CN101560760B - Construction method for fast concreting and dredging and filling ultra-fine earth foundation - Google Patents

Construction method for fast concreting and dredging and filling ultra-fine earth foundation Download PDF

Info

Publication number
CN101560760B
CN101560760B CN2009101433752A CN200910143375A CN101560760B CN 101560760 B CN101560760 B CN 101560760B CN 2009101433752 A CN2009101433752 A CN 2009101433752A CN 200910143375 A CN200910143375 A CN 200910143375A CN 101560760 B CN101560760 B CN 101560760B
Authority
CN
China
Prior art keywords
soil body
soil
foundation
quicklime
concreting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2009101433752A
Other languages
Chinese (zh)
Other versions
CN101560760A (en
Inventor
张建英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Original Assignee
MCC Jingtang Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Jingtang Construction Co Ltd filed Critical MCC Jingtang Construction Co Ltd
Priority to CN2009101433752A priority Critical patent/CN101560760B/en
Publication of CN101560760A publication Critical patent/CN101560760A/en
Application granted granted Critical
Publication of CN101560760B publication Critical patent/CN101560760B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention relates to a construction method, in particular to a construction method for fast concreting and dredging and filling ultra-fine grained soil foundation. The method comprises the following steps of: arranging a well-point pipe on the surface of a consolidated foundation area and starting a vacuum pump for forced water discharging; arranging calcium oxide on the surface of the consolidated foundation area, mixing with an excavator, fully blending within a treatment deep range, leveling the surface with a bulldozer after the completion of the mixing, stewing materials for 24 hoursuntil the calcium oxide is fully decomposed, utilizing the physical and chemical reactions between the calcium oxide and a soil body to increase the weight of the soil body and generate self-weight concreting; starting an impact rolling and vibration rolling equipment to generate displacement, distortion and shearing to the soil grains, thus compacting the deep layer of the soil body together withthe transmission of a shock wave and quickening the sedimentation and consolidation of the soil body within the treatment range. The foundation carrying capacity can reach 80 to 120 kPa after being treated, thus solving the problem that personnel and equipment are operating at the site in a short time, and the technique is mature, and the construction efficiency is high.

