997-11-12 | 邹宗煊 | 建筑基础冲、钻孔灌注桩微差控制无损爆破嵌岩工艺 |
CN1370893A (zh) * | 2002-04-04 | 2002-09-25 | 中国建筑科学研究院 | 长螺旋钻孔灌注桩、cfg桩的桩端预压浆施工方法及装置 |
CN101100858A (zh) * | 2006-07-03 | 2008-01-09 | 翟向滨 | 钻具中心泵送砼后压浆砼灌注桩的施工方法及其施工装置 |
Non-Patent Citations (3)
Title |
---|
吴全友.灌注混凝土桩施工方法及工艺的探讨.《筑路机械与施工机械化》.2005,(第6期),37-39,55. * |
尹春燕.水下钻孔灌注桩施工工艺与质量控制的研究.《中国优秀硕士学位论文全文数据库,工程科技II辑》.2008,62-65. * |
罗肇清.建筑工程基础施工中钻孔灌注桩施工技术探讨.《四川建材》.2007,(第6期),137-138. * |
Also Published As
Publication number | Publication date |
---|---|
CN101629470A (zh) | 2010-01-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104563098B (zh) | 一种超大直径全钢护筒干作业成孔灌注桩施工方法 | |
WO2018210019A1 (zh) | 潜孔冲击旋喷复合桩成桩方法 | |
CN110387880A (zh) | 一种钻孔灌注桩施工方法 | |
CN109594564A (zh) | 一种地铁深基坑明挖防坍塌施工方法 | |
CN103469789A (zh) | 一种岩溶地区桥梁水中墩钻孔桩施工方法 | |
CN102943466A (zh) | 微型钢管混凝土桩穿透路基层加固软弱地基施工工法 | |
CN106759288A (zh) | 一种建筑钻孔灌注桩施工方法 | |
CN108166483A (zh) | 钻孔灌注桩施工方法 | |
KR100762991B1 (ko) | 고강도 몰탈을 충진하는 기성말뚝 매입공법 | |
CN111058443B (zh) | 一种消除黄土湿陷性的预制桩复合地基施工方法 | |
CN105780763A (zh) | 中孔振动套管护壁长螺旋钻孔压灌桩的施工方法 | |
CN106930276A (zh) | 旋挖灌注桩深孔爆破与导管旋挖清除障碍的施工方法 | |
CN110387879A (zh) | 一种液压振动锤击沉管的混凝土灌注桩施工方法 | |
CN113323584B (zh) | 一种大型震动长螺旋钻机钻孔方法 | |
CN110629747A (zh) | 复杂地质条件下桩基础全套管全回转施工工艺 | |
CN107642041A (zh) | 超大直径空心群桩锚碇 | |
CN106812149A (zh) | 一种桩基的施工方法 | |
CN104047542A (zh) | 嵌岩斜桩冲击钻管锤系统及嵌岩斜桩冲击施工方法 | |
CN106677166A (zh) | 卵砾石――风化岩地层钻孔灌注桩双机联合成桩流水施工方法 | |
CN101046094A (zh) | 一种用钢管做护壁套管的钻孔灌注桩施工方法 | |
CN104711975B (zh) | 一种长螺旋钻孔灌注桩施工工艺 | |
CN108643214A (zh) | 一种回填杂土复合地基结构及其施工方法 | |
CN207484290U (zh) | 超大直径空心群桩锚碇 | |
CN110080779A (zh) | 隧道隧底溶洞处理施工方法 | |
CN101280561B (zh) | 一种适用于特殊地层的复合型桩体的制作方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20121107 Termination date: 20190715 |