CN101560880B - Supercritical well bore multi-phase flow test device - Google Patents

Supercritical well bore multi-phase flow test device Download PDF

Info

Publication number
CN101560880B
CN101560880B CN 200910015325 CN200910015325A CN101560880B CN 101560880 B CN101560880 B CN 101560880B CN 200910015325 CN200910015325 CN 200910015325 CN 200910015325 A CN200910015325 A CN 200910015325A CN 101560880 B CN101560880 B CN 101560880B
Authority
CN
China
Prior art keywords
gas
pressure
liquid
well bore
supercritical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200910015325
Other languages
Chinese (zh)
Other versions
CN101560880A (en
Inventor
孙宝江
高永海
李明忠
刘建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Petroleum East China
Original Assignee
China University of Petroleum East China
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Petroleum East China filed Critical China University of Petroleum East China
Priority to CN 200910015325 priority Critical patent/CN101560880B/en
Publication of CN101560880A publication Critical patent/CN101560880A/en
Application granted granted Critical
Publication of CN101560880B publication Critical patent/CN101560880B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)

Abstract

The invention relates to a supercritical well bore multi-phase flow test device which simulates exploitation of high-pressure and high-yield natural gas field under critical condition. The technical proposal is as follows: the test device comprises a water tank, a high-pressure hydraulic pump, a liquid flow controller, a high-pressure gas compressor, a high-pressure gas tank, a dryer, a gas flow controller, a gas-liquid mixer, a high-pressure well bore, an inner pipe, a return pipeline, a gas-liquid separating tank, a back pressure control system, a temperature control system, a void ratio measuring system and a pressure difference measuring system. The test device has the beneficial effects of (1) simulation of gas flow in the well bore under critical condition; (2) simulation of gas-liquid multi-phase flow under critical and supercritical conditions; (3) simulation of gas or gas-liquid multi-phase flow under normal pressure. The device can be built into a comprehensive supercritical well bore multi-phase flow simulation testing platform and become an important base for national supercritical well bore multi-phase flow research.

