CN101586469A - 用于深孔超前欲松动爆破的封孔方法 - Google Patents
用于深孔超前欲松动爆破的封孔方法 Download PDFInfo
- Publication number
- CN101586469A CN101586469A CNA2009100884374A CN200910088437A CN101586469A CN 101586469 A CN101586469 A CN 101586469A CN A2009100884374 A CNA2009100884374 A CN A2009100884374A CN 200910088437 A CN200910088437 A CN 200910088437A CN 101586469 A CN101586469 A CN 101586469A
- Authority
- CN
- China
- Prior art keywords
- packer
- hole
- sealing
- water pipe
- pressure water
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Drilling And Exploitation, And Mining Machines And Methods (AREA)
Abstract
本发明公开了一种用于深孔超前欲松动爆破的封孔方法,具有步骤是:将药卷放入钻孔内,将封隔器放入钻孔并使得封隔器封堵在药卷右端,将导爆索的左端从钻孔右端向左穿过封隔器的中空管,并使得导爆索的左端与药卷充分接触,连接封隔器,圆筒接杆向左推动封隔器及第一高压水管,使得封隔器及第一高压水管在钻孔中向左移动并使封隔器到达钻孔合适位置,当封隔器到达钻孔合适位置后,将第一高压水管与手动泵相连接,封孔,最后实现深孔超前欲松动的爆破。采用本发明的方法对钻孔进行封孔,封孔速度快、封孔效果好、安全性能高。
Description
技术领域
本发明涉及一种用于深孔超前欲松动爆破的封孔方法,属于煤矿安全施工技术领域。
背景技术
冲击地压以及其诱发的煤与瓦斯爆炸事故越来越成为制约煤矿安全高效生产的主要因素。控制冲击地压灾害的发生,实质上就是改变煤岩体的应力状态或者避免产生高应力,以保证煤岩体不足以产生失稳破坏或非稳定破坏。因此,冲击地压的防治途径主要是通过各种手段扩大应力释放范围,以降低应力集中程度与应力释放速度。深孔超前欲松动爆破是工作面高应力区解危的最佳措施。现有技术中,用于深孔超前欲松动爆破的封孔方法一般使用黄泥封孔,将药卷放入钻孔后,使用木制炮棍将黄泥充填钻孔,封堵黄泥要密实同时不能损伤导爆索,这种方法比较原始,全部工艺过程十分繁琐,尤其封堵黄泥,会占用大量的工作时间,有时一个工作班都无法完成一个钻孔的封堵,而且还无法保证封孔的效果。
发明内容
本发明的目的是为了克服现有技术中存在的不足,提供一种简便快速、可靠性高的用于深孔超前欲松动爆破的封孔方法。
本发明的用于深孔超前欲松动爆破的封孔方法是通过以下技术方案实现的:
一种用于用于深孔超前欲松动爆破的封孔方法,其特征在于,包括如下步骤:
步骤101:将药卷放入钻孔;
步骤102:将封隔器放入钻孔并使得封隔器封堵在药卷右端;
步骤103:将导爆索的左端从钻孔右端向左穿过封隔器的中空管,并使得导爆索的左端与药卷充分接触;
步骤104:连接封隔器;
步骤105:圆筒接杆向左推动封隔器及第一高压水管,使得封隔器及第一高压水管在钻孔中向左移动并使封隔器接触药卷;圆筒接杆与钻孔直径相适应,圆筒接杆为金属材料制做而成的可连接也可分段折卸的结构,通过人工推拉的方法使得圆筒接杆在钻孔中移动并带动与之相连接的各装置;
步骤106:当封隔器接触药卷后,将第一高压水管与手动泵相连接;
步骤107:封孔;
步骤108:爆破。
所述步骤104中的连接封隔器包括:将封隔器的左连接头与第一高压水管连接,将封隔器的右连接头与第二高压水管连接,将第二高压水管右端连接截止阀,将圆筒接杆与封隔器后堵头螺纹连接。
所述步骤107中的封孔包括:将截止阀置于高于钻孔的位置处,打开截止阀,手动泵加压,截止阀自然排水,关闭截止阀,不断给封隔器加压,使封隔器膨胀并使封隔器与钻孔壁全断面挤压接触,封孔。
所述步骤108中的爆破包括:将导爆索的右端与雷管相连接并将雷管放入雷管筒中,将雷管与起爆器相连接,引爆雷管,点燃导爆索,进而引爆药卷,爆破;雷管筒为有一定壁厚的金属管,防治雷管起爆后,炸坏高压水管。
