CN101527957A - 一种外环功率控制方法及装置 - Google Patents

一种外环功率控制方法及装置 Download PDF

Info

Publication number
CN101527957A
CN101527957A CN200910077509A CN200910077509A CN101527957A CN 101527957 A CN101527957 A CN 101527957A CN 200910077509 A CN200910077509 A CN 200910077509A CN 200910077509 A CN200910077509 A CN 200910077509A CN 101527957 A CN101527957 A CN 101527957A
Authority
CN
China
Prior art keywords
sir
target
target sir
control
channel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN200910077509A
Other languages
English (en)
Other versions
CN101527957B (zh
Inventor
王中天
张文传
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Potevio Information Technology Co Ltd
Original Assignee
Potevio Institute of Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Potevio Institute of Technology Co Ltd filed Critical Potevio Institute of Technology Co Ltd
Priority to CN2009100775095A priority Critical patent/CN101527957B/zh
Publication of CN101527957A publication Critical patent/CN101527957A/zh
Application granted granted Critical
Publication of CN101527957B publication Critical patent/CN101527957B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Mobile Radio Communication Systems (AREA)

Abstract

本发明公开了一种外环功率控制方法及装置,本发明在信道传输数据时,选择每个TTI的第一个TB块作为控制TB块;针对个传输信道的每一个控制TB块,根据控制TB块的质量评估信道质量,并根据评估得到的信道质量确定是否需要调整目标SIR;在需要调整目标SIR时,在预设SIR范围内上调或下调目标SIR。本发明方法中,由于每个传输信道的目标SIR的调整是独立的,不需要多个信道之间的交互信息,而且不需要在多个信道之间进行外环控制的选择,也不需要事先知道组合业务多个信道满足各自BLER和SIR之间关系,保证了实现的简单和方便。