Description

Supercritical well bore multi-phase flow test device
One, technical field:
The present invention relates to the heterogeneous mobile experimental system of a kind of pit shaft, particularly a kind of supercritical well bore multi-phase flow test device of simulating high pressure under the critical condition, the exploitation of high yield gas field.
Two, background technology:
China southwest and the Northwest are containing the natural gas resource of a large amount of high pressure, high yield, high sulfur-bearing, these natural gas resources in China's energy total amount take up an area of proportion and increase gradually, just progressively become the developing focus of China's petroleum resources.But because these regional ubiquity geological structures are complicated, petroleum resources bury dark, strata pressure is high, output is high, some areas are with high concentration H2S; And factors such as prediction of formation pressure difficulty; Make such gas reservoir development face many safety problems, exist many potential safety hazards.Therefore, the research of wellbore pressure control technology is the important subject in " completion safety technics system is bored in three high gas fields " field always.It bores the ability in completion safety technics level and autonomous exploration and development three high gas fields to promoting China three high gas fields; Prevention and the generation of stopping the particularly serious accident of three high gas fields brill completions; Have important practical significance and far-reaching historical meaning, also will have a tremendous social and economic benefits.
For " three height " gas reservoir; Mostly bury deeplyer, formation fluid is in critical or supercriticality, and critical or supercritical fluid has good dissolubility; Under downhole condition; Can a large amount of supercritical fluid of dissolving in the drilling fluid, this heterogeneous fluid tie up to along be under pressure in the pit shaft migration process, influence of temperature variation, the transmission of respectively meet in the system physical and chemical processes such as phase-state change or interphase mass transfer take place and energy, momentum; Its result causes each physical parameter of borehole fluid to take place to change fast with well depth and time in the short time at the utmost point, makes the flowing law of annular space inner fluid become very complicated.How wait and predict that corresponding annular pressure section is a difficult point of accurately controlling wellbore pressure according to nowed forming, the phase-state change of annular space inner fluid under various different well depth conditions; The research of this respect at present is less, and the experimental facilities of simulation critical condition changes and do not appear in the newspapers.
Three, summary of the invention:
The object of the invention is exactly the above-mentioned defective that exists to prior art; A kind of supercritical well bore multi-phase flow test device is provided, can simulates under the HTHP critical phase conditions, the experimental facilities of flowing law in the pit shaft of gas or gas-liquid two-phase fluid; And then can study the flow behavior of gas in pit shaft under critical and the super critical condition; Set up pit shaft multiphase flow dynamic mechanical model and computational methods, prediction pit shaft multiphase flow pressure is for wellbore pressure control in the oil gas drilling lays the foundation.
Its technical scheme is: mainly be made up of water pot, high-pressure hydraulic pump, liquid flow controller, high-pressure compressor, high pressure gas holder, dryer, gas flow controller, gas-liquid two-phase blender, high pressure pit shaft, interior pipe, reflux pipeline, knockout drum, back pressure control system, temperature control system, void content measuring system and pressure differential pressure measurement system; Described high-pressure well tube inner chamber is provided with interior pipe; The outside is provided with impedance type void content meter; The bottom of described high pressure pit shaft connects the gas-liquid two-phase blender through pipeline, and the gas-liquid two-phase blender is communicated with gas flow controller and liquid flow controller respectively; Described gas flow controller connects dryer, high pressure gas holder and high-pressure compressor successively, and described liquid flow controller connects high-pressure hydraulic pump and water pot successively; The top of described high pressure pit shaft connects reflux pipeline, and the other end of described reflux pipeline is communicated with water pot through knockout drum, back pressure control system and modulator.
Be provided with heating rod, temperature control system, water monitor and temperature monitor in the above-mentioned water pot, the water in the water pot is heated by heating rod, and temperature is controlled by temperature control system, and to keep the pilot system temperature constant, maximum temperature can reach 90 degree.
Above-mentioned knockout drum is communicated with back pressure control system and modulator; Back pressure control system, to keep the pilot system constant pressure, the pit shaft maximum pressure can reach 10Mpa; The water that separates flows into water pot through reflux pipeline, and gas is directly arranged atmosphere through counterbalance valve.
