CN101562842B - Method, system and device for resource allocation - Google Patents

Method, system and device for resource allocation Download PDF

Info

Publication number
CN101562842B
CN101562842B CN200810104186XA CN200810104186A CN101562842B CN 101562842 B CN101562842 B CN 101562842B CN 200810104186X A CN200810104186X A CN 200810104186XA CN 200810104186 A CN200810104186 A CN 200810104186A CN 101562842 B CN101562842 B CN 101562842B
Authority
CN
China
Prior art keywords
ambr
pdn
service regeulations
gbr type
carrying
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN200810104186XA
Other languages
Chinese (zh)
Other versions
CN101562842A (en
Inventor
习建德
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Datang Mobile Communications Equipment Co Ltd
Original Assignee
Datang Mobile Communications Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Datang Mobile Communications Equipment Co Ltd filed Critical Datang Mobile Communications Equipment Co Ltd
Priority to CN200810104186XA priority Critical patent/CN101562842B/en
Publication of CN101562842A publication Critical patent/CN101562842A/en
Application granted granted Critical
Publication of CN101562842B publication Critical patent/CN101562842B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Mobile Radio Communication Systems (AREA)

Abstract

The invention discloses a method, a system and a device for resource allocation, which are used for realizing resource allocation for a non-GBR type bearer under the AMBR mechanism in an EPS system. The method for resource allocation comprises: a packet data network gateway (PDN GW) and an evolved node base station (eNB) acquire aggregate maximum bit rate (AMBR) using regulations which comprise the relative weight coefficient of non-guaranteed bit rate (non-GBR) type service quality classification identification (QCI); and the PDN GW and the eNB are used for resource allocation for the non-GBRtype bearer between a user terminal and a packet data network (PDN) according to the AMBR using regulations. The invention also discloses a PCRF device, a PDN GW and an eNB. The method, the system an d the device are used for the resource allocation for the non-GBR type bearer between a UE and a PDN.

