CN101574721A - Once hot-forging shaping process for manufacturing joint hinge - Google Patents

Once hot-forging shaping process for manufacturing joint hinge Download PDF

Info

Publication number
CN101574721A
CN101574721A CNA2009100527818A CN200910052781A CN101574721A CN 101574721 A CN101574721 A CN 101574721A CN A2009100527818 A CNA2009100527818 A CN A2009100527818A CN 200910052781 A CN200910052781 A CN 200910052781A CN 101574721 A CN101574721 A CN 101574721A
Authority
CN
China
Prior art keywords
joint hinge
adopting
forging
shaping process
friction press
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2009100527818A
Other languages
Chinese (zh)
Other versions
CN101574721B (en
Inventor
周菊明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Chang Qiang industrial Polytron Technologies Inc
Original Assignee
SHANGHAI CHANGQIANG POWER STATION FITTINGS CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI CHANGQIANG POWER STATION FITTINGS CO Ltd filed Critical SHANGHAI CHANGQIANG POWER STATION FITTINGS CO Ltd
Priority to CN2009100527818A priority Critical patent/CN101574721B/en
Publication of CN101574721A publication Critical patent/CN101574721A/en
Priority to PCT/CN2009/001472 priority patent/WO2010142069A1/en
Application granted granted Critical
Publication of CN101574721B publication Critical patent/CN101574721B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21KMAKING FORGED OR PRESSED METAL PRODUCTS, e.g. HORSE-SHOES, RIVETS, BOLTS OR WHEELS
    • B21K1/00Making machine elements
    • B21K1/74Making machine elements forked members or members with two or more limbs, e.g. U-bolts, anchors
    • EFIXED CONSTRUCTIONS
    • E05LOCKS; KEYS; WINDOW OR DOOR FITTINGS; SAFES
    • E05DHINGES OR SUSPENSION DEVICES FOR DOORS, WINDOWS OR WINGS
    • E05D9/00Flaps or sleeves specially designed for making from particular material, e.g. hoop-iron, sheet metal, plastics

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Pivots And Pivotal Connections (AREA)
  • Braking Arrangements (AREA)

Abstract

The invention relates to the technical field of joint hinge manufacturing, in particular to a once hot-forging shaping process for manufacturing a joint hinge. The once hot-forging shaping process is characterized by adopting the following steps of: (1) adopting an intermediate frequency heating furnace to heat blanked material to 1050 to 1150 DEG C; (2) adopting a pneumatic hammer to directly and lightly upset the material heated by the intermediate frequency heating furnace to remove roll scale on the surface of the material; (3) adopting a friction press blocker to mould unfolding sheet of the joint hinge; (4) utilizing a friction press finisher provided with a V-shaped lower die to mould the unfolding sheet into the joint hinge; (5) adopting a hydraulic shape-adjuster to adjust the shape of the joint hinge; and (6) adopting a metal steel-shot to carry out shot blasting so as to lead the surface of forgeable piece to become silvery white. Compared with the prior art, the invention adopting the once hot-forging shaping process has high efficiency. The roll scale is so thin that the roll scale can be removed before forging so as to obtain excellent surface quality; and after the forgeable piece is shaped, the metal steel-shot is adopted to lead the surface of the forgeable piece to become silvery white through shot blasting so as to bring convenience for metal surface fault detection and to avoid painting treatment; and compared with the cost of flat die forging, the cost of the once hot-forging shaping process can be reduced at least by three times.

Description

One pyrogene type preparation technology of joint hinge
[technical field]
The present invention relates to the joint hinge preparing technical field, relate in particular to an a kind of pyrogene type preparation technology of joint hinge.
[background technology]
Joint hinge, claim U type folder again, U type chuck, suspension clamp, be a large amount of products that use in the station boiler, present boiler seven, 80 meters high, and several ten thousand tons of steel constructions all rely on joint hinge to lift from top to down, so the joint hinge quality is extremely important, must adopt forging to the joint hinge regulation in the world, and need do nondestructive inspection, destructive pull test, former boiler industry adopts the open die forging swage forging, general smallclothes five pyrogene types, middle part seven pyrogene types, make the problem of joint hinge production domesticization obtain the part solution, but part can't be done greatly, but this technology have very big deficiency, need five to seven pyrogene types, greater than 20 kilograms seven fire, so the manufacturing cost height, efficient is low, a class can only produce 4-10 spare, and the heating number of times is too much, the general technology regulation is heated to 950 ℃-1050 ℃, final forging temperature causes element losses such as decarburization greater than 850 ℃, influences quality; In addition, forging has only first fire can remove oxide skin, and back six fire all can not remove, and cause product in fetal membrane, and oxide skin is forged in product, the surface quality extreme difference; And open die forging since oxide skin be clipped in the product, can not ball blast, a ball blast blemish just exposes undoubtedly, the darkest depression can reach and have a strong impact on quality about 4mm and the processing that needs painting; Because five~seven pyrogene types, each temperature is difficult to control evenly, so can cause about two pin, front and back, height are inconsistent, even the tolerance that the drawing design provides is very big, repair rate, scrappage are also still very high.
[summary of the invention]
The objective of the invention is to adopt heating in medium frequency one pyrogene type to prepare joint hinge for overcoming the deficiencies in the prior art.
For achieving the above object, the present invention designs an a kind of pyrogene type preparation technology of joint hinge, it is characterized in that adopting following steps: (1) heating in medium frequency: the good material that will fall adopts the heating in medium frequency stove to be heated to 1050~1150 ℃; (2) remove oxide skin: the raw material that adopts the vertical light rammer heating in medium frequency of pneumatic hammer to cross removes the stock chart surface oxidized skin; (3) blocking: adopt the friction press blocker will remove the expansion sheet that raw material mold pressing after the oxide skin goes out joint hinge; (4) finish-forging: and then adopt the friction press finisher be provided with V-arrangement shape die, the expansion sheet of joint hinge is molded into joint hinge; (5) integer: adopt joint hinge hydraulic pressure reshaper, the joint hinge that mold pressing is gone out carries out integer; (6) metal ball blast: adopt the metal shot to carry out ball blast the joint hinge forging after the integer, make the surface of forging become silvery white.
Described pneumatic hammer is the 750KG pneumatic hammer, and gently upset time of raw material of pneumatic hammer is 5~10 seconds, and raw material length is upset short 4.8%~5.1%.
Shape when described blocker employing is launched into the plane with joint hinge, i.e. the expansion plate shape of joint hinge.
Described friction press adopts 560T or 1600T friction press.
The present invention compared with prior art adopts heating in medium frequency one pyrogene type, so efficient is high, output was 240 in eight hours, actually can reach 360; Owing to be heating in medium frequency one pyrogene type, oxide skin is very thin, and can remove before forging, so surface quality is very good, after the forging moulding, adopt metal shot ball blast, it is silvery white that the surface becomes, be the metal true qualities, very convenient to the metal surface flaw detection, so the processing that do not need painting behind the metal ball blast; Die forging, the mould and die accuracy that adopts all is higher than open die forging far away in addition, and a pyrogene type, and joint hinge two pin all arounds misplace far below open die forging, and forging external form surplus is also put fewly more than open die forging, so cost is than low three times at least of open die forgings.
[description of drawings]
Fig. 1 is the schematic diagram of joint hinge in the embodiment of the invention.
Fig. 2 is the expansion sheet of joint hinge in the embodiment of the invention.
Fig. 3 is the schematic diagram of friction press finisher in the embodiment of the invention.
Appointment Fig. 2 is a Figure of abstract.
[specific embodiment]
Below the present invention will be further described.
The material employing heating in medium frequency stove that one, will fall good is heated to 1050-1150 ℃, and firing rate is decided to be 1-2 minute/part according to the workpiece size, and heating in medium frequency stove power is 100-500KV;
With the 750KG pneumatic hammer workpiece is vertically gently upset, the time is 5-10 second, and length is upset short by about 5%, and removing thickness is 0.1mm left and right sides surface scale;
Two, in 560T or 1600T friction press, process then, according to the workpiece size, process in the 560T press less than the workpiece of 16KG, process in the 1600T press greater than the workpiece of 16KG, basic one-tenth plane in the blocker, the main dispensing materials operating time is 10-20 second.Referring to Fig. 2, this process characteristic is an A, the impact forging moulding of three holes of B, because of workpiece A, B place overall volume maximum, feed consumption is also maximum, and has reduced the materials at the maximum positions of feed consumption after the punching, makes the material distribution at each position in the forging die quite reasonable, thereby make the forging forming, overlap reduces;
Three, adopt again to be provided with and be down trapezoidal shape, the friction press finisher of the die of approximate V font, the expansion sheet of joint hinge is molded into joint hinge, and finisher is referring to Fig. 3, maximum characteristics are as follows: 1, the old technology in C place is the angle that becomes not have radian among the figure, when bending moulding, because interior excessive to deflection, the crooked number of degrees are generally 100 °, it is folding to cause the C place to produce, cause scrappage very high, so former technology necessary 100% is in this place's magnetic and dye penetrant inspection;
And the C place is provided with the radian of buffering in the new technology, referring to Fig. 3, makes crooked about 60 ° of joint hinge moulding, deflection reduces greatly when brake forming, so folding with regard to not causing, the operating time is 5-10 second, be reduced to 5% in industry regulation flaw detection now, some in addition inspection-free.2, the perspective plane reduces greatly during moulding, makes the 1600T friction press just can process maximum joint hinge, and promptly the U type presss from both sides, and reduces cost greatly.
Four, joint hinge integer:
Adopt two symmetric arms of the joint hinge that joint hinge goes out mold pressing with the hydraulic pressure reshaper to locate moulding by the required bending angle of product Fig. 1, its physical dimension has all kept very high precision, changed former two pin length, about the asymmetric equal error in dislocation center, improved product quality greatly, this operating time in step is 5-10 second.
Five, metal ball blast: adopt the metal shot to carry out ball blast the joint hinge after the integer, make the surface of joint hinge become silvery white.

