CN101822936A - High-temperature scale anticorrosion construction method for heat-engine plant desulfurizer - Google Patents

High-temperature scale anticorrosion construction method for heat-engine plant desulfurizer Download PDF

Info

Publication number
CN101822936A
CN101822936A CN 201010171720 CN201010171720A CN101822936A CN 101822936 A CN101822936 A CN 101822936A CN 201010171720 CN201010171720 CN 201010171720 CN 201010171720 A CN201010171720 A CN 201010171720A CN 101822936 A CN101822936 A CN 101822936A
Authority
CN
China
Prior art keywords
construction
scale
clay
check
sandblast
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201010171720
Other languages
Chinese (zh)
Inventor
戴才堂
李锋
熊政华
李英玉
吴立忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fifth Bureau Third Construction Co Ltd
Original Assignee
China Construction Fifth Bureau Third Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fifth Bureau Third Construction Co Ltd filed Critical China Construction Fifth Bureau Third Construction Co Ltd
Priority to CN 201010171720 priority Critical patent/CN101822936A/en
Publication of CN101822936A publication Critical patent/CN101822936A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention discloses a high-temperature scale anticorrosion construction method for a heat-engine plant desulfurizer, comprising following steps of basic treatment, undercoat painting, a primary scale daub coating, a secondary scale daub coating, polishing smoothly, local part enhancement, wear-resisting mortar coating, top coat painting and final inspection. The anticorrosion construction method has the advantages of strong anticorrosion capability, stable adherence, no easy fall, strong adhesion of a glass scale liner, small contraction after solidification, long service life of the liner, better shock resistance and anticorrosion performance than other materials, easy repair of local damage, room-temperature (or low-temperature heating) solidification and convenient construction.