Description

一种外环功率控制方法及装置
技术领域
本发明涉及无线通信系统中的功率控制技术,尤指一种组合业务外环功率控制方法及装置。
背景技术
CDMA通信系统是一个码分复用系统,一个用户发射信号会对系统内的其它用户造成干扰。为了使系统达到最大容量,需要对数据发送方进行功率控制,使得每个用户在满足业务质量的条件下以最小功率发射。
功率控制分为开环功率控制和闭环功率控制。开环功率控制根据路径损耗来确定物理信道第一次发送数据的功率。闭环功率控制由外环功率控制和内环功率控制共同完成。图1是外环/内环功率控制的关系示意图。
外环功率控制根据业务要求的误块率(BLER)(或者BER、FER)和测量的BLER,设置内环功率控制的目标SIR,以达到满足业务要求的BLER。通过外环功率控制调整内环功率控制的目标SIR,使得业务的BLER满足系统设置的要求,从而保证通信的质量。
内环功率控制通过接收端测量的信噪比(SIR),与目标SIR的比较来实现功率控制,如果测量SIR>目标SIR,则通过发送TPC命令要求发送方降低发送功率;如果测量SIR<目标SIR,则通过发送TPC命令要求发送方提高发送功率。内环功率控制可以克服多径、衰落和用户移动引起链路质量的变化,保证通信链路的接收端SIR和外环设置的目标SIR一致。
3G系统的组合业务是指多个业务复用在一个物理信道上,这些业务的数据在物理信道发送时的功率是相同的。外环功率控制需要调整该物理信道内环目标SIR,使复用在同一个物理信道上的多个业务的要求得到满足。
目前,对于组合业务外环功率控制的方法大致有以下几种。
方案一,综合考虑组合业务中两种业务的服务质量(QoS)与其目标值的偏差,总是以QoS最差的业务作为功率控制的控制对象,对外环功率进行控制。
方案二,首先,选择一个传输信道作为外环功率控制的参考传输信道;当参考传输信道的外环功率控制收敛之后,再判断其他业务的QoS;若其他业务的QoS均接近或优于对应的质量目标值,则参考传输信道保持不变;若其他业务中有一个或多个业务的服务质量低于对应的质量目标值,则在所有服务质量低于对应质量目标值的业务中,选择实际QoS与目标质量差距最大的业务对应的信道为新的参考传输信道,使用新的参考传输信道进行外环功率控制,如此循环,直到所有其他业务的QoS均接近或优于对应的质量目标值。
方案三,分别测量组合业务中的各业务的BLER,并使用测量的结果分别与各业务的目标BLER进行比较;根据比较的结果调整各业务的SIR目标值,并将调整后的值设定为各业务的新的SIR目标值;比较各业务的新的SIR目标值,选择出一最大SIR目标值;将最大SIR目标值与外环功率控制上一周期的SIR目标值进行比较,根据比较的结果调整SIR目标值,并将调整后的值作为外环功率控制新的SIR目标值。
在方案一、二和三中,需要评估比较不同业务/传输信道的质量,然后进行信道控制的选择,而在控制信道转换的过程中,外环输出的结果可能会发生跳变,使得目标SIR波动的范围大。而且,多个信道之间的切换,影响了外环控制的稳定性,同时实现复杂。
方案四,根据业务所需SIR目标值高低定义各种业务的外环功率控制的优先级,业务所需SIR目标值要求越高,其优先级越高;每种业务根据所接收到的接收信号质量和业务质量目标值,产生各自的目标SIR调整命令;对所接收到的所有业务的目标SIR调整命令进行合并处理,产生最终的目标SIR调整命令。
对于方案四,由于无线链路的错误具有突发性,而方案四中采用接收数据块后立即作出控制的原则,因此突发错误会导致该方法立即提高目标SIR(SIRTarget)。这样会导致在业务质量已经达到满足情况下,接收端提高SIRTarget,最终使得发送端不得不提高功率。发送端功率不必要的提高,会增加了对其它用户的干扰,减小了系统的容量,同时也增加了设备的功耗。
该方法设计两个信道间互相偶合,会一个信道调整SIRTarget后,另外一个信道后续向相反的方向调整SIRTarget,导致SIRTarget差波动较大,同时实现的复杂度高。该方法设计需要事先知道信道在满足业务质量时对应得SIR,由于业务的组合类型种类很多,而且每个业务的BLER/FER设置发生变化,在实际应用中不方便。
发明内容
有鉴于此,本发明的主要目的在于提供一种外环功率控制方法,能够方便、简单地实现组合业务外环功率的稳定控制。
本发明的另一目的在于提供一种外环功率控制装置,能够方便、简单地实现组合业务外环功率的稳定控制。
为达到上述目的,本发明的技术方案具体是这样实现的:
一种外环功率控制方法,该方法包括以下步骤:
A.在信道传输数据时,选择每个TTI的第一个TB块作为控制TB块;
B.针对各传输信道的每一个控制TB块,根据控制TB块的质量评估信道质量,并根据评估得到的信道质量确定是否需要调整目标SIR;
C.在需要调整目标SIR时,在预设SIR范围内上调或下调目标SIR。
步骤B中所述评估信道质量的方法为:
如果所述控制TB块循环冗余码校验CRC正确,则所述控制TB块的传输信道质量为自身减去该信道的目标误块率;
如果所述控制TB块CRC错误,则所述控制TB块的传输信道质量为自身加上该信道的目标误块率。
预先设置突发错误过滤系数M,该突发错误过滤系数M用来过滤突发错误造成的不当调整。步骤B中所述确定是否需要调整目标SIR的方法为:
