CN101593943A - 架空送电线路分裂导线驰度微调器 - Google Patents

架空送电线路分裂导线驰度微调器 Download PDF

Info

Publication number
CN101593943A
CN101593943A CNA2008101638936A CN200810163893A CN101593943A CN 101593943 A CN101593943 A CN 101593943A CN A2008101638936 A CNA2008101638936 A CN A2008101638936A CN 200810163893 A CN200810163893 A CN 200810163893A CN 101593943 A CN101593943 A CN 101593943A
Authority
CN
China
Prior art keywords
speeding
bundle conductor
degree
cross bar
micro actuator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2008101638936A
Other languages
English (en)
Other versions
CN101593943B (zh
Inventor
江洪成
张弓
沈海军
刘金富
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG SHENGDA STEEL TOWER CO Ltd
State Grid Corp of China SGCC
Zhejiang Electric Power Transmission and Transforming Engineering Co
Original Assignee
Zhejiang Electric Power Transmission and Transforming Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Electric Power Transmission and Transforming Engineering Co filed Critical Zhejiang Electric Power Transmission and Transforming Engineering Co
Priority to CN2008101638936A priority Critical patent/CN101593943B/zh
Publication of CN101593943A publication Critical patent/CN101593943A/zh
Application granted granted Critical
Publication of CN101593943B publication Critical patent/CN101593943B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Mutual Connection Of Rods And Tubes (AREA)
  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

一种架空送电线路分裂导线驰度微调器,包括横杆和螺纹杆,所述横杆与所述分裂导线垂直布置,所述横杆与安装在分裂导线上的放线滑车轮槽固定连接,所述横杆上开有调整孔,所述调整孔的位置与各个分裂导线一一对应,所述螺纹杆穿过所述调整孔,所述螺纹杆的穿过所述调整孔的一端安装螺母,所述螺纹杆的另一端安装握紧夹具,所述握紧夹具套装在所述分裂导线上。本发明提供一种操作简单、便于高处作业、调整效率高、实现对单根子导线驰度进行松紧的架空送电线路分裂导线驰度微调器。

