CN101560838B - Method for preventing and controlling water leakage in building wall bodies - Google Patents
Method for preventing and controlling water leakage in building wall bodies Download PDFInfo
- Publication number
- CN101560838B CN101560838B CN2009101437382A CN200910143738A CN101560838B CN 101560838 B CN101560838 B CN 101560838B CN 2009101437382 A CN2009101437382 A CN 2009101437382A CN 200910143738 A CN200910143738 A CN 200910143738A CN 101560838 B CN101560838 B CN 101560838B
- Authority
- CN
- China
- Prior art keywords
- diversion
- wall
- ventilative eyelet
- wall bodies
- ventilative
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Building Environments (AREA)
Abstract
The invention provides a method for preventing and controlling water leakage in building wall bodies, which comprises the following steps: a plurality of water conducting and ventilating holes with certain depth and used for discharging liquid water or water vapor seeping into the wall bodies are penetrated into the interior of the building wall body from the outer side surface thereof and comprise tail ends and open ends. The slope angle of the central axis of the hole is larger than 0 degree and smaller than 90 degrees and the tail ends of the water conducting and ventilating holes are higher than the open ends thereof; water in the wall bodies exists in a liquid or vapor manner and is discharged from the water conducting and ventilating holes out of the wall bodies. Adopting a conducting method, the method utilizes external forces including air convection, solarization and temperature difference to cause water seeping into the interior of the building wall bodies to be discharged from the arranged water conducting and ventilating holes in time, thus the wall bodies can quickly become dry. Therefore, the method not only can prolong the service life of the building wall bodies butalso has fewer procedures and simpler operation with a blocking method for repairing the leakage of the wall bodies; furthermore, the method has practical significance for ensuring construction quali ty and saving resources.
Description
Technical field
The invention belongs to construction engineering technical field, be specifically related to a kind of method of preventing and treating water leakage in building wall bodies.
Background technology
Construction wall in building course because construction material or construction wrong, or construction wall to expose in atmosphere the time too of a specified duration, be subjected to the role and influence of external force such as Exposure to Sunlight, wind and rain, the temperature difference all the year round, can cause that all leakage appears splitting in construction wall.Especially in the many coastal regions of rainwater, skin to split seepage problem more particularly serious.Because the gas permeability of the facing layer material of external wall such as Ceramic Tiles (layer), painting layer is relatively poor, the moisture content that leaks in the construction wall is difficult to timely discharge, and accumulate in the construction wall and in body of wall to around diffusion, and make construction wall be in dampness for a long time.This not only brings great puzzlement to the user, and damages the exterior wall surface decorative layer, and near the furniture of exterior wall, electrical equipment etc., the deterioration of more aggravating body of wall, and make building prematurely senile, also injure its safety of supply line that is embedded in the body of wall when serious.
At present, the measure that solves the construction wall infiltration mainly is a method of taking shutoff, promptly the water slit, crack on the metope is stopped up with waterproof and sealing material, stop water by construction wall outside infiltrate inner, but owing to the reason that causes seepage is varied, add construction wall especially the exterior wall outdoor surface have drastic change unavoidably, displacement deformation, so method for blocking often can not stop water to infiltrate in the construction wall fully, and takes material consumption worker, also can have influence on the impression of construction wall.
Summary of the invention
The present invention is directed to existing water leakage in building wall bodies and can't in time discharge the problem of construction wall, provide a kind of by constructing ejectment and utilizing cross-ventilation and the external force of Exposure to Sunlight and temperature difference formation, the moisture content that leaks in the body of wall is in time dredged out the outer method of construction wall, make the body of wall that makes moist recover dry in a short time.
The present invention solves the problems of the technologies described above the technical scheme that is adopted to be:
A kind of method that is used to prevent and treat water leakage in building wall bodies, it comprises the steps:
(4) on construction wall, wear the ventilative eyelet of most diversions certain depth, that be used for dredging open fire in the body of wall or steam from its lateral surface to its inside, the ventilative eyelet of this diversion comprises end and openend, the inclination angle angle of the central axis of the ventilative eyelet of this diversion is greater than 0 ° and less than 90 °, makes the end of the ventilative eyelet of described diversion be higher than the openend in this hole; Moisture content in the body of wall is discharged outside the body of wall by the ventilative eyelet of this diversion with the form of liquid or gaseous state.