Description

The job practices of fast concreting and dredging and filling ultra-fine earth foundation
Technical field:
The present invention relates to construction techniques, particularly a kind of job practices of fast concreting and dredging and filling ultra-fine earth foundation.
Background technology:
The reclaiming land around sea engineering is faced with two subject matters, and one is the barged-in fill problem of materials, and one is the reinforcing problem of barged-in fill ground.From technical standpoint; optimal hydraulic reclamation material is a sand; but since construction work at present in a large number with sand and environmental protection and water conservancy security needs restriction or forbid adopting sand, so sand costs an arm and a leg and shortage, be difficult to satisfy the needs of reclaiming land around sea engineering material.Main at present silt soil banketing of adopting hydraulic reclamation as reclaiming land around sea.But it is should the soil water content high, be in flow regime, its compressibilty is big, intensity and bearing capacity are extremely low, especially the hydraulic reclamation pipeline exit to the terminal soil body particle in hydraulic reclamation zone from the coarse to fine, bottom to top layer soil body particle presents particle distribution characteristics from the coarse to fine, particle diameter≤0.005mm, organic content is greater than gross mass 7.5%, and bearing capacity of foundation soil can't satisfy the condition that personnel, equipment march into the arena.Routine is to adopt the fixed method of nature, promptly needs the time about 2-3 the water in the super fine grained soils of hydraulic reclamation could be got rid of, if method such as fill out is changed in employing then cost is very high.Therefore, finishing the place at short notice and solidify, solve the construction equipment construction of marching into the arena, is present reclaiming land around sea urgent problem.
Summary of the invention:
The present invention is intended to address the above problem, and a kind of to have a speed of application fast and provide, and the duration is short, reduces construction cost, handles the job practices that the darker vacuum of the degree of depth is forced the fast concreting and dredging and filling ultra-fine earth foundation of precipitation and the fixed associating impact-rolling of quicklime.
The technical solution used in the present invention is: a kind of job practices of fast concreting and dredging and filling ultra-fine earth foundation, undertaken by following step:
(1) be reinforced the well location of foundation region surface, carrying out the well point pipe and lay by the design of dewatering construction layout plan, well point pipe depth of placement 8-18m, the well point pipe connects vacuum pump by water header, starts the vacuum pump draining;
(2) lower 70% when above when water content, dismounting well point pipe, arrange quicklime being reinforced on the foundation region ground then, mix and stir with excavator, when mixing and stirring ultra-fine grain soil layer is translated into the end, the limit flange is mixed, the artificial quicklime admixture ratio of controlling guarantees to handle mixing evenly in the depth bounds, turns at least twice, turn and with bulldozer it is flattened after finishing, stewing material 24 hours fully makes quicklime clear up, and utilizes quicklime and soil body generation physics, chemical reaction, the honeycomb structure that super fine grained soils forms mixes and stirs in quicklime curing and produces cohesion in the process, form jelling structure, under less construction disturbance, the soil body obtains densification and gluing, the severe of the soil body is increased, and the generation deadweight is fixed;
(3) be reinforced layout impact-rolling and vibroroller cmpacting machinery on the foundation region ground, start impact-rolling equipment and vibroroller cmpacting equipment, make between the soil particle and be subjected to displacement, be out of shape and shear, thereby make soil body deep layer along with shock Wave obtains compacting, the sedimentation of quickening the soil body in the process range is fixed, makes bearing capacity of foundation soil reach 80-120kPa.
The know-why of the technical program is: by the vacuum forced drainage pore water in the soil body is discharged, ground generation sedimentation, fixed gradually, mix quicklime in good time and solidify, the honeycomb structure that super fine grained soils is formed mixes and stirs in quicklime curing and produces cohesion in the process, forms jelling structure, under less construction disturbance, the soil body obtains densification and gluing, and the severe of the soil body is increased, and the generation deadweight is fixed; After quicklime is cleared up, adopt impact-rolling to make between the soil particle and be subjected to displacement, be out of shape and shear, thereby make soil body deep layer along with shock Wave obtains compacting.
Compared with prior art, advantage of the present invention and effect are: by organic optimum organization that vacuum forced drainage, quicklime solidify, shock and vibration roll, can make the bearing capacity of foundation soil after the processing reach 80-120kPa, solve the problem that people and equipment ground on the scene carry out operation in the short time.Having saved cost and duration greatly, obtained good economic benefit, is a breakthrough to the ultra-fine grain of original hydraulic reclamation soil base treatment process.Be specially adapted to mud matter silty clay, especially particle diameter≤0.005mm that hydraulic reclamation forms, organic content greater than the mud matter silty clay stratum construction of gross mass 7.5% and blast-filled ground and border on the sea, wait the construction to the tight engineering of construction period such as ultra-fine grain soil site, the road of marching into the arena near a river recently.This method technical maturity, used device is few, speed of application is fast, and the reinforcing expense is low, and is simple to operation, the efficiency of construction height, and ground stabilization is effective.
The specific embodiment:
Below in conjunction with embodiment in detail the present invention is described in detail.
A kind of job practices of fast concreting and dredging and filling ultra-fine earth foundation, undertaken by following step:
(1) is being reinforced the well location of foundation region surface, carrying out the well point pipe and lay, adopting double light well point, outside pipe range 6.0m, inboard pipe range 4.0m, spacing 2.0m by the design of dewatering construction layout plan.The place is inner adopts single light well point, adopts shallow, the deep layer pipe precipitation alternate layout that combines, filter pipe length 1m, well point tube pitch 4.0m, lying pipe array pitch 4.0m.Well point pipe depth of placement 8-18m will
Figure GSB00000159663700031
Lying pipe and
Figure GSB00000159663700032
The vertical drainage pipe is put according to the design well location, adopts supporting junction block to connect lying pipe.Burying underground of well point pipe adopts giant water to rush in row, punching pressure 0.1MPa.Start high-pressure hydraulic pump soil is dashed pine, the limit trimming is heavy, and punching hole diameter is
Figure GSB00000159663700033
To guarantee that well casing has the sand filter blanket of certain thickness (about 130mm) on every side.When punching reaches projected depth, lower hydraulic pressure rapidly.Behind the pore-forming, the well point pipe that has twined filter cloth is dropped into well, the well point pipe adopts the PVC plastic pipe of diameter 36mm.Filtrate is selected the gravel of 3-15mm, fills out and irritates evenly, and be filled to upward 1.5m of chimney filter top.Dry vacuum pump is arranged on the harder ground, periphery, place, adopts the steel wire rubber leather hose to be connected dry vacuum pump and lying pipe, and lying pipe is connected through hard plastic tube with the well point pipe, with plastic sheeting and putty union is sealed.The well point installation draw water unit be connected lying pipe after seal upper space between well point pipe and hole wall with clay, and to check the sealing between each union, with anti-gas-leak.The well point pipe connects vacuum pump by water header, starts the vacuum pump draining.
(2) lower 70% when above when water content, remove inner well point connected system, adopt the special jig of excavator cooperation that vertical well point pipe is hung and pull out dismounting.Arrange the quality quicklime that meets the requirements of the standard being reinforced on the foundation region ground then, the quicklime that mixes 8-15% mixes and stirs with excavator, when mixing and stirring ultra-fine grain soil layer is translated into the end, the limit flange is mixed, the artificial quicklime admixture ratio of controlling guarantees to handle mixing evenly in the depth bounds, turns at least twice, turn and with bulldozer it is flattened after finishing, precision is controlled in the 100mm.Stewing material 24 hours, quicklime is cleared up, utilize quicklime and soil body generation physics, chemical reaction, the honeycomb structure that super fine grained soils forms mixes and stirs in quicklime curing and produces cohesion in the process, form jelling structure, under less construction disturbance, the soil body obtains densification and gluing, the severe of the soil body is increased, and the generation deadweight is fixed.
(3) be reinforced layout impact-rolling and vibroroller cmpacting machinery on the foundation region ground, adopting impact road roller that it is rolled, rolling speed is controlled at 12-15Km/h, rolls 10 times, and settling amount is controlled at 100-150mm.After finishing, adopt impact-rolling 12 tons of vibratory rollers to carry out vibroroller cmpacting 2 times, voltage stabilizing 1 time, and it is further closely knit that the 500mm thick soil body in top layer is obtained.Make between the soil particle to be subjected to displacement, to be out of shape and shear, thereby make soil body deep layer along with shock Wave obtains compacting, the sedimentation of quickening the soil body in the process range is fixed, makes bearing capacity of foundation soil reach 80-120kPa.

