paver
paving
thickness
screed
paves
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2009100013778A
Other languages
Chinese (zh)
Other versions
CN101581065B (en
Inventor
杨再宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Longjian Road and Bridge Co Ltd
Original Assignee
Longjian Road and Bridge Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Longjian Road and Bridge Co Ltd filed Critical Longjian Road and Bridge Co Ltd
Priority to CN2009100013778A priority Critical patent/CN101581065B/en
Publication of CN101581065A publication Critical patent/CN101581065A/en
Application granted granted Critical
Publication of CN101581065B publication Critical patent/CN101581065B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention relates to a method for constructing ground foundation by a bituminous concrete paver. In the prior art, as the mechanization level of construction is not high, the phenomenon of poor control of the mixing rate of a mixed material, unstable dosage of a stabilizer, uneven and impervious stirring and watering and no guarantee of elevation and leveling degree are generated. The method comprises that the following steps: firstly, selecting an initial elevation value of the paver; determining Matsukata coefficient K of a paving layer; measuring the camber of a structural layer completed by the pavement through a water level; determining the hammer pressure and the vibrating beam pressure of the paver; intensively stirring a foundation material by a stirrer; adjusting the positions of a spiral conveyor and an anterior baffle plate; adjusting the distance between the spiral conveyor and the ground to the paving thickness of 1.25; and paving the ground by the bituminous concrete paver at a speed of 2 meters per minute and then grinding the ground by a vibrating type road roller. The method is used for constructing an asphalt concrete road foundation.

