CN101503799A - Anti-corrosive rubber lining method for chemicals tank and pot - Google Patents

Anti-corrosive rubber lining method for chemicals tank and pot Download PDF

Info

Publication number
CN101503799A
CN101503799A CNA2008100335461A CN200810033546A CN101503799A CN 101503799 A CN101503799 A CN 101503799A CN A2008100335461 A CNA2008100335461 A CN A2008100335461A CN 200810033546 A CN200810033546 A CN 200810033546A CN 101503799 A CN101503799 A CN 101503799A
Authority
CN
China
Prior art keywords
rubber
line
jar
tank body
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2008100335461A
Other languages
Chinese (zh)
Inventor
樊金田
刘光明
史涛
代成艳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoding Environment Protection Engineering Technology & Services Co Ltd
Original Assignee
Shanghai Baoding Environment Protection Engineering Technology & Services Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoding Environment Protection Engineering Technology & Services Co Ltd filed Critical Shanghai Baoding Environment Protection Engineering Technology & Services Co Ltd
Priority to CNA2008100335461A priority Critical patent/CN101503799A/en
Publication of CN101503799A publication Critical patent/CN101503799A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Application Of Or Painting With Fluid Materials (AREA)

Abstract

The invention relates to chemical tank and can construction, in particular to the anticorrosion rubber lining for a chemical tank and a chemical can. The invention relates to an anticorrosion rubber lining construction method for the chemical tank and the chemical can. The chemical tank and the chemical can are a steel structure device of which an inner lining is rubber lining. The anticorrosion rubber lining construction method comprises the following steps: step 1, steel structure surface treatment which mainly comprises treatment of the inner surface and welding seams of the steel structure of a tank body and a can body; step 2, the rubber lining construction which mainly comprises charging of the rubber lining, cleaning of a slab rubber, rubber slurry brushing, slab rubber lapping and rubber lining; and step 3, steam vulcanization. The method solves the problem of corroding a steel structure device, prolongs the service life of the device and various steel structured tanks and cans, and has better using effects and economic benefits in the practice.

