CN101624024A - 依托跨电气铁路接触网预制梁的防电隔离棚的制作方法 - Google Patents
依托跨电气铁路接触网预制梁的防电隔离棚的制作方法 Download PDFInfo
- Publication number
- CN101624024A CN101624024A CN200910044089A CN200910044089A CN101624024A CN 101624024 A CN101624024 A CN 101624024A CN 200910044089 A CN200910044089 A CN 200910044089A CN 200910044089 A CN200910044089 A CN 200910044089A CN 101624024 A CN101624024 A CN 101624024A
- Authority
- CN
- China
- Prior art keywords
- precast beam
- isolating shed
- electric railroad
- making
- isolating
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
本发明公开了依托跨电气铁路接触网预制梁的防电隔离棚的制作方法,所述的防电隔离棚是通过在跨铁路桥梁的预制梁长度方向两侧的底部预埋螺母,然后由螺栓连接螺母将角钢固定在预制梁的长度方向,再将多个预制梁平行安装至桥墩上后,在两个相邻的预制梁之间的角钢上依次铺设支撑板、绝缘板、防水布、防火布而成。本发明工艺简单、操作方便、在施工时铁路停运时间短,建设成本低,施工难度小,可替代现有防电隔离棚架施工方法。
Description
技术领域
本发明涉及跨电气铁路接触网桥梁施工防护技术领域,尤其涉及一种跨电气铁路接触网防电隔离棚的制作方法,更具体地涉及一种依托跨电气铁路接触网预制梁的防电隔离棚的制作方法。
背景技术
道路施工过程中,经常会遇到所修道路与铁路交叉而需要修建桥梁跨越铁路的情况。由于现在铁路的电气化程度较高,其轨道上方都架设有电压为上万伏的高压电线。
为保证铁路安全正常运行及桥梁安全施工,目前所采用的方法是在桥梁施工之前预先在铁路与桥梁相交叉的地点架设防电隔离棚。在2005年第2期《铁道建筑技术》中的《跨线桥架空支架兼防电棚施工技术》(作者:朱华来)一文中,对现有的防电隔离棚架设施工技术作出了说明,防电隔离棚采用钢结构来支撑,其高度处于铁路电网和跨铁路桥梁之间,顶部铺满绝缘隔离材料,用以防止桥梁施工过程中上杂物掉落或水流到铁路电网上所造成的安全事故的发生。但由于施工时需要现场制作安装防电隔离棚支撑结构,对施工段的铁路必须进行停电停运处理,虽然施工时间相较跨电网桥梁的建设所需时间要短,但仍会对铁路运输造成较大的影响。且这种防电隔离棚需要钢结构来进行支撑,其造价较高,也造成了整个道路建设工程成本的上升。而防电隔离棚需要在铁路路基上进行支撑结构的架设,为了使防电隔离棚架设完成后不对铁路路基产生影响,对于防电隔离棚架设的施工要求也较高,架设难度较大。
发明内容
为解决现有跨铁路电网防电隔离棚在架设时需停运铁路时间长、建设成本高、施工难度大的技术问题,本发明提供一种工艺简单、操作方便、在施工时铁路停运时间短,建设成本低,施工难度小的依托跨电气铁路接触网预制梁的防电隔离棚的制作方法。
为实现上述发明目的,本发明采用以下技术方案:一种依托跨电气铁路接触网预制梁的防电隔离棚的制作方法,包括以下步骤:
第一步:在预制梁长度方向两侧的底部钢筋上方150~180毫米处,按间距800~1500毫米预埋长螺母,通过螺栓与长螺母连接将长度为1.5~3米的角钢依次固定在预制梁长度方向,角钢与预制梁接触面之间夹装一楔形垫;
第二步:将多片预制梁按设计要求平行安装在桥墩上;
第三步:在相邻两预制梁之间的角钢上依次铺设支撑板、绝缘板、防水布、防火布,即得到本发明所述的防电隔离棚。
上述的一种依托跨电气铁路接触网预制梁的防电隔离棚的制作方法中,其所述的角钢上设有接地线连接头。
上述的一种依托跨电气铁路接触网预制梁的防电隔离棚的制作方法中,其所述楔形垫的楔形角为12~16°。
上述的一种依托跨电气铁路接触网预制梁的防电隔离棚的制作方法中,其所述支撑板为木板、竹架板中的一种。
上述的一种依托跨电气铁路接触网预制梁的防电隔离棚的制作方法中,其所述绝缘板的绝缘电压等级为1000~35000伏。
上述的一种依托跨电气铁路接触网预制梁的防电隔离棚的制作方法中,其所述防火布为石棉布。
本发明的有益效果在于,通过在跨铁路桥预制樑上预埋支撑件来搭建防电隔离棚,利用预制樑作为防电隔离棚的支撑,一方面,在预制樑吊装至桥墩上定位后,即完成防电隔离棚支撑的安装,取消因单独架设防电隔离棚支撑架而必须对铁路实施停电停运的程序,可带来巨大的社会效益和经济效益;同时,由于桥墩的高度较高,使得预制梁处于铁路电网的安全距离之外,因此,架设防电隔离棚时,不需停止铁路电网的供电。另一方面,无需再另外架设防电隔离棚支撑结构,有效的节省了材料的使用,降低了工程的成本,且架设施工简单、所需时间短。可有效保证铁路运输及桥梁施工的安全。
综上所述,本发明工艺简单、操作方便、在施工时铁路停运时间短,建设成本低,施工难度小,可替代现有防电隔离棚架施工方法。