Description

Carry out the method for constructing road foundation with bituminous concrete paver
Technical field:
What the present invention relates to is road surface base layer construction method thereof, and what be specifically related to is the method for carrying out constructing road foundation with bituminous concrete paver.
Background technology:
Basic unit is the important ingredient in road surface, and it mainly plays the load-bearing effect, bears the vehicular load vertical force that surface layer transmits, and it is diffused in bed course and the roadbed.Therefore, require basic unit that enough strength and stiffness are arranged, enough water stabilities and freezing stability are arranged.Basic unit has stabilized with inorganic binder class and pellet to stablize two kinds, stabilized with inorganic binder class rigidity is big, good stability, and economical, but damage phenomenon in various degree in use also appears in this road surface, and a major reason is that the construction quality of sub-surface can't be guaranteed.
The beginning of the eighties in last century, constructing road foundation adopts artificial mix, manually paves, to artificial stone (according to dosage putting sacked cement or lime), automobile watering, five-furrow plough turns and grey soil mixing plant mixes and stirs, artificial levelling; Adopt the loader spice beginning of the nineties, manually cooperate bulldozer to pave; Adopted the still artificial or semi-mechanization operations of genus such as small-sized or medium-sized pellet blending station mixes and stirs, bulldozer paves, blade machine levelling afterwards.Because construction mechanization level is not high, it is bad then to produce Mixture Ratio control, the dosage shakiness of stabilizing agent, and it is irregular, not saturating to mix and stir, sprinkle water, the phenomenon that absolute altitude and planeness can't guarantee.Along with the highway construction grade improves, scale strengthens day by day, and the construction period shortens greatly, presses for to improve base layer construction technology, and the automation of itself and surface construction is complementary.
Summary of the invention:
The purpose of this invention is to provide and a kind ofly carry out the method for constructing road foundation, be used to solve the problem that existing base layer construction process machinery level is not high, construction quality is low with bituminous concrete paver.
The technical solution adopted for the present invention to solve the technical problems is:
Carry out the method for constructing road foundation with bituminous concrete paver, at first select the initial elevation value of paver, determine the loose measure coefficient k of paving layer, the deck camber that paves and finish with the level gauge measurement, determine the hammer ram pressure of paver and the beam pressure that vibrates, adopt lorry mounted mixer that base material is carried out central mix, adjust the position of helical conveyor and preceding side shield, adjusting helical conveyor is that paving thickness becomes 1.25 with the distance on ground, speed with 2 meters of per minutes paves with bituminous concrete paver, and then rolls with vibrating roller.
Described method of carrying out constructing road foundation with bituminous concrete paver:
(1), selects the initial elevation value of described paver
Determine to pave before the elevation angle, need the initial installation of screed is surveyed, promptly paver screed is placed on the ground, the elevation angle, both sides scale indication 0 or 5, the screed of measuring and adjust paver this moment should be horizontal level, and in the case, initial elevation value e=k paves 4(1+k 3) b, wherein k 4Be empirical parameter, k 3Be the loose measure coefficient, b is a paving thickness; Paver is paved and travels behind the segment distance by bilateral extension reference line method, measure the thickness that paves, compare, promptly can determine the calculating parameter between elevation value and the paving thickness with elevation value and the institute's Thickness Measurement by Microwave of this moment, thus the adjustment elevation angle;
(2), determine the loose measure coefficient k of described paving layer
The loose measure coefficient is chosen in about 1.18-1.25, when the basic unit behind the roller-compaction reaches the compactness of regulation, adopts level gauge to measure actual paving thickness, with actual paving thickness and compare without the paving thickness that rolls, can draw the loose measure coefficient that paves;
(3), determine the parameter of vibrating of described paver
The parameter of vibrating of paver should show and to adjust by the vibrate pressure meter of hydraulic system of paver, and for the planeness that guarantees that basic unit paves, the paver hydraulic system pressure adjustment of vibrating is bigger, makes the annex of paver can not produce high vibration and is advisable; Hammer ram pressure 60bar, beam pressure 80bar vibrates;
Plate thickness when (4), paving joint
Plate thickness m=k * b, wherein k is that loose measure coefficient, b are paving thickness;
(5), the adjustment of width
By the base width requirement, screed will be guaranteed straight, and the sound stage width degree does not conform to if original screed is gone the same way, and takes auxiliary screed, perhaps takes the super wide part screed is added the way of baffle plate.
Beneficial effect:
1, the present invention has improved construction quality, the sub-surface that paves with paver is aspect the appearance and size, adopt artificial auxiliary land leveller to pave as technical indicators such as absolute altitude, width, planeness and be greatly improved, can all satisfy the requirement of relevant specification, qualification rate reaches absolutely.It is true that the present invention has reached the machine registration, uniform mixing, consistency of thickness, quick construction, smooth, the mechanization degree height, speed of application be in the past few years in 5 times of base layer construction speed, greatly reduce artificial factor, compound evenly, roll in time, surging, intensity all fully obtained the guarantor; Because mixture laying is even, reduced thickness pellet segregation phenomenon widely, guaranteed the uniformity of foundation base intension, match ratio, to shrink and temperature deformation reduces, reduce in one crack, road surface, has reduced the early damage on road surface, prolonged the application life on road surface.
2, improved operating efficiency, paver paving concrete pavement basic unit has embodied the superiority of mechanized fully, has improved operating efficiency, has reduced working strength of workers.
The specific embodiment:
Embodiment 1:
Present embodiment adopts the bituminous concrete paver of DEMAG model to pave, at first select the initial elevation value of paver, determine the loose measure coefficient k of paving layer, the deck camber that paves and finish with the level gauge measurement, determine the hammer ram pressure of paver and the beam pressure that vibrates, adopt 500 type lorry mounted mixers that base material is carried out central mix, adjust the position of helical conveyor and preceding side shield, adjusting helical conveyor is that paving thickness becomes 1.25 with the distance on ground, speed with 2 meters of per minutes paves with bituminous concrete paver, and then rolls with vibrating roller.
In the present embodiment,, also used following method to determine the relevant technologies parameter of bituminous concrete paver in order to ensure the quality of the basic unit that paves:
(1), selects the initial elevation value of described paver
Determine to pave before the elevation angle, need the initial installation of screed is surveyed, promptly paver screed is placed on the ground, the elevation angle, both sides scale indication 0 or 5, the screed of measuring and adjust paver this moment should be horizontal level, and in the case, initial elevation value e=k paves 4(1+k 3) b, wherein k 4Be empirical parameter, k 3Be the loose measure coefficient, b is a paving thickness; Paver is paved and travels behind the segment distance by bilateral extension reference line method, measure the thickness that paves, compare, promptly can determine the calculating parameter between elevation value and the paving thickness with elevation value and the institute's Thickness Measurement by Microwave of this moment, thus the adjustment elevation angle.
(2), determine the loose measure coefficient k of described paving layer
The loose measure coefficient is chosen in 1.2, when the basic unit behind the roller-compaction reaches the compactness of regulation, adopts level gauge to measure actual paving thickness, with actual paving thickness and compare without the paving thickness that rolls, can draw the loose measure coefficient that paves.
(3), determine the parameter of vibrating of described paver
The parameter of vibrating of paver should show and to adjust by the vibrate pressure meter of hydraulic system of paver, and for the planeness that guarantees that basic unit paves, the paver hydraulic system pressure adjustment of vibrating is bigger, makes the annex of paver can not produce high vibration and is advisable; Hammer ram pressure 60bar, beam pressure 80bar vibrates.
Plate thickness when (4), paving joint
Plate thickness m=k * b, wherein k is that loose measure coefficient, b are paving thickness.
(5), the adjustment of width
By the base width requirement, screed will be guaranteed straight, and original screed sound stage width degree of going the same way does not conform in the present embodiment, differs 25cm, takes the way of auxiliary screed.
Table one and table two provide the contrast situation of base layer construction quality of the present invention and construction speed and original road surface base layer construction method thereof respectively, and be as follows:
The quality contrast table of the new and old basic unit of table one
Figure A20091000137700061
The new and old job practices progress of table two contrast table
Figure A20091000137700071
Shown in above two tables, the present invention adopts the bituminous concrete paver basic unit that paves, and it is true to have reached the machine registration, uniform mixing, and consistency of thickness, quick construction, smooth, the mechanization degree height has reduced the interference of human factor; Daily output is broken through 1,000,000 high pointes, be in the past few years in 5 times of base layer construction speed, benefit is extremely considerable.