Description

High-temperature scale anticorrosion construction method for heat-engine plant desulfurizer
Technical field
The present invention relates to a kind of anticorrosion construction method of heat-engine plant desulfurizer, particularly relate to the anticorrosion construction method of anticorrosive paint spraying in a kind of heat-engine plant desulfurizer high-temperature scale resin interlining.
Background technology
Traditional flue-gas desulfurizing engineering can form moist subenvironment in the part, and this subenvironment can cause the corrosion of certain chemistry and physics to the inwall of metal.Though some present anti-corrosion measures can be controlled the generation of corrosion to a certain extent, owing to reasons such as anticorrosion material, anticorrosion construction methods, cause the not very good and environmental protection of carrying out after the desulfurization of preservative treatment.
Summary of the invention
It is strong that technical problem to be solved by this invention provides a kind of resistance to corrosion, adhere to stable, be not easy to come off, the strong adhesion of glass flake lining, the curing after-contraction is little, the long service life of lining, shock resistance and erosion resistance are better than other materials, and room temperature or low-temperature heat curing are repaired in local damage easily, easy to operate during construction, can reduce cost, save the high-temperature scale anticorrosion construction method for heat-engine plant desulfurizer of duration.
In order to solve the problems of the technologies described above, high-temperature scale anticorrosion construction method for heat-engine plant desulfurizer provided by the invention, may further comprise the steps: basic handling, priming paint brushing, first pass scale clay smear, second time scale clay smeared, polish flat, locally strengthen, anti-wear mortar is smeared, finish paint brushing, inspection eventually, it is characterized in that:
(1), basic handling
A, equipment scale resin antiseptic project matrix are made requirement
1) physical dimension of equipment and intensity adhere to specification;
2) then be the one-time-concreting moulding if any concrete surface, do not allow to use plain sand finish;
3) matrix must be closely knit, smooth, dusting must not be arranged, flakes, crack, voids and pits and greasy dirt;
4) the concrete surface cavity of the exposing reinforcing bar cast of must being in the milk again reaches closely knit smooth, and pre-buried steel member face of weld is level and smooth, no undercut, overlap, dreg defect;
5) the extremely mild transition of hour polishing of template fissure of displacement size, bigger as fissure of displacement size, then polish to arc transition;
6) gradient in liquid overcurrent zone must adhere to specification;
7) basic unit must be dry, and the moisture content in degree of depth 20mm is not more than 6%;
8) more than inner corner trim arc transition R>10mm, more than external corner arc transition R>5mm;
9) all weld seams of anticorrosion district are continuous full weld, and seam then must be replenished inside weld as having only outside weld;
10) good, the zero defect of all appearances of weld, all weld seams must polish flat with abrasive machine, and matrix surface to be served as a contrast can not exist overlap and welding slag;
B, construction safeguard
1) the job site environment temperature is not less than 5 ℃, and is higher than 3 ℃ of dew-point temperatures; Relative air humidity is not more than 85%;
2) reasonably workmen and facility configuration, effectively construction management measure is the important leverage that improves efficiency of construction, the combination of taking to optimize is disposed, and carries out the diversification dynamic management;
3) under the normal condition, divide the construction of relieving of two construction teams, each construction team divides many group multiplex (MUX)s to make surface construction, adopts the operation of working in three shifts when the duration is nervous;
4) if environmental aspect does not reach that above construction environment requires and duration when nervous, will set up the constant temperature dehumidification device, to guarantee the requirement of environment to construction;
C, derusting by sandblasting
Can produce a large amount of dusts during 1) owing to sandblast, therefore must be provided with ventilation equipment, guarantee workmen's safety, at once that the cleaning of the dust on the matrix is clean after the sandblast, clear up with brush, pressure-air and dust catcher utensil;
2) derusting by sandblasting comprises quality examination and brushes the first road priming paint and finish in 8h;
3) if engineering is because working face is bigger, finish in can't be when 8h, the way that adopts segmentation and effectively isolate is promptly earlier carried out derusting by sandblasting to certain area, brushes one priming paint through after the assay was approved, after treating solidifying priming paint, to the remainder derusting by sandblasting, protected the part of priming this moment, and continue the distance that the sandblast end is reserved 50mm at least at it again, enable to intersect sandblast, thereby guarantee the quality of sandblast;
4) the desired credit rating of sandblast must reach the Sa2.5 level, promptly the surface is near the silvery white requirement of metal, remove all foreign material such as grease, oxide skin, corrosion product of metal surface fully, and remove dust with the compressed air of dust catcher, dried and clean or brush, remaining rust staining, oxide skin cause that the area of light discolouration must not surpass 5% on the area of any 100 * 100mm2, and roughness should reach 40-70 μ m;
5) the compressed air drying cleaning of sandblast employing must not contain greasy dirt, foreign material and moisture, and pressure is 0.6-0.8Mpa;
6) particle diameter of sand grains is 2-3mm;
7) sandblast construction technology index: nozzle diameter: 6-8mm; Jet angle: 30-75 degree; Spray distance: 80-200mm;
(2), priming paint brushing