The length of above-mentioned high pressure pit shaft is 14m, outer external diameter of pipe 140mm, and outer tube diameter 130mm, interior external diameter of pipe 60mm, the outlet of high pressure pit shaft is provided with pressure gauge, and the two ends up and down of high pressure pit shaft are respectively equipped with differential manometer and impedance type void content meter; The void content measuring system is in order to judge flow pattern, to measure bobble rise velocity, void content velocity of wave propagation etc.; The pressure differential pressure measurement system is in order to research wellbore gas or heterogeneous flowing law.
The invention has the beneficial effects as follows: can realize wellbore gas or the simulation of gas-liquid polyphase flow phenomenon under the HTHP super critical condition, be the requisite important tool of three high gas-field exploitation technical research.This equipment can be realized: the simulation of (1) super critical condition well-sinking gas flow; (2) gas-liquid polyphase flow flow simulating under critical and the super critical condition; (3) gas or gas-liquid polyphase flow flow simulating under the normal pressure.Building up of this equipment will form a comprehensive overcritical pit shaft multiphase flow dynamic simulated experiment porch, become the important base of domestic overcritical pit shaft multiphase flow research.
Four, description of drawings:
Accompanying drawing 1 is a structural representation of the present invention;
Among the last figure: water pot 1; High-pressure hydraulic pump 2; Liquid flow controller 3; High-pressure compressor 4; High pressure gas holder 5; Dryer 6; Gas flow controller 7; Gas-liquid two-phase blender 8; High pressure pit shaft 9; Interior pipe 10; Reflux pipeline 11; Knockout drum 12; Back pressure control system 13; Reflux pipeline 14; Impedance type void content meter 15; 15 '; 15 "; differential manometer 16; 16 '; temperature controller 17; pressure gauge 18; heating rod 19; Temperature control system 20; Water monitor 21; Temperature monitor 22; Computer control 23; Holding wire 24; Modulator 25.
Five, the specific embodiment:
Embodiment 1: combine accompanying drawing 1, the present invention is described in further detail (simulation of super critical condition well-sinking gas flow):
Overall structure is: mainly by water pot 1; High-pressure hydraulic pump 2; Liquid flow controller 3; High-pressure compressor 4; High pressure gas holder 5; Dryer 6; Gas flow controller 7; Gas-liquid two-phase blender 8; High pressure pit shaft 9; Interior pipe 10; Reflux pipeline 11; Knockout drum 12; Back pressure control system 13; Reflux pipeline 14; Impedance type void content meter 15; 15 '; 15 "; differential manometer 16; 16 '; temperature controller 17; pressure gauge 18; heating rod 19; Temperature control system 20; Water monitor 21; Temperature monitor 22; Computer control 23; Holding wire 24; Modulator 25 connects to form.
Be used for simulating the pit shaft flowing law of ultra dark natural gas well drilling process under super critical condition.
Its technical scheme is: above-mentioned other structures are constant, and water pot 1, high-pressure hydraulic pump 2, liquid flow controller 3, void content meter 15 do not need work.Gases at high pressure are provided by high-pressure compressor 4, high pressure gas holder 5, dryer 6, gas flow controller 7; Two blenders 8 of the gas-liquid of flowing through, high pressure pit shaft 9, interior pipe 10, reflux pipeline 11, knockout drum 12, back pressure control system 13, differential manometer 16 is used to measure flow differential pressure.Can realize that through control back pressure (maximum 10MPa) the overcritical of gas flowed in the pit shaft.The flow parameter that can measure has pit shaft inlet pressure, outlet pressure, along journey pressure reduction, flow, temperature etc., so that computational analysis.
Embodiment 2: combine accompanying drawing 1, the present invention is described in further detail (critical with super critical condition under gas-liquid polyphase flow flow simulating):
Be used for simulating ultra dark natural gas well drilling process under super critical condition and the pit shaft flowing law of liquid output arranged.
Its technical scheme is: above-mentioned other structures are constant; Water pot 1, high-pressure hydraulic pump 2, liquid flow controller 3 are used to provide high-pressure flow liquid; Heating rod 19 heat be used for adding hot water, by temperature controller 20 control temperature values; Gases at high pressure are provided by high-pressure compressor 4, high pressure gas holder 5, dryer 6, gas flow controller 7; Two blenders 8 of the gas-liquid of flowing through, high pressure pit shaft 9, interior pipe 10, reflux pipeline 11, knockout drum 12, back pressure control system 13, differential manometer 16 is used to measure flow differential pressure, and void content meter 15 is used to measure flow process pit shaft void fraction and void content fluctuation.Can realize the pit shaft internal pressure through control back pressure (maximum 10MPa), make gas in the super critical condition current downflow.The flow parameter that can measure has pit shaft inlet pressure, outlet pressure, along journey pressure reduction, flow, void content ripple, averga cross section void fraction, temperature etc., so that computational analysis.
Embodiment 3: combine accompanying drawing 1, the present invention is described in further detail (gas or gas-liquid polyphase flow flow simulating under the normal pressure):
With above-mentioned embodiment 2, just not working of back pressure control system 13 makes the logical atmosphere of pit shaft outlet just can realize.