Claims (4)

1. a pyrogene type preparation technology of a joint hinge is characterized in that adopting following steps: (1) heating in medium frequency: the good material that will fall adopts the heating in medium frequency stove to be heated to 1050~1150 ℃; (2) remove oxide skin: the raw material that adopts the vertical light rammer heating in medium frequency of pneumatic hammer to cross removes the stock chart surface oxidized skin; (3) blocking: adopt the friction press blocker will remove the expansion sheet that raw material mold pressing after the oxide skin goes out joint hinge; (4) finish-forging: and then adopt the friction press finisher be provided with the die of falling the trapezoidal shape, the expansion sheet of joint hinge is molded into joint hinge; (5) integer: adopt joint hinge hydraulic pressure reshaper, the joint hinge that mold pressing is gone out carries out integer; (6) metal ball blast: adopt the metal shot to carry out ball blast the joint hinge after the integer, make the surface of joint hinge become silvery white.
2. a pyrogene type preparation technology of joint hinge as claimed in claim 1, it is characterized in that: described pneumatic hammer is the 750KG pneumatic hammer, gently upset time of raw material of pneumatic hammer is 5~10 seconds.
3. a pyrogene type preparation technology of joint hinge as claimed in claim 1 is characterized in that: the shape when described blocker employing is launched into the plane with joint hinge.
4. a pyrogene type preparation technology of joint hinge as claimed in claim 1 is characterized in that: described friction press employing 560T or 1600T friction press.
CN2009100527818A 2009-06-09 2009-06-09 Once hot-forging shaping process for manufacturing joint hinge Active CN101574721B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN2009100527818A CN101574721B (en) 2009-06-09 2009-06-09 Once hot-forging shaping process for manufacturing joint hinge
PCT/CN2009/001472 WO2010142069A1 (en) 2009-06-09 2009-12-16 Hot-forging shaping process for joint hinge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009100527818A CN101574721B (en) 2009-06-09 2009-06-09 Once hot-forging shaping process for manufacturing joint hinge

Publications (2)

Publication Number Publication Date
CN101574721A true CN101574721A (en) 2009-11-11
CN101574721B CN101574721B (en) 2011-04-06

Family

ID=41269866

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009100527818A Active CN101574721B (en) 2009-06-09 2009-06-09 Once hot-forging shaping process for manufacturing joint hinge

Country Status (2)

Country Link
CN (1) CN101574721B (en)
WO (1) WO2010142069A1 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010142069A1 (en) * 2009-06-09 2010-12-16 上海昌强电站配件有限公司 Hot-forging shaping process for joint hinge
CN102189206A (en) * 2011-03-01 2011-09-21 湖北巨力锻造有限公司 Forging technology of cylinder lifting lug of automobile
US20130276276A1 (en) * 2010-12-17 2013-10-24 Kazuya Ogawa Method of manufacturing automobile door hinge
CN107159831A (en) * 2017-06-30 2017-09-15 陕西宏远航空锻造有限责任公司 A kind of forging method of cross forging part
CN113319229A (en) * 2021-06-04 2021-08-31 武钢集团襄阳重型装备材料有限公司 Manufacturing method of lifting lug for metallurgical slag basin

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB995876A (en) * 1961-05-31 1965-06-23 Mario Macchini Improvements in forging universal joint yokes
CH593108A5 (en) * 1975-12-19 1977-11-30 Press Und Stanzwerk Ag
JPS5545564A (en) * 1978-09-26 1980-03-31 Shinko Kogyo Kk Preparation of cross joint yoke
GB2092031B (en) * 1981-01-29 1985-02-20 Fenner J & H Co Ltd Improved method of manufacturing belt fasteners
IT1244386B (en) * 1990-11-15 1994-07-11 Chiavette Unificate Spa PROCEDURE FOR THE CREATION OF METAL FORK ELEMENTS FOR EXAMPLE OF THE TYPE TO BE COUPLED TO THE ROD OF A FLUID DYNAMIC CYLINDER AND PLANT THAT IMPLEMENTS THIS PROCEDURE.
CN1785550A (en) * 2005-11-08 2006-06-14 内蒙古第一机械制造(集团)有限公司 Forging method of soliding fork
CN100453203C (en) * 2006-09-12 2009-01-21 钟六妹 Forging method of high grade carbon steel hook, ring parts
CN100591437C (en) * 2008-05-07 2010-02-24 四川振强模锻有限公司 U shaped suspension clamp swaging technique
CN101433939A (en) * 2008-10-10 2009-05-20 白城中一精锻股份有限公司 Precision forging technique for cracking connection rod
CN101574721B (en) * 2009-06-09 2011-04-06 上海昌强电站配件有限公司 Once hot-forging shaping process for manufacturing joint hinge

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010142069A1 (en) * 2009-06-09 2010-12-16 上海昌强电站配件有限公司 Hot-forging shaping process for joint hinge
US20130276276A1 (en) * 2010-12-17 2013-10-24 Kazuya Ogawa Method of manufacturing automobile door hinge
US8984726B2 (en) * 2010-12-17 2015-03-24 Hiroshi Ogawa Method of manufacturing automobile door hinge
CN102189206A (en) * 2011-03-01 2011-09-21 湖北巨力锻造有限公司 Forging technology of cylinder lifting lug of automobile
CN102189206B (en) * 2011-03-01 2012-11-28 湖北巨力锻造有限公司 Forging technology of cylinder lifting lug of automobile
CN107159831A (en) * 2017-06-30 2017-09-15 陕西宏远航空锻造有限责任公司 A kind of forging method of cross forging part
CN113319229A (en) * 2021-06-04 2021-08-31 武钢集团襄阳重型装备材料有限公司 Manufacturing method of lifting lug for metallurgical slag basin
CN113319229B (en) * 2021-06-04 2023-05-23 武钢集团襄阳重型装备材料有限公司 Manufacturing method of lifting lug for metallurgical slag basin

Also Published As

Publication number Publication date
WO2010142069A1 (en) 2010-12-16
CN101574721B (en) 2011-04-06

Similar Documents

Publication Publication Date Title
CN101574721B (en) Once hot-forging shaping process for manufacturing joint hinge
CN101745784B (en) Simple forming process of seal head for titanium alloy cylinder
CN101941039B (en) High-strength aluminum alloy isothermal direction-change open die forging method and device
CN100371129C (en) Tech. for forging forming of hook fastener flame of wagon and maould thereof
CN100467156C (en) Method for smithing GH4169 alloy plate shaped forgeable piece in air at an approximately equal temperature
CN107252866B (en) The multiple protrusion ozzle large-sized end enclosure forging integral forging and forming methods of nuclear reactor band
CN105252230B (en) Machining process for inclined tee
CN102527803A (en) Method for locally heating and forming high-strength steel
CN101386054B (en) Forging technique of 1000MW nuclear power plant steam turbine low-pressure rotor
CN101602157A (en) A kind of production technology of speed reducer output shaft
CN107999687A (en) A kind of aluminium alloy vane forging and preparation method thereof
CN101456060A (en) Forging device pipeline of complicated forging piece and forging production technique thereof
CN111745101B (en) Cake forging rounding forming forging method
CN101279354A (en) Method for producing connecting pin forging
CN112355208A (en) Near-net rolling forming method of GH907 special-shaped ring forging
CN103286521A (en) Forging technology of oval wind-power door frame flange
RU2374028C1 (en) Production method of gas turbine engine disk
CN102744569A (en) Plate flange thick tampering bending hot forging process for impeller cover disc for large-scale centrifugal fan
CN112846059A (en) Free forging process of bearing seat
CN101618499B (en) Method for eliminating seaming coarse grains of rolling vane
CN101428291A (en) Production process for large weight soldering-free molybdenum wire pole stock
CN101214602A (en) Method of preparing coupler yoke frame
CN102990288B (en) Core secondary stainless steel body Forging Technology
CN109013995A (en) A kind of nearly isothermal precision forging method of titanium alloy forging
CN106862446B (en) The free forging method of super-big and overweight forging is realized using 3 tons of flat-die hammers

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: Songjiang District Shanghai Yexie town 201608 Huayuan Road South

Patentee after: Shanghai Chang Qiang industrial Polytron Technologies Inc

Address before: Songjiang District Shanghai Yexie town 201608 Huayuan Road South

Patentee before: Shanghai Changqiang Power Station Fittings Co.,Ltd.

CP01 Change in the name or title of a patent holder