Get 120g/m 2Epoxy zinc rich primer mixes according to volume ratio with diluent at 1: 0.5, after stirring according to volume ratio 100: 10~12 ratios adding complete curing agent, brushes twice, consumption 170-200g/m with hairbrush or roller 2
(3), the scale clay smears
A, get the scale clay and mix at 1: 0.5 according to volume ratio with diluent, adding complete curing agent according to volume ratio 100: 10~12 ratios stirs, use after stirring evenly and leave standstill the about 15min of slaking after the batching, each scale clay that stirs is controlled in the 30min and uses up, and the presetting period should be controlled at 38~42min;
B, coating on the basis of priming paint with the unidirectional material of will constructing equably of scraper plate or spatula, is 1.0 ± 0.2mm after the initial set of per pass construction thickness, and the time interval that per pass is smeared is 12h;
After C, per pass scale clay are smeared, before initial set, must in time use the wool felt roll roll extrusion that speckles with styrene solvent till the perusal smooth surface evenly, the surface does not allow the trickling vestige, and roll extrusion is smooth again once producing; Two-layer clay smear finish and completion of cure after, test with the electric spark detector;
In work progress, construction surface keeps clean, and polishes flat if any thrust or construction tear drop;
Butt joint should be avoided in the interface, end that D, secondary are smeared, and must take the overlapping the slot mode to overlap;
(4), the repairing of scale clay layer
A, when pin hole, foreign material are found in check, the application wheel machine is removed its polishing, should polish to basal surface to pin hole or the defective that connects lining, and become the domatic transition, the angle of domatic and matrix is less than 15 degree; After solvent washing and drying, smear priming paint and scale clay again; Find to have holiday or the not enough defective of local lining thickness through check, this region surface is clean with solvent clean, smear the construction material after the drying once more and reach specific thickness;
After B, scaffold were removed, its intersection point place did corresponding the repairing;
(5), local glass fiber cloth or felt strengthen
The flange seal end that A, flue are served as a contrast the flange of all corner regions of zone, deflector, non-metal expansion joint and transition region and miscellaneous equipment, adapter is all solidified the back at the scale lining and is adopted glass fabric or felt to strengthen, and the enhancement region width is that both sides respectively are not less than 100mm; The handing-over material of small pieces of cloth used for patches glass fabric or felt must adopt the resin preparation identical with scale lining clay;
B, the scale liner surface is polished flat, undertaken by the order of gluing-patch-gluing with the clean back of solvent washing, the lap of splice of glass fabric or felt is greater than 50mm; It is smooth that the lining flange sealing surface should keep, and glass fabric or felt after strengthening 12h are removed the burr of enhancement region;
(6), finish paint brushing
A, finish that priming paint brushing, scale clay are smeared, after the operation that the repairing of scale clay layer, glass fabric or felt strengthen, the brushing finish paint;
B, get epoxy resin varnish 0.12kg/m 2Add diluent at 1: 0.5 according to volume ratio, and add the corresponding curing agent of volume ratio 100: 10~12, the back brushing that stirs, finish paint brush twice.
(7), maintenance
Generally speaking, construction finishes and get final product in back maintenance one week, but if environment is relatively poor, is lower than 5 ℃ or humidity greater than 85% as temperature, then prolongation;
(8), detect and check and accept
A, general provision
After each procedure of scale clay construction is finished, be intermediate survey all through checking, can carry out the construction of next process after qualified; The part of disqualified upon inspection must be reprocessed, and check once more, till being up to the standards; After all anticorrosive constructions are finished,, could check and accept after qualified through final inspection; Should reprocess when defective and check again;
B, intermediate survey
1) surface-treated check: adopt ocular estimate and roughness instrument detection method, quality reaches the regulation requirement;
2) detection after the coating brushing: adopt ocular estimate, quality requirement must not be holiday, the figure layer should be even, and brushless line, sagging, bubble, pinprick, micro-crack, foreign material defective do not allow to exist whiting yet or solidify incomplete situation;
3) check behind the daub mud: adopt ocular estimate, anticorrosion surfacing behind the daub mud or one-tenth rounding off;
C, final inspection
Final test item mainly contains open defect, pin hole test, thickness detection, hammering detection, and concrete grammar is as follows:
1) open defect inspection: adopt ocular estimate, figure layer evenly, and brushless line, sagging, bubble, pinprick, micro-crack, foreign material defective do not allow to exist whiting or solidify incomplete;
2) pin hole test: adopt the defective and the discontinuity point of direct current spark detector checkout coating, with do not produce disruptive spark, alarm free is qualified; Detect after twice clay construction finished, the detection voltage of 1.5mm scale lining is: 5000V;
3) test of thickness: utilize calibrator, in the surface measurements of whole coating, every square metre is no less than a point, and liner thickness reaches designing requirement;
4) sound test: touch coating surface with wooden mallet, any access point testing, the sound of the hollowing that do not have.
