CN101591876A - A kind of novel embedded part that is used to connect guide strip and concrete beam body - Google Patents

A kind of novel embedded part that is used to connect guide strip and concrete beam body Download PDF

Info

Publication number
CN101591876A
CN101591876A CNA2009100575008A CN200910057500A CN101591876A CN 101591876 A CN101591876 A CN 101591876A CN A2009100575008 A CNA2009100575008 A CN A2009100575008A CN 200910057500 A CN200910057500 A CN 200910057500A CN 101591876 A CN101591876 A CN 101591876A
Authority
CN
China
Prior art keywords
embedded part
guide strip
beam body
concrete beam
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2009100575008A
Other languages
Chinese (zh)
Inventor
吴祥明
黄靖宇
吴杰
吴忠
单晨晓
赵晓梅
张耀生
张士晓
周国河
李文沛
叶丰
陈定祥
成广伟
孙宪铭
过浩侃
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Maglev Transportation Development Co Ltd
Shanghai Construction Group Co Ltd
Original Assignee
Shanghai Maglev Transportation Development Co Ltd
Shanghai Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Maglev Transportation Development Co Ltd, Shanghai Construction Group Co Ltd filed Critical Shanghai Maglev Transportation Development Co Ltd
Priority to CNA2009100575008A priority Critical patent/CN101591876A/en
Publication of CN101591876A publication Critical patent/CN101591876A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Railway Tracks (AREA)

Abstract

The invention discloses a kind of novel embedded part that is used to connect guide strip and concrete beam body, comprise embedded part body, one platform structure is set, be used to connect guide strip at an end of described embedded part body; On described platform structure, vertically offer a connecting hole, and run through embedded part body.The present invention solves the connectivity problem of guide strip and concrete beam body on the floating concrete track beam of monolithic magnetic.Guarantee simultaneously that embedded part is built at concrete beam body and bury in the process that to put the location convenient; Easy to operate in later stage machine and stator installation process, fastening reliable.