如果所述传输信道质量的绝对值小于突发错误过滤系数M,那么不发出调整目标SIR的请求;
如果所述传输信道质量小于负的突发错误过滤系数M且当前信道是主信道,那么,发出下调目标SIR的请求,同时信道质量为自身加上预设的突发错误过滤系数M;
如果所述传输信道质量小于负的突发错误过滤系数M且当前信道是辅助信道,那么,信道质量为自身加上突发错误过滤系数M,并不发出调整目标SIR的请求;
如果所述传输信道质量大于突发错误过滤系数M,那么,发出上调目标SIR的请求,同时信道质量为自身减去突发错误过滤系数M。
预先设置用于平衡收敛时间和外环稳定时波动的范围的平衡系数δ,预先设置SIR调整范围[SIRmin, SIRmax];所述步骤C具体为:
如果收到下调目标SIR的请求,则目标SIR为自身减去平衡系数δ;如果收到上调目标SIR的请求,则目标SIR为自身加上平衡系数δ;
如果调整后的目标SIR小于预设调整范围的下限值SIRmin,则取目标SIR为SIRmin;如果调整后的目标SIR小大于预设调整范围的上限值SIRmax,则取目标SIR为SIRmax
否则目标SIR为调整后的目标SIR。
一种外环功率控制装置,包括对应不同传输信道DCH的控制质量选择单元,对应不同DCH的信道调整单元,以及所有DCH公用的SIR控制单元,其中,
控制质量选择单元,接收对应传输信道的数据,选择每个TTI的第一个TB块作为控制TB块,并输出给信道调整单元;
信道调整单元,根据控制TB块的质量评估信道质量,根据评估得到的信道质量确定是否需要调整目标SIR,并向SIR调整控制单元发送调整指令;
SIR调整控制单元,根据接收的调整指令,在预设SIR范围内上调或下调目标SIR。
所述SIR调整控制单元包括SIR调整模块和SIR控制模块,其中,
SIR调整模块,用于接收所述调整指令,在调整指令显示需要调整目标SIR时,上调或下调目标SIR。
SIR控制模块,用于判断接收到的调整后的当前的目标SIR是否在预设的调整范围,如果是,以调整后的当前的目标SIR为目标SIR输出;
否则,如果调整后的当前SIR小于预设调整范围的下限值SIRmin,则取输出的目标SIR为SIRmin;如果调整后的当前SIR大于预设调整范围的上限值SIRmax,则取输出的目标SIR为SIRmax
由上述技术方案可见,本发明在信道传输数据时,选择每个TTI的第一个TB块作为控制TB块;针对个传输信道的每一个控制TB块,根据控制TB块的质量评估信道质量,并根据评估得到的信道质量确定是否需要调整目标SIR;在需要调整目标SIR时,在预设SIR范围内上调或下调目标SIR。本发明方法中,由于每个传输信道的目标SIR的调整是独立的,不需要多个信道之间的交互信息,而且不需要在多个信道之间进行外环控制的选择,也不需要事先知道组合业务多个信道满足各自BLER和SIR之间关系,保证了实现的简单和方便。进一步,本发明引入用于平衡收敛时间和外环稳定时波动的范围的平衡系数,对目标SIR进行调整,克服了信道突发错误引起链路SIRTarget不必要的调整,增加了外环功率控制的稳定性。
附图说明
图1是外环/内环功率控制的关系示意图;
图2是本发明外环功率控制方法的流程图;
图3是本发明外环功率控制装置的组成结构示意图;
图4是本发明实现外环功率控制的实施例的流程图。
具体实施方式
为使本发明的目的、技术方案及优点更加清楚明白,以下参照附图并举实施例,对本发明进一步详细说明。
图2是本发明外环功率控制方法的流程图,本发明方法包括以下步骤:
步骤200:在信道传输数据时,选择每个TTI的第一个TB块作为控制TB块。
在信道没有数据传输时,不产生控制TB块。
步骤201:针对每一个控制TB块,根据控制TB块的质量评估信道质量,并根据评估得到的信道质量确定是否需要调整目标SIR。这里,目标SIR是指信道当前的目标SIR即SIRtarget
如果该控制TB块循环冗余吗校验(CRC)正确,则该控制TB块的传输信道质量Ashort将按照公式(1)进行更新:
Ashort=Ashort-BLERtarget    (1)
其中,目标误块率BLERtarget是该信道的目标误块率。Ashort的获取方法属于现有公知技术,且与本发明无关,这里不再详述。
如果该控制TB块CRC校验错误,则该控制TB块的信道质量Ashort将按照公式(2)进行更新:
Ashort=Ashort+BLERtarget    (2)
按照公式(1)或(2)评估得到当前信道质量后,确定是否需要调整目标SIR。具体实现方法为:
如果|Ashort|<M,那么确定不需要调整目标SIR。其中,M为突发错误过滤系数,可以预先设置,用于过滤突发错误造成的不当调整,典型M=[5,10],也可以根据环境设置为其他值。
如果Ashort<-M且当前信道是主信道,那么,确定需要调整目标SIR且为下调即降低当前的目标SIR,同时更新信道质量为:Ashort=Ashort+M。
如果Ashort<-M且当前信道是辅助信道,那么,更新信道质量为:Ashort=Ashort+M并确定不需要调整目标SIR。