Because scale resin has unique anti-permeability performance on the structure of institute's composition material.Between apparatus body and corrosive medium, with the solid glass resin flake lining of one deck, make it to be not easy to be permeated by medium, realize desired anticorrosion purpose, in the corrosion-inhibiting coating resin, sneak into the scale filler, not only can improve its mechanical strength, reduce its linear expansion coefficient and cure shrinkage, but also the coating of very easy formation thick-slurry type.The adding of scale filler also can suppress the intrusion of corrosive medium widely.Adopt the high-temperature scale anticorrosion construction method for heat-engine plant desulfurizer of technique scheme, solved anti-corrosion material as adopting glass fibre, glass cloth etc. continuous distributed in resin, thereby make its residual stress, a thereby difficult problem that comes off easily bigger among a small circle.And suppressed the intrusion of corrosive medium effectively, and improved mechanical strength, reduced its linear expansion coefficient and cure shrinkage.And the long service life of its lining, shock resistance and erosion resistance are better than other materials, and local damage repairs easily, and room temperature (or low-temperature heat) is solidified, and easy construction has reached the saving duration, the purpose that reduces cost.
Can form moist subenvironment in the part with traditional flue-gas desulfurizing engineering, this subenvironment can cause the corrosion of certain chemistry and physics to the inwall of metal.Though some present anti-corrosion measures can be controlled the generation of corrosion to a certain extent, owing to reasons such as anticorrosion material, anticorrosion construction methods, cause the not very good and environmental protection of carrying out after the desulfurization of preservative treatment.This paper has proposed scale resin lining anticorrosive paint spraying method on the basis of simple elaboration chimney desulfurization antiseptic principle.
In sum, the present invention is that a kind of resistance to corrosion is strong, adhere to stablely, be not easy to come off the strong adhesion of glass flake lining, it is little to solidify after-contraction, the long service life of lining, shock resistance and erosion resistance are better than other materials, and local damage is repaired easily, room temperature (or low-temperature heat) is solidified, the high-temperature scale anticorrosion construction method for heat-engine plant desulfurizer of easy construction.
Description of drawings
Fig. 1 is interface, the end overlapping the slot schematic diagram of smearing.
The specific embodiment
The invention will be further described below in conjunction with the specific embodiment.
With the silver-colored Loudi gold Zhushan County's power plant desulfurization engineering construction of Datang China is example.
One, project profile
Gold Zhushan County, the silver-colored Loudi of Datang China power plant desulfurization engineering is positioned at the Hunan Lengshuijiang City, and by Datang Hua Yinjin Zhushan County power plant investment construction, its dynamo-electric cost is 1,100 ten thousand yuan, goes into operation in June, 2008, and be completed in July, 2009.
Main points of operation
(1), preliminary preparation
A, equipment scale resin antiseptic project matrix are made requirement
All weld seams of anticorrosion district must be continuous full weld, and seam then must be replenished inside weld as having only outside weld.All weld seams are answered forming, zero defect, and all weld seams must polish flat with abrasive machine.Matrix surface to be served as a contrast can not exist overlap and welding slag.
B, construction environment requirement
The job site environment temperature is not less than 5 ℃, and is higher than 3 ℃ of dew-point temperatures; Relative air humidity is not more than 85%.
C, derusting by sandblasting
Can produce a large amount of dusts during 1) owing to sandblast, therefore must be provided with ventilation equipment, guarantee workmen's safety, after the sandblast, should be at once that the cleaning of the dust on the matrix is clean, the cleaning of utensils such as available brush, pressure-air and dust catcher.
2) derusting by sandblasting (comprise quality examination and brush the first road priming paint) should be finished in 8h.
3), finish the way that can adopt segmentation and effectively isolate in can't be when 8h if engineering is because working face is bigger.Promptly earlier certain area is carried out derusting by sandblasting, brushes priming paint one through after the assay was approved, treat solidifying priming paint after, again to the remainder derusting by sandblasting, the reply this moment part of having primed is protected, and continues the distance that sandblast end should be reserved 50mm at least at it.Enable to intersect sandblast, thereby guarantee the quality of sandblast.
4) the desired credit rating of sandblast must reach the Sa2.5 level, promptly the surface is near the silvery white requirement of metal, remove all foreign material such as grease, oxide skin, corrosion product of metal surface fully, and remove dust with the compressed air or the brush of dust catcher, dried and clean.Remaining rust staining, oxide skin etc. cause that the area of light discolouration must not surpass 5% on the area of any 100 * 100mm2.Roughness should reach 40-70 μ m.
5) compressed air of sandblast employing is answered dried and clean, must not contain greasy dirt, foreign material and moisture, and pressure is 0.6-0.8Mpa.
6) particle diameter of sand grains is 2-3mm.
7) sandblast construction technology index is as follows
Nozzle diameter: 6-8mm; Jet angle: 30-75 degree; Spray distance: 80-200mm
(2) priming paint brushing
Get 120g/m 2Epoxy zinc rich primer mixes according to volume ratio with diluent at 1: 0.5, after stirring according to volume ratio 100: 10~12 ratios adding complete curing agent, brushes twice, consumption 170-200g/m with hairbrush or roller 2
(3) the scale clay smears
Get the scale clay mixes according to volume ratio with diluent at 1: 0.5, adding complete curing agent according to volume ratio 100: 10~12 ratios stirs, use after stirring evenly and leave standstill the about 15min of slaking after the batching, each scale clay that stirs is controlled in the 30min and uses up, and the presetting period should be controlled at 38~42min;
Coating on the basis of priming paint with scraper plate or the unidirectional material of will constructing equably of spatula, per pass construction thickness (after the initial set) is 1.0 ± 0.2mm, and the time interval that per pass is smeared is 12h.