Description

架空送电线路分裂导线驰度微调器
技术领域
本发明涉及一种架空送电线路分裂导线驰度微调器。
背景技术
架空送电线路施工中,分裂导线的驰度(也即弧垂,以下统称驰度)微调尚无专用工器具。目前一般采用导线卡线器与双钩联合使用进行分裂导线驰度微调,从而使分裂导线的驰度达到规范要求,参照图1。
在输电线路分裂导线紧线施工中,目前驰度调整常采用先紧线段紧线划印,紧线驰度一般不能一次成优,再进行附件安装,然后驰度复核,若偏差超出标准要求则通过附件返工,适度移动导线悬垂线夹调整驰度,将驰度调整的不平衡线长量汇总到耐张塔档,再进行割线压接进行调整。该方法中附件安装返工与割线压接施工所需施工人员多、操作复杂、安全风险大、施工效率低、影响导线质量,附件和间隔棒常需多次拆装,多次返工易造成导线磨损,影响导线质量。
现有技术存在的缺陷有:1、结构笨重,所需工器具较多,不利于高处作业;2、安装后只能单向调整驰度,无法直接进行反向驰度调整,需将导线卡线器反向安装后方能进行反向调整。3、只能起到各相邻子导线间相互推拉作用,无法对单根子导线驰度进行松紧。
发明内容
为了克服已有的架空送电线路分裂导线驰度微调的不利于高处作业、调整效率低、无法对单根子导线驰度进行松紧的不足,本发明提供一种操作简单、便于高处作业、调整效率高、实现对单根子导线驰度进行松紧的架空送电线路分裂导线驰度微调器。
本发明解决其技术问题所采用的技术方案是:
一种架空送电线路分裂导线驰度微调器,包括横杆和螺纹杆,所述横杆与所述分裂导线垂直布置,所述横杆与安装在分裂导线上的放线滑车轮槽固定连接,所述横杆上开有调整孔,所述调整孔的位置与各个分裂导线一一对应,所述螺纹杆穿过所述调整孔,所述螺纹杆的穿过所述调整孔的一端安装螺母,所述螺纹杆的另一端安装握紧夹具,所述握紧夹具套装在所述分裂导线上。
进一步,相邻的分裂导线上的握紧夹具分别布置在所述横杆的两侧。
再进一步,所述握紧夹具包括两个半圆形夹体,所述两个半圆形夹体之间的空腔与分裂导线的截面大小相同,所述两个半圆形夹体的一侧相互铰接,所述两个半圆形夹体的另一侧相互固定连接。
更进一步,所述的握紧夹具端部设有锥形段,开口胶管套装在所述锥形段上。
本发明的有益效果主要表现在:1、结构简单、便于高处作业;2、能够对单根子导线驰度进行松紧调整,调整效率高;3、能够达到分裂导线紧线驰度的依次成优。
附图说明
图1是现有架空送电线路分裂导线驰度微调设备的工作示意图。
图2是本发明的架空送电线路分裂导线驰度微调器的结构图。
图3是单根分裂导线的调节单元的示意图。
图4是图3的俯视图。
图5是横杆的示意图。
具体实施方式
下面结合附图对本发明作进一步描述。
参照图2~图5,一种架空送电线路分裂导线驰度微调器,包括横杆1和螺纹杆2,所述横杆1与所述分裂导线3垂直布置,所述横杆1与安装在分裂导线3上的放线滑车轮槽4固定连接,所述横杆1上开有调整孔5,所述调整孔5的位置与各个分裂导线3一一对应,所述螺纹杆2穿过所述调整孔5,所述螺纹杆的穿过所述调整孔的一端安装螺母6,所述螺纹杆2的另一端安装握紧夹具7,所述握紧夹具7套装在所述分裂导线3上。
相邻的分裂导线上的握紧夹具7分别布置在所述横杆1的两侧。
所述握紧夹具7包括两个半圆形夹体,所述两个半圆形夹体之间的空腔与分裂导线的截面大小相同,所述两个半圆形夹体的一侧相互铰接,所述两个半圆形夹体的另一侧相互固定连接。
所述的握紧夹具7端部设有锥形段,开口胶管8套装在所述锥形段上。放线滑车轮槽4与位于架空送电线路两侧的放线滑车立柱9固定连接,所述放线滑车立柱9与横杆1固定连接。
本实施例的工作过程为:在耐张段初步紧线后,先锚固各分裂子导线并进行双保险,再在直线塔放线滑车上通过驰度微调器的调整与控制,将初步紧线的线长不平衡量汇总到紧线场档,调整锚固葫芦消化线长不平衡量,使耐张段各档紧线驰度达到质量要求后进行划印,然后进行附件安装,从而达到分裂导线紧线驰度一次成优,避免附件安装完成后进行返工来调整驰度。
本实施例的调整器加工要求:(1)、调整器由φ12螺纹杆和导线夹具两部分组成,为适用不同规格导线,与导线接触的开口胶管需根据不同导线直径加工。(2)、φ12螺纹杆长600mm,每根螺纹杆配备两只螺帽,螺纹杆在导线夹具上应可上下摆动,以方便穿入横杆。(3)、导线夹具须具备10kN握着力,以确保通过螺纹杆螺母调整驰度时紧握导线而不滑动。
本实施例的驰度调整过程:
(1)、在紧线段一侧已挂线或锚线后,另一侧各子导线同时收紧进行初步紧线,初步紧线一般同相子导线驰度偏差无法达到规范要求以内(500kV线路标准:50mm),由于后面将采用驰度微调器进行调整,故初步紧线同相子导线驰度偏差控制在500mm以内即可,由于驰度微调器控制相间驰度的能力有限,故初步紧线应将相间驰度控制在误范围以内。
(2)、初步紧线后,先将该相各子导线分别锚固并进行双保险,再在直线塔放线滑车上安装驰度微调器,驰度微调器不必每基铁塔都装,需安装塔位选择原则:确保驰度观测档两端有驰度微调器能进行驰度调整,小档距可跳跃设置,一般相对较大档距两端(三基以内)应有微调器。驰度微调观测档的选择原则:相对较大的档距均需选择为观测档。
(3)、按驰度观测方法,从锚塔端向紧线端逐档进行驰度调整与控制。根据测工的要求,在装有驰度微调器的放线滑车上,高空作业人员通过调整某子导线的微调器上螺母位置来达到收紧或放松该子导线驰度的目的。
(4)、在该档各相子导线驰度偏差均达到规范要求后,不拆除驰度微调器,再进行下一观测档的导线驰度调整,直至所有观测档子导线驰度偏差均达到规范要求。
(5)、最后调整锚固导线葫芦,以将各档累积线长不平衡量消化,避免驰度微调器上承受不平衡拉力时间过长在握紧夹具上引起滑动。
(6)、重新确认各观测档驰度达到质量要求后,通知每基铁塔划印人员进行划印,并要求测工测量各观测档驰度,由技术人员分析相间驰度误差是否符合要求,若不符合,则在附件安装时通过确定每基塔附件偏移值来进行控制。

