CN101608473A - 房屋抗震预制结合现浇楼板的制作方法 - Google Patents

房屋抗震预制结合现浇楼板的制作方法 Download PDF

Info

Publication number
CN101608473A
CN101608473A CNA2008100481896A CN200810048189A CN101608473A CN 101608473 A CN101608473 A CN 101608473A CN A2008100481896 A CNA2008100481896 A CN A2008100481896A CN 200810048189 A CN200810048189 A CN 200810048189A CN 101608473 A CN101608473 A CN 101608473A
Authority
CN
China
Prior art keywords
precast plate
reinforcing bar
building
wall
cast
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2008100481896A
Other languages
English (en)
Inventor
汤凯全
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNA2008100481896A priority Critical patent/CN101608473A/zh
Publication of CN101608473A publication Critical patent/CN101608473A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

一种房屋抗震预制结合现浇楼板的制作方法,它解决了传统预制板建筑的楼房不能抗震和现浇房屋建设成本高的问题,其特征在于:在需要砌筑的房屋承重墙体上间距预埋垂直钢筋,然后将两侧设有凸块的预制板铺放于承重墙体上,使放置于墙体上的预制板端部伸出的钢筋与墙体预埋垂直钢筋连接在一起,在铺设于整栋楼房上的预制板两侧的凸块之间形成的凹槽内铺设一根通长钢筋,然后对墙体与预制板之间的空隙和预制板之间形成的凹槽进行砼现场浇制,即可使整栋房屋楼板形成一体,制作的楼房既具有预制板省时、节俭、方便快捷的优点,也具有整体现浇的抗震功能,可广泛应用于新农村房屋建设。

Description

房屋抗震预制结合现浇楼板的制作方法
一、技术领域
本发明属于建筑施工过程中楼板的制作方法,尤其是涉及到一种将预制和现浇工序相结合制作房屋抗震楼板的制作方法。
二、背景技术
在我国农村城镇民用建筑物中,目前基本上都在使用预制水泥板。由于预制水泥板设有多个中空管道孔,因而具有重量轻、隔音好、成本低、安装方便快捷的优点,特别是它中间的钢筋是拉直并加了预应力,因此强度也大,而为人们广泛接受。但由于这种预制水泥板均为长条状,并排设置在承重墙上,且互不相连,不能形成整体,因而存在无法抗震的问题。而目前城镇建设大型高档建筑物中,通常采用的现浇方式,虽具有能与房梁互联成整体、抗震能力强、不漏水的优点,但它必须到现场铺设,施工进度慢,且内铺的钢筋很难有高强的预应力,整体强度不高;因其自身重量大,因而其挠度变形大,容易开裂。再则,现浇楼层的中间无中空管道孔,施工时还要铺设模板,因此也存在材料消耗大、施工成本高、隔音效果差、施工进度慢的缺点。随着建筑节能标准的提高,楼板必须铺设保温隔热层,而在两个混凝土层之间夹设保温层,又会使得楼板不能形成整体结构,达不到相互牵连减压的效果,而只能增加对楼板下层混凝土层的压迫重量,使楼板的挠度变形和裂缝进一步增大。
三、发明内容
本发明的目的就是提供一种将预制板的快捷、隔音和现浇板的防震等优点有机结合在一起的抗震楼板的制作方法。
本发明的技术方案是:首先在预制厂内制作好预制板,其次在需要砌筑的房屋承重墙体达到需要盖板高度时,间距预埋垂直钢筋,将预制板铺放于承重墙体上,使放置于墙体上两侧预制板端部的钢筋与墙体预埋垂直钢筋连接在一起,再次在铺设于整栋楼房上的预制板两侧的凸块之间形成的凹槽内铺设一根通长钢筋,最后进行砼现场浇制,即可使整栋房屋楼板形成一体。所述预制板由设有中空管道孔、铺设拉伸加预应力的钢筋和砼制作而成,所述钢筋自预制板两端伸出,预制板的两侧下部设有凸块。
本发明的有益效果是:由于两块预制板端部可以通过伸出钢筋相互连接于承重墙上预埋的垂直钢筋上,整栋房屋横向预制板之间设置通长钢筋,然后进行局部现浇,从而大大提高了房屋整体抗震强度,既具有预制省时、节俭、方便快捷的优点,也具有整体现浇的抗震功能。
四、附图说明
图1为本发明预制板的结构示意图;
图2为本发明使用时板墙局部结构示意图;
图3为本发明预制板之间现浇结构示意图。
图中:1预制板本体,2齿形块,3钢筋,4砼,5承重墙体,6预埋垂直钢筋,7中空管道孔,8为凹槽,9为通长钢筋。
五、具体实施方式
下面结合附图对本发明作进一步描述。
如图1、图2所示,实施本发明时,只需要在制作传统预制水泥板的基础上,将预制板1的厚度增至12-13厘米,使制作预制板1内加预应力的钢筋3伸出两端长约5-10厘米,同时在预制板1的下部两侧增设凸块2,该凸块2宽度为5-6厘米,厚度为3-4厘米,其外侧厚度略高于预制板壁侧。实施本发明时(如图3所示),当建造房屋墙体5即将达到需要盖板高度时,在承重墙体5内间距预埋垂直钢筋6,然后将预制水泥板1的两端分别放置于承重墙体5上对整栋房屋进行平铺,再将放置于承重墙5上的左右两块预制板1两端伸出的钢筋3与承重墙体5上预埋垂直钢筋6连接在一起。同时在平铺于墙体5上的预制板1之间的凸块2处形成横向凹槽8,在凹槽8内设置通长钢筋9,再对承重墙体5与左右两边预制板之间的空隙以及两块预制板1之间凸块2形成的凹槽8进行砼4现浇,从而使整层预制板1与承重墙体5结合成一整体,达到抗震设防的目的。
实施本发明时,为了更进一步增强楼板抗震强度,在预制板1的横向还可增设预应力钢筋使其伸出于凸块2的上方,使用时,将其与设置于凹槽8内的通长钢筋9连接即可进行现浇。