Claims (1)

1. the job practices of a fast concreting and dredging and filling ultra-fine earth foundation, undertaken by following step:
(1) be reinforced the well location of foundation region surface, carrying out the well point pipe and lay by the design of dewatering construction layout plan, well point pipe depth of placement 8-18m, the well point pipe connects vacuum pump by water header, starts the vacuum pump draining;
(2) lower 70% when above when water content, dismounting well point pipe, arrange quicklime being reinforced on the foundation region ground then, mix and stir with excavator, when mixing and stirring ultra-fine grain soil layer is translated into the end, the limit flange is mixed, the artificial quicklime admixture ratio of controlling guarantees to handle mixing evenly in the depth bounds, turns at least twice, turn and with bulldozer it is flattened after finishing, stewing material 24 hours fully makes quicklime clear up, and utilizes quicklime and soil body generation physics, chemical reaction, the honeycomb structure that super fine grained soils forms mixes and stirs in quicklime curing and produces cohesion in the process, form jelling structure, under less construction disturbance, the soil body obtains densification and gluing, the severe of the soil body is increased, and the generation deadweight is fixed;
(3) be reinforced layout impact-rolling and vibroroller cmpacting machinery on the foundation region ground, start impact-rolling equipment and vibroroller cmpacting equipment, make between the soil particle and be subjected to displacement, be out of shape and shear, thereby make soil body deep layer along with shock Wave obtains compacting, the sedimentation of quickening the soil body in the process range is fixed, makes bearing capacity of foundation soil reach 80-120kPa.
CN2009101433752A 2009-05-22 2009-05-22 Construction method for fast concreting and dredging and filling ultra-fine earth foundation Active CN101560760B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009101433752A CN101560760B (en) 2009-05-22 2009-05-22 Construction method for fast concreting and dredging and filling ultra-fine earth foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009101433752A CN101560760B (en) 2009-05-22 2009-05-22 Construction method for fast concreting and dredging and filling ultra-fine earth foundation

Publications (2)

Publication Number Publication Date
CN101560760A CN101560760A (en) 2009-10-21
CN101560760B true CN101560760B (en) 2010-11-10

Family

ID=41219718

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009101433752A Active CN101560760B (en) 2009-05-22 2009-05-22 Construction method for fast concreting and dredging and filling ultra-fine earth foundation

Country Status (1)