Description

A kind of novel embedded part that is used to connect guide strip and concrete beam body
Technical field
The invention belongs to monolithic magnetic suspension concrete track beam applied technical field, also can amplify and be applied to other concrete construction field, specifically, the present invention relates to a kind of novel embedded part that is used to connect guide strip and concrete beam body.
Background technology
The whole functional district is a full steel structure in the existing magnetic levitation track girder technology, and steel work is connected with concrete beam body again, and steel using amount is big.Concrete structure is intended adopting in existing functional areas, and guide strip installs and fixes the form that connects built-in fitting that adopts, but lacks ready-made practical experience for the form of built-in fitting.
Summary of the invention
The objective of the invention is to develop a kind of novel embedded part, and then solve the connectivity problem of guide strip and concrete beam body on the floating concrete track beam of monolithic magnetic.Guarantee simultaneously that embedded part is built at concrete beam body and bury in the process that to put the location convenient; Easy to operate in later stage machine and stator installation process, fastening reliable.
In order to achieve the above object, the invention provides a kind of novel embedded part that is used to connect guide strip and concrete beam body, comprise embedded part body, one platform structure is set, be used to connect guide strip at an end of described embedded part body; On described platform structure, vertically offer a connecting hole, and run through embedded part body.
The other end in described embedded part body vertically is provided with some installing holes, and described installing hole connects dowel.
The arranged outside of described embedded part body has ribs.
The end face of described platform structure is provided with some locating holes.
The present invention has the following advantages:
1. the location of embedded part, pre-buried problem have well been solved;
2. machine and easy for installation, fastening reliable;
3. the embedded part steel using amount is little, economic and reliable.
Description of drawings
Fig. 1 is the structure chart of novel embedded part provided by the invention;
Fig. 2 is the structure chart of the another side of novel embedded part provided by the invention;
The specific embodiment
Followingly specify a kind of better embodiment of the present invention according to Fig. 1~2:
As shown in Figure 1 and Figure 2, the novel embedded part that the present invention is used to connect guide strip and concrete beam body comprises embedded part body 2, end in described embedded part body 2 is provided with platform structure 7, and conduct contacted the carrier that is connected with guide strip after the effect of platform structure 7 was fine finishining.Embedded part body 2 all is embedded in concrete beam body inside.On described embedded part body 2 other ends two installing holes 21 are set vertically, are used to install dowel 1, to strengthen the anchored force of embedded part, also be provided with ribs on embedded part body 2, the effect of ribs also is to improve anchored force.
The end face 5 of platform structure 7 is that contact surface is installed, on the position that is cornerwise two angles on this installation contact surface 5, two locating holes 4 are set, described locating hole 4 is as the location benchmark of this embedded part, and its effect is to water in the process of smashing as the beam body concrete to be fixedly coupled the hole with template.The position of locating hole 4 needs on platform structure accurately location, and the degree of depth of locating hole 4 is reserved the size of chipping allowance according to design, and comprehensively determines according to precision controlling level in the actual production, thereby does not impact contact surface 5 is installed.
The present invention is used to connect the novel embedded part employing monoblock cast mode of guide strip and concrete beam body, the making processing of embedded part needs to carry out and strengthen quality inspection in strict accordance with designing requirement, specification need be controlled in the designing requirement accuracy rating, to guarantee supporting capacity; And want strict control cast casting quality, and avoid occurring defectives such as pore, require when satisfying fine finishining and the supporting capacity of embedded part.
This embedded part to bury process underground as follows: the inspection of quality before at first embedded part being installed, dowel 1 is installed in qualified back, dowel 1 is connected with embedded part body 2 by installing hole 21, is screwed into the degree of depth and needs strict control, avoids being screwed into the shallow bonding strength deficiency that causes, then, carry out embedded part and be connected, connect locating hole 4 with bolt embedded part is fixed on the rail beam making template, and rail beam is made template adjustment location with the installation that rail beam is made template, after qualified by inspection, disturbing concrete again.After finishing, the rail beam casting and compacting of concrete enters curing time.At first, carry out stream curing, after reaching form removal and pretensioned prestressing and putting a condition, form removal, put open, lifting; Afterwards, enter the natural curing phase, maintenance to 60 day length of time, during through twice post-stressed stretch-draw with wait for applying of load.The curing time end of beam body, carry out machine tooling, to being installed, contact surface 5 carries out grinding, by measurement, with reference to circuit geodetic coordinates parameter to the beam body, be ground to the assembling controlling dimension of beam body and bore connecting hole 3,,, locate by the envelope method balance according to the circuit geodetic coordinates by the measurement to the beam body by Digit Control Machine Tool the position of connecting hole 3, determine the optimum position of connecting hole 3, and reach the diameter and the degree of depth of the connecting hole 3 of designing requirement.Guide strip and fastening is installed afterwards, and guide strip adopts high-strength bolt to be connected with connecting hole.
The invention solves the connectivity problem of guide strip and concrete beam body on the floating concrete track beam of monolithic magnetic.Guarantee simultaneously that embedded part is built at concrete beam body and bury in the process that to put the location convenient, easy to operate in later stage machine and stator installation process, fastening reliable.
Although content of the present invention has been done detailed introduction by above preferred embodiment, will be appreciated that above-mentioned description should not be considered to limitation of the present invention.After those skilled in the art have read foregoing, for multiple modification of the present invention with to substitute all will be conspicuous.Therefore, protection scope of the present invention should be limited to the appended claims.