Description

A kind of resource allocation methods, system and device
Technical field
The present invention relates to communication technical field, relate in particular to a kind of resource allocation methods, system and device.
Background technology
At present, at Long Term Evolution (LTE, Long Term Evolution)/System Architecture Evolution (SAE, System Architecture Evolution) in the evolution process of standard, for Aggregate Maximum Bit Rate (AMBR, Aggregation Maximum Bit Rate) realization mechanism, the TS23.401v8.1.0 standard of third generation partner program (3GPP) has provided the principle regulation of framework, specifically comprise: each (PDN of Packet Data Network, Packet Data Network Connection) connection is connected access network (IP-CAN with IP, IP Connectivity Access Network) session level (Session level) service quality (QoS) parameter A MBR is associated, a plurality of evolved packet systems (EPS, EvolvedPacket System) carryings (Bearer) that identical PDN connects can sharing A MBR.That is to say, when other EPS bearer does not transmit any business, each EPS bearer can utilize whole AMBR resource, and AMBR is limiting the AMBR that the EPS bearer expectation of sharing A MBR can provide, and the business datum that surpasses AMBR will be dropped.The AMBR notion is applied to the carrying of all non-assurance bit rates (non-GBR, nonGuaranteed Bit Rate) type.
In the prior art, each contracted user's AMBR parameter is stored among user's subscribed services device HSS (Home Subscriber Server) of EPS system, when a user carries out network attachment, be responsible for the mobile management entity (MME of user mobility management function, Mobility Management Entity) obtains contracted user's AMBR parameter from HSS, and in creating the process of default bearing, send to packet data network gateway (PDN GW) and preserve, so that when PDN GW sets up the carrying of non-GBR type, scheduling sends the resource of downlink data.And, PDN GW sends to evolved base station (eNodeB with contracted user's AMBR parameter, evolved NodeB) (hereinafter to be referred as eNB) preserves, and eNB is according to contracted user's AMBR parameter, the transmission of uplink data piece resource that dispatched users terminal (UE) sends.
In the EPS system, according to user's signatory restriction, a user can have a plurality of PDN to connect to a plurality of access point networks (APN, Access Point Network).Up to the present, each PDN that has only defined each user who belongs to the non-GBR type in the standard connects among pairing all EPS Bearer, if there are not data to transmit in a period of time on certain EPS bearer, then the scheduling of resource that can in the AMBR limited field this EPS bearer be taken uses for other carrying of the same type.
In sum, do not provide the specific implementation of the resource allocation of the carrying of the non-GBR type under the AMBR mechanism in the EPS system in the prior art.
Summary of the invention
The embodiment of the invention provides a kind of resource allocation methods, system and device, in order to realize the resource allocation of the carrying of the non-GBR type under the AMBR mechanism in the EPS system.
A kind of resource allocation methods that the embodiment of the invention provides comprises:
Grouped data network gateway PDN GW and evolved base station eNB obtain Aggregate Maximum Bit Rate AMBR service regeulations, comprising the relative weighting coefficient of the service quality class indication QCI of non-ensured bit rate non-GBR type;
Described PDN GW and eNB carry out resource allocation according to the relative weighting coefficient of the QCI of the non-GBR type in the described AMBR service regeulations to the carrying of the non-GBR type between user terminal and the grouped data network PDN.
A kind of resource allocation system that the embodiment of the invention provides comprises:
Grouped data network gateway PDN GW, be used to obtain the AMBR service regeulations, relative weighting coefficient comprising the service quality class indication QCI of non-ensured bit rate non-GBR type, and, resource allocation is carried out in the carrying of the non-GBR type between user terminal and the grouped data network PDN according to the relative weighting coefficient of the QCI of the non-GBR type in the described AMBR service regeulations;
Evolved base station eNB is used to obtain described AMBR service regeulations, and according to the relative weighting coefficient of the QCI of the non-GBR type in the described AMBR service regeulations, resource allocation is carried out in the carrying of the non-GBR type between user terminal and the grouped data network PDN.
A kind of control rule of policy billing function PCRF device that the embodiment of the invention provides comprises:
Memory cell is used to store pre-configured Aggregate Maximum Bit Rate AMBR service regeulations, comprising the relative weighting coefficient of the service quality class indication QCI of non-ensured bit rate non-GBR type;