Before above-mentioned steps, it also can may further comprise the steps:
(1) measures the construction wall thickness d;
(2) position of demarcation construction wall percolating water;
(3) according to the central axis and the surperficial angle α of described construction wall of the ventilative eyelet of diversion, calculate the degree of depth X of the ventilative eyelet of diversion, design formulas is as follows: X≤d/sin α, and 20mm≤X<1/2d, when X<d/sin α, the described construction wall medial surface of terminal no show of the ventilative eyelet of described diversion is when X=d/sin α, the ventilative eyelet of described diversion penetrates construction wall, its terminal medial surface that arrives described construction wall.
Increase above-mentioned steps, help the constructor to decide the degree of depth of the ventilative eyelet of set diversion according to the infiltration degree of construction wall.When the construction wall infiltration is serious, can suitably increase ventilative its length of eyelet of the diversion that is arranged in the body of wall and density.Described step (4) is at described body of wall percolating water position, and on every side on the outdoor metope in 300~500mm scope, the ventilative eyelet of several described diversions is set.
The ventilative eyelet spacing each other of described each diversion is less than or equal to X.
Also comprise the steps: afterwards in described step (4)
(5) the ventilative eyelet of described diversion is clean with scour without sediment motion, remove dust and gravel;
(6) the openend of the ventilative eyelet of the described diversion that cleans up inwardly greater than 1cm less than the inwall in the 3cm scope on, waterproofing course is set one.
Openend at the ventilative eyelet of described diversion is provided with the ventilative material of non-hydrophily.
The ventilative eyelet of described diversion can be arranged on the seepage place of construction wall or occur the position of seepage easily.
As to improvement of the technical scheme, the central axis of the ventilative eyelet of described diversion is 5~85 ° with the angle between the construction wall vertical centre axis, further preferred 15~65 °.
Beneficial effect of the present invention is: the above-mentioned method that is used to prevent and treat water leakage in building wall bodies, it adopts the conventional measure that connects the ventilative eyelet of water on the existing building body of wall obliquely, the moisture that infiltrates construction wall inside is in time shed by the ventilative eyelet of diversion, avoid moisture content diffusion and alluvial in body of wall, to occur, prolong the application life of construction wall, guaranteed the function of use of building.The infiltration method of taking the ventilative measure of diversion to draw in the construction wall is compared existing method for blocking, not only more reasonable and durable reliable, and it is comparatively economical, therefore the above-mentioned method that is used to prevent and treat water leakage in building wall bodies has solved people and has thirsted for solving but unsolved technical barrier always, obtain beyond thought technique effect, had important and practical meanings.
The specific embodiment
Embodiment 1: a kind of impervious method of construction wall, and it may further comprise the steps:
(1) measures the construction wall thickness d;
(2) position of demarcation construction wall percolating water;
(3) according to the central axis and the described construction wall surface angle α of the ventilative eyelet of diversion, calculate the degree of depth X of the ventilative eyelet of diversion, design formulas is as follows: X≤d/sin α, and 20mm≤X<1/2d;
(4) on the seepage place of construction wall, and on every side on the outdoor metope in 300~500mm scope, wear certain depth from its lateral surface to its inside, be used for dredging the ventilative eyelet of most diversions of interior seepage open fire of body of wall or vaporous water, the ventilative eyelet spacing each other of described each diversion is less than or equal to X, the ventilative eyelet of this diversion comprises end and openend, the inclination angle angle of the central axis of the ventilative eyelet of this diversion is greater than 0 ° and less than 90 °, and the end of the ventilative eyelet of described diversion is higher than the openend in this hole, percolating water is discharged outside the body of wall by the ventilative eyelet of this diversion with the form of liquid or gaseous state in the body of wall;
(5) the ventilative eyelet of described diversion is clean with scour without sediment motion, remove dust and gravel;
(6) the openend of the ventilative eyelet of the described diversion that cleans up inwardly greater than 1cm less than the inwall in the 3cm scope on, waterproofing course is set one, import the inside of body of wall along the ventilative eyelet of this diversion with the water on the construction wall metope of avoiding trickling;
(7) openend at the ventilative eyelet of described diversion is provided with the ventilative material of non-hydrophily, with the impression of the metope that increases construction wall.