Claims (4)

1. a novel embedded part that is used to connect guide strip and concrete beam body comprises embedded part body (2), it is characterized in that:
End in described embedded part body (2) is provided with a platform structure (7), is used to connect guide strip;
On described platform structure (7), vertically offer a connecting hole (3), and run through embedded part body (2).
2. novel embedded part as claimed in claim 1 is characterized in that:
The other end in described embedded part body (2) vertically is provided with some installing holes (21), and described installing hole (21) connects dowel (1).
3. novel embedded part as claimed in claim 1 is characterized in that:
The arranged outside of described embedded part body (2) has ribs.
4. novel embedded part as claimed in claim 1 is characterized in that:
The end face (5) of described platform structure (7) is provided with some locating holes (4).
CNA2009100575008A 2009-06-30 2009-06-30 A kind of novel embedded part that is used to connect guide strip and concrete beam body Pending CN101591876A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2009100575008A CN101591876A (en) 2009-06-30 2009-06-30 A kind of novel embedded part that is used to connect guide strip and concrete beam body

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2009100575008A CN101591876A (en) 2009-06-30 2009-06-30 A kind of novel embedded part that is used to connect guide strip and concrete beam body

Publications (1)

Publication Number Publication Date
CN101591876A true CN101591876A (en) 2009-12-02

Family

ID=41406744

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2009100575008A Pending CN101591876A (en) 2009-06-30 2009-06-30 A kind of novel embedded part that is used to connect guide strip and concrete beam body

Country Status (1)

Country Link
CN (1) CN101591876A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114197251A (en) * 2021-12-17 2022-03-18 中建八局第二建设有限公司 Precast beam for rail transit and preparation method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114197251A (en) * 2021-12-17 2022-03-18 中建八局第二建设有限公司 Precast beam for rail transit and preparation method
CN114197251B (en) * 2021-12-17 2023-09-26 中建八局第二建设有限公司 Precast beam for rail transit and preparation method

Similar Documents

Publication Publication Date Title
CN103306168B (en) A kind of prefabricated floating plate railway roadbed and construction method thereof
CN110409304A (en) A kind of precast segment bent cap free cantilever erection construction method
CN104652293A (en) Cable-stayed bridge structure used for reinforcing PSC (Pre-stressed Concrete) continuous box girder bridge and construction method
CN203474271U (en) Special assembly type rail base for portal crane
CN104652244B (en) A kind of Suspension bridge structure for reinforcing PSC Continuous Box Girder Bridge and construction method
CN104652242A (en) Derrick connecting structure used for reinforcing PSC (Pre-stressed Concrete) continuous box girder bridge and construction method
CN111549932A (en) Connecting structure of lightweight concrete wallboard and foundation structure and construction method
CN111705670A (en) Accurate adjusting device for longitudinal slope of precast beam shoe and construction method
CN101591876A (en) A kind of novel embedded part that is used to connect guide strip and concrete beam body
CN116263039A (en) Method for reinforcing concrete bridge structure crack by combining bonding steel plate and bonding carbon fiber cloth
CN106968164B (en) Cable way bridge abutment
CN201013008Y (en) Corbel of cable-stayed bridge rope tower anchorage zone
CN110863652A (en) Precise positioning and mounting method for prefabricated and assembled double-section stand column
CN105442855A (en) High-precision burying method for large-size pre-buried board
CN111501428A (en) Direct-buried fastener and construction method thereof
CN204436457U (en) The prefabricated evacuation platform of a kind of shield structure running tunnel
CN106284999A (en) Assembled architecture haydite concrete batten of internal partition mounting process
CN201981448U (en) Plate-type ballastless track switching turnout plate
CN206784159U (en) A kind of bridge girder anti-seismic bearing
CN204920244U (en) Supporting structure of large -span steel construction segmentation hoist and mount
CN211228068U (en) Festival segmentation pier convenient to installation
CN114086460A (en) Novel bearing platform and prefabricated bridge pier connecting method
CN102943484B (en) Tapered-iron pulp-bedding rapid leveling method for large-size and middle-size equipment installation
CN103485247B (en) The installation leveling method of floating plate in prefabricated floating plate railway roadbed
CN102031731B (en) Plate type ballastless track turnout plate and manufacture method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20091202