CN101509297A CNA200910094276XA CN200910094276A CN101509297A CN 101509297 A CN101509297 A CN 101509297A CN A200910094276X A CNA200910094276X A CN A200910094276XA CN 200910094276 A CN200910094276 A CN 200910094276A CN 101509297 A CN101509297 A CN 101509297A
Authority
CN
China
Prior art keywords
keel
grab
main joist
barb
muscle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA200910094276XA
Other languages
Chinese (zh)
Other versions
CN101509297B (en
Inventor
童军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUNAN ANYADA BUILDING MATERIAL TECHNOLOGY Co Ltd
Original Assignee
HUNAN ANYADA BUILDING MATERIAL TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUNAN ANYADA BUILDING MATERIAL TECHNOLOGY Co Ltd filed Critical HUNAN ANYADA BUILDING MATERIAL TECHNOLOGY Co Ltd
Priority to CN200910094276XA priority Critical patent/CN101509297B/en
Publication of CN101509297A publication Critical patent/CN101509297A/en
Application granted granted Critical
Publication of CN101509297B publication Critical patent/CN101509297B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Toys (AREA)
  • Stringed Musical Instruments (AREA)

Abstract

The invention provided an overlapped keel mounting method. The overlapped keel comprises a block mounted hanging hook (2), a key keel (1) and a false keel (3); the mounting method is: firstly mounting the hanging hook at the decorated top surface, then clamping the wedge-shaped hook (1c) at the top of key keel into a U-shaped clip from bottom to be hung on a barb, and finally inserting an upper hanging lug (3a) on the upper wallboard of the rider keel into an upper supporting lug (2e) at the lower part of the footboard of the hanging hook, and inserting a lower hanging lug (3a') on the lower wallboard of the rider keel into a lower supporting lug (1d) at the lower part of the hanging steel bar of the key keel or at the back of a supporting board. The method is easy in mounting, maintenance, and replacing, steady in mounting and good in decorative effect.

