CN101619883B - 一种中央空调冷冻水送水温度控制方法 - Google Patents

一种中央空调冷冻水送水温度控制方法 Download PDF

Info

Publication number
CN101619883B
CN101619883B CN 200910055507 CN200910055507A CN101619883B CN 101619883 B CN101619883 B CN 101619883B CN 200910055507 CN200910055507 CN 200910055507 CN 200910055507 A CN200910055507 A CN 200910055507A CN 101619883 B CN101619883 B CN 101619883B
Authority
CN
China
Prior art keywords
delivery temperature
water delivery
water
refrigerator
total current
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN 200910055507
Other languages
English (en)
Other versions
CN101619883A (zh
Inventor
朱伟峰
金正日
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Jianke Construction Design Institute Co., Ltd.
Original Assignee
Shanghai Building Science Research Institute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Building Science Research Institute Group Co Ltd filed Critical Shanghai Building Science Research Institute Group Co Ltd
Priority to CN 200910055507 priority Critical patent/CN101619883B/zh
Publication of CN101619883A publication Critical patent/CN101619883A/zh
Application granted granted Critical
Publication of CN101619883B publication Critical patent/CN101619883B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Air Conditioning Control Device (AREA)

Abstract

本发明提供一种中央空调冷冻水送水温度控制方法,包括步骤:计算当前冷冻机总电流值和历年冷冻机总电流的最大值的比值。根据当前冷冻机总电流值和历年冷冻机总电流最大值的比值的大小确定冷冻水送水温度。如果当前冷冻机总电流值和历年冷冻机总电流的最大值的比值低于某一值时,对冷冻水送水温度进行调节,比值越低,送水温度越高,比值越高,送水温度越低。如果当前冷冻机总电流值和历年冷冻机总电流的最大值的比值高于某一值时,冷冻水送水温度控制在设计的送水温度。本发明根据空调负荷自动调节冷冻水送水温度,提高了整个中央空调系统的能效。

Description

一种中央空调冷冻水送水温度控制方法
技术领域
本发明属于中央空调技术领域,尤其涉及一种中央空调冷冻水送水温度控制方法。
背景技术
在中央空调系统运行过程中,空调负荷随着室外气象条件等因素变化,多数时间远小于设计负荷。如果在空调负荷减少时,适当提高冷水送水温度,可以提高冷水机组的运行效率,降低冷机的运行能耗,但提高送水温度可能会增加水泵的电耗,会造成额外的能耗,所以需要做综合考虑,这样就给冷冻水送水温度的调节带来困难。因此,在目前中央空调系统的全年运行过程中,对冷冻水送水温度的调节一般都缺乏科学的依据,在实际工程中基本不进行调节,或者凭运行人员的经验比较随意地进行调节,影响了中央空调系统的整体运行效率。
发明内容
本发明的目的是提供一种中央空调冷冻水送水温度控制方法,提高整个中央空调系统的能效。
本发明的技术方案是,一种中央空调冷冻水送水温度控制方法,其特征在于,包括以下步骤:
A1,取中央空调历年冷冻机总电流的最大值Imax,然后取当前各冷冻机电流值i1、i2、i3、…in
A2,计算当前冷冻机的总电流值和历年冷冻机总电流的最大值的比值
k = Σ m = 1 n i m I max ;
A3,判断所述比值k是否大于或等于常数C,如果比值k大于或等于常数C,则执行步骤A4,如果小于常数C,则执行步骤A5,这里常数C的取值范围在20%~80%之间;
A4,获取冷冻水送水温度设计值td;
A5,根据部分负荷工况下系统允许的最高送水温度tp和冷冻水送水温度设计值td,设定并控制所述冷冻水送水温度ts,延迟5分钟后返回执行步骤A1。
上述方案中,冷冻机总电流值是指当前运行工况下各冷冻机电流的总和,单位是安培,符号为A。它是衡量冷冻机负荷大小的直接参数,即负荷越大冷冻机电流越大,负荷越小冷冻机电流越小。历年冷冻机总电流的最大值指历年冷冻机总电流的最大值。常数C个设定的百分比,具体数值和具体系统有关,通常取在20%~80%之间的某个值。
本发明的有益效果是可以根据空调负荷自动调节冷冻水送水温度。由于在实际运行中较难获得空调负荷的准确数据,本发明利用当前冷冻机总电流值和往年冷冻机最大总电流值的比值自动调节冷冻水送水温度,进而提高整个中央空调系统的能效。
附图说明
图1是本发明一实施例的方法步骤流程图
具体实施方式
下面结合附图进一步说明发明的具体实施方式。
本发明是一种中央空调冷冻水送水温度控制方法,根据当前冷冻机总电流值和历年冷冻机最大总电流值的比值确定冷冻水送水温度。如果其比值高于某个百分比常数C时,则冷冻水送水温度控制在送水温度的设计值,无需调节送水温度。反之,如果其比值低于该百分比常数C时,则根据此比值的大小、冷冻水送水温度的设计值、部分负荷工况下系统允许的最高送水温度的线性曲线对冷冻水送水温度进行调节,电流比值越低,送水温度越高,电流比值越高,送水温度越低。上述百分比常数C的具体数值与具体系统有关,通常取在20%~80%之间的某个值。
如图1所示,本发明的一具体实施方式包括以下步骤:
步骤S101,首先取历年冷冻机总电流的最大值Imax,然后取当前各冷冻机电流值i1、i2、i3、…in
步骤S102,计算当前冷冻机总电流值和历年冷冻机总电流的最大值的比值
k = Σ m = 1 n i m I max ;
步骤S103,如果常数C取50%,判断当前冷冻机总电流值和历年冷冻机总电流的最大值的比值k是否大于或等于50%,如果其值大于或等于50%时,则执行步骤S104,如果小于50%时,则执行步骤S105;
步骤S104,取冷冻水送水温度设计值td(例如7℃),并且冷冻水送水温度设定值取冷冻水送水温度设计值;
步骤S105,首先取冷冻水送水温度设计值td(例如7℃)和部分负荷工况下系统允许的最高送水温度tp(例如12℃),然后根据从步骤S102计算得到的电流比值k值,计算冷冻水送水温度设定值ts=2×k×(td-tp)+tp。延迟5分钟后继续执行步骤S101。
本发明适用于所有公共建筑的中央空调系统冷冻水送水温度的控制。本发明具体实施方式所描述的中央空调冷冻水送水温度控制方法只需对冷冻机的软件系统进行升级,对中央空调系统内其余设备无任何影响。

Claims (1)

1.一种中央空调冷冻水送水温度控制方法,其特征在于,包括以下步骤:
A1,取中央空调历年冷冻机总电流的最大值Imax,然后取当前各冷冻机电流值i1、i2、i3、...in
A2,计算当前冷冻机的总电流值和历年冷冻机总电流的最大值的比值 k = Σ m = 1 n i m I max ;
A3,判断所述比值k是否大于或等于常数C,如果比值k大于或等于常数C,则执行步骤A4,如果小于常数C,则执行步骤A5,这里常数C的取值范围在20%~80%之间;
A4,将冷冻水送水温度设定值设置为预置的冷冻水送水温度设计值td:
A5,根据部分负荷工况下系统允许的最高送水温度tp和冷冻水送水温度设计值td,计算并保持所述冷冻水送水温度ts,这里ts=2×k×(td-tp)+tp,延迟5分钟后返回执行步骤A1。
CN 200910055507 2009-07-28 2009-07-28 一种中央空调冷冻水送水温度控制方法 Active CN101619883B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200910055507 CN101619883B (zh) 2009-07-28 2009-07-28 一种中央空调冷冻水送水温度控制方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200910055507 CN101619883B (zh) 2009-07-28 2009-07-28 一种中央空调冷冻水送水温度控制方法

Publications (2)

Publication Number Publication Date
CN101619883A CN101619883A (zh) 2010-01-06
CN101619883B true CN101619883B (zh) 2011-02-09

Family

ID=41513236

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200910055507 Active CN101619883B (zh) 2009-07-28 2009-07-28 一种中央空调冷冻水送水温度控制方法

Country Status (1)

Country Link
CN (1) CN101619883B (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106801975A (zh) * 2016-12-28 2017-06-06 杭州裕达自动化科技有限公司 中央空调监控系统中制冷主机智能化控制方法

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102322671B (zh) * 2011-07-29 2013-11-20 天津大学 一种中央空调控制方法
CN111795486B (zh) * 2019-04-03 2022-03-11 群光电能科技股份有限公司 空调系统的控制方法
CN111256313B (zh) * 2020-01-21 2021-08-03 田雨辰 一种制冷智能质调节算法

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106801975A (zh) * 2016-12-28 2017-06-06 杭州裕达自动化科技有限公司 中央空调监控系统中制冷主机智能化控制方法

Also Published As

Publication number Publication date
CN101619883A (zh) 2010-01-06

Similar Documents

Publication Publication Date Title
CN107084491B (zh) 空调室外机电加热器的控制方法及装置
CN103206767B (zh) 变频空调器的节能控制方法及装置
CN109059195B (zh) 用于削减电网负荷峰值的中央空调的控制方法及控制系统
JP5646205B2 (ja) 消費電力管理システム、およびこれに利用される消費電力管理装置、消費電力管理方法、中央供給電力管理装置、供給電力管理方法
CN106461257A (zh) 空调控制装置、空调控制方法及空调控制程序
CN101619883B (zh) 一种中央空调冷冻水送水温度控制方法
CN102080863A (zh) 中央空调的控制方法和控制装置
CN106440594B (zh) 一种室外风机控制方法、系统和空调器
CN101929721B (zh) 中央空调节能控制ar模型负荷预测系统的预测方法
CN104456845A (zh) 公用建筑中央空调预开启时间的计算方法
CN111076378A (zh) 一种基于负荷预测的地铁车站通风空调节能系统及方法
CN104374051A (zh) 一种中央空调节能控制装置
CN103743068B (zh) 一种基于能效优化的中央空调冷却塔风机控制方法及系统
US10808979B2 (en) Ice storage amount adjusting system and adjusting method for the same
CN115081220A (zh) 一种高能效中央空调系统调节方法及其系统
CN203719032U (zh) 一种基于能效优化的中央空调冷却塔风机控制系统
CN107917503A (zh) 太阳能空调器控制方法和太阳能空调器
CN202149568U (zh) 冷热水机组及中央空调系统
CN108981088A (zh) 一种基于酒店业态分析的中央空调系统节能控制方法
CN201917002U (zh) 用于公共建筑供热节能的环境温度自动补偿装置
CN107563547B (zh) 一种用户侧用能纵深优化综合能源管控方法
CN100570387C (zh) 一种基于散热装置的电子设备的老化方法
CN111288559A (zh) 一种直接制冷式磁悬浮空调机组的变频控制方法
JP6968431B2 (ja) 制御装置、システム及びプログラム
CN110953680A (zh) 空调控制方法及系统

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: SHANGHAI JIANKE ARCHITECTURE DESIGN INSTITUTE CO.,

Free format text: FORMER OWNER: SHANGHAI RESEARCH INSTITUTE OF BUILDING SCIENCES (GROUP) CO., LTD.

Effective date: 20110722

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 200032 NO. 75, WANPING SOUTH ROAD, XUHUI DISTRICT, SHANGHAI TO: 200032 6 + 7/F, BUILDING 8, NO. 75, WANPING SOUTH ROAD, XUHUI DISTRICT, SHANGHAI

TR01 Transfer of patent right

Effective date of registration: 20110722

Address after: 200032 Shanghai city Xuhui District Wanping Road No. 75 Building 8, 6 floor, 7 floor

Patentee after: Shanghai Jianke Construction Design Institute Co., Ltd.

Address before: 200032 Shanghai city Xuhui District Wanping Road No. 75

Patentee before: Shanghai Research Institute of Building Sciences (Group) Co., Ltd.