Claims (4)

1. supercritical well bore multi-phase flow test device; It is characterized in that: mainly form by water pot (1), high-pressure hydraulic pump (2), liquid flow controller (3), high-pressure compressor (4), high pressure gas holder (5), dryer (6), gas flow controller (7), gas-liquid two-phase blender (8), high pressure pit shaft (9), interior pipe (10), reflux pipeline (11), knockout drum (12), back pressure control system (13), temperature control system (20), void content measuring system and pressure differential pressure measurement system; Described high pressure pit shaft (9) inner chamber is provided with interior pipe (10); The outside is provided with impedance type void content meter (15,15 ', 15 "); the bottom of described high pressure pit shaft (9) connects gas-liquid two-phase blender (8) through pipeline, and gas-liquid two-phase blender (8) is communicated with gas flow controller (7) and liquid flow controller (3) respectively; Described gas flow controller (7) connects dryer (6), high pressure gas holder (5) and high-pressure compressor (4) successively, and described liquid flow controller (3) connects high-pressure hydraulic pump (2) and water pot (1) successively; The top of described high pressure pit shaft (9) connects reflux pipeline (11), and the other end of described reflux pipeline (11) is communicated with water pot (1) through knockout drum (12), back pressure control system (13) and modulator (25).
2. supercritical well bore multi-phase flow test device according to claim 1; It is characterized in that: be provided with heating rod (19), temperature control system (20), water monitor (21) and temperature monitor (22) in the described water pot (1); Water in the water pot is by heating rod (19) heating, and temperature is controlled by temperature control system (20).
3. supercritical well bore multi-phase flow test device according to claim 1; It is characterized in that: described knockout drum (12) is communicated with back pressure control system (13) and modulator (25); Water level is controlled by modulator (25); The water that separates flows into water pot (1) through reflux pipeline (14), and gas is directly arranged atmosphere through counterbalance valve.
4. supercritical well bore multi-phase flow test device according to claim 1; It is characterized in that: the length of described high pressure pit shaft (9) is 14m; Outer external diameter of pipe 140mm, outer tube diameter 130mm, interior external diameter of pipe 60mm; High pressure pit shaft outlet is provided with pressure gauge (18), and the two ends up and down of high pressure pit shaft are respectively equipped with differential manometer (16,16 ') and impedance type void content meter (15,15 ', 15 ").
CN 200910015325 2009-05-15 2009-05-15 Supercritical well bore multi-phase flow test device Expired - Fee Related CN101560880B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200910015325 CN101560880B (en) 2009-05-15 2009-05-15 Supercritical well bore multi-phase flow test device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200910015325 CN101560880B (en) 2009-05-15 2009-05-15 Supercritical well bore multi-phase flow test device

Publications (2)

Publication Number Publication Date
CN101560880A CN101560880A (en) 2009-10-21
CN101560880B true CN101560880B (en) 2012-12-19

Family

ID=41219835

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200910015325 Expired - Fee Related CN101560880B (en) 2009-05-15 2009-05-15 Supercritical well bore multi-phase flow test device

Country Status (1)

Country Link
CN (1) CN101560880B (en)

Families Citing this family (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101709639B (en) * 2009-11-20 2013-08-21 中国石油大学(华东) Mineshaft multiphase flow device for simulating deep-water oil and gas production
CN101936158A (en) * 2010-08-14 2011-01-05 中国石油大学(华东) Test method for wellbore multiphase flow under supercritical condition
CN102128031B (en) * 2011-01-11 2012-03-28 西南石油大学 Simulation device and method for researching horizontal well gas-liquid two-phase pipe flow mechanism
CN102606139B (en) * 2012-03-02 2014-08-06 中国石油大学(华东) Underwater wellhead system load test device and test method thereof
CN102606136B (en) * 2012-04-01 2013-03-06 中国石油大学(华东) Logging-while-drilling value response law simulated experimental device
CN103726815B (en) * 2012-10-11 2016-03-02 中国石油化工股份有限公司 A kind of CO 2drive produced well pit shaft fluidised form is determined and parameter optimization method
CN104234708B (en) * 2014-09-11 2016-08-31 西安石油大学 A kind of multi-functional pit shaft oil gas water multiphase analogue experiment installation
CN104879094B (en) * 2015-05-11 2017-10-17 中国石油天然气股份有限公司 A kind of downhole choke Wellbore of Gas Wells analogue experiment installation
CN105242014A (en) * 2015-10-22 2016-01-13 中国石油天然气股份有限公司 Underground gas-liquid simulative testing system
CN106124705B (en) * 2016-07-21 2019-04-23 中国地质大学(武汉) A kind of biphase gas and liquid flow simulator
CN106401580B (en) * 2016-11-28 2023-07-18 中国石油大学(北京) Multiphase flow experimental device for complex inner boundary multi-heat source lifting shaft
CN109580207B (en) * 2018-12-28 2020-02-18 中国科学院武汉岩土力学研究所 Downhole packer performance test method and device
CN109765265B (en) * 2019-01-24 2022-03-15 中国石油大学(华东) Device and method for measuring heat preservation performance of deepwater gas well annulus test fluid
CN110207749B (en) * 2019-06-05 2022-01-04 中海石油(中国)有限公司 Well killing simulation experiment device adopting top well killing method
CN110529100B (en) * 2019-09-05 2020-06-02 西南石油大学 High-temperature high-pressure shaft salt deposition physical simulation device and simulation method thereof
CN111764885A (en) * 2020-07-19 2020-10-13 西南石油大学 Visual gas well intermittent production simulation experiment device and method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0702211A2 (en) * 1994-09-13 1996-03-20 Agar Corporation Inc. A high void fraction multi-phase fluid flow meter
CN1384477A (en) * 2002-04-23 2002-12-11 西安交通大学 Gas-liquid-solid multiphase flow simulating method and plant
CN1584948A (en) * 2004-05-31 2005-02-23 中国科学院力学研究所 Split-phase mixed circulating oil gas and water multi-phase flow analog experimental devices