Claims (3)

1、一种房屋抗震预制结合现浇楼板的制作方法,它包括预制、铺板和现浇工序,其特征在于:首先在预制厂内制作好预制板(1),其次在需要砌筑的房屋承重墙体(5)达到需要盖板高度时,间距预埋垂直钢筋(6),将预制板(1)铺放于承重墙体(5)上,使放置于墙体(5)上两侧预制板(1)端部的钢筋(3)与墙体预埋垂直钢筋(6)连接在一起,再次在铺设于整栋楼房上的预制板(1)两侧的凸块(2)之间形成的凹槽(8)内铺设一根通长钢筋(9),最后进行砼现场浇制,即可使整栋房屋楼板形成一体。
2、根据权利要求1所述的房屋抗震预制结合现浇楼板的制作方法,其特征在于:该预制板(1)由设有中空管道孔(7)、铺设拉伸加预应力的钢筋(3)和砼(4)制作而成,所述钢筋(3)自预制板(1)两端伸出,预制板(1)的两侧下部设有凸块(2)。
3、根据权利要求1或2所述的房屋抗震预制结合现浇楼板的制作方法,其特征在于:钢筋(3)自预制板(1)两端伸出5-10厘米,两侧凸块(2)的宽度为5-6厘米,且外侧略高于内侧。
CNA2008100481896A 2008-06-22 2008-06-22 房屋抗震预制结合现浇楼板的制作方法 Pending CN101608473A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2008100481896A CN101608473A (zh) 2008-06-22 2008-06-22 房屋抗震预制结合现浇楼板的制作方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2008100481896A CN101608473A (zh) 2008-06-22 2008-06-22 房屋抗震预制结合现浇楼板的制作方法

