CN101560880B - Supercritical well bore multi-phase flow test device - Google Patents
Supercritical well bore multi-phase flow test device Download PDFInfo
- Publication number
- CN101560880B CN101560880B CN 200910015325 CN200910015325A CN101560880B CN 101560880 B CN101560880 B CN 101560880B CN 200910015325 CN200910015325 CN 200910015325 CN 200910015325 A CN200910015325 A CN 200910015325A CN 101560880 B CN101560880 B CN 101560880B
- Authority
- CN
- China
- Prior art keywords
- gas
- pressure
- liquid
- well bore
- supercritical
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)
Abstract
The invention relates to a supercritical well bore multi-phase flow test device which simulates exploitation of high-pressure and high-yield natural gas field under critical condition. The technical proposal is as follows: the test device comprises a water tank, a high-pressure hydraulic pump, a liquid flow controller, a high-pressure gas compressor, a high-pressure gas tank, a dryer, a gas flow controller, a gas-liquid mixer, a high-pressure well bore, an inner pipe, a return pipeline, a gas-liquid separating tank, a back pressure control system, a temperature control system, a void ratio measuring system and a pressure difference measuring system. The test device has the beneficial effects of (1) simulation of gas flow in the well bore under critical condition; (2) simulation of gas-liquid multi-phase flow under critical and supercritical conditions; (3) simulation of gas or gas-liquid multi-phase flow under normal pressure. The device can be built into a comprehensive supercritical well bore multi-phase flow simulation testing platform and become an important base for national supercritical well bore multi-phase flow research.
Description
One, technical field:
The present invention relates to the heterogeneous mobile experimental system of a kind of pit shaft, particularly a kind of supercritical well bore multi-phase flow test device of simulating high pressure under the critical condition, the exploitation of high yield gas field.
Two, background technology:
China southwest and the Northwest are containing the natural gas resource of a large amount of high pressure, high yield, high sulfur-bearing, these natural gas resources in China's energy total amount take up an area of proportion and increase gradually, just progressively become the developing focus of China's petroleum resources.But because these regional ubiquity geological structures are complicated, petroleum resources bury dark, strata pressure is high, output is high, some areas are with high concentration H2S; And factors such as prediction of formation pressure difficulty; Make such gas reservoir development face many safety problems, exist many potential safety hazards.Therefore, the research of wellbore pressure control technology is the important subject in " completion safety technics system is bored in three high gas fields " field always.It bores the ability in completion safety technics level and autonomous exploration and development three high gas fields to promoting China three high gas fields; Prevention and the generation of stopping the particularly serious accident of three high gas fields brill completions; Have important practical significance and far-reaching historical meaning, also will have a tremendous social and economic benefits.
For " three height " gas reservoir; Mostly bury deeplyer, formation fluid is in critical or supercriticality, and critical or supercritical fluid has good dissolubility; Under downhole condition; Can a large amount of supercritical fluid of dissolving in the drilling fluid, this heterogeneous fluid tie up to along be under pressure in the pit shaft migration process, influence of temperature variation, the transmission of respectively meet in the system physical and chemical processes such as phase-state change or interphase mass transfer take place and energy, momentum; Its result causes each physical parameter of borehole fluid to take place to change fast with well depth and time in the short time at the utmost point, makes the flowing law of annular space inner fluid become very complicated.How wait and predict that corresponding annular pressure section is a difficult point of accurately controlling wellbore pressure according to nowed forming, the phase-state change of annular space inner fluid under various different well depth conditions; The research of this respect at present is less, and the experimental facilities of simulation critical condition changes and do not appear in the newspapers.
Three, summary of the invention:
The object of the invention is exactly the above-mentioned defective that exists to prior art; A kind of supercritical well bore multi-phase flow test device is provided, can simulates under the HTHP critical phase conditions, the experimental facilities of flowing law in the pit shaft of gas or gas-liquid two-phase fluid; And then can study the flow behavior of gas in pit shaft under critical and the super critical condition; Set up pit shaft multiphase flow dynamic mechanical model and computational methods, prediction pit shaft multiphase flow pressure is for wellbore pressure control in the oil gas drilling lays the foundation.