本发明的用于深孔超前欲松动爆破的封孔方法相对于现有技术具有如下有益效果:
1、本发明的封孔方法方法简单、方便、快捷,提高封孔速度。
2、本发明的封孔方法方法封孔效果好、安全性高等优点。
附图说明
图1为本发明的用于深孔超前欲松动爆破的封孔方法流程图;
图2为本发明的用于深孔超前欲松动爆破的封孔方法原理图;
图3为本发明的用于深孔超前欲松动爆破的封孔方法的封孔器装置结构剖面图。
具体实施方式
为了使本领域的一般技术能够清楚理解本发明的技术方案,现结合附图对本发明作进一步详尽地说明:
本发明涉及以下装置:如图1及图2所示,包括:与钻孔直径相适应的圆筒接杆8,圆筒接杆8为中空,第一高压水管4与手动泵11连接,第二高压水管10与截止阀9连接,雷管6置于雷管筒5中,封隔器2置于药卷1左端,封隔器2与第一高压水管4、第二高压水管10连接,其中封隔器2由前堵头21、中空管22、胶筒23、后堵头24、左连接头25、右连接头26组成,胶筒23通过螺纹和前堵头21、中空管22、后堵头24连接构成一个封闭整体,胶筒23通过左连接头25及第一高压水管4连接到手动泵11上用于加压,加压时,胶筒23膨胀,胶筒23紧贴钻孔13内壁,封堵钻孔13,胶筒23通过右连接头26和第二高压水管10连接到截止阀9,构成排气结构,封隔器2加压之前需将封隔器2中的空气排出。
具体封孔方法:如图1及图2所示。
本发明的用于深孔超前欲松动爆破的封孔方法具有如下步骤:
步骤101:将药卷1放入钻孔13内;
步骤102:将封隔器2放入钻孔13并使得封隔器2封堵在药卷1右端;
步骤103:将导爆索3的左端从钻孔13右端向左穿过封隔器2的中空管22,并使得导爆索3的左端与药卷1充分接触;
步骤104:连接封隔器2;
步骤105:圆筒接杆8向左推动封隔器2及第一高压水管4,使得封隔器2及第一高压水管4在钻孔13中向左移动并使封隔器2接触药卷1;
步骤106:当封隔器2接触药卷1后,将第一高压水管4与手动泵11相连接;
步骤107:封孔;
步骤108:爆破。
步骤104中连接封隔器2包括:将封隔器2的左连接头25与第一高压水管4连接,将封隔器2的右连接头26与第二高压水管10连接,将第二高压水管10右端连接截止阀9,将圆筒接杆8与封隔器2的后堵头24螺纹连接。
步骤107中的封孔包括:将截止阀9置于高于钻孔13的位置处,打开截止阀9,手动泵11加压,截止阀9自然排水,关闭截止阀9,不断给封隔器2加压,使封隔器2膨胀并使膨胀后的封隔器2与钻孔13内壁全断面挤压接触,即实现封孔。
步骤108中的爆破包括:将导爆索3的右端与雷管6相连接并将雷管6放入雷管筒5中,将雷管6用导线7与起爆器12连接起来,引爆雷管6,点燃导爆索3,进而引爆药卷1,实现对钻孔的爆破。
采用本发明的方法对钻孔进行封孔,封孔速度快、封孔效果好、安全性能高。
Claims (4)
1、一种用于深孔超前欲松动爆破的封孔方法,其特征在于,包括如下步骤:
步骤101:将药卷放入钻孔;
步骤102:将封隔器放入钻孔并使得封隔器封堵在药卷右端;
步骤103:将导爆索的左端从钻孔右端向左穿过封隔器的中空管,并使得导爆索的左端与药卷充分接触;
步骤104:连接封隔器;
步骤105:圆筒接杆向左推动封隔器及第一高压水管,使得封隔器及第一高压水管在钻孔中向左移动并使封隔器接触药卷;
步骤106:当封隔器接触到药卷后,将第一高压水管与手动泵相连接;
步骤107:封孔;
步骤108:爆破。
2、根据权利要求1所述的用于深孔超前欲松动爆破的封孔方法,其特征在于,所述步骤4中连接封隔器包括:将封隔器的左连接头与第一高压水管连接,将封隔器的右连接头与第二高压水管连接,将第二高压水管右端连接截止阀,将圆筒接杆与封隔器后堵头螺纹连接。
3、根据权利要求1所述的用于深孔超前欲松动爆破的封孔方法,其特征在于,所述步骤7中的封孔包括:将截止阀置于高于钻孔的位置处,打开截止阀,手动泵加压,截止阀自然排水,关闭截止阀,不断给封隔器加压,使封隔器膨胀并使封隔器与钻孔壁全断面挤压接触,封孔。