Description

The anti-corrosive rubber lining method of chemicals tank, jar
Technical field
The present invention relates to chemicals tank, jar construction, relate in particular to the anticorrosion line with rubber of chemicals tank, jar.
Background technology
There often have pickling line equipment pickling tank, acid regeneration station equipment acid storage tank, dissolving tank, settling bath to carry out line with rubber in metallurgy industry mechanical means installation project to be anticorrosion, and small-sized storage tank is installed most hot sulfurization line with rubber storage tanks that are.The existing line with rubber often line with rubber undercapacity of constructing, impaired easily, cause steel construction equipment to be corroded, influence work-ing life, maintenance is then wasted time and energy.
Summary of the invention
The present invention is intended to address the deficiencies of the prior art, and the anti-corrosive rubber lining method of a kind of chemicals tank, jar is provided.The invention solves the phenomenon that steel construction equipment is corroded, improved the work-ing life of the various grooves of equipment and steel construction, jar, have result of use and economic benefit preferably in actual applications.
The present invention is achieved in that
A kind of chemicals tank, jar anti-corrosive rubber lining method, described chemicals tank, be lined with the steel construction equipment of line with rubber in jar being, described anti-corrosive rubber lining method comprises the following steps:
Step 1, the steel construction surface treatment: this step mainly comprises to be handled groove, tank body steel construction internal surface and weld seam;
Step 2, the line with rubber construction: this step mainly comprises the blanking of line with rubber, cleaning, brush coating slurry, offset plate overlap joint and the line with rubber of offset plate;
Step 3, steam vulcanization: this step comprises:
A, in vulcanizing boiler, feed steam and carry out the low-temperature atmosphere-pressure sulfuration;
B, curing temperature control are carried out according to the curing temperature graphic representation;
Want in equipment, to place simultaneously sample when c, sulfuration to confirm state of vulcanization at any time;
After d, the hot sulfurization groove, tank body line with rubber are checked have problem to repair comprehensively.
The anti-corrosive rubber lining method of described chemicals tank, jar comprises groove, tank body steel construction internal surface and weld seam processing in the described step 1:
A. all Steel Structure Weld weldering meat are answered full and are polished into slyness excessively, and steel plate corner angle polishing finishing is fillet, and minimum radius is greater than 3mm;
B. the steel construction surface derusting adopts blasting method, and shot-peening is selected quartz sand for use; Humidity during sandblast is below 80%, and can not have dewfall to take place, and derusting grade is Sa2.5; After the sandblast that the dust cleaning is clean, and to steel construction line with rubber surface mopping brushing adhesive slurry.
The anti-corrosive rubber lining method of described chemicals tank, jar comprises in the described step 2 line with rubber construction:
A. blanking: carry out blanking according to groove, tank body physical size, adopt the method for cutting out a piece of cloth in a way with the minimum material to make two or more articles of clothing;
B. clean: with clean-out system offset plate is cleaned up, and the metallic surface is removed clean;
C. brush coating is starched:
The rubber cement proportioning: the proportioning of catalyzer and rubber cement is 7:100~10:100, and described rubber cement is the natural rubber adhesive that configures;
Rubber cement uses: twice rubber cement of each even scrubbing brush on steel construction and offset plate, 2 hours pot lives of allotment; Rubber cement air-dry time first pass is the shortest 2 hours, and second omnipresence guaranteed not touch with one's hand in 10~30 minutes;
D. offset plate overlaps: offset plate overlaps overlapping width between 25~30mm, and 30 ° of angles are splayed at the edge in overlap joint zone, and coarse with the polishing machine polishing, and the zone of polishing is about 40~50mm; Flange face line with rubber overlap joint is smooth;
E. line with rubber