Its technical scheme is: mainly be made up of water pot, high-pressure hydraulic pump, liquid flow controller, high-pressure compressor, high pressure gas holder, dryer, gas flow controller, gas-liquid two-phase blender, high pressure pit shaft, interior pipe, reflux pipeline, knockout drum, back pressure control system, temperature control system, void content measuring system and pressure differential pressure measurement system; Described high-pressure well tube inner chamber is provided with interior pipe; The outside is provided with impedance type void content meter; The bottom of described high pressure pit shaft connects the gas-liquid two-phase blender through pipeline, and the gas-liquid two-phase blender is communicated with gas flow controller and liquid flow controller respectively; Described gas flow controller connects dryer, high pressure gas holder and high-pressure compressor successively, and described liquid flow controller connects high-pressure hydraulic pump and water pot successively; The top of described high pressure pit shaft connects reflux pipeline, and the other end of described reflux pipeline is communicated with water pot through knockout drum, back pressure control system and modulator.
Be provided with heating rod, temperature control system, water monitor and temperature monitor in the above-mentioned water pot, the water in the water pot is heated by heating rod, and temperature is controlled by temperature control system, and to keep the pilot system temperature constant, maximum temperature can reach 90 degree.
Above-mentioned knockout drum is communicated with back pressure control system and modulator; Back pressure control system, to keep the pilot system constant pressure, the pit shaft maximum pressure can reach 10Mpa; The water that separates flows into water pot through reflux pipeline, and gas is directly arranged atmosphere through counterbalance valve.
The length of above-mentioned high pressure pit shaft is 14m, outer external diameter of pipe 140mm, and outer tube diameter 130mm, interior external diameter of pipe 60mm, the outlet of high pressure pit shaft is provided with pressure gauge, and the two ends up and down of high pressure pit shaft are respectively equipped with differential manometer and impedance type void content meter; The void content measuring system is in order to judge flow pattern, to measure bobble rise velocity, void content velocity of wave propagation etc.; The pressure differential pressure measurement system is in order to research wellbore gas or heterogeneous flowing law.
The invention has the beneficial effects as follows: can realize wellbore gas or the simulation of gas-liquid polyphase flow phenomenon under the HTHP super critical condition, be the requisite important tool of three high gas-field exploitation technical research.This equipment can be realized: the simulation of (1) super critical condition well-sinking gas flow; (2) gas-liquid polyphase flow flow simulating under critical and the super critical condition; (3) gas or gas-liquid polyphase flow flow simulating under the normal pressure.Building up of this equipment will form a comprehensive overcritical pit shaft multiphase flow dynamic simulated experiment porch, become the important base of domestic overcritical pit shaft multiphase flow research.
Four, description of drawings:
Accompanying drawing 1 is a structural representation of the present invention;
Among the last figure: water pot 1; High-pressure hydraulic pump 2; Liquid flow controller 3; High-pressure compressor 4; High pressure gas holder 5; Dryer 6; Gas flow controller 7; Gas-liquid two-phase blender 8; High pressure pit shaft 9; Interior pipe 10; Reflux pipeline 11; Knockout drum 12; Back pressure control system 13; Reflux pipeline 14; Impedance type void content meter 15; 15 '; 15 "; differential manometer 16; 16 '; temperature controller 17; pressure gauge 18; heating rod 19; Temperature control system 20; Water monitor 21; Temperature monitor 22; Computer control 23; Holding wire 24; Modulator 25.
Five, the specific embodiment:
Embodiment 1: combine accompanying drawing 1, the present invention is described in further detail (simulation of super critical condition well-sinking gas flow):
Overall structure is: mainly by water pot 1; High-pressure hydraulic pump 2; Liquid flow controller 3; High-pressure compressor 4; High pressure gas holder 5; Dryer 6; Gas flow controller 7; Gas-liquid two-phase blender 8; High pressure pit shaft 9; Interior pipe 10; Reflux pipeline 11; Knockout drum 12; Back pressure control system 13; Reflux pipeline 14; Impedance type void content meter 15; 15 '; 15 "; differential manometer 16; 16 '; temperature controller 17; pressure gauge 18; heating rod 19; Temperature control system 20; Water monitor 21; Temperature monitor 22; Computer control 23; Holding wire 24; Modulator 25 connects to form.