After per pass scale clay is smeared, before initial set, must in time use the wool felt roll roll extrusion that speckles with styrene solvent till the perusal smooth surface evenly, the surface does not allow the trickling vestige, and roll extrusion is smooth again once producing.Two-layer clay smear finish and completion of cure after, test with the electric spark detector.
In work progress, construction surface should keep clean, and should polish flat if any thrust or construction tear drop.Butt joint should be avoided in the interface, end that secondary is smeared, and must take overlapping the slot 1 overlap joint, sees Fig. 1;
(4) repairing of scale clay layer
When pin hole, foreign material were found in check, the application wheel machine was removed its polishing, should polish to basal surface to the defective of pin hole or perforation lining, and become the domatic transition, and domatic angle with matrix should be less than 15 degree.After solvent washing and drying, should smear priming paint and scale clay again.Find that through check defectives such as holiday or local lining thickness deficiency are arranged, should this region surface is clean with solvent clean, smear the construction material after the drying once more and reach specific thickness.After scaffold was removed, its intersection point place should do corresponding repairing.
(5) local glass fiber cloth (felt) strengthens
Flue is served as a contrast the flange of all corner regions of zone, deflector, non-metal expansion joint and back employing glass fabric (felt) enhancing all should be solidified by the scale lining in the flange seal end of transition region and miscellaneous equipment, adapter etc., and the enhancement region width should be both sides and respectively is not less than 100mm.The handing-over material of small pieces of cloth used for patches glass fabric (felt) must adopt the resin preparation identical with scale lining clay.
The scale liner surface is polished flat, undertaken by the order of gluing-patch-gluing with the clean back of solvent washing, the lap of splice of glass fabric (felt) should be greater than 50mm.It is smooth that the lining flange sealing surface should keep, and glass fabric (felt) should be removed the burr of enhancement region after strengthening 12h.
(6) finish paint brushing
Should be after finishing the operation that priming paint brushing, scale clay are smeared, scale clay layer is repaired, glass fabric (felt) strengthens, the brushing finish paint.
Get epoxy resin varnish 0.12kg/m 2Add diluent at 1: 0.5 according to volume ratio, and add the corresponding curing agent of volume ratio 100: 10~12, the back brushing that stirs, finish paint brush twice.
(7) maintenance
Generally speaking, construction finishes and get final product in back maintenance one week, but relatively poor as if environment, is lower than 5 ℃ or humidity greater than 85% as temperature, then should prolong as one sees fit.
(8), detect and check and accept
A, general provision
After each procedure of scale clay construction is finished, be intermediate survey all through checking, can carry out the construction of next process after qualified; The part of disqualified upon inspection must be reprocessed, and check once more, till being up to the standards; After all anticorrosive constructions are finished,, could check and accept after qualified through final inspection; Should reprocess when defective and check again;
B, intermediate survey
1) surface-treated check: adopt ocular estimate and roughness instrument detection method, quality reaches the regulation requirement;
2) detection after the coating brushing: adopt ocular estimate, quality requirement must not be holiday, the figure layer should be even, and brushless line, sagging, bubble, pinprick, micro-crack, foreign material defective do not allow to exist whiting yet or solidify incomplete situation;
3) check behind the daub mud: adopt ocular estimate, anticorrosion surfacing behind the daub mud or one-tenth rounding off;
C, final inspection
Final test item mainly contains open defect, pin hole test, thickness detection, hammering detection, and concrete grammar is as follows:
1) open defect inspection: adopt ocular estimate, figure layer evenly, and brushless line, sagging, bubble, pinprick, micro-crack, foreign material defective do not allow to exist whiting or solidify incomplete;
2) pin hole test: adopt the defective and the discontinuity point of direct current spark detector checkout coating, with do not produce disruptive spark, alarm free is qualified; Detect after twice clay construction finished, the detection voltage of 1.5mm scale lining is: 5000V;
3) test of thickness: utilize calibrator, in the surface measurements of whole coating, every square metre is no less than a point, and liner thickness reaches designing requirement;
4) sound test: touch coating surface with wooden mallet, any access point testing, the sound of the hollowing that do not have.
Two, condition of construction
Gold Zhushan County, the silver-colored Loudi of Datang China power plant desulfurization engineering, the anticorrosion worker's method of scale resin lining has been adopted in the oil tank of this project, flue, absorption tower preservative treatment, after this project is gone into operation operation in the July, 2009, adopt the device of the anticorrosion worker's method of scale resin lining to eliminate corrosion phenomenon, the maintenance cost that produces because of corrosion is zero, for this project is directly saved on the cost 100,000 yuan.And in work progress economic benefit we be example with the accident slurries case of its oil tank:
It is 825m that its accident slurries case need be coated with the scale resin area, is the strong corrosion that waits, as calculated, as follows with epoxy coating, epoxy coking coal coating economic efficiency contrast table:
Project Scale resin Epoxy resin Tar resin
Fee of material (unit/m 2) ??136950 ??175725 ??225225
Labour cost (unit/m 2) ??63525 ??77550 ??84975
Project Scale resin Epoxy resin Tar resin
Amount to (unit/m 2) ??200475 ??253275 ??310200
Save cost rate ??0 ??30% ??36%
 