After offset plate brush coating slurry dries, under the tensile situation offset plate is not attached on the steel construction with hand lightly having, will be during the rubberizing plate by medium flow to considering the scrap (bridge) direction, it is straight that scrap (bridge) is wanted; And offset plate is pressed onto on the matrix with the wide dandy roll of 30mm; Will use the roll extrusion of fillet dandy roll on seam, edge and the angle, firmly roll-in equably of a roller one roller in order during roll extrusion has the repetition roll-in face of 0.5~1cm between every roller.
Described chemicals tank, jar anti-corrosive rubber lining method, during the rubber roll roll extrusion, with the chalk zonule of drawing, the zone ground roll-in in a zone.
The anti-corrosive rubber lining method of described chemicals tank, jar in the line with rubber process, will be put thermometer and wet bulb thermometer in groove, the jar, and carry out the record of temperature and humidity, does not have dewfall when guaranteeing line with rubber; The line with rubber personnel enter the footwear that must not be installed with the band nail in groove, the jar.
The anti-corrosive rubber lining method of described chemicals tank, jar, during line with rubber, relative humidity should be greater than 75%, and groove, jar interior temperature should surpass this standard greater than 10 ℃, then open calorifier and dehumidifier in the line with rubber zone.
The anti-corrosive rubber lining method of described chemicals tank, jar also comprises in the described step 3 steam vulcanization:
Insulation is carried out in h, the groove that needs steam vulcanization, tank body outside;
After i, groove, tank body line with rubber finish, steam-pipe is connected on the hot sulfurization tank body, and the on-off control valve is set;
J, fix a drainpipe, and be connected in the inspection shaft of factory building outside at the lowest part of steam vulcanization groove, tank body;
K, on the flange port of the upper and lower of tank body a tensimeter and thermometer are installed respectively, are monitored in sulfidation, the 30 minutes records in every interval once seal other flange hole;
L, a cover steam heating spray tube is installed in tank body;
M, put into 4 test specimens when each tank body vulcanizes, sample dimensions be 300mm * * 15mm, the test specimen line with rubber is put into the different heights of vulcanizing boiler with iron wire from the tank top flange port, and carries out record;
Vapor pressure is 0.3~0.35Mpa when n, hot sulfurization, and vapor pressure is 0.05~0.1Mpa during insulation, and air demand is 0.5m 3/ h finishes sulfuration according to described curing temperature-time.The anti-corrosive rubber lining method of described chemicals tank, jar, described curing temperature curve is:
Elevated temperature is to 40-50 ℃ within six hours, keeps cooling after 12 hours, check described test specimen surface quality after, elevated temperature to 90-100 ℃ up to sulfurizing time.
Described chemicals tank, jar anti-corrosive rubber lining method, described inspection test specimen surface quality and front and back heating-cooling process thereof were finished in 6 hours, and described sulfurizing time is after reaching 90-100 ℃ 45-50 hour.
The present invention utilizes groove, the tank body line with rubber of anti-corrosive rubber lining method to steel construction, has solved the phenomenon that steel construction equipment is corroded, and has improved the work-ing life of the various grooves of equipment and steel construction, jar.Anti-corrosive rubber lining method is adapted to the application of anticorrosion line with rubber of pickling line equipment, acid regeneration station equipment and other industries of metallurgy industry, has result of use and economic benefit preferably in actual applications.
Description of drawings
Fig. 1 is described curing temperature-time plot.
Embodiment
Below, the present invention is described further in conjunction with embodiment:
(1) steel construction surface treatment
1. to groove, tank body steel construction internal surface and weld seam requirement
All Steel Structure Weld weldering meat should be full, and undercut, pore, slag inclusion must not be arranged.All weldering meat polishings should be excessively slick and sly, and steel plate corner angle polishing finishing is fillet, and minimum radius is greater than 3mm.
2. the steel construction surface derusting adopts blasting method, and shot-peening is selected quartz sand for use.