下面结合附图对本发明作进一步说明。
附图说明
附图1为实施本发明方法所制作的防电隔离棚的横截面局部示意图;
附图2为实施本发明方法中所述角钢与预制梁的安装示意图;
附图3为实施本发明方法中所述楔形垫的示意图,所示楔形角α为12~16°
图中:1为预制梁,2为螺母,3为螺栓,4为角钢,5为楔形垫,6为支撑板,7为绝缘板,8为防水布,9为防火布。
具体实施方式
以下实施例及实施方式旨在进一步说明本发明,而非限制本发明。
参见附图1、附图2,预制梁1作为桥梁桥面的骨架部分,是由钢筋水泥预制而成,其截面呈倒梯形。本发明在预制梁1的制作过程中,预先在倒梯形底部钢筋的上方150~180毫米处,按800~1500毫米的间距顺着预制梁延伸的长度方向来预埋长螺母2,然后再进行水泥浇注,待水泥浇注定型后,即可通过螺栓3来连接螺母2,以将长度为1.5~3米的角钢4依次沿预制梁1长度方向固定在预制梁1底部。由于预制梁1的截面呈倒梯形,其侧面未与水平面垂直,为保证用于支撑防电隔离棚的角钢4的上平面呈水平,在角钢4与预制梁1接触面之间夹装一楔形垫5,楔形垫5与预制梁1的侧面相适应以使角钢4上平面保持水平,其楔形角α为12~16°。同时为确保在施工时不会因防电隔离棚自身的绝缘材料摩擦而产生的感应电使施工人员受到伤害,在角钢4上设有接地线连接头,用接地线将感应电导至地表。
在架设跨铁路桥梁时,首先在铁路两侧浇注桥墩,待桥墩成型后,即可按照道路设计的路宽在桥墩上沿道路延伸方向平行安装多条预设有角钢的预制梁1。安装预设角钢预制梁1的长度可根据需搭建的防电隔离棚的实际需要而定。
预制梁铺设安装完毕后,首先在相邻的两预制梁之间的角钢上铺设木板或者竹架板来作为防电隔离棚的支撑板6,然后再在支撑板6上铺设绝缘板7,绝缘板7的绝缘电压等级为1000~35000伏,可根据具体所跨越的铁路电网的电压而定。在绝缘板上再铺设防水布8,以防止积水从防电隔离棚上下泄至铁路电网。最后在防水布8上铺设石棉布作为防火布9,即完成了防电隔离棚的架设。
Claims (6)
1、依托跨电气铁路接触网预制梁的防电隔离棚的制作方法,其特征在于:包括以下步骤:
第一步:在预制梁(1)长度方向两侧的底部钢筋上方150~180毫米处,按间距800~1500毫米预埋螺母(2),通过螺栓(3)与长螺母(2)连接将长度为1.5~3米的角钢(4)依次固定在预制梁长度方向,角钢与预制梁接触面之间夹装一楔形垫(5);
第二步:将多片预制梁(1)按设计要求平行安装在桥墩上;
第三步:在相邻两预制梁(1)之间的角钢(4)上依次铺设支撑板(6)、绝缘板(7)、防水布(8)、防火布(9),即得到本发明所述的防电隔离棚。
2、根据权利要求1所述的依托跨电气铁路接触网预制梁的防电隔离棚的制作方法,其特征在于,所述的角钢(4)上设有接地线连接头。
3、根据权利要求1所述的依托跨电气铁路接触网预制梁的防电隔离棚的制作方法,其特征在于,所述楔形垫(5)的楔形角为12~16°。
4、根据权利要求1所述的依托跨电气铁路接触网预制梁的防电隔离棚的制作方法,其特征在于,所述支撑板(6)为木板、竹架板中的一种。
5、根据权利要求1所述的依托跨电气铁路接触网预制梁的防电隔离棚的制作方法,其特征在于,所述绝缘板(7)的绝缘电压等级为1000~35000伏。
6、根据权利要求1所述的依托跨电气铁路接触网预制梁的防电隔离棚的制作方法,其特征在于,所述防火布(9)为石棉布。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009100440890A CN101624024B (zh) | 2009-08-12 | 2009-08-12 | 依托跨电气铁路接触网预制梁的防电隔离棚的制作方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009100440890A CN101624024B (zh) | 2009-08-12 | 2009-08-12 | 依托跨电气铁路接触网预制梁的防电隔离棚的制作方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101624024A true CN101624024A (zh) | 2010-01-13 |
CN101624024B CN101624024B (zh) | 2011-04-27 |
Family
ID=41520072
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009100440890A Active CN101624024B (zh) | 2009-08-12 | 2009-08-12 | 依托跨电气铁路接触网预制梁的防电隔离棚的制作方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101624024B (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104989117A (zh) * | 2015-07-14 | 2015-10-21 | 中交第二航务工程局有限公司 | 预制梁安装施工的防护棚布置结构及其布置方法 |