Transmitting element is used for described AMBR service regeulations are sent to grouped data network gateway PDNGW.
A kind of grouped data network gateway PDN GW that the embodiment of the invention provides comprises:
Acquiring unit is used to obtain Aggregate Maximum Bit Rate AMBR service regeulations, comprising the relative weighting coefficient of the service quality class indication QCI of non-ensured bit rate non-GBR type;
Resource allocation unit is used for the relative weighting coefficient according to the QCI of the non-GBR type of described AMBR service regeulations, and resource allocation is carried out in the carrying of the non-GBR type between user terminal and the grouped data network PDN.
A kind of evolved base station eNB that the embodiment of the invention provides comprises:
Acquiring unit is used to obtain Aggregate Maximum Bit Rate AMBR service regeulations, comprising the relative weighting coefficient of the service quality class indication QCI of non-ensured bit rate non-GBR type;
Resource allocation unit is used for the relative weighting coefficient according to the QCI of the non-GBR type of described AMBR service regeulations, and resource allocation is carried out in the carrying of the non-GBR type between user terminal and the grouped data network PDN.
The embodiment of the invention, grouped data network gateway PDN GW and evolved base station eNB obtain Aggregate Maximum Bit Rate AMBR service regeulations, comprising the relative weighting coefficient of the service quality class indication QCI of non-ensured bit rate non-GBR type; Described PDN GW and eNB are according to the relative weighting coefficient of the QCI of the non-GBR type in the described AMBR service regeulations, resource allocation is carried out in carrying to the non-GBR type between user terminal and the grouped data network PDN, thereby realized the resource allocation of the carrying of the non-GBR type under the AMBR mechanism in the EPS system, the resource that can comparatively reasonably in the AMBR limited range, use the user to contract by this technical scheme the biglyyest, improve user's business experience effect, and can improve the resource utilization of whole network.
Description of drawings
The overall procedure schematic diagram of a kind of resource allocation methods that Fig. 1 provides for the embodiment of the invention;
The schematic diagram of IP-CAN Bearer that Fig. 2 provides for the embodiment of the invention and the tabulation of the incidence relation policy information of IP-CAN Session;
Fig. 3 passes through the schematic flow sheet of PCCDecision Provision signaling to PDN GW for the PCRF entity that the embodiment of the invention provides with the AMBR service regeulations;
The idiographic flow schematic diagram of a kind of resource allocation methods that Fig. 4 provides for the embodiment of the invention;
The PDN GW that Fig. 5 provides for the embodiment of the invention is notified to the AMBR service regeulations schematic flow sheet of eNB;
Fig. 6 for the embodiment of the invention provide when the AMBR service regeulations are upgraded, the AMBR service regeulations after PDN GW will upgrade are notified to the schematic flow sheet of eNB;
The structural representation of a kind of resource allocation system that Fig. 7 provides for the embodiment of the invention;
The structural representation of a kind of PCRF entity apparatus that Fig. 8 provides for the embodiment of the invention;
The structural representation of a kind of PDN GW that Fig. 9 provides for the embodiment of the invention;
The structural representation of a kind of eNB that Figure 10 provides for the embodiment of the invention.
Embodiment
The embodiment of the invention provides a kind of resource allocation methods and system, and a kind of PCRF entity, PDNGW and eNB, in order to realize the resource allocation of the carrying of the non-GBR type under the AMBR mechanism in the EPS system, improve user's the business experience effect and the resource utilization of whole network.
Below in conjunction with accompanying drawing, the embodiment of the invention is elaborated.
The business features transmitted in the carrying of the embodiment of the invention according to non-GBR type definition bearing resource shared proportion in the AMBR limited range, thus reach the purpose of the business experience effect that improves the user effectively.Particularly, pre-configured AMBR service regeulations, service quality class indication (QCI comprising the non-GBR type, QoS Class Identifier) relative weighting coefficient, a plurality of EPS Bearer that one or more session is adopted, the distribution of carrying out bearing resource according to the AMBR service regeulations (need to prove, a session also has a plurality of EPS Bearer transmission, the video session process of being undertaken for example by video telephone, video transmits in a carrying, voice transmission in the another one carrying).Wherein, described relative weighting coefficient is to set according to the business statistics result of transmitting on the EPS Bearer of each non-GBR type.Referring to Fig. 1, a kind of resource allocation methods that the embodiment of the invention provides totally comprises step:
S101, PDN GW and eNB obtain the AMBR service regeulations, comprising the relative weighting coefficient of the QCI of non-GBR type.
Preferably, the embodiment of the invention is in advance at control rule of policy billing function (PCRF, Policy ﹠amp; Charging Rule Function) configuration AMBR service regeulations in the entity; The AMBR service regeulations that PDN GW obtains are that the PCRF entity sends to PDN GW; It is that PDNGW sends to eNB that eNB obtains the AMBR service regeulations.
Certainly, PDN GW and eNB also can obtain the AMBR service regeulations by other modes, for example, the AMBR service regeulations can be set in PDN GW and eNB separately, also can and send to PDN GW and eNB by other physical arrangements AMBR service regeulations.
S102, PDN GW and eNB carry out resource allocation according to the AMBR service regeulations to the carrying of the non-GBR type between UE and the PDN.
According to the definition of present AMBR, AMBR only is applicable to the carrying of the Non-GBR type that each UE is connected with each PDN.Based on this principle, preferably, as shown in Figure 2, in the embodiment of the invention, operator is tactful on the PCRF entity of operator's control according to operation, configuration AMBR QoS resource allocation default policy (being the AMBR service regeulations) in IP-CAN Bearer and IP-CAN session (Session) incidence relation form is comprising the relative weighting coefficient according to the QCI of each non-GBR type of Operator Specific Service statistical model definition.In addition, the AMBR service regeulations also can send to PDN GW and eNB by independent a piece of news, and do not need to be included in the incidence relation form of IP-CAN Bearer and IP-CAN Session.
Referring to Fig. 3, in the initial mutual process of PCRF entity and PDN GW, the PCRF entity is by the strategy and the control (PCC that charges, Policy Control and Charging) decision-making customization signaling, the AMBR service regeulations are disposed the GW to PDN, be that the PCRF entity sends strategy and charging control decision customization (PCC Decision Provision) message to PDN GW, wherein carry the incidence relation form of IP-CAN Bearer and IP-CANSession, include the AMBR service regeulations in this form, after PDN GW extraction and the preservation AMBR service regeulations wherein, return strategy and charging control decision customized responses (PCCDecision Provision ACK) message.And, set up at the default bearing of UE attaching process that PDN GW sends to eNB with the AMBR service regeulations in the process.
When the EPS system increases or deletes the carrying of a non-GBR type, when perhaps the carrying of certain non-GBR type does not have transfer of data within a certain period of time, the bearing resource that PDN GW adjusts the non-GBR type according to the AMBR service regeulations distributes, and the user data that makes UE send transmits on the bearing resource that is distributed.Therefore, only need between the initial setting stage or AMBR service regeulations when changing, up-to-date AMBR service regeulations be disposed to PDN GW and eNB, in follow-up AMBR adjustment process, can save a lot of signalings mutual between the network element at UE by this scheme.And,, help carrying out of Operator Specific Service by PCRF control AMBR service regeulations.
Referring to Fig. 4, the concrete grammar of a kind of resource allocation that the embodiment of the invention provides comprises step:
S401, PCRF physical arrangements AMBR service regeulations.
S402, first when mutual at PCRF entity and PDN GW, perhaps when the AMBR service regeulations changed, the PCRF entity disposed the GW to PDN with up-to-date AMBR service regeulations by PCC Decision Provision signaling.PDN GW sends to eNB by relevant signaling message with up-to-date AMBR service regeulations again.
S403, after the user sets up default bearing, PDN GW and eNB monitoring carrying situation of change, if when having bearing event newly-built or deletion non-GBR type to take place, then execution in step S404 promptly starts the AMBR adjustment process; Otherwise, execution in step S405.
S404, PDN GW and eNB adjust bearing resource according to the relation of the relative weighting between the QCI of appointment in the AMBR rule in the speed range that AMBR limited, set the maximum upper limit of each non-GBR carrying among the PDN GW.