Embodiment 2: the impervious method of the construction wall that present embodiment provided is substantially with embodiment 1, and its difference is: the angle between the central axis of the ventilative eyelet of described diversion and the vertical centre axis of described construction wall is 45 °.
Embodiment 3: the impervious method of the construction wall that present embodiment provided is substantially with embodiment 1, and its difference is: the angle between the central axis of the ventilative eyelet of described diversion and the vertical centre axis of described construction wall is 60 °.
Embodiment 4: the impervious method of the construction wall that present embodiment provided is substantially with embodiment 1, and its difference is: the angle between the central axis of the ventilative eyelet of described diversion and the vertical centre axis of described construction wall is 85 °.
Embodiment 5: the impervious method of the construction wall that present embodiment provided is substantially with embodiment 1, and its difference is: the angle between the central axis of the ventilative eyelet of described diversion and the vertical centre axis of described construction wall is 5 °.
The instrument that connects the ventilative eyelet of water on construction wall can adopt electric drill and other perforating tools commonly used.
The impervious method of above-mentioned construction wall can be used for construction wall, and the seepage part of exterior wall particularly is so that the moisture content in the construction wall is discharged fast; Also can be used for healthy construction wall, prevent the infiltration phenomenon of construction wall with this.
The ventilative eyelet of described diversion also can be arranged on the position that occurs seepage easily of construction wall, comprises the side bar bottom of exterior wall, and seepage appears in the prevention body of wall.
In order to prevent that the diversion air-vent eye on the construction wall from having influence on the construction wall outward appearance, can on construction wall, connect the ventilative eyelet of water according to certain geometrical rule, make the openend of the ventilative eyelet of diversion be arranged in beautiful pattern.
The present invention is not limited to above-mentioned embodiment, and every all embodiments that can realize the object of the invention are all within protection scope of the present invention.
Claims (4)
1. a method that is used to prevent and treat water leakage in building wall bodies is characterized in that, on construction wall, wears the ventilative eyelet of most diversions certain depth, that be used for dredging open fire in the body of wall or steam from its lateral surface to its inside, and it comprises the steps:
(1) measures the construction wall thickness d;
(2) position of demarcation construction wall percolating water;
(3) according to the central axis and the surperficial angle α of construction wall of the ventilative eyelet of diversion, calculate the degree of depth X of the ventilative eyelet of diversion, design formulas is as follows: X≤d/sin α, and 20mm≤X<1/2d, and the ventilative eyelet spacing each other of described each diversion is less than or equal to X;
(4) the ventilative eyelet of a described majority diversion is arranged on body of wall percolating water position and on every side on the outdoor metope in 300~500mm scope, the ventilative eyelet of this diversion comprises end and openend, the inclination angle angle of the central axis of the ventilative eyelet of this diversion makes the end of the ventilative eyelet of described diversion be higher than openend greater than 0 ° and less than 90 °; Moisture content is discharged outside the body of wall by the ventilative eyelet of this diversion with the form of liquid or gaseous state in the body of wall;
(5) the ventilative eyelet of described diversion is clean with scour without sediment motion, remove dust and gravel;
(6) the openend of the ventilative eyelet of the described diversion that cleans up inwardly greater than 1cm less than the inwall in the 3cm scope on, waterproofing course is set one, at the openend of the ventilative eyelet of described diversion the ventilative material of non-hydrophily is set.
2. the method that is used to prevent and treat water leakage in building wall bodies according to claim 1 is characterized in that, the ventilative eyelet of described diversion is arranged on the seepage place of construction wall or occurs the position of seepage easily.
3. the method that is used to prevent and treat water leakage in building wall bodies according to claim 1 is characterized in that, ventilative eyelet central axis of described diversion and described construction wall surface angle are 5~85 °.