Claims (2)

1, a kind of method of carrying out constructing road foundation with bituminous concrete paver, it is characterized in that: at first select the initial elevation value of paver, determine the loose measure coefficient k of paving layer, the deck camber that paves and finish with the level gauge measurement, determine the hammer ram pressure of paver and the beam pressure that vibrates, adopt lorry mounted mixer that base material is carried out central mix, adjust the position of helical conveyor and preceding side shield, adjusting helical conveyor is that paving thickness becomes 1.25 with the distance on ground, speed with 2 meters of per minutes paves with bituminous concrete paver, and then rolls with vibrating roller.
2, according to claim 1ly carry out the method for constructing road foundation, it is characterized in that with bituminous concrete paver:
(1), selects the initial elevation value of described paver
Determine to pave before the elevation angle, need the initial installation of screed is surveyed, promptly paver screed is placed on the ground, the elevation angle, both sides scale indication 0 or 5, the screed of measuring and adjust paver this moment should be horizontal level, and in the case, initial elevation value e=k paves 4(1+k 3) b, wherein k 4Be empirical parameter, k 3Be the loose measure coefficient, b is a paving thickness; Paver is paved and travels behind the segment distance by bilateral extension reference line method, measure the thickness that paves, compare, promptly can determine the calculating parameter between elevation value and the paving thickness with elevation value and the institute's Thickness Measurement by Microwave of this moment, thus the adjustment elevation angle;
(2), determine the loose measure coefficient k of described paving layer
The loose measure coefficient is chosen in 1.18-1.25, about when the basic unit behind the roller-compaction reaches the compactness of regulation, adopt level gauge to measure actual paving thickness, with actual paving thickness and compare, can draw the loose measure coefficient that paves without the paving thickness that rolls;
(3), determine the parameter of vibrating of described paver
The parameter of vibrating of paver should show and to adjust by the vibrate pressure meter of hydraulic system of paver, and for the planeness that guarantees that basic unit paves, the paver hydraulic system pressure adjustment of vibrating is bigger, makes the annex of paver can not produce high vibration and is advisable; Hammer ram pressure 60bar, beam pressure 80bar vibrates;
Plate thickness when (4), paving joint
Plate thickness m=k * b, wherein k is that loose measure coefficient, b are paving thickness;
(5), the adjustment of width
By the base width requirement, screed will be guaranteed straight, and the sound stage width degree does not conform to if original screed is gone the same way, and takes auxiliary screed, perhaps takes the super wide part screed is added the way of baffle plate.
CN2009100013778A 2008-05-13 2009-01-05 Method for constructing road foundation by using bituminous concrete paver Active CN101581065B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009100013778A CN101581065B (en) 2008-05-13 2009-01-05 Method for constructing road foundation by using bituminous concrete paver