3. the humidity during sandblast is below 80%, and can not have dewfall to take place, and derusting grade is Sa2.5
4. after the sandblast that the dust cleaning is clean, to steel construction line with rubber surface mopping brushing adhesive slurry.
(2) line with rubber construction
1. blanking: carry out blanking according to groove, tank body physical size, adopt and cut out a piece of cloth in a way with the minimum material to make two or more articles of clothing method, reduce consumption.
2. clean: with clean-out system offset plate is cleaned up, and the metallic surface is removed clean.
3. brush coating is starched:
A. rubber cement proportioning: according to natural gum regular convention formula configuration rubber cement, linking agent is a sulphur, and adds catalyzer, and described catalyst levels is 7%~10%.
B. rubber cement uses: respectively brush twice rubber cement on steel construction and offset plate, about 2 hours of the pot life of allotment.Rubber cement air-dry time first pass is the shortest 2 hours, will decide according to the situation of temperature, humidity for second time, generally at 10~30 minutes and do not touch with one's hand just, wants evenly during the brush coating slurry.Relative humidity should be greater than 75% during the line with rubber, and a temperature should be greater than 10 ℃ in groove, the jar.When humidity exceeds standard in order to guarantee that the duration can open calorifier and dehumidifier in the line with rubber zone.
4. offset plate overlaps: offset plate overlaps overlapping width between 25~30mm, and 30 ° of angles should be splayed in the edge in overlap joint zone, and coarse with the polishing machine polishing, and the zone of polishing is about 40~50mm.Flange face line with rubber overlap joint is smooth.
5. line with rubber
A. after offset plate brush coating slurry dries, under the tensile situation offset plate is not attached on the steel construction with hand lightly having, will be during the rubberizing plate by medium flow to considering the scrap (bridge) direction, it is straight that scrap (bridge) is wanted.The dandy roll wide with 30mm is pressed onto offset plate on the matrix.To use firmly roll extrusion of fillet dandy roll (about 3mm is wide) on seam, edge and the angle.Firmly roll-in equably of a roller one roller in order during roll extrusion must have the repetition roll-in face of 0.5~1cm between every roller.For having prevented Lou roller place, the available chalk zonule of drawing, the zone ground roll-in in a zone.
B. in the line with rubber process, to put thermometer and wet bulb thermometer in groove, the jar, and carry out the record of temperature and humidity, must not line with rubber if any dewfall.
C. the line with rubber personnel enter the footwear that must not be installed with the band nail in groove, the jar.
(3) steam vulcanization
Construction requirement
Insulation will be finished in a, the gummed tank that needs steam vulcanization, tank body outside.
After b, groove, tank body line with rubber finish, steam-pipe is connected on the hot sulfurization tank body, and the on-off control valve is set.
C, fix a drainpipe, and be connected in the inspection shaft of factory building outside at the lowest part of steam vulcanization groove, tank body.
D, on the flange port of the upper and lower of tank body, a tensimeter and thermometer are installed respectively, in sulfidation, are monitored, the 30 minutes records in every interval once, other flange hole will seal.
E, a cover steam heating spray tube is installed in tank body.
F, put into 4 test specimens when each tank body vulcanizes, sample dimensions be 300mm * * 15mm, put into the different heights of vulcanizing boiler with iron wire from the tank top flange port behind the test specimen line with rubber, and carry out record.
Vapor pressure is 3~3.5bar when g, hot sulfurization, and vapor pressure is 0.5~1bar during insulation, and air demand is 0.5m 3/ h.
Offset plate hardness after h, the sulfuration will reach design requirements.
Construction procedure
A, in vulcanizing boiler, feed steam and carry out the low-temperature atmosphere-pressure sulfuration.
B, curing temperature control are carried out according to following vulcanization curve figure
Want in equipment, to place simultaneously sample when c, sulfuration to confirm state of vulcanization at any time.
After d, the hot sulfurization groove, tank body line with rubber are checked have problem to repair comprehensively.