Claims (2)

1. high-temperature scale anticorrosion construction method for heat-engine plant desulfurizer, may further comprise the steps: basic handling, priming paint brushing, first pass scale clay smear, second time scale clay smeared, polish flat, locally strengthen, anti-wear mortar is smeared, finish paint brushing, inspection eventually, it is characterized in that:
(1), basic handling
A, equipment scale resin antiseptic project matrix are made requirement
1) physical dimension of equipment and intensity adhere to specification;
2) then be the one-time-concreting moulding if any concrete surface, do not allow to use plain sand finish;
3) matrix must be closely knit, smooth, dusting must not be arranged, flakes, crack, voids and pits and greasy dirt;
4) the concrete surface cavity of the exposing reinforcing bar cast of must being in the milk again reaches closely knit smooth, and pre-buried steel member face of weld is level and smooth, no undercut, overlap, dreg defect;
5) the extremely mild transition of hour polishing of template fissure of displacement size, bigger as fissure of displacement size, then polish to arc transition;
6) gradient in liquid overcurrent zone must adhere to specification;
7) basic unit must be dry, and the moisture content in degree of depth 20mm is not more than 6%;
8) more than inner corner trim arc transition R>10mm, more than external corner arc transition R>5mm;
9) all weld seams of anticorrosion district must be continuous full weld, and seam then must be replenished inside weld as having only outside weld;
10) good, the zero defect of all appearances of weld, all weld seams must polish flat with abrasive machine, and matrix surface to be served as a contrast can not exist overlap and welding slag;
B, construction safeguard
1) the job site environment temperature is not less than 5 ℃, and is higher than 3 ℃ of dew-point temperatures; Relative air humidity is not more than 85%;
2) reasonably workmen and facility configuration, the diversification dynamic management is carried out in effectively construction management measure;
3) under the normal condition, the construction of relieving of branch construction team;
4) if environmental aspect does not reach that above construction environment requires and duration when nervous, will set up the constant temperature dehumidification device, to guarantee the requirement of environment to construction;
C, derusting by sandblasting
Can produce a large amount of dusts during 1) owing to sandblast, therefore must be provided with ventilation equipment, guarantee workmen's safety, after the sandblast, should be at once that the cleaning of the dust on the matrix is clean, clear up with brush, pressure-air and dust catcher utensil;
2) derusting by sandblasting comprises quality examination and brushes the first road priming paint and finish in 8h;
3) if engineering is because working face is bigger, finish in can't be when 8h, the way that adopts segmentation and effectively isolate is promptly earlier carried out derusting by sandblasting to certain area, brushes one priming paint through after the assay was approved, after treating solidifying priming paint, to the remainder derusting by sandblasting, protected the part of priming this moment, and continue the distance that the sandblast end is reserved 50mm at least at it again, enable to intersect sandblast, thereby guarantee the quality of sandblast;
4) the desired credit rating of sandblast must reach the Sa2.5 level, promptly the surface is near the silvery white requirement of metal, remove grease, oxide skin, the corrosion product of metal surface fully, and remove dust with the compressed air of dust catcher, dried and clean or brush, remaining rust staining, oxide skin cause that the area of light discolouration is at any 100 * 100mm 2Area on must not surpass 5%, roughness should reach 40-70 μ m;
5) the compressed air drying cleaning of sandblast employing must not contain greasy dirt, foreign material and moisture, and pressure is 0.6-0.8Mpa;
6) particle diameter of sand grains is 2-3mm;
7) sandblast construction technology index: nozzle diameter: 6-8mm; Jet angle: 30-75 degree; Spray distance: 80-200mm;
(2), priming paint brushing
Get 120g/m 2Epoxy zinc rich primer mixes according to volume ratio with diluent at 1: 0.5, after stirring according to volume ratio 100: 10~12 ratios adding complete curing agent, brushes twice, consumption 170-200g/m with hairbrush or roller 2
(3), the scale clay smears
A, get the scale clay and mix at 1: 0.5 according to volume ratio with diluent, adding complete curing agent according to volume ratio 100: 10~12 ratios stirs, use after stirring evenly and leave standstill the about 15min of slaking after the batching, each scale clay that stirs is controlled in the 30min and uses up, and the presetting period should be controlled at 38~42min;
B, coating on the basis of priming paint with the unidirectional material of will constructing equably of scraper plate or spatula, is 1.0 ± 0.2mm after the initial set of per pass construction thickness, and the time interval that per pass is smeared is 12h;
After C, per pass scale clay are smeared, before initial set, must in time use the wool felt roll roll extrusion that speckles with styrene solvent till the perusal smooth surface evenly, the surface does not allow the trickling vestige, and roll extrusion again is smooth once producing; Two-layer clay smear finish and completion of cure after, test with the electric spark detector; In work progress, construction surface keeps clean, and polishes flat if any thrust or construction tear drop;
Butt joint is avoided at the interface, end that D, secondary are smeared, and must take overlapping the slot (1) mode to overlap;
(4), the repairing of scale clay layer
A, when pin hole, foreign material are found in check, with abrasive machine its polishing is removed, pin hole or the defective that connects lining are polished to basal surface, and become the domatic transition, the angle of domatic and matrix is less than 15 degree; After styrene solvent flushing and drying, smear priming paint and scale clay again; Find to have holiday or the not enough defective of local lining thickness through check, this region surface is cleaned up with styrene solvent, smear the construction material after the drying once more and reach specific thickness;
After B, scaffold were removed, its intersection point place did corresponding the repairing;
(5), local glass fiber cloth or felt strengthen
The flange seal end that A, flue are served as a contrast the flange of all corner regions of zone, deflector, non-metal expansion joint and transition region and miscellaneous equipment, adapter is solidified the back by the scale lining and is adopted glass fabric or felt to strengthen, the enhancement region width is that both sides respectively are not less than 100mm, and the handing-over material of small pieces of cloth used for patches glass fabric or felt must adopt the epoxy resin preparation identical with scale lining clay;
B, the scale liner surface is polished flat, rinse the back well with styrene solvent and undertaken by the order of gluing-patch-gluing, the lap of splice of glass fabric or felt is greater than 50mm, and it is smooth that the lining flange sealing surface keeps, glass fabric or felt after strengthening 12h are removed the burr of enhancement region;
(6), finish paint brushing
A, finish that priming paint brushing, scale clay are smeared, after the operation that the repairing of scale clay layer, glass fabric or felt strengthen, the brushing finish paint;
B, get epoxy resin varnish 0.12kg/m 2Add diluent at 1: 0.5 according to volume ratio, and add the corresponding curing agent of volume ratio 100: 10~12, the back brushing that stirs, finish paint brush twice.
(7), maintenance
Generally speaking, construction finishes and get final product in back maintenance one week, but relatively poor as if environment, is lower than 5 ℃ or humidity greater than 85% as temperature, then should prolong as one sees fit.
(8), detect and check and accept.
2. high-temperature scale anticorrosion construction method for heat-engine plant desulfurizer according to claim 1 is characterized in that: described step (8) detects and checks and accepts:
A, general provision
After each procedure of scale clay construction is finished, all should be intermediate survey through check, can carry out the construction of next process after qualified, the part of disqualified upon inspection must be reprocessed, and check once more, till being up to the standards, after all anticorrosive construction is finished, should pass through final inspection, could check and accept after qualified, reprocess when defective and check again;
B, intermediate survey
1) surface-treated check: adopt ocular estimate and roughness instrument detection method, quality reaches the regulation requirement;
2) detection after the coating brushing: adopt ocular estimate, quality requirement must not be holiday, the figure layer should be even, and brushless line, sagging, bubble, pinprick, micro-crack, foreign material defective do not allow to exist whiting yet or solidify incomplete situation;
3) check behind the daub mud: adopt ocular estimate, anticorrosion surfacing behind the daub mud or one-tenth rounding off;
C, final inspection
Final test item mainly contains open defect, pin hole test, thickness detection, hammering detection, and concrete grammar is as follows:
1) open defect inspection: adopt ocular estimate, figure layer evenly, and brushless line, sagging, bubble, pinprick, micro-crack, foreign material defective do not allow to exist whiting yet or solidify incomplete;
2) pin hole test: adopt the defective and the discontinuity point of direct current spark detector checkout coating, with do not produce disruptive spark, alarm free is qualified, detects after twice clay construction finished, the detection voltage of 1.5mm scale lining is: 5000V;
3) test of thickness: utilize calibrator, in the surface measurements of whole coating, every square metre is no less than a point, and liner thickness should reach designing requirement;
4) sound test: touch coating surface with wooden mallet, any access point testing, the sound of the hollowing that do not have.
CN 201010171720 2010-05-14 2010-05-14 High-temperature scale anticorrosion construction method for heat-engine plant desulfurizer Pending CN101822936A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010171720 CN101822936A (en) 2010-05-14 2010-05-14 High-temperature scale anticorrosion construction method for heat-engine plant desulfurizer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010171720 CN101822936A (en) 2010-05-14 2010-05-14 High-temperature scale anticorrosion construction method for heat-engine plant desulfurizer