S405, check not have data to transmit in the carrying whether have a non-GBR type of having set up, carrying for the non-GBR type that does not have data to transmit, start the timer (the EPS Bearer carrying for each non-GBR type of having set up in advance is provided with a timer in the embodiment of the invention) that is provided with for this carrying in advance, when timer expiry, if still there are not data to transmit in this carrying, execution in step S404 then, promptly PDN GW and eNB start the AMBR adjustment process.
Below step S402 is elaborated.
As shown in Figure 5, when during the UE network attachment, setting up default bearing (Default Bearer), MME sends to gateway (Serving GW) and sets up default bearing request (Create Default BearerRequest) message, Serving GW transmits Create Default Bearer Request message to PDN GW, then, PDN GW is notified to gateway Serving GW by creating default bearing response (Create Default Bearer Response) message with the AMBR service regeulations, Serving GW gives MME with this forwards, MME sets up request (Initial Context Setup Request) message by initial context these AMBR service regeulations is disposed to eNB, eNB receives and storage AMBR service regeulations, returns initial context foundation then and finishes (Initial Context Setup Complete) message to MME.
When the AMBR service regeulations that dispose in the PCRF entity took place to upgrade, the AMBR service regeulations after the PCRF entity will upgrade by PCCDecision Provision signaling sent to PDN GW; As shown in Figure 6, PDN GW is notified to Serving GW by the AMBR service regeulations of new bearer request (Update Bearer Request) after message will be upgraded more, Serving GW gives MME with this forwards, MME is notified to eNB by revising carrying request (Modify Bearer Request) AMBR service regeulations after message will be upgraded, eNB utilizes the up-to-date AMBR service regeulations that receive to upgrade the AMBR service regeulations of self storing, and returns modification carrying response (Modify Bearer Response) message and give MME; MME sends more, and new bearer responds (Update Bearer Response) message to Serving GW; Serving GW transmits Update Bearer Response message and gives PDN GW.
Below step S404 is elaborated.
PDN GW is used for the resource allocation to downlink service data stream, and eNB is used for the resource allocation to uplink business data stream.Described resource allocation is included as each carrying and distributes maximum bandwidth, and this maximum bandwidth is corresponding to maximum bit rate (MBR).Wherein, the resource that eNB distributes specifically is meant the physical transport block of transmitting between eNB and the UE (comprising single carrier frequency division multiplexing (SC-FDMA) symbolic number in number of sub carrier wave, time slot and the time domain in the frequency domain), and the size of physical transport block and the number result who obtains that multiplies each other is maximum bit rate MBR.
PDN GW is provided with a downlink service data stream limiter of speed for each EPS Bearer, and the maximum bit rate of limiter of speed obtains according to AMBR and relative weighting multiplication.PDN GW is when carrying out the AMBR adjustment, according to the AMBR service regeulations, carrying for the non-GBR type that does not have data to transmit, the weight coefficient of setting this carrying is changed to 0, for other carrying of the non-GBR type of data transmission is arranged, these carryings are carried out the pro rate of relative weighting coefficient according to QCI, for example, suppose QCI6: QCI7: QCI8: the relative weighting coefficient of QCI9 is 4: 3: 2: 1, a user has set up the EPS carrying that QCI equals 6, and transmission is gone up in this carrying the interactive game data flow; Also set up the EPS carrying that QCI equals 7 simultaneously, transmission is gone up in this carrying buffered video stream; Also establish the EPS carrying that QCI equals 8 simultaneously, transmission is gone up in this carrying the p2p document data flow.If interactive game finishes for one innings, be in extended break, then PDN GW and eNB are according to pre-configured AMBR regulation rule, redistribute bearing resource, promptly according to QCI7: the series of fortified passes system that compares that QCI8 equals 3: 2, improve the MBR of QCI7 EPS carrying and the MBR of QCI8 EPS carrying, according to MBR, PDN GW and eNB distribute corresponding bandwidth and physical resource block size and number.Thereby in the AMBR restricted portion, improve the utilance of resource, strengthen user's experience effect.The example here is a demonstration, and concrete network needing to realize operator's concrete configuration.