Country Link
CN (1) CN101560760B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101929151B (en) * 2010-09-29 2012-08-29 中国石油集团川庆钻探工程有限公司 Treatment method for saturated over-wet soil
CN102162237A (en) * 2011-05-05 2011-08-24 西安建筑科技大学 Vibration rolling and impact rolling combined construction method for compacting loess high filling body
CN105625129A (en) * 2016-01-17 2016-06-01 游洪臣 Constructing method of rice field roadbed
CN107687118A (en) * 2017-08-31 2018-02-13 中建三局第建设工程有限责任公司 The forming method of hydraulic reclamation region saturated soft soil roadbed
CN110230312A (en) * 2018-03-06 2019-09-13 上海港湾基础建设(集团)股份有限公司 Waterproof solidified earth method for processing foundation
CN108360495A (en) * 2018-05-07 2018-08-03 杨诚龙 Construction method of soft foundation
CN117802974A (en) * 2024-02-29 2024-04-02 安徽建筑大学 Special-shaped pipe pile capable of recycling drainage and heating for weak ground multi-layer section and construction method

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1932168A (en) * 2006-08-14 2007-03-21 毛心焰 Strong rammer treatment high-water content foundation soil auxiliary construction process
CN101302757A (en) * 2008-03-07 2008-11-12 张伯谦 Method for quickly processing heavy layer soft soil foundation

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1932168A (en) * 2006-08-14 2007-03-21 毛心焰 Strong rammer treatment high-water content foundation soil auxiliary construction process
CN101302757A (en) * 2008-03-07 2008-11-12 张伯谦 Method for quickly processing heavy layer soft soil foundation

Also Published As

Publication number Publication date
CN101560760A (en) 2009-10-21

Similar Documents

Publication Publication Date Title
CN101560760B (en) Construction method for fast concreting and dredging and filling ultra-fine earth foundation
CN101250868B (en) Precipitation prepressing association motive power induration deep densification method
CN102011391B (en) Reinforcement processing method of soft foundation
CN110512589B (en) Vacuum drainage-reducing and magnesium oxide carbonization combined shallow ultra-soft foundation curing method
CN105220674A (en) Deep soft foundation reinforcing and processing method
CN109736291A (en) One kind owing consolidation and blows on the base of alluvial plain that biological cement is reinforcing road bed and its construction method
CN203393530U (en) Anti-floating lightweight high-fill embankment structure
CN106192974B (en) A kind of device and method of sludge solidification processing
Chu et al. Land reclamation using clay slurry or in deep water: challenges and solutions
CN101220589B (en) Soil engineering bag and method for dynamically squeezing and synthetically reinforcing soft groundwork
WO2007129693A1 (en) Soil improvement method
CN101634139B (en) Dynamic compaction method for backfill foundation with drainage layer
CN104711968A (en) Negative-pressure three-dimensional flow-guiding disturbance impact solidification dredger filling method
CN113174933B (en) Microorganism-induced calcium carbonate precipitation gravel composite pile reinforcing structure and construction method
CN110512591B (en) Reinforcing method for vacuum preloading and carbonization ultra-soft foundation by utilizing gas injection of guide pipe pile
CN110512592B (en) Vacuum preloading and guide pipe pile gas injection carbonization ultra-soft foundation reinforcement processing system
CN103215945A (en) Stereo combined power drainage solidifying system and method for soft soil foundation of heterogeneous field
CN101634140B (en) Consolidation method of soft earth foundation
CN111676750A (en) Roadbed treatment method based on vacuum dewatering and dynamic compaction
CN114888063B (en) In-situ remediation method for polluted soil around buried sewage pipeline
CN216194634U (en) Flow state earth bag protective layer and vacuum combined surcharge preloading foundation treatment structure
CN112049103B (en) Construction method for rapid drainage and reinforcement of soft soil foundation
CN104790282A (en) Guniting processing device for pavements on soft foundations
CN210458817U (en) Prevent road settlement's foundation structure
CN212001021U (en) Soft soil foundation reinforcing structure in dredger fill area

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200518

Address after: 064000 Hebei province Fengrun District No. 16 Tangshan City road of happiness

Patentee after: CHINA 22MCC GROUP CORPORATION Ltd.

Address before: 064000 Hebei province Fengrun District No. 16 Tangshan City road of happiness

Patentee before: MCC JINGTANG CONSTRUCTION Co.,Ltd.