4. the method that is used to prevent and treat water leakage in building wall bodies according to claim 1 is characterized in that, ventilative eyelet central axis of described diversion and described construction wall surface angle are 15~65 °.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009101437382A CN101560838B (en) | 2009-05-25 | 2009-05-25 | Method for preventing and controlling water leakage in building wall bodies |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009101437382A CN101560838B (en) | 2009-05-25 | 2009-05-25 | Method for preventing and controlling water leakage in building wall bodies |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101560838A CN101560838A (en) | 2009-10-21 |
CN101560838B true CN101560838B (en) | 2011-03-02 |
Family
ID=41219795
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009101437382A Active CN101560838B (en) | 2009-05-25 | 2009-05-25 | Method for preventing and controlling water leakage in building wall bodies |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101560838B (en) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103306490A (en) * | 2012-03-13 | 2013-09-18 | 张保林 | Anti-leakage detachment-free treatment method of bathroom |
CN102588709A (en) * | 2012-03-30 | 2012-07-18 | 周介明 | Air-permeable anchored vacuum heat-insulation plate and manufacturing method thereof |
CN106150528A (en) * | 2015-03-25 | 2016-11-23 | 昆明百谦科技有限公司 | A kind of special slow release water-stop glue construction method |
CN108868185B (en) * | 2018-06-30 | 2020-05-12 | 厦门防水博士建筑工程有限公司 | Building ground water channeling leakage repairing system |
CN109577671B (en) * | 2018-11-09 | 2020-11-06 | 北京正洋外墙装饰有限公司 | Environment-friendly window water leakage wall surface repairing method |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1145440A (en) * | 1995-09-13 | 1997-03-19 | 水利部建筑工程处 | Mounting outer wall slab crack water-proof repairing method |
CN1210184A (en) * | 1997-09-04 | 1999-03-10 | 同济大学 | Isobaric tightening structure of external wall board and leakage maintaining method therefor |
-
2009
- 2009-05-25 CN CN2009101437382A patent/CN101560838B/en active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1145440A (en) * | 1995-09-13 | 1997-03-19 | 水利部建筑工程处 | Mounting outer wall slab crack water-proof repairing method |
CN1210184A (en) * | 1997-09-04 | 1999-03-10 | 同济大学 | Isobaric tightening structure of external wall board and leakage maintaining method therefor |
Non-Patent Citations (1)
Title |
---|
鲁国培,何玉成.诊治外墙渗漏症.《四川建筑》.2007,第27卷(第03期),第198至200页. * |
Also Published As
Publication number | Publication date |
---|---|
CN101560838A (en) | 2009-10-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101560838B (en) | Method for preventing and controlling water leakage in building wall bodies | |
CN202730973U (en) | Concrete outer wall bolt hole leakproof structure | |
CN104264717A (en) | Basement rigid material and flexible material combined waterproof construction method | |
CN204023501U (en) | A kind of reinforcement Anti-seeping technology structure for earth and rockfill dam | |
CN203411994U (en) | Support pile basement outer wall structure | |
CN202559540U (en) | Waterproof plugging structure for outer wall split bolt hole | |
CN205077694U (en) | Waterproof roof is planted to underground garage | |
CN105201025A (en) | Basement waterproof structure and construction method thereof | |
CN203890966U (en) | Asphalt concrete core wall anti-seepage structure | |
CN203270818U (en) | Water-seepage preventing structure of outer window opening of outer insulating building | |
CN204982789U (en) | A dam body prevention of seepage drainage system for roller compacted concrete dam | |
CN204001465U (en) | A kind of antiseepage exhaust flat roof deck | |
CN205578014U (en) | Plastics waterproof board with prevent scurrying water function | |
CN205875541U (en) | Anti -drop's roof waterproof structure | |
CN205894523U (en) | Roof drainage mouth waterproof insulation structure | |
CN106869304A (en) | Outer wall of basement waterproof construction and construction method in a kind of confined space | |
CN206917207U (en) | Decorate the water guide cover plate and drainage system of clear water brick exterior wall | |
CN206581104U (en) | A kind of easy dewatering type permeable pavement structure | |
CN205046589U (en) | Waterproof structure of basement | |
CN204626470U (en) | A kind of winter construction pile crown water-tight device | |
CN104343137B (en) | Underground waterproof engineering construction method | |
CN103912123A (en) | Caisson type washroom water leakage preventing-draining construction method | |
CN202285515U (en) | Saline and alkaline land and coastal road surface paving and desalting system | |
CN209099097U (en) | A kind of novel water permeable floor tile | |
CN204001603U (en) | Washroom self arrangement waterproofing course |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
DD01 | Delivery of document by public notice | ||
DD01 | Delivery of document by public notice |
Addressee: Zhou Yanman Document name: Notification of Qualified Procedures |