Description

A kind of stacking keel installation method
Technical field
The invention belongs to the keel mounting technique field that the architectural decoration field is used to install suspended ceiling.
Background technology
Along with the raising of people's living standard, the demand that the building end face is decorated is also more and more abundanter, and increasing customer requirements is decorated the building end face to such an extent that levels are rich, third dimension are strong.For this reason, the installation keel that multilayer level ceiling can be installed must be arranged, reach the effect of furred ceiling stereo decoration.Chinese patent ZL200520022563.7 discloses a kind of staged keel, and the furred ceiling that height is straggly, third dimension is strong can be installed.Waste time and energy but this keel are installed, it is very inconvenient to keep in repair, change.Secondly, load onto ceiling after, the main joist below always has one section to expose, and must be equipped with a buckle and block, not only installation bothers, and is also higher to the dimension precision requirement of keel and buckle, also not attractive in appearance.In addition, the stability of keel is also relatively poor, and when its vertical main joist was long, keel rocked easily, influence decorative effect and dangerous.
Summary of the invention
Purpose of the present invention provides a kind of be easy to installation, maintenance, replacing just in order to solve the deficiencies in the prior art, the stacking keel installation method of firm and good decorating effect is installed.
The objective of the invention is to be achieved through the following technical solutions.
A kind of stacking keel installation method comprises suspension hook, main joist and the rider keel of aggregate erection; Described main joist is to be hung muscle and be positioned at the integrated member that the supporting plate that hangs the muscle bottom constitutes by vertical, is manufactured with the wedge shape hook on the top of hanging muscle; Described suspension hook is by having the integrated member that riser that base plate is installed and the vertical grab that is positioned at the riser below constitute, grab is lower ending opening " U " type grab, be manufactured with the barb that a pair of or a pair of above symmetry makes progress in the inboard of grab, the riser bottom manufacture overhanging on the folding the pop-up ear; The both sides, muscle bottom of hanging at keel are positioned at above the supporting plate or are positioned at the supporting plate back side and hang the muscle both sides and manufacture prominent subiculum ear; Described rider keel is the trough keel of notch towards the side, notch wainscot and lower wall panels be manufactured with respectively downward extension on hangers and following hangers; Mounting method is suspension hook to be installed on to decorate on the end face earlier, wedge shape hook with the main joist top snaps fits into " U " type grab of main joist from the bottom again, hang on the barb, at last the last hangers on the rider keel wainscot is inserted in the pop-up ear of suspension hook riser bottom, the following hangers on the rider keel lower wall panels is inserted main joist hang in the subiculum ear at the muscle bottom or the supporting plate back side.
As preferably, be manufactured with the barb that two pairs of symmetries make progress in the grab inboard of main joist, a pair of barb is positioned at the grab bottom, and it is inboard that another is positioned at the grab middle part to barb.The present invention is manufactured with the backup plate that oppositely extends with last hangers on the wainscot of rider keel.
The present invention adopts the wedge shape hook on main joist top equipped mutually with the barb of suspension hook " U " type grab inboard dexterously, during installation, main joist can directly snap fits into the suspension hook from the suspension hook below, does not need longitudinally to insert from the side of suspension hook, install very conveniently, and save the operating space.Downward " U " type grab of suspension hook upper shed has structural elasticity, and when the wedge shape hook on main joist top upwards pushed up, the opening of grab opened, and when the wedge shape hook pushed in the grab, opening sprang back to original state.The wedge shape that heads into is hung on the barb of grab inboard and get final product.The hook on main joist top is made into wedge shape, is convenient to head into grab.Adopt a flute profile rider keel to be fitted to main joist and suspension hook side, not only increased the steadiness that main joist is installed, wainscot that the more important thing is rider keel has constituted a step again, can on this step, take dress one deck ceiling again, ceil thereby realizing interlocks to take respectively on main joist supporting plate and wainscot, constitute the three-dimensional ceiling furred ceiling of good decorating effect.The installation of rider keel is also very convenient, only needs the last hangers on the wainscot is inserted in the pop-up ear of suspension hook riser bottom, the following hangers insertion main joist on the rider keel lower wall panels is hung in the subiculum ear at the muscle bottom or the supporting plate back side to get final product.The present invention is because structure design is ingenious, installation, maintenance, change all very convenient.During the dismounting keel, only need earlier rider keel slightly upwards to be mentioned taking-up, the opening with the suspension hook grab struts or issues out again, can easily main joist be taken out.Adopt method of the present invention, suspension hook can be equipped with main joist arbitrarily.Main joist is as long as the top is made into the wedge shape hook, and arbitrary structures can be made in other position, satisfies the modern society people to the diversified demand of keel.
If the inboard at the suspension hook grab makes two pairs of barbs that symmetry makes progress, wedge shape is hung on the top a pair of barb, following a pair of barb can block the muscle that hangs of main joist, makes main joist install firmly, not wave and rocks, and can improve the degree of accuracy and precision that main joist is installed.The backup plate of making on the wainscot of rider keel that oppositely extends with last hangers can abut on the riser of main joist when mounted, has promptly increased the rigidity and the stability of rider keel, the rigidity of main joist is strengthened, make a whole set of stacking keel Stability Analysis of Structures, not yielding, safe and reliable.
Further set forth content of the present invention below in conjunction with Figure of description.
Description of drawings
Fig. 1 is that main joist of the present invention cooperates assembling and takes the schematic diagram that ceils with suspension hook and rider keel;
Fig. 2 is the schematic diagram of another embodiment of the present invention.
The specific embodiment
As shown in Figure 1 and Figure 2, the present invention includes suspension hook 2, main joist 1 and the rider keel 3 of aggregate erection; Described main joist 1 is to be hung muscle 1a and be positioned at the integrated member that the supporting plate 1b that hangs the muscle bottom constitutes by vertical, is manufactured with wedge shape hook 1c on the top of hanging muscle.Described suspension hook 2 is by having the integrated member that riser 2d that base plate 2a is installed and the vertical grab 2b that is positioned at the riser below constitute, grab is lower ending opening " U " type grab, be manufactured with the barb that a pair of or a pair of above symmetry makes progress in the inboard of grab, present embodiment is barb 2c, the 2c ' that has two pairs of symmetries to make progress, a pair of barb 2c is positioned at the grab bottom, and it is inboard that another is positioned at the grab middle part to barb 2c '.The riser bottom manufacture overhanging on the folding pop-up ear 2e.Be positioned at the supporting plate back side as shown in Figure 1 and hang the muscle both sides and manufacture prominent subiculum ear 1d, also can as shown in Figure 2 subiculum ear 1d be manufactured in the both sides, muscle bottom of hanging of keel and be positioned at above the supporting plate.Described rider keel is the trough keel of notch towards the side, notch wainscot 3a and lower wall panels 3a ' be manufactured with respectively downward extension on hangers 3b and following hangers 3b ', on the wainscot 3a of rider keel 3, be manufactured with the backup plate 3c that oppositely extends with last hangers 3b.Mounting method is earlier suspension hook to be installed on the decoration end face by base plate 2a is installed, wedge shape hook 1c with the main joist top snaps fits into " U " type grab of main joist from the bottom again, hang on the barb, at last the last hangers 3b on the rider keel wainscot is inserted among the pop-up ear 2e of suspension hook riser bottom, following hangers 3b ' insertion main joist on the rider keel lower wall panels is hung among the subiculum ear 1d at the muscle bottom or the supporting plate back side, promptly be assembled into stacking keel, then as shown in the figure with decorative ceiling 4 staggered take that the supporting plate 1b that is contained in main joist goes up and the wainscot 3a of rider keel on, constitute two-layer three-dimensional furred ceiling.