CN107806009A (zh) * | 2017-10-27 | 2018-03-16 | 中铁五局集团有限公司 | 一种高速公路跨既有线铁路接触网防护棚及其施工方法 |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2732521C3 (de) * | 1977-07-19 | 1980-02-07 | Steag Ag, 4300 Essen | Stahlbrücke Über Gleisanlagen, insbesondere für RohrleitungstraBen |
CN2324173Y (zh) * | 1997-12-23 | 1999-06-16 | 郑州铁路局西安科学技术研究所 | 电气化铁道跨线桥施工防电设备 |
CN2589258Y (zh) * | 2002-12-04 | 2003-12-03 | 郑州铁路局西安科学技术研究所 | 直挂式防电装置 |
CN2742025Y (zh) * | 2004-03-17 | 2005-11-23 | 曹辉 | 滑道滑行式防电棚架 |
RU2281210C1 (ru) * | 2005-02-17 | 2006-08-10 | Андрей Викторович Федькин | Кронштейн контактного рельса |
CN2839028Y (zh) * | 2005-09-20 | 2006-11-22 | 马勇 | 穿滑式防电隔离棚 |
CN201082948Y (zh) * | 2007-07-17 | 2008-07-09 | 贺东贤 | 上跨电气化铁路立交桥施工防护棚 |
-
2009
- 2009-08-12 CN CN2009100440890A patent/CN101624024B/zh active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104989117A (zh) * | 2015-07-14 | 2015-10-21 | 中交第二航务工程局有限公司 | 预制梁安装施工的防护棚布置结构及其布置方法 |
CN107806009A (zh) * | 2017-10-27 | 2018-03-16 | 中铁五局集团有限公司 | 一种高速公路跨既有线铁路接触网防护棚及其施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN101624024B (zh) | 2011-04-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9222225B2 (en) | Pre-stressed concrete track slab of slab-type ballast-less track | |
CN105839510A (zh) | 一种钢-超高性能混凝土组合连续梁桥结构及其施工方法 | |
CN105780994B (zh) | 一种震后自复位的偏心支撑钢框架组合楼板及其施工方法 | |
CN106192620B (zh) | 一种铁路无砟轨道支撑层及下部结构拆换方法 | |
CN106049209A (zh) | 一种用于铁路无砟轨道支撑层拆换的临时钢轨支撑装置 | |
CN113585075A (zh) | 一种钢混叠合梁现浇桥面板模架 | |
CN105298115A (zh) | 用于大斜度坡屋面的施工结构 | |
CN114809734B (zh) | 一种装配式站台雨棚施工方法 | |
CN203394027U (zh) | 半装配式框架剪力墙筒体结构施工体系 | |
CN101624024B (zh) | 依托跨电气铁路接触网预制梁的防电隔离棚的制作方法 | |
CN111549952A (zh) | 一种gis设备的安装基础 | |
CN108457148B (zh) | 一种装配式多功能临时道路结构及其施工方法 | |
CN103711199A (zh) | 大截面梁、柱节点施工缝处理方法及结构 | |
CN104562944B (zh) | 大跨径叠合梁斜拉桥边钢箱临时锚固体系 | |
CN110388096B (zh) | 一种关于焦炉大棚灵活施工的结构及施工方法 | |
CN104562919A (zh) | 一种站线分离的高架站结构 | |
CN102936873A (zh) | 上跨电气化铁路连续梁施工接触网线防护系统 | |
CN208668245U (zh) | 一种用于斜拉桥的钢-uhpc组合梁构造 | |
CN201526006U (zh) | 预应力混凝土连续箱梁 | |
CN203096534U (zh) | 一种阻尘道砟覆盖层 | |
CN115029983A (zh) | 基于后注浆工艺纵横交错双向预应力装配道路及施工方法 | |
CN204753382U (zh) | 城际铁路带声屏障预制人行道 | |
KR101302045B1 (ko) | 개량형 철도교량 리모델링 구조 및 이의 시공방법 | |
CN210049373U (zh) | 装配式工字钢叠合楼板安装结构 | |
CN204530507U (zh) | 大跨径叠合梁斜拉桥边钢箱临时锚固体系 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |