CN101614080A - 一体化房塔 - Google Patents
一体化房塔 Download PDFInfo
- Publication number
- CN101614080A CN101614080A CN200910182316A CN200910182316A CN101614080A CN 101614080 A CN101614080 A CN 101614080A CN 200910182316 A CN200910182316 A CN 200910182316A CN 200910182316 A CN200910182316 A CN 200910182316A CN 101614080 A CN101614080 A CN 101614080A
- Authority
- CN
- China
- Prior art keywords
- iron tower
- tower
- machine room
- bolt
- room
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Ventilation (AREA)
Abstract
本发明涉及一种一体化房塔,具体地说是将通信单管塔置于通信机房内部,属于通信装置技术领域。其主要包括避雷针、通风座、平台、铁塔,通风座连接在铁塔顶端,避雷针通过螺栓连接在通风座上,平台通过螺栓连接在铁塔上,特征是:铁塔通过地锚螺栓安装在混凝土基础上,铁塔置于机房框架内,防水罩用螺栓安装在铁塔上,防水罩其位置在机房与铁塔结合处,铁塔门通过铰链装在铁塔上,铁塔门其位置在铁塔下部,机房内部。本发明将通信单管塔置于通信机房内部,能减少占地面积,减少馈线长度,可以降低建设成本,自然降低通信机房温度,达到节约降耗的目的。
Description
技术领域
本发明涉及一种一体化房塔,具体地说是将通信单管塔置于通信机房内部,属于通信装置技术领域。
背景技术
在已有技术中,以往通信单管塔和机房是分离布置,通信塔和机房之间距离2米左右,整个基站占地面积大于50平方米,而且从通信塔上下来的馈线要通到机房,长度较长。由于通信单管塔和机房分离,因此,建设成本较高,既浪费时间,又增加了工人强度。
发明内容
本发明的目的在于克服上述不足之处,从而提供一种将通信单管塔置于通信机房内部,能减少占地面积,减少馈线长度,可以降低建设成本,自然降低通信机房温度,达到节约降耗的一体化房塔。
按照本发明提供的技术方案,一体化房塔包括避雷针、通风座、平台、铁塔,通风座连接在铁塔顶端,避雷针通过螺栓连接在通风座上,平台通过螺栓连接在铁塔上,特征是:铁塔通过地锚螺栓安装在混凝土基础上,铁塔置于机房框架内,防水罩用螺栓安装在铁塔上,防水罩其位置在机房与铁塔结合处,铁塔门通过铰链装在铁塔上,铁塔门其位置在铁塔下部,机房内部。
所述铁塔上焊接馈线孔其位置应在机房内部,高度应适宜铁塔馈线排放。
所述铁塔下部(在通信机房高度内)设置有馈线口和门洞。所述铁塔和机房之间留有间隙。
本发明与已有技术相比具有以下优点:
1、减少占地面积。由于采用一体化塔房后,其占地面积可以减少到25平方米左右。
2、减少馈线长度。由于采用一体化塔房后,馈线长度可大大缩短。
3、利用铁塔承重平台作为通信机房基础,可以降低建设成本。
4、增加铁塔的安全性,攀登铁塔必须经过通信机房防盗门,减少铁塔零件被盗的可能性。
5、利用单管塔通风原理,自然降低通信机房温度,达到节能降耗的目的。
附图说明
图1为本发明结构主视图。
图2为本发明结构俯视图。
图3为本发明结构A放大图。
图4为本发明结构B放大图。
图5为本发明结构C放大图。
具体实施方式
下面本发明将结合附图中的实施例作进一步描述:
如图1~图5所示,包括避雷针1、通风座2、平台3、铁塔4、防水罩5、馈线孔6、机房7、混凝土基础8、铁塔门9等。
本发明将通信单管塔置于通信机房内部。将通信单管塔和通信机房融为一体。通风座2直接焊接或通过螺栓连接在铁塔4顶端。避雷针1通过螺栓连接在通风座2上。平台3通过螺栓连接在铁塔4上。铁塔4通过地锚螺栓安装在混凝土基础8上。铁塔4安装完毕之后,再建设机房7,铁塔4置于机房7框架内。防水罩5用螺栓安装在铁塔4上,其位置在机房7与铁塔4结合处。馈线孔6焊接在铁塔4上,其位置应在机房4内部,高度应适宜铁塔馈线排放。铁塔门9通过铰链装在铁塔4上,其位置在铁塔4下部,机房7内部。高度应适合人员进出。机房7利用铁塔4的基础8为基础,这样不仅可以减少通信基站的占地面积,也可以降低基站的建设成本。铁塔4下部(在通信机房高度内)设置有馈线口和门洞。馈线孔除了走馈线之外,同时还起着通风作用。可以将机房内的热空气经由铁塔4内部空间和铁塔4顶部的通风座2向外扩散。铁塔门9用于维修人员进出。在铁塔4穿越机房7顶部的位置上端,设置有防水罩5,以阻止雨水等进入机房7。机房7和铁塔4非紧密结合。在铁塔4穿越机房7的位置,铁塔4和机房7之间留有间隙。
Claims (6)
1、一种一体化房塔,包括避雷针(1)、通风座(2)、平台(3)、铁塔(4),通风座(2)连接在铁塔(4)顶端,避雷针(1)通过螺栓连接在通风座(2)上,平台(3)通过螺栓连接在铁塔(4)上,其特征是:所述铁塔(4)通过地锚螺栓安装在混凝土基础(8)上,铁塔(4)置于机房(7)框架内,防水罩(5)用螺栓安装在铁塔(4)上,铁塔门(9)通过铰链装在铁塔(4)上。
2、根据权利要求1所述的一体化房塔,其特征在于所述的铁塔(4)上焊接馈线孔(6),馈线孔(6)其位置设在机房(7)内部。
3、根据权利要求1所述的一体化房塔,其特征在于所述铁塔4下部设置有馈线口和门洞。
4、根据权利要求1所述的一体化房塔,其特征在于所述铁塔(4)和机房(7)之间留有间隙。
5、根据权利要求1所述的一体化房塔,其特征在于所述防水罩(5)其位置设在机房(7)与铁塔(4)结合处。
6、根据权利要求1所述的一体化房塔,其特征在于所述铁塔门(9)其位置设在铁塔(4)下部,机房(7)内部。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200910182316A CN101614080A (zh) | 2009-07-08 | 2009-07-08 | 一体化房塔 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200910182316A CN101614080A (zh) | 2009-07-08 | 2009-07-08 | 一体化房塔 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101614080A true CN101614080A (zh) | 2009-12-30 |
Family
ID=41493949
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN200910182316A Pending CN101614080A (zh) | 2009-07-08 | 2009-07-08 | 一体化房塔 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101614080A (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103485567A (zh) * | 2013-08-29 | 2014-01-01 | 洛阳市环城供电局 | 一种输电塔架的防攀爬工作间 |
CN106049915A (zh) * | 2016-08-05 | 2016-10-26 | 曙光信息产业(北京)有限公司 | 立体式机房 |
CN107503554A (zh) * | 2017-07-31 | 2017-12-22 | 中国铁塔股份有限公司长春市分公司 | 一种通信基站 |
-
2009
- 2009-07-08 CN CN200910182316A patent/CN101614080A/zh active Pending
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103485567A (zh) * | 2013-08-29 | 2014-01-01 | 洛阳市环城供电局 | 一种输电塔架的防攀爬工作间 |
CN106049915A (zh) * | 2016-08-05 | 2016-10-26 | 曙光信息产业(北京)有限公司 | 立体式机房 |
CN107503554A (zh) * | 2017-07-31 | 2017-12-22 | 中国铁塔股份有限公司长春市分公司 | 一种通信基站 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203660327U (zh) | 一种户外箱柜小室防雨门 | |
CN101614080A (zh) | 一体化房塔 | |
CN204510985U (zh) | 内爬式微平台通信三管塔 | |
CN104358318B (zh) | 一种采用混凝土钢结构立柱的建筑房屋 | |
CN107215747A (zh) | 一种外电梯井道与墙体固定装置 | |
CN204742364U (zh) | 门型塔杆驱鸟器 | |
CN201554253U (zh) | 一体化房塔 | |
CN206128287U (zh) | 一种装配式厢房 | |
CN206900371U (zh) | 轨道交通站台门立柱组合及采用该立柱组合的站台门系统 | |
CN204847704U (zh) | 防水型室外电梯轿厢 | |
CN207406012U (zh) | 建筑施工电梯工具式悬挑安全通道 | |
CN204876692U (zh) | 一种活顶盖预制舱、活顶盖预制舱的顶盖和防水连接件 | |
CN205777794U (zh) | 一种多挂载、内爬内维护、笼式结构的通信塔 | |
CN202530824U (zh) | 便捷塔 | |
CN206014221U (zh) | 一种手扶电梯导轨连接结构 | |
CN106089294B (zh) | 一体式复合材料疏散平台 | |
CN205777182U (zh) | 一种钢结构玻璃幕墙雨棚 | |
CN201474283U (zh) | 建筑用复式外挂架 | |
CN207016306U (zh) | 一种外电梯井道与墙体固定装置 | |
CN206494613U (zh) | 装有太阳能供电装置的户外电梯 | |
CN207228708U (zh) | 一种折叠通信机房 | |
CN201167125Y (zh) | 屋面通信天线装置 | |
CN205932851U (zh) | 一种观光电梯 | |
CN201915966U (zh) | 吊盘固定器 | |
CN211949513U (zh) | 改良型定型化电梯井内架与电梯门洞防护一体化操作平台 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Open date: 20091230 |