ENB is the radio bearer (RB of each non-GBR type of user, Radio Bearer) timer is set, when not having grouped data to send on this radio bearer, start the timer of this carrying, when this timer expiry, still do not have grouped data to send on this radio bearer, then trigger AMBR adjustment process among the eNB.The AMBR adjustment process that eNB carries out comprises: according to the AMBR service regeulations, set the carrying institute data block transmitted size of each non-GBR type, be the size of the UE uplink data block that can send, and grant (UE grant) schedule information by user terminal the size of this uplink data block is notified to UE.
To sum up, according to the requirement of AMBR service regeulations, need be on PDN GW timer, an AMBR adjusting device and a limiter of speed of a duration that is used to monitor that this carrying free of data is transmitted be set in the carrying of each non-GBR type; Need on eNB, set a timer that monitors the duration of this carrying free of data transmission to the carrying of each non-GBR type, and an AMBR adjusting device.
Referring to Fig. 7, a kind of resource allocation system that the embodiment of the invention provides comprises:
Control rule of policy billing function PCRF entity 701 is used to store pre-configured AMBR service regeulations, comprising the relative weighting coefficient of the QCI of non-GBR type; And, described AMBR service regeulations are sent to PDN GW 702.
PDN GW 702 is used to receive the AMBR service regeulations that PCRF entity 701 sends, and these AMBR service regeulations is sent to eNB 703; And, according to these AMBR service regeulations resource allocation is carried out in the carrying of the non-GBR type between user terminal and the PDN.
ENB 703, are used to receive the AMBR service regeulations that PDN GW 702 sends, and according to these AMBR service regeulations resource allocation carried out in the carrying of the non-GBR type between user terminal and the PDN.
Referring to Fig. 8, a kind of PCRF device that the embodiment of the invention provides comprises:
Memory cell 801 is used to store pre-configured AMBR service regeulations, comprising the relative weighting coefficient of the QCI of non-GBR type.
Transmitting element 802 is used for the AMBR service regeulations of memory cell 801 storages are sent to PDNGW.
Referring to Fig. 9, a kind of PDN GW that the embodiment of the invention provides comprises:
Acquiring unit 901 is used to obtain the AMBR service regeulations, comprising the relative weighting coefficient of the QCI of non-GBR type.
Resource allocation unit 902, the AMBR service regeulations that are used for obtaining according to acquiring unit 901 are carried out resource allocation to the carrying of the non-GBR type between user terminal and the PDN.
Preferably, the PDN GW that provides of the embodiment of the invention also comprises:
Transmitting element 903, the AMBR service regeulations that are used for acquiring unit 901 is obtained send to evolved base station eNB.
Referring to Figure 10, a kind of eNB that the embodiment of the invention provides comprises:
Acquiring unit 101 is used to obtain the AMBR service regeulations, comprising the relative weighting coefficient of the QCI of non-GBR type.
Resource allocation unit 102, the AMBR service regeulations that are used for obtaining according to acquiring unit 101 are carried out resource allocation to the carrying of the non-GBR type between user terminal and the PDN.
In sum, the embodiment of the invention has proposed a kind of resource allocation techniques of realizing AMBR mechanism in the EPS system, according to operation strategy configuration AMBR service regeulations on the PCRF entity of operator's control of operator, these service regeulations are set its relative weighting coefficient for the pairing QCI of carrying of each non-GBR type; The PCRF entity is notified to PDN GW by relevant signaling with up-to-date AMBR service regeulations when or the regular change of AMBR alternately first with PDN GW; PDN GW receives and installs the AMBR service regeulations, and by relevant signaling the AMBR service regeulations is notified to eNB.PDN GW and eNB are according to the AMBR service regeulations, during the carrying of or deletion non-GBR type newly-built in follow-up generation, the bearing resource of adjusting the non-GBR type distributes, perhaps when the carrying of finding a non-GBR type never had transfer of data at the appointed time, the bearing resource of adjusting the non-GBR type distributed.Therefore, the technical scheme by the embodiment of the invention provides can improve utilization rate of network resource and user's experience effect on the whole.In addition, by PCRF entity control AMBR service regeulations, help carrying out of Operator Specific Service.
Obviously, those skilled in the art can carry out various changes and modification to the present invention and not break away from the spirit and scope of the present invention.Like this, if of the present invention these are revised and modification belongs within the scope of claim of the present invention and equivalent technologies thereof, then the present invention also is intended to comprise these changes and modification interior.