Claims (3)

1, a kind of stacking keel installation method is characterized in that, comprises suspension hook (2), main joist (1) and the rider keel (3) of aggregate erection; Described main joist (1) is to be hung muscle (1a) and be positioned at the integrated member that the supporting plate (1b) that hangs the muscle bottom constitutes by vertical, is manufactured with wedge shape hook (1c) on the top of hanging muscle; Described suspension hook (2) is by having the riser (2d) that base plate (2a) is installed and being positioned at an integrated member of vertical grab (2b) formation of riser below, grab is lower ending opening " U " type grab, be manufactured with the barb (2c, 2c ') that a pair of or a pair of above symmetry makes progress in the inboard of grab, the riser bottom manufacture overhanging on the folding pop-up ear (2e); The both sides, muscle bottom of hanging at keel are positioned at above the supporting plate or are positioned at the supporting plate back side and hang the muscle both sides and manufacture prominent subiculum ear (1d); Described rider keel (3) is the trough keel of notch towards the side, is manufactured with the last hangers (3b) and the following hangers (3b ') of downward extension respectively in notch wainscot (3a) and lower wall panels (3a '); Mounting method is suspension hook to be installed on to decorate on the end face earlier, wedge shape hook (1c) with the main joist top snaps fits into " U " type grab of main joist from the bottom again, hang on the barb, at last the last hangers (3a) on the rider keel wainscot is inserted in the pop-up ear (2e) of suspension hook riser bottom, the following hangers (3a ') on the rider keel lower wall panels is inserted main joist hang in the subiculum ear (1d) at the muscle bottom or the supporting plate back side.
2, a kind of stacking keel installation method according to claim 1, it is characterized in that, be manufactured with the barb (2c, 2c ') that two pairs of symmetries make progress in the grab inboard of main joist, a pair of barb (2c) is positioned at the grab bottom, and it is inboard that another is positioned at the grab middle part to barb (2c ').
3, a kind of stacking keel installation method according to claim 1 is characterized in that, on the wainscot (3a) of rider keel (3), is manufactured with the backup plate (3c) that oppositely extends with last hangers (3b).
CN200910094276XA 2009-03-31 2009-03-31 Stacking keel installation method Active CN101509297B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200910094276XA CN101509297B (en) 2009-03-31 2009-03-31 Stacking keel installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200910094276XA CN101509297B (en) 2009-03-31 2009-03-31 Stacking keel installation method

Publications (2)

Publication Number Publication Date
CN101509297A true CN101509297A (en) 2009-08-19
CN101509297B CN101509297B (en) 2010-12-01

Family

ID=41001818

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200910094276XA Active CN101509297B (en) 2009-03-31 2009-03-31 Stacking keel installation method

