CN101575849B - 一种软土地基气水置换固结方法 - Google Patents
一种软土地基气水置换固结方法 Download PDFInfo
- Publication number
- CN101575849B CN101575849B CN2009100996026A CN200910099602A CN101575849B CN 101575849 B CN101575849 B CN 101575849B CN 2009100996026 A CN2009100996026 A CN 2009100996026A CN 200910099602 A CN200910099602 A CN 200910099602A CN 101575849 B CN101575849 B CN 101575849B
- Authority
- CN
- China
- Prior art keywords
- air
- soil
- boring
- foundation
- soft soil
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
本发明公开了一种软土地基气水置换固结方法,该方法首先对需要加固的软土区域按5~10米间隔纵横布置钻孔,钻孔内插入输气管,用输气管和四通气阀连接空气压缩机和插入钻孔的各输气管,各钻孔之间设置纵横排水沟;然后向各钻孔压入空气,对需要加固的地基土层进行充气,通过空气压力挤出软土地层中的地下水,实现气水置换,待压入气体在地表冒出,停止向地层压入空气,并快速放气,使非饱和土层在上覆土层荷载作用下产生压缩变形,达到加固地基土的目的。应用本发明,软土地基排水固结的深度不受限制,工程造价低,工程实施过程操作简便,可以快速产生深部软土地基的加固效果,适用于包括水下岸坡等复杂环境地基的加固处理。
Description
技术领域
本发明涉及一种软土地基的排水固结技术,尤其涉及一种软土地基气水置换固结方法。
背景技术
软土地基天然含水量高,强度极低,压缩性大,透水性差,地基承载力低,需要进行加固处理,才能进行工程建设。目前常用的方法有桩基法、换土法、灌浆法、排水固结法和加筋法等。排水固结法具有费用较低和对环境影响小的特点而被广泛应用于大范围软土地基的处理。排水固结法由排水系统和加压系统两部分组合而成,在地基中设置排水体,在地基表面铺设砂垫层,在垫层上加载。
目前排水固结法加固软土地基常用的有三种类型:(1)加载预压法,在软基上打设砂井或排水带并铺上砂垫层,在垫层面上施加堆载预压,对地基加载是填料的自重,当填筑到其要求的高度及固结度时,预压完成,其缺点是软土的排水速度缓慢并有侧向位移挤出,要控制加载速率,固结时间完成时间长,对建筑软基加固,当达到所要求固结度后,还需卸载,工序复杂,时间长,造价高;(2)降水预压法,在软基上打设约6~8米的下端带有滤管的金属井管并将管顶连成管路,借真空泵的吸力使地下水位下降,减少土中的浮力增加土层的有效重量达到预压目的,对加固渗透性差的淤泥地基的固结时间长,软土层较深效果较差;(3)真空预压或真空联合加载预压法,该法是一种经济有效的软基加固方法,但工序复杂,处理时间长,造价也较高。
当前排水固结法加固软土地基存在的主要问题:对深部软土的排水固结效果差,固结处理要求的时间长,工程费用高;对水下岸坡、潮间带等复杂环境地基的加固处理工艺复杂,施工难度大。
发明内容
为了克服当前软土地基处理技术对深部软土的排水固结效果差、固结处理时间长等缺点,本发明提供一种软土地基气水置换固结方法,该方法施工过程简单、形成深部软土加固效果时间短、适用于复杂环境软土地基加固处理。
本发明的目的是通过以下技术方案来实现的:一种软土地基气水置换固结方法,该方法包括以下步骤:
(1)对需要加固的软土区域按5~10米间隔纵横布置钻孔,钻孔的深度为软土层厚度的90%以上;钻孔内插入输气管,插入钻孔的输气管分为钻孔孔壁封闭段和钻孔孔壁透气段两部分,钻孔孔壁封闭段和钻孔孔壁透气段的长度比一般为2∶1;用输气管和四通气阀连接空气压缩机和插入钻孔的各输气管,各钻孔之间设置纵横排水沟;
(2)向各钻孔压入空气,对需要加固的地基土层进行充气,充气压力由小到大;通过空气压力挤出软土地层中的地下水,实现气水置换,使待加固的软土层处于非饱和状态;待压入气体在地表冒出,且钻孔中的气压不再上升后,停止向地层压入空气,并快速放气,迅速降低土层中的气压,使非饱和土层在上覆土层荷载作用下产生压缩变形,达到加固地基土的目的。
本发明的有益效果是:应用本发明,软土地基排水固结的深度不受限制,工程造价低,工程实施过程操作简便,可以快速产生深部软土地基的加固效果,适用于包括水下岸坡等复杂环境地基的加固处理,可以方便地与堆载预压法和真空预压法联合使用。
附图说明
图1是本发明软土地基气水置换固结方法实施工作示意图;
图中:空气压缩机1,输气管2,四通气阀3,钻孔4,钻孔孔壁封闭段5,钻孔孔壁透气段6,排水沟7。
具体实施方式
本发明的原理是在软土层的深部压入气体,利用高压气体置换软土地基中的地下水,然后快速排气减压,使非饱和土层产生压缩变形。具体来说,首先在待加固地基上钻探形成一系列钻孔,插入输气管,采用空压机向各钻孔压入高压气体,在软土地基深部土层中利用高压气体置换地基中的地下水,使地基土层处于非饱和状态,待压入高压气体的气压不再上升后,快速放气降低土层中的气压,使非饱和土层在上覆土层荷载作用下产生压缩变形,达到加固地基土。向地基土充气和放气过程可多次反复。
下面根据附图详细说明本发明,本发明的目的和效果将变得更加明显。
如图1所示,根据地基工程地质条件的勘察结果,对需要加固的软土区域按5~10米间隔纵横布置钻孔4,根据软土层厚度,确定钻孔4深度,孔深一般为软土层厚度的90%以上。钻孔4内插入输气管2,插入钻孔4的输气管2分为钻孔孔壁封闭段5和钻孔孔壁透气段6两部分,钻孔孔壁封闭段5和钻孔孔壁透气段6的长度比一般为2∶1。用输气管2和四通气阀3连接空气压缩机1和插入钻孔4的输气管2,各钻孔4之间设置纵横排水沟。
使用时,向各钻孔压入空气,对需要加固的地基土层进行充气,充气压力由小到大。通过空气压力挤出软土地层中的地下水,实现气水置换,使待加固的软土层处于非饱和状态。待压入气体在地表冒出,且钻孔中的气压不再上升后,停止向地层压入空气,并快速放气,迅速降低土层中的气压,使非饱和土层在上覆土层荷载作用下产生压缩变形,达到加固地基土的目的。向地基土充气和放气过程可多次反复。
在反复充放气加固软土地基过程中应注意对地基的沉降变形和地下水位的监测,以便达到加固效果的分析评价。在放气阶段开打四通气阀3顶阀期间可监测地下水位变化过程。
Claims (1)
1.一种软土地基气水置换固结方法,其特征在于,该方法包括以下步骤:
(1)对需要加固的软土区域按5~10米间隔纵横布置钻孔,钻孔的深度为软土层厚度的90%以上;钻孔内插入输气管,插入钻孔的输气管分为钻孔孔壁封闭段和钻孔孔壁透气段两部分,钻孔孔壁封闭段和钻孔孔壁透气段的长度比为2∶1;用输气管和四通气阀连接空气压缩机和插入钻孔的各输气管,各钻孔之间设置纵横排水沟;
(2)向各钻孔压入空气,对需要加固的地基土层进行充气,充气压力由小到大;通过空气压力挤出软土地层中的地下水,实现气水置换,使待加固的软土层处于非饱和状态;待压入气体在地表冒出,且钻孔中的气压不再上升后,停止向地层压入空气,并快速放气,迅速降低土层中的气压,使非饱和土层在上覆土层荷载作用下产生压缩变形,达到加固地基土的目的。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009100996026A CN101575849B (zh) | 2009-06-11 | 2009-06-11 | 一种软土地基气水置换固结方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009100996026A CN101575849B (zh) | 2009-06-11 | 2009-06-11 | 一种软土地基气水置换固结方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101575849A CN101575849A (zh) | 2009-11-11 |
CN101575849B true CN101575849B (zh) | 2010-12-01 |
Family
ID=41270904
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009100996026A Expired - Fee Related CN101575849B (zh) | 2009-06-11 | 2009-06-11 | 一种软土地基气水置换固结方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101575849B (zh) |
Families Citing this family (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102660969B (zh) * | 2012-05-27 | 2014-12-03 | 上海岩土工程勘察设计研究院有限公司 | 一种建筑物纠偏方法 |
CN103061324A (zh) * | 2013-01-28 | 2013-04-24 | 河海大学 | 一种地下充气的液化地基处理装置及施工方法 |