Be used for simulating the pit shaft flowing law of ultra dark natural gas well drilling process under super critical condition.
Its technical scheme is: above-mentioned other structures are constant, and water pot 1, high-pressure hydraulic pump 2, liquid flow controller 3, void content meter 15 do not need work.Gases at high pressure are provided by high-pressure compressor 4, high pressure gas holder 5, dryer 6, gas flow controller 7; Two blenders 8 of the gas-liquid of flowing through, high pressure pit shaft 9, interior pipe 10, reflux pipeline 11, knockout drum 12, back pressure control system 13, differential manometer 16 is used to measure flow differential pressure.Can realize that through control back pressure (maximum 10MPa) the overcritical of gas flowed in the pit shaft.The flow parameter that can measure has pit shaft inlet pressure, outlet pressure, along journey pressure reduction, flow, temperature etc., so that computational analysis.
Embodiment 2: combine accompanying drawing 1, the present invention is described in further detail (critical with super critical condition under gas-liquid polyphase flow flow simulating):
Be used for simulating ultra dark natural gas well drilling process under super critical condition and the pit shaft flowing law of liquid output arranged.
Its technical scheme is: above-mentioned other structures are constant; Water pot 1, high-pressure hydraulic pump 2, liquid flow controller 3 are used to provide high-pressure flow liquid; Heating rod 19 heat be used for adding hot water, by temperature controller 20 control temperature values; Gases at high pressure are provided by high-pressure compressor 4, high pressure gas holder 5, dryer 6, gas flow controller 7; Two blenders 8 of the gas-liquid of flowing through, high pressure pit shaft 9, interior pipe 10, reflux pipeline 11, knockout drum 12, back pressure control system 13, differential manometer 16 is used to measure flow differential pressure, and void content meter 15 is used to measure flow process pit shaft void fraction and void content fluctuation.Can realize the pit shaft internal pressure through control back pressure (maximum 10MPa), make gas in the super critical condition current downflow.The flow parameter that can measure has pit shaft inlet pressure, outlet pressure, along journey pressure reduction, flow, void content ripple, averga cross section void fraction, temperature etc., so that computational analysis.
Embodiment 3: combine accompanying drawing 1, the present invention is described in further detail (gas or gas-liquid polyphase flow flow simulating under the normal pressure):
With above-mentioned embodiment 2, just not working of back pressure control system 13 makes the logical atmosphere of pit shaft outlet just can realize.
Claims (4)
1. supercritical well bore multi-phase flow test device; It is characterized in that: mainly form by water pot (1), high-pressure hydraulic pump (2), liquid flow controller (3), high-pressure compressor (4), high pressure gas holder (5), dryer (6), gas flow controller (7), gas-liquid two-phase blender (8), high pressure pit shaft (9), interior pipe (10), reflux pipeline (11), knockout drum (12), back pressure control system (13), temperature control system (20), void content measuring system and pressure differential pressure measurement system; Described high pressure pit shaft (9) inner chamber is provided with interior pipe (10); The outside is provided with impedance type void content meter (15,15 ', 15 "); the bottom of described high pressure pit shaft (9) connects gas-liquid two-phase blender (8) through pipeline, and gas-liquid two-phase blender (8) is communicated with gas flow controller (7) and liquid flow controller (3) respectively; Described gas flow controller (7) connects dryer (6), high pressure gas holder (5) and high-pressure compressor (4) successively, and described liquid flow controller (3) connects high-pressure hydraulic pump (2) and water pot (1) successively; The top of described high pressure pit shaft (9) connects reflux pipeline (11), and the other end of described reflux pipeline (11) is communicated with water pot (1) through knockout drum (12), back pressure control system (13) and modulator (25).
2. supercritical well bore multi-phase flow test device according to claim 1; It is characterized in that: be provided with heating rod (19), temperature control system (20), water monitor (21) and temperature monitor (22) in the described water pot (1); Water in the water pot is by heating rod (19) heating, and temperature is controlled by temperature control system (20).