如果Ashort>M,那么,确定需要调整目标SIR且为上调即提高当前的目标SIR,同时更新信道质量为:Ashort=Ashort-M;
当确定为不需要调整时,退出本流程。
步骤202:在需要调整目标SIR时,在预设SIR范围内上调或下调目标SIR。
如果需要降低当前的目标SIR,则当前的目标SIR按照公式(3)进行调整:
SIRtarget=SIRtarget-δ    (3)
其中,δ平衡系数,可以预先设置,用于平衡收敛时间和外环稳定时波动的范围,δ的取值与控制的收敛时间和收敛时的稳定度有关,典型δ=[1,3],也可以根据环境设置为其他值。关于收敛时间、外环稳定时波动的范围为本领域技术人员公知概念,这里不再详述,这里强调的是利用平衡系数对SIR进行平衡调整,保证外环功率控制的稳定性。
如果需要提高当前的目标SIR,则当前的目标SIR按照公式(4)进行调整:
SIRtarget=SIRtarget+δ    (4)
我们知道,对当前SIR的调整应该在预设的调整范围[SIRmin,SIRmax]内进行,因此:如果调整后的当前的目标SIR小于预设调整范围的下限值SIRmin即SIRtarget<SIRmin,则取目标SIR为SIRmin即SIRtarget=SIRmin;如果调整后的当前的目标SIR小大于预设调整范围的上限值SIRmax即SIRtarget>SIRmin,则取目标SIR为SIRmax即SIRtarget=SIRmax
图3是本发明外环功率控制装置的组成结构示意图,如图2所示,本发明装置包括对应不同传输信道(DCH)的控制质量选择单元(如图3中对应DCH1的控制质量选择单元1,对应DCH2的控制质量选择单元2.....对应DCHn的控制质量选择单元n),对应不同DCH的信道调整单元(如图3中对应DCH1的信道调整单元1,对应DCH2的信道调整单元2.....对应DCHn的信道调整单元n),以及所有DCH公用的SIR控制单元,其中,
控制质量选择单元,用于接收来自其对应传输信道的传输的数据,选择每个TTI的第一个TB块作为控制TB块,并输出给信道调整单元。
信道调整单元,用于针对每一个控制TB块,根据控制TB块的质量评估信道质量,并根据评估得到的信道质量确定是否需要调整目标SIR,并向SIR调整控制单元发送调整指令。信道调整单元的具体实现可参见图2中步骤201的描述,这里不再赘述。
SIR调整控制单元,用于接收调整指令,在调整指令显示需要调整目标SIR时,在预设SIR范围内上调或下调目标SIR。SIR调整控制单元包括SIR调整模块和SIR控制模块:
其中,SIR调整模块,用于接收调整指令,在调整指令显示需要调整目标SIR时,上调或下调目标SIR。
SIR控制模块,用于判断接收到的调整后的当前SIR是否在预设的调整范围,如果是,以调整后的当前的目标SIR为目标SIR输出;否则,如果调整后的当前SIR小于预设调整范围的下限值SIRmin即SIRtarget<SIRmin,则取输出的目标SIR为SIRmin;如果调整后的当前的目标SIR大于预设调整范围的上限值SIRmax即SIRtarget>SIRmax,则取输出的目标SIR为SIRmax
图4是本发明实现外环功率控制的实施例的流程图,如图4所示,假设预先设置有突发错误过滤系数M、平衡系数δ、调整范围[SIRmin,SIRmax]等,本实施例针对传输信道i进行描述,包括:
步骤400~步骤401:接收传输信道i的数据块,并判断是否为TTI的第一TB块,如果是,将该第一TB块作为控制TB块并进入步骤402,否则返回步骤400。
步骤402:判断控制TB块CRC校验是否正确,如果正确,进入步骤403,否则进入步骤404。
步骤403:将该控制TB块的信道质量Ashort更新为Ashort-BLERtarget后进入步骤405。Ashort的获取方法属于现有公知技术,且与本发明无关,这里不再详述。
步骤404:将该控制TB块的信道质量Ashort更新为Ashort+BLERtarget后进入步骤405。
步骤405:判断更新后的Ashort的绝对值是否小于M,如果是返回步骤400;否则进入步骤406。
步骤406:判断更新后的Ashort是否大于M,如果是进入步骤407,否则进入步骤408。
步骤407:更新后的Ashort为自身减去M,当前目标SIR为上调δ,即SIRtarget=SIRtarget+δ,之后进入步骤411。
步骤408~步骤409:更新后的Ashort为自身加上M,并判断当前传输信道为主信道,如果是进入步骤410,否则返回步骤400。
步骤410:当前目标SIR为下调δ,即SIRtarget=SIRtarget-δ。
步骤411:判断调整后的当前目标SIR是否小于调整范围的下限值SIRmin,如果是进入步骤412,否则进入步骤413。
步骤412:取目标SIR为SIRmin
步骤413:判断调整后的当前目标SIR是否大于调整范围的上限值SIRmax,如果是进入步骤414,否则进入步骤415。
步骤414:取目标SIR为SIRmax
步骤415:取目标SIR为调整后的当前目标SIR。
以上所述仅为本发明的较佳实施例而已,并非用于限定本发明的保护范围。凡在本发明的精神和原则之内,所作的任何修改、等同替换以及改进等,均应包含在本发明的保护范围之内。