Claims (9)

  1. A chemicals tank, jar anti-corrosive rubber lining method, described chemicals tank, be lined with the steel construction equipment of line with rubber in jar being, it is characterized in that described anti-corrosive rubber lining method comprises the following steps:
    Step 1, the steel construction surface treatment: this step mainly comprises to be handled groove, tank body steel construction internal surface and weld seam;
    Step 2, the line with rubber construction: this step mainly comprises the blanking of line with rubber, cleaning, brush coating slurry, offset plate overlap joint and the line with rubber of offset plate;
    Step 3, steam vulcanization: this step comprises:
    A, in vulcanizing boiler, feed steam and carry out the low-temperature atmosphere-pressure sulfuration;
    B, curing temperature control are carried out according to the curing temperature graphic representation;
    Want in equipment, to place simultaneously sample when c, sulfuration to confirm state of vulcanization at any time;
    After d, the hot sulfurization groove, tank body line with rubber are checked have problem to repair comprehensively.
  2. 2. the anti-corrosive rubber lining method of chemicals tank according to claim 1, jar is characterized in that, in the described step 1 groove, tank body steel construction internal surface and weld seam processing is comprised:
    A. all Steel Structure Weld weldering meat are answered full and are polished into slyness excessively, and steel plate corner angle polishing finishing is fillet, and minimum radius is greater than 3mm;
    B. the steel construction surface derusting adopts blasting method, and shot-peening is selected quartz sand for use; Humidity during sandblast is below 80%, and can not have dewfall to take place, and derusting grade is Sa2.5; After the sandblast that the dust cleaning is clean, and to steel construction line with rubber surface mopping brushing adhesive slurry.
  3. 3. the anti-corrosive rubber lining method of chemicals tank according to claim 1, jar is characterized in that, comprises in the described step 2 line with rubber construction:
    A. blanking: carry out blanking according to groove, tank body physical size, adopt the method for cutting out a piece of cloth in a way with the minimum material to make two or more articles of clothing;
    B. clean: with clean-out system offset plate is cleaned up, and the metallic surface is removed clean;
    C. brush coating is starched:
    The rubber cement proportioning: the proportioning of catalyzer and rubber cement is 7:100~10:100, and described rubber cement is the natural rubber adhesive that configures;
    Rubber cement uses: twice rubber cement of each even scrubbing brush on steel construction and offset plate, 2 hours pot lives of allotment; Rubber cement air-dry time first pass is the shortest 2 hours, and second omnipresence guaranteed not touch with one's hand in 10~30 minutes;
    D. offset plate overlaps: offset plate overlaps overlapping width between 25~30mm, and 30 ° of angles are splayed at the edge in overlap joint zone, and coarse with the polishing machine polishing, and the zone of polishing is about 40~50mm; Flange face line with rubber overlap joint is smooth;
    E. line with rubber
    After offset plate brush coating slurry dries, under the tensile situation offset plate is not attached on the steel construction with hand lightly having, will be during the rubberizing plate by medium flow to considering the scrap (bridge) direction, it is straight that scrap (bridge) is wanted; And offset plate is pressed onto on the matrix with the wide dandy roll of 30mm; Will use the roll extrusion of fillet dandy roll on seam, edge and the angle, firmly roll-in equably of a roller one roller in order during roll extrusion has the repetition roll-in face of 0.5~1cm between every roller.
  4. According to claim 1 or 3 described chemicals tanks, jar anti-corrosive rubber lining method, it is characterized in that, during the rubber roll roll extrusion, with the chalk zonule of drawing, the zone ground roll-in in a zone.
  5. According to claim 1 or 3 described chemicals tanks, jar anti-corrosive rubber lining method, it is characterized in that, in the line with rubber process, groove, jar in to put thermometer and wet bulb thermometer, and carry out the record of temperature and humidity, do not have dewfall when guaranteeing line with rubber; The line with rubber personnel enter the footwear that must not be installed with the band nail in groove, the jar.
  6. 6. the anti-corrosive rubber lining method of chemicals tank according to claim 5, jar is characterized in that during line with rubber, relative humidity should be greater than 75%, and groove, jar interior temperature should surpass this standard greater than 10 ℃, then open calorifier and dehumidifier in the line with rubber zone.
  7. 7. the anti-corrosive rubber lining method of chemicals tank according to claim 1, jar is characterized in that, also comprises in the described step 3 steam vulcanization:
    Insulation is carried out in a, the groove that needs steam vulcanization, tank body outside;
    After b, groove, tank body line with rubber finish, steam-pipe is connected on the hot sulfurization tank body, and the on-off control valve is set;
    C, fix a drainpipe, and be connected in the inspection shaft of factory building outside at the lowest part of steam vulcanization groove, tank body;
    D, on the flange port of the upper and lower of tank body a tensimeter and thermometer are installed respectively, are monitored in sulfidation, the 30 minutes records in every interval once seal other flange hole;
    E, a cover steam heating spray tube is installed in tank body;
    F, put into 4 test specimens when each tank body vulcanizes, sample dimensions be 300mm * * 15mm, the test specimen line with rubber is put into the different heights of vulcanizing boiler with iron wire from the tank top flange port, and carries out record;
    Vapor pressure is 0.3~0.35Mpa when g, hot sulfurization, and vapor pressure is 0.05~0.1Mpa during insulation, and air demand is 0.5m 3/ h finishes sulfuration according to described curing temperature-time.
  8. According to claim 1 or 8 described chemicals tanks, jar anti-corrosive rubber lining method, it is characterized in that described curing temperature curve is:
    Elevated temperature is to 40-50 ℃ within six hours, keeps cooling after 12 hours, check described test specimen surface quality after, elevated temperature to 90-100 ℃ up to sulfurizing time.
  9. According to claim 1 or 8 described chemicals tanks, jar anti-corrosive rubber lining method, it is characterized in that, described inspection test specimen surface quality and front and back heating-cooling process thereof were finished in 6 hours, and described sulfurizing time is after reaching 90-100 ℃ 45-50 hour.
CNA2008100335461A 2008-02-05 2008-02-05 Anti-corrosive rubber lining method for chemicals tank and pot Pending CN101503799A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2008100335461A CN101503799A (en) 2008-02-05 2008-02-05 Anti-corrosive rubber lining method for chemicals tank and pot