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0702211A2 (en) * 1994-09-13 1996-03-20 Agar Corporation Inc. A high void fraction multi-phase fluid flow meter
CN1384477A (en) * 2002-04-23 2002-12-11 西安交通大学 Gas-liquid-solid multiphase flow simulating method and plant
CN1584948A (en) * 2004-05-31 2005-02-23 中国科学院力学研究所 Split-phase mixed circulating oil gas and water multi-phase flow analog experimental devices

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李明忠.井筒多相流实验研究装置的建设与应用.《石油教育》.1994,(第S1期), *

Also Published As

Publication number Publication date
CN101560880A (en) 2009-10-21

Similar Documents

Publication Publication Date Title
CN101560880B (en) Supercritical well bore multi-phase flow test device
CN101709639B (en) Mineshaft multiphase flow device for simulating deep-water oil and gas production
CN104500031B (en) Natural gas hydrate stratum drilling simulation device
Li et al. Experimental and numerical studies on heat transfer characteristics of vertical deep-buried U-bend pipe to supply heat in buildings with geothermal energy
CN102518432B (en) Test device capable of simulating plugging of high temperature and high pressure dropping strata
CN101936158A (en) Test method for wellbore multiphase flow under supercritical condition
CN105571647A (en) Natural gas hydrate exploitation multi-physical field evolution simulation test device and method
CN205426212U (en) Many physics of gas hydrate exploitation field evolution simulating measurement setup
CN105571991B (en) Cement slurry property pilot system and its method
CN103674593B (en) A kind of device and method for simulating the flood pot test of low permeability reservoir pressure break straight well
CN102373918B (en) Oil well batch production simulation experimental facility for low-permeability reservoir
Zhou et al. Optimization of methods for liquid loading prediction in deep condensate gas wells
CN104807850A (en) Experimental device and method for measuring thermodynamic parameters of oil gas well shaft fluid and oil well pipe
Gong et al. Research status and development trend of key technologies for enhanced geothermal systems
Du et al. Experimental and numerical simulation research on heat transfer performance of coaxial casing heat exchanger in 3500m-deep geothermal well in Weihe Basin
CN113743037B (en) Method for calculating water injection induced dynamic fracture change diversion capacity of low-permeability oil reservoir
CN206205885U (en) Complicated inner boundary multi-heat source lifts well bore multi-phase flow test device
Hongwei et al. Partial phase flow rate measurements for stratified oil-water flow in horizontal wells
Gao et al. A comprehensive model for simulating supercritical-water flow in a vertical heavy-oil well
Wei et al. Heat transfer investigation between wellbore and formation in U-shaped geothermal wells with long horizontal section
CN110929447B (en) Shaft temperature field numerical calculation method in thickening acid acidification process
CN103195401A (en) Coal reservoir yield increasing transforming experiment device under stratum conditions
CN104316448B (en) A kind of Forecasting Methodology of high-order coal petrography gas phase permeability dynamic change
CN106401580A (en) Multiphase flow experimental device for complex inner boundary multi-heat-source lifting shaft
CN107314949B (en) Viscosity reduction testing device and method for thick oil well shaft

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121219

Termination date: 20160515

CF01 Termination of patent right due to non-payment of annual fee