Country Status (1)

Country Link
CN (1) CN101509297B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105587065A (en) * 2015-07-01 2016-05-18 胡崇亮 Composite ceiling layer structure and two-stage ceiling layer applying same
CN110805193A (en) * 2019-10-31 2020-02-18 北京承达创建装饰工程有限公司 Bar wood decorative plate ceiling system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105587065A (en) * 2015-07-01 2016-05-18 胡崇亮 Composite ceiling layer structure and two-stage ceiling layer applying same
CN110805193A (en) * 2019-10-31 2020-02-18 北京承达创建装饰工程有限公司 Bar wood decorative plate ceiling system

Also Published As

Publication number Publication date
CN101509297B (en) 2010-12-01

Similar Documents

Publication Publication Date Title
CN203201082U (en) Multifunctional wood decorative wall protecting panel and splicing structure thereof
CN211597339U (en) Modeling gypsum board suspended ceiling structure
CN101509297B (en) Stacking keel installation method
CN205314449U (en) Building decorative board dogging formula connecting device
CN201546357U (en) Supporting keel structure of integrated suspended ceiling
CN204715602U (en) A kind of duplex integrated ceiling
CN103590566A (en) Stone drying mucilage glue installing structure and installing method
CN201605698U (en) Novel butterfly-shaped ceiling
CN201261925Y (en) Hoisting structure for arc ceiling
CN203821680U (en) Fully invisible frame system structure
CN101538908A (en) Combined installation method of keel and hanging hook
CN201268906Y (en) Hoisting ceiling structure
CN202706430U (en) Dry hanging system of ceramic plate
CN215212075U (en) Mounting structure of detachable wallboard
CN201391031Y (en) Stepped groove-shaped supporting board hook type ceiling keel
CN202144652U (en) Ceramic rod and/or plate decoration system for abnormal connecting part of external wall
CN202595992U (en) Inclined integration lamp strip decoration ceiling joist
CN202227557U (en) Keel and cellular board suspended ceiling system constructed by same
CN202047508U (en) Connecting structure for horizontal keel and vertical keel of curtain wall
CN219451169U (en) Assembled partition wall fossil fragments structure
CN2541532Y (en) Curtain wall hook
CN214169633U (en) Novel connecting system for furred ceiling
CN201128961Y (en) Edge type mounting bracket for suspended ceiling
CN109138255A (en) Hidden frame toughened interlayer glass furred ceiling assembly system
CN204804136U (en) Mounting structure of inclined plane buckle and compound furred ceiling medium dip face

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: Kunming Anyada Building Material Technology Co.,Ltd.

Assignor: HUNAN ANYADA BUILDING MATERIAL TECHNOLOGY Co.,Ltd.

Contract record no.: 2012530000025

Denomination of invention: Stacking keel installation method

Granted publication date: 20101201

License type: Exclusive License

Open date: 20090819

Record date: 20120518

EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20090819

Assignee: Kunming Anyada Building Material Technology Co.,Ltd.

Assignor: HUNAN ANYADA BUILDING MATERIAL TECHNOLOGY Co.,Ltd.

Contract record no.: 2012530000025

Denomination of invention: Stacking keel installation method

Granted publication date: 20101201

License type: Exclusive License

Record date: 20120518

LICC Enforcement, change and cancellation of record of contracts on the licence for exploitation of a patent or utility model
EC01 Cancellation of recordation of patent licensing contract

Assignee: Kunming Anyada Building Material Technology Co.,Ltd.

Assignor: HUNAN ANYADA BUILDING MATERIAL TECHNOLOGY Co.,Ltd.

Contract record no.: 2012530000025

Date of cancellation: 20190911

EC01 Cancellation of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20090819

Assignee: Yiyang Mingxin Small and Medium sized Enterprise Public Service Platform Co.,Ltd.

Assignor: HUNAN ANYADA BUILDING MATERIAL TECHNOLOGY Co.,Ltd.

Contract record no.: X2023980042953

Denomination of invention: A method for installing stacked keel

Granted publication date: 20101201

License type: Common License

Record date: 20231010