CN101514637B - 一种瓦斯隧道防突综合措施执行系统 - Google Patents
一种瓦斯隧道防突综合措施执行系统 Download PDFInfo
- Publication number
- CN101514637B CN101514637B CN2009100588258A CN200910058825A CN101514637B CN 101514637 B CN101514637 B CN 101514637B CN 2009100588258 A CN2009100588258 A CN 2009100588258A CN 200910058825 A CN200910058825 A CN 200910058825A CN 101514637 B CN101514637 B CN 101514637B
- Authority
- CN
- China
- Prior art keywords
- measures
- outburst prevention
- tunnel
- gas
- outburst
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
Description
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009100588258A CN101514637B (zh) | 2009-04-02 | 2009-04-02 | 一种瓦斯隧道防突综合措施执行系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009100588258A CN101514637B (zh) | 2009-04-02 | 2009-04-02 | 一种瓦斯隧道防突综合措施执行系统 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101514637A CN101514637A (zh) | 2009-08-26 |
CN101514637B true CN101514637B (zh) | 2010-12-29 |
Family
ID=41039241
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009100588258A Active CN101514637B (zh) | 2009-04-02 | 2009-04-02 | 一种瓦斯隧道防突综合措施执行系统 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101514637B (zh) |
Families Citing this family (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101806224B (zh) * | 2010-03-09 | 2012-12-26 | 煤炭科学研究总院重庆研究院 | 井下煤层气抽采产能预测方法 |
CN102022133B (zh) * | 2010-11-16 | 2012-07-25 | 郑州大学 | 区域瓦斯井下高压射流掏穴卸压防突方法 |
CN102536250B (zh) * | 2010-12-31 | 2014-10-08 | 中铁二局股份有限公司 | 岩溶与瓦斯共生隧道施工方法 |
CN103696806B (zh) * | 2013-12-19 | 2015-11-11 | 中铁八局集团有限公司 | 瓦斯隧道防治方法及其系统 |
CN104989418B (zh) * | 2015-04-02 | 2017-10-17 | 四川省交通运输厅公路规划勘察设计研究院 | 用于瓦斯隧道的隧道结构 |
CN104847363A (zh) * | 2015-05-07 | 2015-08-19 | 中铁四局集团第四工程有限公司 | 大断面隧道穿越近距离瓦斯突出煤层群施工方法 |
CN105332695A (zh) * | 2015-08-17 | 2016-02-17 | 綦江县科信煤矿安全技术服务有限公司 | 一种采煤工作面的预测方法 |
CN105736040A (zh) * | 2016-02-02 | 2016-07-06 | 中铁隧道集团一处有限公司 | 利用平导施工钻孔抽排平导及正洞前方各煤层瓦斯的方法 |
CN105863638A (zh) * | 2016-05-05 | 2016-08-17 | 山东唐口煤业有限公司 | 一种冲击地压倾向煤层瓦斯异常涌出治理方法 |
CN107035403B (zh) * | 2016-12-13 | 2019-06-04 | 中铁隧道集团有限公司 | 一种高瓦斯及瓦斯突出隧道非防爆无轨运输方法 |
CN108316929A (zh) * | 2018-01-29 | 2018-07-24 | 中国水利水电第十工程局有限公司 | 一种水利水电瓦斯隧洞施工方法 |
CN110656973B (zh) * | 2019-11-08 | 2021-05-18 | 湖南科技大学 | 一种矿井瓦斯涌出的防治方法 |
CN110863858B (zh) * | 2019-11-13 | 2022-04-08 | 中铁十局集团有限公司 | 非煤系地层隧道高压有害气体防突控制程序及防突方法 |
CN111119983B (zh) * | 2019-12-30 | 2021-07-02 | 中铁六局集团天津铁路建设有限公司 | 隧洞开挖过程中瓦斯喷出燃烧处理方法 |
-
2009
- 2009-04-02 CN CN2009100588258A patent/CN101514637B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN101514637A (zh) | 2009-08-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101514637B (zh) | 一种瓦斯隧道防突综合措施执行系统 | |
Gong et al. | TBM tunnelling under adverse geological conditions: an overview | |
CN104763432B (zh) | 一种高应力巷道围岩卸压控制大变形的方法 | |
CN103089275B (zh) | 富水极破碎围岩隧道塌方段围岩控制方法 | |
CN102493822B (zh) | 一种通过富水断层影响带的隧道的帷幕注浆施工方法 | |
CN104453899B (zh) | 复杂条件下孤岛工作面安全回采方法 | |
CN104790978B (zh) | 小净距立体交叉隧道环形导坑施工方法 | |
CN101603431B (zh) | 一种突出危险煤层石门揭煤加固方法 | |
CN101713624A (zh) | 地下隐蔽岩体地面钻孔爆破破碎方法 | |
CN103195443B (zh) | 深部开采优化支护参数预防巷道滞后突水的方法 | |
CN101922302A (zh) | 高压富水区域断层处理方法 | |
CN106643361A (zh) | 超大暗挖隧道双侧壁上下导坑开挖施工方法 | |
CN109611103B (zh) | 一种针对盾构区间上悬孤石群加固处理的方法 | |
CN114233385B (zh) | 一种斜井井筒突泥涌水的治理方法 | |
CN109236353A (zh) | 一种高瓦斯隧道穿越煤层的揭煤防突施工方法 | |
CN100557375C (zh) | 横向松动爆破 | |
CN114991770B (zh) | 基于多级发散式定向井的孤岛工作面注浆防冲回采方法 | |
CN103032083A (zh) | 一种隔水壳再造方法 | |
CN104141500B (zh) | 一种板结砂砾石地层洞室施工方法 | |
CN113187486A (zh) | 一种深井无煤柱沿空掘巷方法以及形成的巷道 | |
CN106437796A (zh) | 一种岩石地层盾构隧道端头加固结构及加固方法 | |
CN106968675A (zh) | 瓦斯隧道采空区的施工方法 | |
CN112943306A (zh) | 一种基于失稳变形研究的巷道过断层带支护方法及步骤 | |
CN106285777B (zh) | 大水矿山矿房超前放水的方法 | |
CN206989839U (zh) | 盾构限界内基岩突起爆破预处理系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C41 | Transfer of patent application or patent right or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20160115 Address after: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 16 Patentee after: CHINA RAILWAY NO.2 BUREAU ENGINEERING CO., LTD. Address before: 610031 Ma Jia 10, Huayuan Road, Sichuan, Chengdu Patentee before: China Railway Erju Co., Ltd. Patentee before: China Railway Erju Co., Ltd. |
|
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan Patentee after: China Railway No. 2 Engineering Group Co., Ltd. Address before: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan Patentee before: CHINA RAILWAY NO.2 BUREAU ENGINEERING CO., LTD. |