Claims (4)

1、一种架空送电线路分裂导线驰度微调器,其特征在于:所述驰度微调器包括横杆和螺纹杆,所述横杆与所述分裂导线垂直布置,所述横杆与安装在分裂导线上的放线滑车轮槽固定连接,所述横杆上开有调整孔,所述调整孔的位置与各个分裂导线一一对应,所述螺纹杆穿过所述调整孔,所述螺纹杆的穿过所述调整孔的一端安装螺母,所述螺纹杆的另一端安装握紧夹具,所述握紧夹具套装在所述分裂导线上。
2、如权利要求1所述的架空送电线路分裂导线驰度微调器,其特征在于:相邻的分裂导线上的握紧夹具分别布置在所述横杆的两侧。
3、如权利要求1或2所述的架空送电线路分裂导线驰度微调器,其特征在于:所述握紧夹具包括两个半圆形夹体,所述两个半圆形夹体之间的空腔与分裂导线的截面大小相同,所述两个半圆形夹体的一侧相互铰接,所述两个半圆形夹体的另一侧相互固定连接。
4、如权利要求3所述的架空送电线路分裂导线驰度微调器,其特征在于:所述的握紧夹具端部设有锥形段,开口胶管套装在所述锥形段上。
CN2008101638936A 2008-12-30 2008-12-30 架空送电线路分裂导线驰度微调器 Active CN101593943B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008101638936A CN101593943B (zh) 2008-12-30 2008-12-30 架空送电线路分裂导线驰度微调器

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008101638936A CN101593943B (zh) 2008-12-30 2008-12-30 架空送电线路分裂导线驰度微调器

Publications (2)

Publication Number Publication Date
CN101593943A true CN101593943A (zh) 2009-12-02
CN101593943B CN101593943B (zh) 2011-05-25

Family

ID=41408462

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008101638936A Active CN101593943B (zh) 2008-12-30 2008-12-30 架空送电线路分裂导线驰度微调器

Country Status (1)

Country Link
CN (1) CN101593943B (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106207872A (zh) * 2016-08-29 2016-12-07 国网山东省电力公司商河县供电公司 可控式电缆弧度调整装置

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2077606U (zh) * 1989-12-31 1991-05-22 郑华彪 双功能导线弛度观测仪
KR100407547B1 (ko) * 2001-06-02 2003-12-06 대원전기 주식회사 엘피애자용 전선 연선롤러 및 이를 이용한 전선 배선공법
CN101299520B (zh) * 2008-06-23 2010-07-21 西安供电局 高压输电线路地线提升器
CN201365086Y (zh) * 2008-12-30 2009-12-16 浙江省送变电工程公司 架空送电线路分裂导线驰度微调器

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106207872A (zh) * 2016-08-29 2016-12-07 国网山东省电力公司商河县供电公司 可控式电缆弧度调整装置
CN106207872B (zh) * 2016-08-29 2018-01-19 国网山东省电力公司商河县供电公司 可控式电缆弧度调整装置