4、根据权利要求1所述的用于深孔超前欲松动爆破的封孔方法,其特征在于,所述步骤8中的爆破包括:将导爆索的右端与雷管相连接并将雷管放入雷管筒中,将雷管与起爆器相连接,引爆雷管,点燃导爆索,进而引爆药卷,爆破。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009100884374A CN101586469B (zh) | 2009-07-07 | 2009-07-07 | 用于深孔超前欲松动爆破的封孔方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009100884374A CN101586469B (zh) | 2009-07-07 | 2009-07-07 | 用于深孔超前欲松动爆破的封孔方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101586469A true CN101586469A (zh) | 2009-11-25 |
CN101586469B CN101586469B (zh) | 2011-10-12 |
Family
ID=41370873
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009100884374A Expired - Fee Related CN101586469B (zh) | 2009-07-07 | 2009-07-07 | 用于深孔超前欲松动爆破的封孔方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101586469B (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102852522A (zh) * | 2012-04-01 | 2013-01-02 | 天地科技股份有限公司 | 煤矿巷道卸压水力压裂方法及装置 |
CN108592723A (zh) * | 2018-05-04 | 2018-09-28 | 中国矿业大学 | 一种井下爆破注水一体化封孔器 |
CN108661693A (zh) * | 2018-04-25 | 2018-10-16 | 山东科技大学 | 一种多级式煤层注水钻孔封孔系统及注水钻孔封孔方法 |
CN108775233A (zh) * | 2018-05-04 | 2018-11-09 | 中国矿业大学 | 一种井下深孔松动爆破注水一体化封孔装置 |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1048125A1 (ru) * | 1982-03-12 | 1983-10-15 | Ленинградский Ордена Ленина,Ордена Октябрьской Революции И Ордена Трудового Красного Знамени Горный Институт Им.Г.В.Плеханова | Герметизатор шпуров |
SU1726739A1 (ru) * | 1989-02-13 | 1992-04-15 | Ташкентский Политехнический Институт Им.А.Р.Бируни | Способ подземной газификации углей |
CN1055036A (zh) * | 1990-12-28 | 1991-10-02 | 煤炭科学研究总院抚顺分院 | 深孔控制卸压爆破防突技术、工艺与装备 |
CN2851580Y (zh) * | 2005-11-28 | 2006-12-27 | 李继水 | 煤层带压注水和爆破喷雾装置 |
CN100434653C (zh) * | 2006-07-28 | 2008-11-19 | 辽河石油勘探局 | 煤层气井爆破式洞穴完井工艺方法 |
-
2009
- 2009-07-07 CN CN2009100884374A patent/CN101586469B/zh not_active Expired - Fee Related
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102852522A (zh) * | 2012-04-01 | 2013-01-02 | 天地科技股份有限公司 | 煤矿巷道卸压水力压裂方法及装置 |
CN102852522B (zh) * | 2012-04-01 | 2014-09-10 | 天地科技股份有限公司 | 煤矿巷道卸压水力压裂方法及装置 |
CN108661693A (zh) * | 2018-04-25 | 2018-10-16 | 山东科技大学 | 一种多级式煤层注水钻孔封孔系统及注水钻孔封孔方法 |
CN108661693B (zh) * | 2018-04-25 | 2019-04-05 | 山东科技大学 | 一种多级式煤层注水钻孔封孔系统及注水钻孔封孔方法 |
CN108592723A (zh) * | 2018-05-04 | 2018-09-28 | 中国矿业大学 | 一种井下爆破注水一体化封孔器 |
CN108775233A (zh) * | 2018-05-04 | 2018-11-09 | 中国矿业大学 | 一种井下深孔松动爆破注水一体化封孔装置 |
CN108775233B (zh) * | 2018-05-04 | 2020-06-09 | 中国矿业大学 | 一种井下深孔松动爆破注水一体化封孔装置 |
AU2018421568B2 (en) * | 2018-05-04 | 2021-02-25 | China University Of Mining And Technology | Underground deep hole loosening blasting and water injection intergrated hole sealing device |
Also Published As
Publication number | Publication date |
---|---|
CN101586469B (zh) | 2011-10-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2019210657A1 (zh) | 一种井下深孔松动爆破注水一体化封孔装置 | |
CN103510979B (zh) | 干冰爆炸增透装置及其抽放瓦斯的方法 | |
CN110485979B (zh) | 基于二氧化碳相变致裂装置的煤层瓦斯安全驱替抽采方法 | |
CN103352684B (zh) | 化学物理复合爆破压裂器及其制造方法 | |
CN207315333U (zh) | 一种高能多脉冲射孔压裂装置 | |
CN107842352B (zh) | 一种提高煤矿井下水力压裂增透增产效果的方法 | |
CN101586469B (zh) | 用于深孔超前欲松动爆破的封孔方法 | |
CN106368663B (zh) | 一种油气井高能气体压裂增产装置 | |
WO2024077842A1 (zh) | 岩层变频脉冲缝网压裂方法与装备 | |
CN105370256A (zh) | 一种分段预裂提高低透气性煤层高压注水湿润半径的方法 | |
CN208900072U (zh) | 一种新型囊袋式封孔器 | |
CN107654213B (zh) | 一种高能负压解堵装置 | |
CN105888639A (zh) | 塞控全通径滑套分段压裂管柱 | |
CN110485980B (zh) | 本质安全型二氧化碳致裂及驱替一体系统 | |
CN117005842A (zh) | 电缆防烧防窜高能气体压裂装置 | |
CN102619493A (zh) | 筛管完井的稠油水平井调剖堵水方法及其组合装置 | |
CN112392484B (zh) | 一种不动管柱的二氧化碳相变致裂增透装置及工作方法 | |
CN102619496B (zh) | 含油气岩分层分段多级爆破扩孔增裂方法 | |
CN110410053A (zh) | 基于孔眼支护的煤矿顶板卸压方法 | |
CN204663509U (zh) | 二氧化碳煤层震动增透系统 | |
CN105064973A (zh) | 一种爆破式压裂控制阀 | |
CN203808896U (zh) | 长段套损井膨胀管双卡套管分层封隔修复装置 | |
CN103437742B (zh) | 快速开关充填通道的补砂工具 | |
CN205243492U (zh) | 一种爆破式压裂控制阀 | |
CN201778771U (zh) | 不动管柱水力喷射分层压裂一体化管柱 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20111012 Termination date: 20140707 |
|
EXPY | Termination of patent right or utility model |