Publications (1)

Publication Number Publication Date
CN101822936A true CN101822936A (en) 2010-09-08

Family

ID=42687230

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010171720 Pending CN101822936A (en) 2010-05-14 2010-05-14 High-temperature scale anticorrosion construction method for heat-engine plant desulfurizer

Country Status (1)

Country Link
CN (1) CN101822936A (en)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103407221A (en) * 2013-02-04 2013-11-27 四川泸天化股份有限公司 Anti-corrosion and anti-abrasion lining, preparation method and application thereof
CN103802381A (en) * 2013-02-04 2014-05-21 四川泸天化股份有限公司 Repairation method of anticorrosion and abrasion-resistant lining
CN105499034A (en) * 2015-12-30 2016-04-20 山东瑞嘉通风环保科技有限公司 Internal corrosion resistant treatment process of desulfurization tower
CN106622897A (en) * 2016-12-23 2017-05-10 山东国舜建设集团有限公司 Construction process of anticorrosion ceramic organic coating used for inner wall of desulfurizing tower and inner wall of flue
CN107061929A (en) * 2017-05-05 2017-08-18 山东电力基本建设总公司 Steel circulating water pipe anti-corrosion method
CN107224858A (en) * 2016-03-23 2017-10-03 上海建冶科技工程股份有限公司 The wear-and corrosion-resistant technique of wet desulphurization equipment
CN107379640A (en) * 2017-08-16 2017-11-24 江苏大唐国际吕四港发电有限责任公司 The special aseptic technic of circulating water pipeline
CN108097007A (en) * 2017-11-23 2018-06-01 山东明晟化工工程有限公司 Ammonia desulfurizing process inside lining anti-corrosive technology
CN110130407A (en) * 2019-06-13 2019-08-16 江苏慧天新能源科技有限公司 A kind of offshore steel structure basis novel anticorrosion etching method
CN110898635A (en) * 2019-11-20 2020-03-24 中国化学工程第三建设有限公司 Thermal power plant desulphurization device glass scale anti-corrosion maintenance construction method
CN110961063A (en) * 2019-12-16 2020-04-07 石狮华宝新材料工程有限公司 Photocuring nano anticorrosive material for desulfurization system and construction process thereof
CN113801548A (en) * 2021-09-30 2021-12-17 成都龙之泉科技股份有限公司 Desulfurization and corrosion prevention local repairing material for thermal power plant
CN113999050A (en) * 2021-11-15 2022-02-01 济南鑫蒲华防腐工程有限公司 Process for spraying epoxy glass flakes on prilling tower
CN114352846A (en) * 2022-01-06 2022-04-15 重庆钢铁股份有限公司 Long-life desulfurization slurry pipeline and manufacturing method thereof

Non-Patent Citations (10)

* Cited by examiner, † Cited by third party
Title
《中华人民共和国化工行业标准GB/T2640-2004》 20041214 郑卫京,刘继向 玻璃鳞片衬里施工技术条件 , 1 *
《中华人民共和国行业标准HGJ229-91》 19920701 化学工业部基本建设司 工业设备、管道防腐蚀工程施工及验收规范 , 1 *
《全面腐蚀控制》 19951231 江镇海 玻璃鳞片衬里在大型化工装置上的施工及应用 28-34 , 第4期 2 *
《化工设备与管道》 20080630 仝朋国 烟气脱硫装置乙烯玻璃鳞片衬里施工技术经验 59,60,64 第45卷, 第3期 2 *
《华北电力技术》 20040831 山乐胜,张怀军,张卫华 湿法烟气脱硫设备中鳞片衬里的防腐工艺 23-26 , 第8期 2 *
《华北电力技术》 20071231 陈凯 4号炉烟气海水脱硫工程防腐施工技术 24-27 , 2 *
《小氮肥》 20090630 班云福,高洪善 热电厂电石渣浆液二次脱硫系统防腐施工技术探讨(下) 7-9 第37卷, 第6期 2 *
《电力建设》 20060731 陈建兵 乙烯基酯玻璃鳞片涂料在烟囱钢内壁防腐中的应用 54-58 第27卷, 第2期 2 *
《电力环境保护》 20070228 钱小文,李天晓 湿法脱硫改造条件下烟囱防腐的若干技术问题 39-41 第23卷, 第1期 2 *
《重庆大学工程硕士学位论文》 20080531 孙融 盘南600MW燃煤发电机组石灰石-石膏湿法脱硫的技术设计和实施 37-39 , 1 *