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2008100335461A CN101503799A (en) 2008-02-05 2008-02-05 Anti-corrosive rubber lining method for chemicals tank and pot

Publications (1)

Publication Number Publication Date
CN101503799A true CN101503799A (en) 2009-08-12

Family

ID=40976172

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2008100335461A Pending CN101503799A (en) 2008-02-05 2008-02-05 Anti-corrosive rubber lining method for chemicals tank and pot

Country Status (1)

Country Link
CN (1) CN101503799A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103921055A (en) * 2014-03-25 2014-07-16 贵阳中化开磷化肥有限公司 Method of repairing phosphoric acid equipment corroded
CN110525818A (en) * 2019-07-31 2019-12-03 武汉吉隆过滤技术有限公司 A kind of anti-corrosion slot and preparation method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103921055A (en) * 2014-03-25 2014-07-16 贵阳中化开磷化肥有限公司 Method of repairing phosphoric acid equipment corroded
CN110525818A (en) * 2019-07-31 2019-12-03 武汉吉隆过滤技术有限公司 A kind of anti-corrosion slot and preparation method thereof

Similar Documents

Publication Publication Date Title
CN104741741B (en) A kind of pipe pipe docking all positon automatic TIG welding technique of continuous pipe
CN101822936A (en) High-temperature scale anticorrosion construction method for heat-engine plant desulfurizer
CN102679086A (en) Intermediate-frequency heating repaired opening construction technology for thermal contraction band of buried steel pipeline
CN107442369A (en) Oil paint coating construction method under hot and humid environment
CN112893055A (en) COREX gas chamber bottom plate anticorrosion treatment method
CN101503799A (en) Anti-corrosive rubber lining method for chemicals tank and pot
CN105826823A (en) Electric cabinet wear resistance anti-corrosion repair method
CN105109853B (en) Large-scale storage tank lining plastic anticorrosion process
CN108499347A (en) The glass flake composite anti-corrosive technique of ammonia process desulfuration tower
CN106311577B (en) High-pressure water descaling saves up strength the method for the online derusting anti-corrosive of top tank structure
CN108096876A (en) Top method of inhibiting corrosion in a kind of phosphoric acid extraction slot
CN100540975C (en) A kind of method for joint coating on pipeline
CN108404642A (en) The glass flake composite anti-corrosive technique of desulfurization by lime gypsum method tower
CN110860448A (en) Novel polyurethane coating process for nodular cast iron pipe fitting
CN108825931B (en) Processing technology of polyurea full-corrosion-resistant steel-plastic introducing pipe
CN112411892A (en) Bare top decoration structure of steel structure building and elastic coating construction method
CN111515099A (en) Airless spraying process for steel structure surface
CN108097007A (en) Ammonia desulfurizing process inside lining anti-corrosive technology
CN211176859U (en) Connecting structure for interfaces of different anticorrosive materials
Tiong et al. Experiences On" Thermal Spray Aluminum (Tsa)" Coating On Offshore Structures
CN103921055A (en) Method of repairing phosphoric acid equipment corroded
CN109114362B (en) Construction method of heat insulation protective layer of pipeline
AU2006255489B2 (en) Protection of autoclave batten strips
AU2005100551A4 (en) Protection of Autoclave Batten Strips
CN115558978A (en) Repairing method of degreasing electrolytic tank

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20090812