Claims (6)

1.一种外环功率控制方法,其特征在于,该方法包括以下步骤:
A.在信道传输数据时,选择每个TTI的第一个TB块作为控制TB块;
B.针对各传输信道的每一个控制TB块,根据控制TB块的质量评估信道质量,并根据评估得到的信道质量确定是否需要调整目标SIR;
C.在需要调整目标SIR时,在预设SIR范围内上调或下调目标SIR。
2.根据权利要求1所述的外环功率控制方法,其特征在于,步骤B中所述评估信道质量的方法为:
如果所述控制TB块循环冗余码校验CRC正确,则所述控制TB块的传输信道质量为自身减去该信道的目标误块率;
如果所述控制TB块CRC错误,则所述控制TB块的传输信道质量为自身加上该信道的目标误块率。
3.根据权利要求2所述的外环功率控制方法,其特征在于,预先设置突发错误过滤系数M,该突发错误过滤系数M用来过滤突发错误造成的不当调整。步骤B中所述确定是否需要调整目标SIR的方法为:
如果所述传输信道质量的绝对值小于突发错误过滤系数M,那么不发出调整目标SIR的请求;
如果所述传输信道质量小于负的突发错误过滤系数M且当前信道是主信道,那么,发出下调目标SIR的请求,同时信道质量为自身加上预设的突发错误过滤系数M;
如果所述传输信道质量小于负的突发错误过滤系数M且当前信道是辅助信道,那么,信道质量为自身加上突发错误过滤系数M,并不发出调整目标SIR的请求;
如果所述传输信道质量大于突发错误过滤系数M,那么,发出上调目标SIR的请求,同时信道质量为自身减去突发错误过滤系数M。
4.根据权利要求1所述的外环功率控制方法,其特征在于,预先设置用于平衡收敛时间和外环稳定时波动的范围的平衡系数δ,预先设置SIR调整范围[SIRmin,SIRmax];所述步骤C具体为:
如果收到下调目标SIR的请求,则目标SIR为自身减去平衡系数δ;如果收到上调目标SIR的请求,则目标SIR为自身加上平衡系数δ;
如果调整后的目标SIR小于预设调整范围的下限值SIRmin,则取目标SIR为SIRmin;如果调整后的目标SIR小大于预设调整范围的上限值SIRmax,则取目标SIR为SIRmax
否则目标SIR为调整后的目标SIR。
5.一种外环功率控制装置,其特征在于,包括对应不同传输信道DCH的控制质量选择单元,对应不同DCH的信道调整单元,以及所有DCH公用的SIR控制单元,其中,
控制质量选择单元,接收对应传输信道的数据,选择每个TTI的第一个TB块作为控制TB块,并输出给信道调整单元;
信道调整单元,根据控制TB块的质量评估信道质量,根据评估得到的信道质量确定是否需要调整目标SIR,并向SIR调整控制单元发送调整指令;
SIR调整控制单元,根据接收的调整指令,在预设SIR范围内上调或下调目标SIR。
6.根据权利要求5所述的外环功率控制装置,其特征在于,所述SIR调整控制单元包括SIR调整模块和SIR控制模块,其中,
SIR调整模块,用于接收所述调整指令,在调整指令显示需要调整目标SIR时,上调或下调目标SIR。
SIR控制模块,用于判断接收到的调整后的当前的目标SIR是否在预设的调整范围,如果是,以调整后的当前的目标SIR为目标SIR输出;
否则,如果调整后的当前SIR小于预设调整范围的下限值SIRmin,则取输出的目标SIR为SIRmin;如果调整后的当前SIR大于预设调整范围的上限值SIRmax,则取输出的目标SIR为SIRmax
CN2009100775095A 2009-01-21 2009-01-21 一种外环功率控制方法及装置 Expired - Fee Related CN101527957B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009100775095A CN101527957B (zh) 2009-01-21 2009-01-21 一种外环功率控制方法及装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009100775095A CN101527957B (zh) 2009-01-21 2009-01-21 一种外环功率控制方法及装置