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103407221A (en) * 2013-02-04 2013-11-27 四川泸天化股份有限公司 Anti-corrosion and anti-abrasion lining, preparation method and application thereof
CN103802381A (en) * 2013-02-04 2014-05-21 四川泸天化股份有限公司 Repairation method of anticorrosion and abrasion-resistant lining
CN105499034A (en) * 2015-12-30 2016-04-20 山东瑞嘉通风环保科技有限公司 Internal corrosion resistant treatment process of desulfurization tower
CN107224858A (en) * 2016-03-23 2017-10-03 上海建冶科技工程股份有限公司 The wear-and corrosion-resistant technique of wet desulphurization equipment
CN106622897A (en) * 2016-12-23 2017-05-10 山东国舜建设集团有限公司 Construction process of anticorrosion ceramic organic coating used for inner wall of desulfurizing tower and inner wall of flue
CN107061929A (en) * 2017-05-05 2017-08-18 山东电力基本建设总公司 Steel circulating water pipe anti-corrosion method
CN107379640A (en) * 2017-08-16 2017-11-24 江苏大唐国际吕四港发电有限责任公司 The special aseptic technic of circulating water pipeline
CN108097007A (en) * 2017-11-23 2018-06-01 山东明晟化工工程有限公司 Ammonia desulfurizing process inside lining anti-corrosive technology
CN110130407A (en) * 2019-06-13 2019-08-16 江苏慧天新能源科技有限公司 A kind of offshore steel structure basis novel anticorrosion etching method
CN110130407B (en) * 2019-06-13 2021-09-28 江苏慧天新能源科技有限公司 Novel anti-corrosion method for offshore steel structure foundation
CN110898635A (en) * 2019-11-20 2020-03-24 中国化学工程第三建设有限公司 Thermal power plant desulphurization device glass scale anti-corrosion maintenance construction method
CN110961063A (en) * 2019-12-16 2020-04-07 石狮华宝新材料工程有限公司 Photocuring nano anticorrosive material for desulfurization system and construction process thereof
CN113801548A (en) * 2021-09-30 2021-12-17 成都龙之泉科技股份有限公司 Desulfurization and corrosion prevention local repairing material for thermal power plant
CN113801548B (en) * 2021-09-30 2022-04-22 成都龙之泉科技股份有限公司 Desulfurization and corrosion prevention local repairing material for thermal power plant
CN113999050A (en) * 2021-11-15 2022-02-01 济南鑫蒲华防腐工程有限公司 Process for spraying epoxy glass flakes on prilling tower
CN114352846A (en) * 2022-01-06 2022-04-15 重庆钢铁股份有限公司 Long-life desulfurization slurry pipeline and manufacturing method thereof
CN114352846B (en) * 2022-01-06 2024-02-06 重庆钢铁股份有限公司 Long-life desulfurization slurry pipeline and manufacturing method thereof

Similar Documents

Publication Publication Date Title
CN101822936A (en) High-temperature scale anticorrosion construction method for heat-engine plant desulfurizer
CN107061929B (en) steel circulating water pipe anti-corrosion method
Bahadori Essentials of coating, painting, and lining for the oil, gas and petrochemical industries
CN100503971C (en) Construction method for guided way for embedded railway traffic engineering
CN107442369A (en) Oil paint coating construction method under hot and humid environment
KR102016387B1 (en) Construction method of concrete floor
CN104841626A (en) Repairing method of metal workpiece
CN114210530A (en) Corrosion-resistant coating process for construction main body and auxiliary structure of offshore wind turbine generator
CN105065852A (en) Construction method for laying pressure penstock inside water tunnel of hydropower station
CN108906554A (en) A kind of rolling stock coating layer structure and coating process
CN112403866A (en) Surface treatment method for anti-corrosion steel beam component and anti-corrosion steel beam component
CN105109853B (en) Large-scale storage tank lining plastic anticorrosion process
CN106883734A (en) A kind of application of resin ceramic material in the antiseptic project of wet desulphurization absorption tower
CN208810511U (en) A kind of rolling stock coating layer structure
CN103924752B (en) Nano wearproof pottery composite protective construction method
CN110863670A (en) Method for repairing corrosion of tower foot of transmission steel tower
CN104929254A (en) Antiseptic and processing method for margin plate at bottom outside gas chamber
CN106311577A (en) Online rust removal and corrosion resisting method for inner wall of high pressure water scale removal power storing tank
CN201454795U (en) Large-scale automatic painting production line for steel pipe anticorrosive coatings
CN106622897A (en) Construction process of anticorrosion ceramic organic coating used for inner wall of desulfurizing tower and inner wall of flue
CN207500646U (en) A kind of reinforced pipeline
CN105598011A (en) Method for rapidly repairing defect on outer surface of automobile through weathered stone
Wang et al. Study on non-destructive reinforcing material of modified one component polyurethane for tunnel crack disease prevention
CN110860448A (en) Novel polyurethane coating process for nodular cast iron pipe fitting
CN108097007A (en) Ammonia desulfurizing process inside lining anti-corrosive technology

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20100908