Also Published As

Publication number Publication date
CN101593943B (zh) 2011-05-25

Similar Documents

Publication Publication Date Title
CN205123185U (zh) 免维护绝缘子导线固定夹
CN104505766B (zh) 一种带电更换变电站500kV耐张绝缘子串的工具及方法
CN203531401U (zh) 用于墙壁模板和地面之间的斜向支撑固定装置
CN203967713U (zh) 用于吊装电缆的终端夹紧装置
CN204927981U (zh) 一种调换耐张整串绝缘子用可调节长度的拉杆装置
CN103935822B (zh) 一种预应力钢绞线圈固定放线装置及其制作方法
CN101593943B (zh) 架空送电线路分裂导线驰度微调器
CN201365086Y (zh) 架空送电线路分裂导线驰度微调器
CN206738322U (zh) 电缆支架立柱与电缆支架横担的连接结构
CN203251021U (zh) 放线滑车夹紧装置
CN202197048U (zh) 一种塔用双角钢挂点起重连接工具
CN201898295U (zh) 砼杆接地引下线的提升装置
CN205104835U (zh) 一种用于电力线路架设的辅助装置
CN202420761U (zh) 应力传感器的检测装置
CN202503218U (zh) 绝缘子更换装置
CN106300128B (zh) 一种更换双分裂导线间隔棒提线工具及使用方法
CN206128793U (zh) 一种多功能低压电线杆保护圈
CN103594974B (zh) 用于架空线路紧线的组合式紧线工具
CN104022461B (zh) 更换500kv直线单联双串水平绝缘子工具
CN103579952B (zh) 用于架空线路紧线的球头卡线器
CN206471748U (zh) 通用型500kV直线酒杯塔线路检修横担挂点装置
CN203301101U (zh) 一种船体线夹u型螺丝紧固器
CN203553770U (zh) 用于架空线路紧线的球头卡线器
CN206332390U (zh) 一种电缆抱箍
CN203553771U (zh) 用于架空线路紧线的滑车固定板

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE GRID CORPORATION OF CHINA

Effective date: 20121206

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20121206

Address after: Jianggan District Qingchun Road Hangzhou city Zhejiang province 310016 No. 87

Patentee after: ZHEJIANG ELECTRIC TRANSMISSION AND TRANSFORMATION ENGINEERING Corp.

Patentee after: State Grid Corporation of China

Address before: Jianggan District Qingchun Road Hangzhou city Zhejiang province 310016 No. 87

Patentee before: ZHEJIANG ELECTRIC TRANSMISSION AND TRANSFORMATION ENGINEERING Corp.

ASS Succession or assignment of patent right

Owner name: STATE GRID CORPORATION OF CHINA ZHEJIANG SHENGDA S

Free format text: FORMER OWNER: STATE GRID CORPORATION OF CHINA

Effective date: 20141128

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20141128

Address after: Jianggan District Qingchun Road Hangzhou city Zhejiang province 310016 No. 87

Patentee after: ZHEJIANG ELECTRIC TRANSMISSION AND TRANSFORMATION ENGINEERING Corp.

Patentee after: State Grid Corporation of China

Patentee after: ZHEJIANG SHENGDA STEEL TOWER Co.,Ltd.

Address before: Jianggan District Qingchun Road Hangzhou city Zhejiang province 310016 No. 87

Patentee before: ZHEJIANG ELECTRIC TRANSMISSION AND TRANSFORMATION ENGINEERING Corp.

Patentee before: State Grid Corporation of China

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: Jianggan District Qingchun Road Hangzhou city Zhejiang province 310016 No. 87

Patentee after: ZHEJIANG TRANSMISSION AND TRANSFORMATION ENGINEERING Co.,Ltd.

Patentee after: STATE GRID CORPORATION OF CHINA

Patentee after: ZHEJIANG SHENGDA STEEL TOWER Co.,Ltd.

Address before: Jianggan District Qingchun Road Hangzhou city Zhejiang province 310016 No. 87

Patentee before: ZHEJIANG ELECTRIC TRANSMISSION AND TRANSFORMATION ENGINEERING Corp.

Patentee before: State Grid Corporation of China

Patentee before: ZHEJIANG SHENGDA STEEL TOWER Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220308

Address after: Jianggan District Qingchun Road Hangzhou city Zhejiang province 310016 No. 87

Patentee after: ZHEJIANG TRANSMISSION AND TRANSFORMATION ENGINEERING Co.,Ltd.

Patentee after: STATE GRID CORPORATION OF CHINA

Address before: Jianggan District Qingchun Road Hangzhou city Zhejiang province 310016 No. 87

Patentee before: ZHEJIANG TRANSMISSION AND TRANSFORMATION ENGINEERING Co.,Ltd.

Patentee before: STATE GRID CORPORATION OF CHINA

Patentee before: ZHEJIANG SHENGDA STEEL TOWER Co.,Ltd.