Claims (19)

1. a resource allocation methods is characterized in that, this method comprises:
Grouped data network gateway PDN GW and evolved base station eNB obtain Aggregate Maximum Bit Rate AMBR service regeulations, comprising the relative weighting coefficient of the service quality class indication QCI of non-ensured bit rate non-GBR type;
Described PDN GW and eNB carry out resource allocation according to the relative weighting coefficient of the QCI of the non-GBR type in the described AMBR service regeulations to the carrying of the non-GBR type between user terminal and the grouped data network PDN.
2. method according to claim 1 is characterized in that, described AMBR service regeulations are included in the tabulation, and this tabulation connects Access Network carrying IP-CAN Bearer is connected Access Network session IP-CAN Session with IP incidence relation information table for IP.
3. method according to claim 1 is characterized in that, the AMBR service regeulations that described PDN GW obtains are that control rule of policy billing function PCRF entity sends to described PDN GW.
4. method according to claim 3 is characterized in that, described PDN GW is with described PCRF entity when first mutual, when the AMBR service regeulations that perhaps dispose in described PCRF entity take place to upgrade, obtains described AMBR service regeulations.
5. method according to claim 3 is characterized in that, obtains described AMBR service regeulations strategy that described PDN GW sends from described PCRF entity and the charging control decision customization PCC Decision Provision signaling.
6. method according to claim 1 is characterized in that, the AMBR service regeulations that described eNB obtains are that described PDN GW sends to described eNB's.
7. method according to claim 6 is characterized in that, described PDN GW sends to described eNB with described AMBR service regeulations and specifically may further comprise the steps:
Described PDN GW creates response message by default bearing described AMBR service regeulations is sent to gateway Serving GW in the initial attaching process of user terminal;
Described Serving GW creates response message by default bearing described AMBR service regeulations is sent to mobile controlled entity MME;
Described MME sets up request message by initial context described AMBR service regeulations is sent to described eNB.
8. method according to claim 6 is characterized in that, when described AMBR service regeulations took place to upgrade, this method also comprised step:
PDN GW sends to gateway Serving GW by the AMBR service regeulations after more new bearer request Update Bearer Request message will be upgraded;
Described Serving GW gives mobile management entity MME with described Update Bearer Request forwards;
Described MME sends to described eNB by the AMBR service regeulations of revising after carrying asks Modify Bearer Request message with described renewal.
9. method according to claim 1, it is characterized in that, described PDN GW and eNB are when finding the carrying of newly-built or deletion non-GBR type between user terminal and the PDN, perhaps when the carrying that has the non-GBR type between discovery user terminal and the PDN does not have transfer of data within a certain period of time, described PDN GW and eNB carry out resource allocation according to the relative weighting coefficient of the QCI of the non-GBR type in the described AMBR service regeulations again to the carrying of the non-GBR type between user terminal and the PDN.
10. method according to claim 1 is characterized in that, the step that described PDN GW and eNB carry out resource allocation according to described AMBR service regeulations to the carrying of the non-GBR type between user terminal and the grouped data network PDN comprises:
Described PDN GW and eNB concern according to the relative weighting between the QCI of appointment in the described AMBR service regeulations, in the speed range that AMBR limited, carry out resource allocation, and set the message transmission rate maximum in the carrying of each non-GBR type for the carrying of the non-GBR type between user terminal and the PDN.
11. method according to claim 10, it is characterized in that, the downlink service data stream limiter of speed that described PDN GW is provided with by the carrying for each described non-GBR type, realization is to the distribution of the bearing resource of each described non-GBR type, and the maximum of the message transmission rate in the carrying of each non-GBR type is carried the maximum rate of pairing limiter of speed for this.
12. method according to claim 11 is characterized in that, the maximum rate of described limiter of speed is to determine according to the product of the relative weighting coefficient of the carrying of described limiter of speed correspondence and AMBR.
13. method according to claim 10 is characterized in that, the step that described eNB carries out resource allocation to the carrying of described each non-GBR type comprises:
Described eNB sets the carrying institute data block transmitted size of each non-GBR type;
Described eNB grants UE grant schedule information by user terminal, and the carrying institute data block transmitted size of each non-GBR type is notified to described user terminal as the size of user terminal uploads data block.
14. a resource allocation system is characterized in that, this system comprises:
Grouped data network gateway PDN GW, be used to obtain the AMBR service regeulations, relative weighting coefficient comprising the service quality class indication QCI of non-ensured bit rate non-GBR type, and, resource allocation is carried out in the carrying of the non-GBR type between user terminal and the grouped data network PDN according to the relative weighting coefficient of the QCI of the non-GBR type in the described AMBR service regeulations;
Evolved base station eNB is used to obtain described AMBR service regeulations, and according to the relative weighting coefficient of the QCI of the non-GBR type in the described AMBR service regeulations, resource allocation is carried out in the carrying of the non-GBR type between user terminal and the grouped data network PDN.
15. system according to claim 14 is characterized in that, this system also comprises:
Control rule of policy billing function PCRF entity is used to store pre-configured described AMBR service regeulations, and described AMBR service regeulations is sent to described PDN GW.
16. a control rule of policy billing function PCRF device is characterized in that described device comprises:
Memory cell is used to store pre-configured Aggregate Maximum Bit Rate AMBR service regeulations, comprising the relative weighting coefficient of the service quality class indication QCI of non-ensured bit rate non-GBR type;
Transmitting element is used for described AMBR service regeulations are sent to grouped data network gateway PDNGW.
17. a grouped data network gateway PDN GW is characterized in that, described PDN GW comprises:
Acquiring unit is used to obtain Aggregate Maximum Bit Rate AMBR service regeulations, comprising the relative weighting coefficient of the service quality class indication QCI of non-ensured bit rate non-GBR type;
Resource allocation unit is used for the relative weighting coefficient according to the QCI of the non-GBR type of described AMBR service regeulations, and resource allocation is carried out in the carrying of the non-GBR type between user terminal and the grouped data network PDN.
18. PDN GW according to claim 17 is characterized in that, described PDN GW also comprises:
Transmitting element is used for described AMBR service regeulations are sent to evolved base station eNB.
19. an evolved base station eNB is characterized in that, described eNB comprises:
Acquiring unit is used to obtain Aggregate Maximum Bit Rate AMBR service regeulations, comprising the relative weighting coefficient of the service quality class indication QCI of non-ensured bit rate non-GBR type;
Resource allocation unit is used for the relative weighting coefficient according to the QCI of the non-GBR type of described AMBR service regeulations, and resource allocation is carried out in the carrying of the non-GBR type between user terminal and the grouped data network PDN.
CN200810104186XA 2008-04-16 2008-04-16 Method, system and device for resource allocation Active CN101562842B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200810104186XA CN101562842B (en) 2008-04-16 2008-04-16 Method, system and device for resource allocation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200810104186XA CN101562842B (en) 2008-04-16 2008-04-16 Method, system and device for resource allocation