Publications (1)

Publication Number Publication Date
CN101608473A true CN101608473A (zh) 2009-12-23

Family

ID=41482371

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2008100481896A Pending CN101608473A (zh) 2008-06-22 2008-06-22 房屋抗震预制结合现浇楼板的制作方法

Country Status (1)

Country Link
CN (1) CN101608473A (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103243847A (zh) * 2013-05-17 2013-08-14 东南大学 一种预制装配式冷成型钢楼盖及其施工方法
CN107100279A (zh) * 2017-06-26 2017-08-29 江苏沪宁钢机股份有限公司 一种用于钢结构建筑中防漏浆可预制式连接结构
CN110029741A (zh) * 2019-05-07 2019-07-19 河南绿建建筑科技有限公司 无预埋无支撑式墙板连接节点
CN111502091A (zh) * 2020-05-28 2020-08-07 佛山市高明长峰建设工程有限公司 一种使用寿命长的建筑楼面及其制备方法

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103243847A (zh) * 2013-05-17 2013-08-14 东南大学 一种预制装配式冷成型钢楼盖及其施工方法
CN107100279A (zh) * 2017-06-26 2017-08-29 江苏沪宁钢机股份有限公司 一种用于钢结构建筑中防漏浆可预制式连接结构
CN110029741A (zh) * 2019-05-07 2019-07-19 河南绿建建筑科技有限公司 无预埋无支撑式墙板连接节点
CN111502091A (zh) * 2020-05-28 2020-08-07 佛山市高明长峰建设工程有限公司 一种使用寿命长的建筑楼面及其制备方法

Similar Documents

Publication Publication Date Title
CN100386487C (zh) 密肋结构体系及其连接施工工艺方法
CN103015565B (zh) 预制装配整体式钢筋混凝土承重墙及建筑施工方法
CN104005502B (zh) 一种预制轻质楼盖板及工业化建筑房屋楼层板结构
CN104032870A (zh) 一种装配整体式密肋箱形复合楼板
CN105003020A (zh) 一种陶粒混凝土金属网架轻质墙板及其拼接结构
CN101608473A (zh) 房屋抗震预制结合现浇楼板的制作方法
CN201560514U (zh) 节能复合楼板
CN108867991B (zh) 基于uhpc的预制混凝土保温板、模块化建筑单元及制作方法
CN107938934B (zh) 一种复合材料增强木骨架墙板及现场快速拼装方法
CN103334525A (zh) 一种单向预应力叠合板结构及其施工方法
CN202689240U (zh) 一种石砌墙体
CN201314091Y (zh) 新型抗震预制板
CN205063155U (zh) 一种与框架结构填充墙同时施工的装配式构造柱砌块
CN202755532U (zh) 一种拉砌组合建筑装配式墙板
CN203856132U (zh) 建筑用冷弯薄壁拱形屋架
CN112376738A (zh) 一种钢丝网煤矸石混凝土装配式剪力墙及其施工方法
CN206681206U (zh) 集块建筑外叶墙用钢‑砌块组合梁
CN202117166U (zh) 型钢石膏组合式建筑结构
CN103953133A (zh) 内藏马牙芯柱芯梁节能抗震空心墙砌体结构及其制作方法
CN210767301U (zh) 一种轻质高强保温板结构
CN216341210U (zh) 钢结构装配式房屋
CN203769123U (zh) 内藏马牙芯柱芯梁节能抗震空心墙砌体结构
CN211646901U (zh) 一种高强度复合降噪楼板结构
CN1123668C (zh) 网/桁架-砼组合结构复合板建筑体系的建造方法
CN203891247U (zh) 底部钢筋混凝土剪力墙上部配筋砌体剪力墙混合结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
AD01 Patent right deemed abandoned

Effective date of abandoning: 20091223

C20 Patent right or utility model deemed to be abandoned or is abandoned