CN103726486A (zh) * | 2013-12-16 | 2014-04-16 | 邓立新 | 直流电场增强真空预压软地基处理法 |
CN103866757B (zh) * | 2014-04-10 | 2015-10-14 | 宜兴市良旭焊接瓷件有限公司 | 土壤脱水干化或固化的方法 |
CN105203277A (zh) * | 2015-08-14 | 2015-12-30 | 中广核工程有限公司 | 核电站氢气储罐注水置换和保压试验方法 |
CN105970967A (zh) * | 2016-05-19 | 2016-09-28 | 辽宁工程技术大学 | 一种富水地区地铁车站基坑处理方法 |
CN106592572A (zh) * | 2016-10-21 | 2017-04-26 | 温州大学 | 气压劈裂地基加固处理结构和采用气压劈裂地基加固处理结构 |
CN106677156B (zh) * | 2016-12-27 | 2018-12-11 | 吴慧明 | 一种应用气溶胶对软土地基进行扰动处理的方法 |
CN109837919A (zh) * | 2019-01-06 | 2019-06-04 | 许增荣 | 注气驱排岩土体中液体的技术 |
CN113431019A (zh) * | 2021-06-03 | 2021-09-24 | 上海市基础工程集团有限公司 | 用于土体快速排水的加压注气装置 |
CN117385860B (zh) * | 2023-12-07 | 2024-02-23 | 石家庄铁道大学 | 一种深土层气水交换设备 |
-
2009
- 2009-06-11 CN CN2009100996026A patent/CN101575849B/zh not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN101575849A (zh) | 2009-11-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101575849B (zh) | 一种软土地基气水置换固结方法 | |
CN103233454B (zh) | 湿陷性黄土地基的砂桩浸水真空预压及注浆处理方法 | |
CN104120710B (zh) | 一种真空预压联合吹填泥浆的软基加固处理方法 | |
CN105862706A (zh) | 一种利用微生物气泡处理可液化砂土地基的方法 | |
CN104278667A (zh) | 一种地下溶洞的充填处理方法 | |
CN109797731A (zh) | 一种分区段柔性隔振袋、隔振装置及方法 | |
CN101806055B (zh) | 真空预压联合刚性桩复合地基加固方法 | |
CN1888331A (zh) | 导坑式人工挖孔桩对建筑物基础的加固与托换方法及复合支撑桩 | |
CN102296589A (zh) | 一种井点抽水控制群管虹吸的地基降排水方法 | |
CN104947650B (zh) | 砂井堆载预压后后注浆封闭加固方法 | |
CN101597898B (zh) | 刚性排水桩及施工方法 | |
CN101575857B (zh) | 一种滑坡充气排水治理方法 | |
CN109653197B (zh) | 一种可三维拓展的桩基施工方法 | |
CN107178077B (zh) | 一种岩溶地区溶洞上覆土层注浆加固结构及其设计方法 | |
CN105178285A (zh) | 一种扩大岩土注浆加固和防渗堵塞范围的方法 | |
CN205604220U (zh) | 超弱饱和软粘土次固结排水装置 | |
CN201214787Y (zh) | 刚性排水桩 | |
CN102767174A (zh) | 动静排水振击法 | |
CN105926579A (zh) | 一种加压式套管冲击排水固结系统及方法 | |
CN212129114U (zh) | 一种软土地基气囊膨胀挤压排水固结设备 | |
CN105369797A (zh) | 湿陷性黄土真空辐射固结法 | |
CN109139057B (zh) | 一种采煤巷道底板吸水底鼓治理方法 | |
CN109113049B (zh) | 工后应力变形可调节预制桩及其施工方法 | |
CN106049413A (zh) | 一种应用于深层饱和软土地基的复合动力排水固结系统及施工方法 | |
CN103122631A (zh) | 软土地基堆载冲压加固法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20101201 Termination date: 20130611 |