Publications (2)

Publication Number Publication Date
CN101527957A true CN101527957A (zh) 2009-09-09
CN101527957B CN101527957B (zh) 2011-01-05

Family

ID=41095590

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009100775095A Expired - Fee Related CN101527957B (zh) 2009-01-21 2009-01-21 一种外环功率控制方法及装置

Country Status (1)

Country Link
CN (1) CN101527957B (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103582102A (zh) * 2012-07-31 2014-02-12 中兴通讯股份有限公司 Hs-scch的功率调整方法和装置
WO2014205828A1 (zh) * 2013-06-29 2014-12-31 华为技术有限公司 功率控制方法、装置和系统

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060084459A1 (en) * 2004-10-13 2006-04-20 Vinh Phan Outer loop power control of user equipment in wireless communication
CN100553185C (zh) * 2007-01-09 2009-10-21 北京天碁科技有限公司 高速下行分组接入中信道质量指示的产生方法及用户设备

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103582102A (zh) * 2012-07-31 2014-02-12 中兴通讯股份有限公司 Hs-scch的功率调整方法和装置
CN103582102B (zh) * 2012-07-31 2018-06-05 深圳市中兴微电子技术有限公司 Hs-scch的功率调整方法和装置
WO2014205828A1 (zh) * 2013-06-29 2014-12-31 华为技术有限公司 功率控制方法、装置和系统
CN104488200A (zh) * 2013-06-29 2015-04-01 华为技术有限公司 功率控制方法、装置和系统
US10129833B2 (en) 2013-06-29 2018-11-13 Huawei Technologies Co., Ltd. Power control method, apparatus, and system

Also Published As

Publication number Publication date
CN101527957B (zh) 2011-01-05

Similar Documents

Publication Publication Date Title
CN109151969B (zh) 发送功率的确定方法及装置、终端
EP2566260B1 (en) Method and device for controlling uplink power
JP4684530B2 (ja) 可変マルチレート通信方式の高速適応電力制御
AU2012327574B2 (en) Method, user equipment, and access point for uplink power control
CN100438365C (zh) 多级功率控制命令信令
CN102668651B (zh) 用于无线通信网络中的上行链路功率控制的方法和设备
JP5027283B2 (ja) 無線通信システムにおいて送信パワーを管理するための装置、システムおよび方法
CN101027857B (zh) 发送功率控制装置及发送功率控制方法
EP2086127B1 (en) Mobile communication terminal transmission power control method and mobile communication terminal transmission power control device
CN102291812B (zh) 上行功控参数配置及上行功控方法、系统和设备
CN102300304B (zh) 一种上行功控的实现方法及装置
CN110392418A (zh) 功率控制方法和装置、基站、终端、计算机可读存储介质
CN101132203A (zh) 增强上行物理信道的功率控制方法
CN1722636B (zh) 移动通信系统、移动通信系统中的发送功率控制方法
CN102404836B (zh) Tpc命令获取方法及装置
US20060034226A1 (en) Radio resource control in HSUPA system
CN101527957B (zh) 一种外环功率控制方法及装置
EP4195571A1 (en) Srs transmission method, terminal, and storage medium
WO2013164024A1 (en) Method for power control of sounding reference signals
US8437704B2 (en) System and method for resuming power control after interruption
CN101068121B (zh) 一种外环功率控制中信干比目标值的调整方法和装置
WO2002023764A2 (en) Method and apparatus for setting transmit power control command energy
JP4099086B2 (ja) 移動通信システム、無線制御装置、基地局及び送信電力制御方法
CN101437282B (zh) 一种对组合业务进行外环功率控制的方法及装置
US8442444B2 (en) Method of transmit power control and device thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHINA POTEVIO CO., LTD.

Free format text: FORMER OWNER: PUTIAN IT TECH INST CO., LTD.

Effective date: 20130304

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20130304

Address after: 100080, No. two, 2 street, Zhongguancun science and Technology Park, Beijing, Haidian District

Patentee after: CHINA POTEVIO CO.,LTD.

Address before: 100080 Beijing, Haidian, North Street, No. two, No. 6, No.