3. supercritical well bore multi-phase flow test device according to claim 1; It is characterized in that: described knockout drum (12) is communicated with back pressure control system (13) and modulator (25); Water level is controlled by modulator (25); The water that separates flows into water pot (1) through reflux pipeline (14), and gas is directly arranged atmosphere through counterbalance valve.
4. supercritical well bore multi-phase flow test device according to claim 1; It is characterized in that: the length of described high pressure pit shaft (9) is 14m; Outer external diameter of pipe 140mm, outer tube diameter 130mm, interior external diameter of pipe 60mm; High pressure pit shaft outlet is provided with pressure gauge (18), and the two ends up and down of high pressure pit shaft are respectively equipped with differential manometer (16,16 ') and impedance type void content meter (15,15 ', 15 ").
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200910015325 CN101560880B (en) | 2009-05-15 | 2009-05-15 | Supercritical well bore multi-phase flow test device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200910015325 CN101560880B (en) | 2009-05-15 | 2009-05-15 | Supercritical well bore multi-phase flow test device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101560880A CN101560880A (en) | 2009-10-21 |
CN101560880B true CN101560880B (en) | 2012-12-19 |
Family
ID=41219835
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200910015325 Expired - Fee Related CN101560880B (en) | 2009-05-15 | 2009-05-15 | Supercritical well bore multi-phase flow test device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101560880B (en) |
Families Citing this family (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101709639B (en) * | 2009-11-20 | 2013-08-21 | 中国石油大学(华东) | Mineshaft multiphase flow device for simulating deep-water oil and gas production |
CN101936158A (en) * | 2010-08-14 | 2011-01-05 | 中国石油大学(华东) | Test method for wellbore multiphase flow under supercritical condition |
CN102128031B (en) * | 2011-01-11 | 2012-03-28 | 西南石油大学 | Simulation device and method for researching horizontal well gas-liquid two-phase pipe flow mechanism |
CN102606139B (en) * | 2012-03-02 | 2014-08-06 | 中国石油大学(华东) | Underwater wellhead system load test device and test method thereof |
CN102606136B (en) * | 2012-04-01 | 2013-03-06 | 中国石油大学(华东) | Logging-while-drilling value response law simulated experimental device |
CN103726815B (en) * | 2012-10-11 | 2016-03-02 | 中国石油化工股份有限公司 | A kind of CO 2drive produced well pit shaft fluidised form is determined and parameter optimization method |
CN104234708B (en) * | 2014-09-11 | 2016-08-31 | 西安石油大学 | A kind of multi-functional pit shaft oil gas water multiphase analogue experiment installation |
CN104879094B (en) * | 2015-05-11 | 2017-10-17 | 中国石油天然气股份有限公司 | A kind of downhole choke Wellbore of Gas Wells analogue experiment installation |
CN105242014A (en) * | 2015-10-22 | 2016-01-13 | 中国石油天然气股份有限公司 | Underground gas-liquid simulative testing system |
CN106124705B (en) * | 2016-07-21 | 2019-04-23 | 中国地质大学(武汉) | A kind of biphase gas and liquid flow simulator |
CN106401580B (en) * | 2016-11-28 | 2023-07-18 | 中国石油大学(北京) | Multiphase flow experimental device for complex inner boundary multi-heat source lifting shaft |
CN109580207B (en) * | 2018-12-28 | 2020-02-18 | 中国科学院武汉岩土力学研究所 | Downhole packer performance test method and device |
CN109765265B (en) * | 2019-01-24 | 2022-03-15 | 中国石油大学(华东) | Device and method for measuring heat preservation performance of deepwater gas well annulus test fluid |
CN110207749B (en) * | 2019-06-05 | 2022-01-04 | 中海石油(中国)有限公司 | Well killing simulation experiment device adopting top well killing method |
CN110529100B (en) * | 2019-09-05 | 2020-06-02 | 西南石油大学 | High-temperature high-pressure shaft salt deposition physical simulation device and simulation method thereof |
CN111764885A (en) * | 2020-07-19 | 2020-10-13 | 西南石油大学 | Visual gas well intermittent production simulation experiment device and method |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0702211A2 (en) * | 1994-09-13 | 1996-03-20 | Agar Corporation Inc. | A high void fraction multi-phase fluid flow meter |