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN200810064486.X 2008-05-13
CN200810064486 2008-05-13
CN2009100013778A CN101581065B (en) 2008-05-13 2009-01-05 Method for constructing road foundation by using bituminous concrete paver

Publications (2)

Publication Number Publication Date
CN101581065A true CN101581065A (en) 2009-11-18
CN101581065B CN101581065B (en) 2011-02-16

Family

ID=41363372

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009100013778A Active CN101581065B (en) 2008-05-13 2009-01-05 Method for constructing road foundation by using bituminous concrete paver

Country Status (1)

Country Link
CN (1) CN101581065B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102852080A (en) * 2012-10-12 2013-01-02 中联重科股份有限公司 Paver as well as method, device and system for controlling paver operation
CN111172849A (en) * 2020-01-19 2020-05-19 陕西中大力鼎科技有限公司 Full-width seamless integral forming asphalt paving method for old road extension

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2530977Y (en) * 2002-02-28 2003-01-15 孟昭彬 Full hydraulic wheel type asphalt concrete paver
CN100564679C (en) * 2004-10-11 2009-12-02 上海诚建道路机械施工有限公司 Technique for constructing asphalt concrete pavement of racetrack
CN100537898C (en) * 2007-10-16 2009-09-09 哈尔滨工业大学 The job practices of rubber grain asphalt concrete pavement

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102852080A (en) * 2012-10-12 2013-01-02 中联重科股份有限公司 Paver as well as method, device and system for controlling paver operation
CN102852080B (en) * 2012-10-12 2015-06-03 中联重科股份有限公司 Paver as well as method, device and system for controlling paver operation
CN111172849A (en) * 2020-01-19 2020-05-19 陕西中大力鼎科技有限公司 Full-width seamless integral forming asphalt paving method for old road extension

Also Published As

Publication number Publication date
CN101581065B (en) 2011-02-16

Similar Documents

Publication Publication Date Title
CN105780618B (en) A kind of prefabricated board is to stretching vertical no slope embankment and construction method
CN109914178A (en) A kind of biological enzyme curing materials integration paved roads construction method
CN106149500A (en) A kind of construction method of cement emulsified asphalt mortar penetration type half-flexible pavement
CN101532273B (en) Anti-rutting road surface RS2000 modified asphalt mixture proportion and construction technology
CN109680586A (en) A kind of pavement asphalt laying method
CN110409252A (en) A kind of pin-connected panel Prefabricated Concrete gutter synchronization road construction in layer method
CN103114509A (en) Slipform construction method for concrete side film of roadbase
CN103835205A (en) Construction method for road edge stone sliding mode
CN101581065B (en) Method for constructing road foundation by using bituminous concrete paver
CN209338946U (en) A kind of large longitudinal slope Deteriorated concrete pavement regenerated road surface structure
CN107460801A (en) A kind of polymer SRX asphalt roads construction technologies
CN108193572A (en) A kind of method recycled to precast beam precasting yard hardened layer
CN103422407A (en) Construction process using cement diatomite to stabilize desert sand mixture to build Niger desert road
CN105064163A (en) Cement stabilization macadam base layer ultrahigh reverse slope section one-time molding construction method
CN113699852A (en) Environment-friendly high-strength solidified soil construction process
CN107151961A (en) A kind of construction method of town road
CN112982058A (en) Vibration mixing construction method for cement stabilized macadam
CN113585317B (en) Construction method for mucky soil support beam cushion layer
JPH02157304A (en) Construction for pavement of bed in play-ground
CN103174216B (en) Method for constructing roof drain through adopting geotechnical formwork technology
CN1584209A (en) Block pavement constructing method
CN108677643A (en) A kind of grinding coagulation soil composite pavement and preparation method thereof for not cracking, being not required to setting expansion or contraction joints
CN110304868A (en) A kind of high additive Machine-made Sand border stone slip-form concrete and its construction technology
CN106758653A (en) Pin-connected panel shearing resistance bituminous paving and its method for paving
CN108049398A (en) Bridge location is in the pile base construction method in mud area

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Shi Tieqiao

Inventor after: Ma Yong

Inventor after: Jiang Yueping

Inventor after: Sun Xuefei

Inventor before: Yang Zaiyu

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: YANG ZAIYU TO: SHI TIEQIAO MA YONG JIANG YUEPING SUN XUEFEI

C14 Grant of patent or utility model
GR01 Patent grant