Patentee before: PETEVIO INSTITUTE OF TECHNOLOGY Co.,Ltd.

ASS Succession or assignment of patent right

Owner name: PUTIAN IT TECH INST CO., LTD.

Free format text: FORMER OWNER: CHINA POTEVIO CO., LTD.

Effective date: 20130313

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20130313

Address after: 100080 Beijing, Haidian, North Street, No. two, No. 6, No.

Patentee after: PETEVIO INSTITUTE OF TECHNOLOGY Co.,Ltd.

Address before: 100080, No. two, 2 street, Zhongguancun science and Technology Park, Beijing, Haidian District

Patentee before: CHINA POTEVIO CO.,LTD.

PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Outer loop power control method and device

Effective date of registration: 20131210

Granted publication date: 20110105

Pledgee: Bank of Beijing Limited by Share Ltd. Century City Branch

Pledgor: PETEVIO INSTITUTE OF TECHNOLOGY Co.,Ltd.

Registration number: 2013990000954

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model
C56 Change in the name or address of the patentee

Owner name: POTEVIO INFORMATION TECHNOLOGY CO., LTD.

Free format text: FORMER NAME: PUTIAN IT TECH INST CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: 100080 Beijing, Haidian, North Street, No. two, No. 6, No.

Patentee after: POTEVIO INFORMATION TECHNOLOGY Co.,Ltd.

Address before: 100080 Beijing, Haidian, North Street, No. two, No. 6, No.

Patentee before: PETEVIO INSTITUTE OF TECHNOLOGY Co.,Ltd.

PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20151102

Granted publication date: 20110105

Pledgee: Bank of Beijing Limited by Share Ltd. Century City Branch

Pledgor: POTEVIO INFORMATION TECHNOLOGY Co.,Ltd.

Registration number: 2013990000954

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model
PM01 Change of the registration of the contract for pledge of patent right

Change date: 20151102

Registration number: 2013990000954

Pledgor after: POTEVIO INFORMATION TECHNOLOGY Co.,Ltd.

Pledgor before: PETEVIO INSTITUTE OF TECHNOLOGY Co.,Ltd.

PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Outer loop power control method and device

Effective date of registration: 20151105

Granted publication date: 20110105

Pledgee: Bank of Beijing Limited by Share Ltd. Century City Branch

Pledgor: POTEVIO INFORMATION TECHNOLOGY Co.,Ltd.

Registration number: 2015990000948

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20161008

Granted publication date: 20110105

Pledgee: Bank of Beijing Limited by Share Ltd. Century City Branch

Pledgor: POTEVIO INFORMATION TECHNOLOGY Co.,Ltd.

Registration number: 2015990000948

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Outer loop power control method and device

Effective date of registration: 20161011

Granted publication date: 20110105

Pledgee: Bank of Beijing Limited by Share Ltd. Century City Branch

Pledgor: POTEVIO INFORMATION TECHNOLOGY Co.,Ltd.

Registration number: 2016990000859

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model
PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20170802

Granted publication date: 20110105

Pledgee: Bank of Beijing Limited by Share Ltd. Century City Branch

Pledgor: POTEVIO INFORMATION TECHNOLOGY Co.,Ltd.

Registration number: 2016990000859

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Outer loop power control method and device

Effective date of registration: 20171012

Granted publication date: 20110105

Pledgee: Bank of Beijing Limited by Share Ltd. Century City Branch

Pledgor: POTEVIO INFORMATION TECHNOLOGY Co.,Ltd.

Registration number: 2017990000948

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20180112

Granted publication date: 20110105

Pledgee: Bank of Beijing Limited by Share Ltd. Century City Branch

Pledgor: POTEVIO INFORMATION TECHNOLOGY Co.,Ltd.

Registration number: 2017990000948

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Outer loop power control method and device

Effective date of registration: 20180117

Granted publication date: 20110105

Pledgee: Bank of Beijing Limited by Share Ltd. Century City Branch

Pledgor: POTEVIO INFORMATION TECHNOLOGY Co.,Ltd.

Registration number: 2018990000033

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20181017

Granted publication date: 20110105

Pledgee: Bank of Beijing Limited by Share Ltd. Century City Branch

Pledgor: POTEVIO INFORMATION TECHNOLOGY Co.,Ltd.

Registration number: 2018990000033

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110105

Termination date: 20220121