CN1384477A (en) * | 2002-04-23 | 2002-12-11 | 西安交通大学 | Gas-liquid-solid multiphase flow simulating method and plant |
CN1584948A (en) * | 2004-05-31 | 2005-02-23 | 中国科学院力学研究所 | Split-phase mixed circulating oil gas and water multi-phase flow analog experimental devices |
-
2009
- 2009-05-15 CN CN 200910015325 patent/CN101560880B/en not_active Expired - Fee Related
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0702211A2 (en) * | 1994-09-13 | 1996-03-20 | Agar Corporation Inc. | A high void fraction multi-phase fluid flow meter |
CN1384477A (en) * | 2002-04-23 | 2002-12-11 | 西安交通大学 | Gas-liquid-solid multiphase flow simulating method and plant |
CN1584948A (en) * | 2004-05-31 | 2005-02-23 | 中国科学院力学研究所 | Split-phase mixed circulating oil gas and water multi-phase flow analog experimental devices |
Non-Patent Citations (1)
Title |
---|
李明忠.井筒多相流实验研究装置的建设与应用.《石油教育》.1994,(第S1期), * |
Also Published As
Publication number | Publication date |
---|---|
CN101560880A (en) | 2009-10-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101560880B (en) | Supercritical well bore multi-phase flow test device | |
CN101709639B (en) | Mineshaft multiphase flow device for simulating deep-water oil and gas production | |
CN104500031B (en) | Natural gas hydrate stratum drilling simulation device | |
Li et al. | Experimental and numerical studies on heat transfer characteristics of vertical deep-buried U-bend pipe to supply heat in buildings with geothermal energy | |
CN102518432B (en) | Test device capable of simulating plugging of high temperature and high pressure dropping strata | |
CN101936158A (en) | Test method for wellbore multiphase flow under supercritical condition | |
CN105571647A (en) | Natural gas hydrate exploitation multi-physical field evolution simulation test device and method | |
CN205426212U (en) | Many physics of gas hydrate exploitation field evolution simulating measurement setup | |
CN105571991B (en) | Cement slurry property pilot system and its method | |
CN103674593B (en) | A kind of device and method for simulating the flood pot test of low permeability reservoir pressure break straight well | |
CN102373918B (en) | Oil well batch production simulation experimental facility for low-permeability reservoir | |
Zhou et al. | Optimization of methods for liquid loading prediction in deep condensate gas wells | |
CN104807850A (en) | Experimental device and method for measuring thermodynamic parameters of oil gas well shaft fluid and oil well pipe | |
Gong et al. | Research status and development trend of key technologies for enhanced geothermal systems | |
Du et al. | Experimental and numerical simulation research on heat transfer performance of coaxial casing heat exchanger in 3500m-deep geothermal well in Weihe Basin | |
CN113743037B (en) | Method for calculating water injection induced dynamic fracture change diversion capacity of low-permeability oil reservoir | |
CN206205885U (en) | Complicated inner boundary multi-heat source lifts well bore multi-phase flow test device | |
Hongwei et al. | Partial phase flow rate measurements for stratified oil-water flow in horizontal wells | |
Gao et al. | A comprehensive model for simulating supercritical-water flow in a vertical heavy-oil well | |
Wei et al. | Heat transfer investigation between wellbore and formation in U-shaped geothermal wells with long horizontal section | |
CN110929447B (en) | Shaft temperature field numerical calculation method in thickening acid acidification process | |
CN103195401A (en) | Coal reservoir yield increasing transforming experiment device under stratum conditions | |
CN104316448B (en) | A kind of Forecasting Methodology of high-order coal petrography gas phase permeability dynamic change | |
CN106401580A (en) | Multiphase flow experimental device for complex inner boundary multi-heat-source lifting shaft | |
CN107314949B (en) | Viscosity reduction testing device and method for thick oil well shaft |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20121219 Termination date: 20160515 |
|
CF01 | Termination of patent right due to non-payment of annual fee |