Publications (2)

Publication Number Publication Date
CN101562842A CN101562842A (en) 2009-10-21
CN101562842B true CN101562842B (en) 2011-05-04

Family

ID=41221414

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200810104186XA Active CN101562842B (en) 2008-04-16 2008-04-16 Method, system and device for resource allocation

Country Status (1)

Country Link
CN (1) CN101562842B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104301944A (en) * 2014-09-17 2015-01-21 华为技术有限公司 Resource capacity allocation method and equipment

Families Citing this family (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102045853B (en) * 2009-10-22 2015-09-30 华为技术有限公司 A kind of information transmitting methods, equipment and system
CN102271405B (en) * 2010-06-04 2014-09-10 中兴通讯股份有限公司 Method and device for allocating bearer resources
CN102469530B (en) * 2010-11-09 2014-12-10 中兴通讯股份有限公司 Method and system for controlling sending rate of home NodeB uplink data
CN102833857A (en) * 2011-06-17 2012-12-19 中兴通讯股份有限公司 Method, system and device for transmitting and scheduling uplink data
WO2012159321A1 (en) * 2011-07-07 2012-11-29 华为技术有限公司 Method and device for controlling quality of service
CN103596272B (en) * 2012-08-13 2017-03-15 电信科学技术研究院 A kind of resource allocation methods of fixed broadband network, apparatus and system
CN103733678B (en) * 2012-08-15 2017-07-25 华为技术有限公司 The method and apparatus of control data service quality
WO2015000141A1 (en) * 2013-07-02 2015-01-08 华为技术有限公司 Method, related device and system supporting streaming media multicast
CN104936227B (en) * 2014-03-21 2019-05-10 中国移动通信集团广东有限公司 Non-GBR user resources calculation method and device in a kind of load balancing
CN104270794B (en) * 2014-09-23 2018-01-12 中国联合网络通信集团有限公司 Resource allocation methods and device
CN106385696A (en) * 2016-09-14 2017-02-08 海能达通信股份有限公司 Business processing method, related equipment, and system
WO2018107490A1 (en) * 2016-12-16 2018-06-21 华为技术有限公司 Method and device for controlling data transmission rate on non-gbr bearer
CN106658733B (en) * 2016-12-28 2020-04-21 南京邮电大学 Throughput optimization method based on user fairness and QoS in multi-user MIMO-OFDM
CN108616931B (en) * 2017-02-04 2023-06-09 中兴通讯股份有限公司 Control method and device for maximum bandwidth of user equipment
CN111510912B (en) * 2019-01-30 2021-11-30 大唐移动通信设备有限公司 Control method of terminal transmission rate, base station and core network equipment

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101001454A (en) * 2006-06-22 2007-07-18 华为技术有限公司 User dispatching method and system in uplink enhanced link
CN101043644A (en) * 2006-05-01 2007-09-26 华为技术有限公司 Establishing and modifying method for guarantying bit rate service loading in evolvement network

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101043644A (en) * 2006-05-01 2007-09-26 华为技术有限公司 Establishing and modifying method for guarantying bit rate service loading in evolvement network
WO2007124682A1 (en) * 2006-05-01 2007-11-08 Huawei Technologies Co., Ltd. Method and device for handling guaranteed bit rate service bearer in evolution network
CN101001454A (en) * 2006-06-22 2007-07-18 华为技术有限公司 User dispatching method and system in uplink enhanced link

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104301944A (en) * 2014-09-17 2015-01-21 华为技术有限公司 Resource capacity allocation method and equipment
CN104301944B (en) * 2014-09-17 2018-02-13 华为技术有限公司 Resource capability distribution method and equipment

Also Published As

Publication number Publication date
CN101562842A (en) 2009-10-21

Similar Documents

Publication Publication Date Title
CN101562842B (en) Method, system and device for resource allocation
CN101409951B (en) Method for establishing load bearing and relevant apparatus
US10455386B2 (en) Controlling data transmissions for machine type communications in a mobile communication system
CN104822166B (en) Transmission rate control, mobility management entity and communication system
KR101284828B1 (en) Method for performing semi-persistent scheduling according to the state of user channel and base station for performing the same
EP2675234B1 (en) Scheduling method, device and system based on quality of service
US8848700B2 (en) Method for device-to-device communication based on cellular telecommunication system
US20190174360A1 (en) Service transmission control method, related device, and communications system
EP3579609B1 (en) Network congestion control method, device and system
US10051458B2 (en) Method and apparatus for efficiently transmitting small amounts of data in wireless communication systems
US20130148526A1 (en) Apparatus and method for controlling group setting in device-to-device communication
CN101540979B (en) Emergency bearing-establishing method and communication system for emergency call service
US10039154B2 (en) Node and method for establishing an inactivity timer in a wireless network
JP3926799B2 (en) Wireless network system and wireless communication control method
EP3001746B1 (en) Embms management method, multimedia broadcast multicast service coordination entity and base station
CN110072258A (en) Communication means and relevant apparatus for certainty transmission
US10511995B2 (en) Apparatus and method for controlling traffic in wireless communication system
CN105120529A (en) Long-term evolutional cellular network based D2D (Device to Device) communication establishing device and method
CN102932913A (en) Method and system for acquiring access position of MAB (Multiple Access and Binding) terminal, server and gateway
CN102238730A (en) Radio resource management method and device
US8942185B2 (en) Quality of service management in a mobile communication system
Andres-Maldonado et al. Reduced M2M signaling communications in 3GPP LTE and future 5G cellular networks
CN104427638B (en) Method for building up, device and the equipment of cluster sessions carry
CN101925136B (en) Load establishing method and related device
Calin et al. LTE application and congestion performance

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant