CN101502149A - A network managing system for completing customized operation automatically and a method thereof - Google Patents

A network managing system for completing customized operation automatically and a method thereof Download PDF

Info

Publication number
CN101502149A
CN101502149A CN 200680055524 CN200680055524A CN101502149A CN 101502149 A CN101502149 A CN 101502149A CN 200680055524 CN200680055524 CN 200680055524 CN 200680055524 A CN200680055524 A CN 200680055524A CN 101502149 A CN101502149 A CN 101502149A
Authority
CN
China
Prior art keywords
task
groups
center
trigger condition
implementing result
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200680055524
Other languages
Chinese (zh)
Other versions
CN101502149B (en
Inventor
付连续
宋志伟
谢建光
蒋新建
柯朝曦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZTE Corp
Original Assignee
ZTE Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZTE Corp filed Critical ZTE Corp
Publication of CN101502149A publication Critical patent/CN101502149A/en
Application granted granted Critical
Publication of CN101502149B publication Critical patent/CN101502149B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W24/00Supervisory, monitoring or testing arrangements
    • H04W24/04Arrangements for maintaining operational condition

Abstract

A network managing system for completing customized operation automatically and a method thereof, the system (1) includes: a task pool (4) for storing task group (5) defined by a user (2), and a task center (3) for executing and managing the task group (5). The method includes the following steps: the user (2) defines a task group (5) and sends it to the task center (3); the task center (3) receives the task group (5) defined by the user (2), the task pool (4) stores the task group (5); the task center (3) begins to function when it detects that there is task group (5) satisfying the trigger condition in the task pool (4). The present invention provides a method for completing customized operation automatically to base station subsystem BSS and switch subsystem MSS in the mobile communication system, and provides a suit of convenient, flexible, effective operation and maintenance technique for starting new stations, updating old stations, and locating failures in mobile communication system. Especially in the case of nobody is in charge, the user can set tasks in advance, which overcomes mostly the problem in the prior art that needs manual interference frequently.

Description

A network managing system for completing customized operation automatically and a method thereof
It is a kind of to be automatically performed the self-defined NMS and its implementation for pushing work violently
Technical field
The present invention relates to the network management technology in GSM, and in particular to a kind of NMS and method for being automatically performed self-defining operation.Background technology
There is used herein three terms:Task, task groups and task center.Task refers to can complete the operating process of some function, such as allocation radio resource in mobile communication system;Task groups refer to the set of the task with dependency relation, such as single board edition generation, single board edition loading, single board edition activation, and single board edition operation enable etc. belongs to a task groups of veneer operation;Task center refers to the central processing unit of task run, is responsible for the actual execution of task.Wherein the division of task and task groups can be according to different system actual conditions self-defining.
One typical wireless communication system generally includes switching subsystem MSS, base station sub-system BSS and mobile station subsystem MS.BSS can be divided into base transceiver subsystem BTS for transmitting/receiving wireless signal, the base station control subsystem BSC controlled for base station BS etc. again;MSS has moving exchanging center MSC, attaching position register HLR, VLR Visitor Location Register VLR, AUC AC and message center MC etc..
For effective management to whole network resource, it is necessary to which a personal-machine operation module and foreground all devices have the operation maintenance center OMC of interactive function, referred to as NMS.Operation maintenance center at least needs to complete following function:
1. configuring base station and mutual resource, data configuration, data syn-chronization, data recovery and data backup are included;
2. the operation of each board operation software in base station and switching subsystem, such as loading, deletion, activation, inquiry;
3. acquisition system running performance index, such as collection initial data, calculating collect and generate various 4 blunt tables;
4. information of mobile user is managed, such as increase user profile, modification user profile, deletion user's letter ir ·
5. self-defined specific warnings are reported.
In OMC in use, it is most frequently used be surely belong to above-mentioned 1,2,3 three functions, it is especially during upgrading, it is necessary to which operating personnel at every moment operate in the post of OMC centers in the debugging of new opening base station and legacy system.In order to reduce the influence to user to greatest extent, Carrier Requirements system operatio must be completed in the defined time.Therefore it will be a major issue that equipment supplier must take into consideration that task how is quickly and efficiently completed within the most short time, particularly manpower it is few, be pressed for time in the case of.The dynamic logical letter net Network administrative skills of shifting with self-defining operation function are to be desirable to operate by OMC, and user can predefine partial task to realize that operating process standardization, operating process are intelligent.
In existing OMC, operation is carried out in real time, is typically initiated to operate by user, system is responded at once.System, which does not have, pre-sets operation, the situation of condition triggering, has the disadvantage:Using very flexible, it is necessary to which the link of manual intervention must be more, efficiency is low.
The content of the invention
The invention provides a kind of NMS and its implementation for being automatically performed self-defining operation, it can realize that operating process standardization, operating process are intelligent, and reduce the shortcoming for needing manually frequently to intervene in existing network administrative skill as far as possible.
The technical solution adopted by the present invention is:
A kind of NMS for being automatically performed self-defining operation, it is characterised in that including:Task pool, is the task container for depositing user-defined task groups, and the instruction issued according to task center increases task groups;
Task center, be perform and management role group Logical processing unit, for receiving user-defined task groups and issuing the task groups in the instructions of increase task groups, monitoring task pool to task pool and execution meets the task groups of trigger condition.
Further, the task center is according to user command or represents that task groups perform the instruction that correct implementing result issues the deletion task groups to task pool;Task pool deletes the task groups according to the instruction.
Further, the implementing result is fed back to user by the task center after the implementing result of task groups is obtained. Further, the task groups at least include a task, and the operation to task groups is actually decomposed into the operation to each task in task groups;The operation to each task at least includes definition, increase, deletes, monitors, performing one of them, or any combination wherein;When the task center has the one or more task to meet trigger condition in task groups, it is believed that the task groups meet trigger condition.
Further, the trigger condition of the task include it is following it is several in one kind or its any combination:There is predetermined implementing result, reach the scheduled time;
The type of the task is divided into following several:As long as needing to obtain sequence type task that predetermined implementing result could perform, needing the timing type task started in the scheduled time, need while meeting both the above condition or meeting the Hybrid tasks of any of which condition;
The task center when obtaining predetermined implementing result, or reach the scheduled time when, or not only obtained predetermined implementing result again arrival the scheduled time when, start to perform corresponding task.
Further, task center is according to a kind of execution task in following two modes:
Parallel action method, task pool is monitored while the task of execution, the task just parallel execution for meeting trigger condition occurs;Or
Mode is independently executed, it is once to perform the meeting trigger condition of the task, obtain starting to monitor task pool again after implementing result;During using independently executing mode, when two or more tasks meets trigger condition simultaneously, the task center is performed successively from high to low according to the priority of task.
Further, the implementing result is fed back to user by the task center after the implementing result for the task that obtains.
Technical scheme also includes a kind of method for being automatically performed self-defining operation, it is characterised in that the method Bao include Yi Xia Bu Sudden:
(a) user defines task groups and is sent to task center;
(b) task center receives user-defined task groups, and issues to task pool the instruction of increase task groups;Task pool preserves task groups;
(c) whether there are the task groups for meeting trigger condition in task center monitors task pool, if then starting step(D), if it is not, continuing(c ) ;
) task center performs and meet the task groups of trigger condition, obtains implementing result;Return(c ). Further, the step(D) also include:The implementing result of task groups is fed back to user by task center.
Further, the task center is according to user instruction or represents that task groups perform correct implementing result and issue the instruction for deleting the task groups to task pool, and task pool deletes the task groups.
Further, the task groups at least include a task;Each task at least includes following key element:Task identification, task definition, the criterion of trigger condition and task action result;
The operation to task groups is actually decomposed into the operation to each task in task groups;The operation to each task at least includes definition, increase, deletes, monitors, performing one of them, or any combination wherein;When the task center has the one or more task to meet trigger condition in task groups, it is believed that the task groups meet trigger condition.
Further, the trigger condition of the task includes one kind or its any combination in following situations:There is predetermined implementing result, reach the scheduled time;The type of the task is divided into following several:As long as needing to obtain sequence type task that predetermined implementing result could perform, needing the timing type task started in the scheduled time, need while meeting both the above condition or meeting the Hybrid tasks of any of which condition.
Further, task center is according to a kind of execution task in following two modes:
Parallel action method, task pool is monitored while the task of execution, the task just parallel execution for meeting trigger condition occurs;Or
Mode is independently executed, it is once to perform the meeting trigger condition of the task, obtain starting to monitor task pool again after implementing result;During using independently executing mode, when two or more tasks meets trigger condition simultaneously, the task center is performed successively from high to low according to the priority of task.
Further, the implementing result of task is fed back to user by task center.
Further, task center is issued to task pool after the instruction of adding and deleting task group, and by task groups, whether additions and deletions successfully feed back to user.
Technical scheme provides a kind of method for being automatically performed self-defining operation for the base station sub-system BSS and switching subsystem MSS in GSM, is that the new website of mobile communcations system is opened, station upgrading, fault location etc. provide a set of Operation and Maintenance technology easy to use, flexible and efficient always.Particularly in the case of unattended duty, user can pre-set task, overcome existing as much as possible The shortcoming manually frequently intervened is needed in network management technology.Summary of drawings
Fig. 1 is the structure chart of the NMS for being automatically performed self-defining operation of the present invention;Fig. 2 is the flow chart of the increase task groups of the present invention;
Fig. 3 is the flow chart of execution task in the embodiment of the present invention.
The better embodiment of the present invention
Technical scheme is described in detail below in conjunction with drawings and Examples.Referring to Fig. 1, a kind of NMS for being automatically performed self-defining operation, the system includes task center and task pool;
Task pool, is the task container for depositing user-defined task groups, and according to the instruction adding and deleting task group at task center, the task groups can include the task of one or more;But not excluding the presence of does not have the situation of task yet in task groups, i.e. idle task group.
Task center, is to perform the Logical processing unit with management role group, and the instruction of task groups is increased for receiving user-defined task groups and being sent to task pool, and the task groups in monitoring task pool, and performs the task groups for meeting trigger condition.Task center is always according to user command or represents that task groups perform the instruction that correct implementing result sends deletion task groups to task pool, and task pool deletes task groups according to the instruction;And after the implementing result of the task that obtains and/or task groups, the implementing result is fed back into user.
The task groups being previously mentioned in the present invention include one or its combination in following several task groups:The task groups of the task groups of one or more modules, the task groups of one or more veneers, and one or more base stations.
The operation of the user, task pool and task center to task groups is actually decomposed into the operation to each task in task groups.The operation at least includes definition, additions and deletions, monitoring and performs one of them, or any combination wherein.When thering is the one or more task to meet trigger condition in task groups, that is, think that the task groups meet trigger condition.When task center performs one or more tasks in task groups, that is, think that task center is performing the task groups.
Task center is according to a kind of execution task in following two modes: Parallel action method, task pool is monitored while the task of execution, the task just parallel execution for meeting trigger condition occurs;Or
Mode is independently executed, it is once to perform the meeting trigger condition of the task, obtain starting to monitor task pool again after implementing result;During using independently executing mode, when two or more tasks meets trigger condition simultaneously, the task center is performed successively from high to low according to the priority of task.
In actual applications, user firstly the need of define task groups and its comprising each task, user define task groups when task is planned;The planning of task because system implementations are different with the specific needs of system constructing personnel and it is different, each task includes following several key elements:
1. task number:The unique mark of task.
2. task trigger condition:The trigger condition of task includes one kind or its combination in following situations:The scheduled time is reached, predetermined implementing result occurs.The trigger condition of one task can be with more than one, than if any task A, it is task B successes, task C failures that its trigger condition, which can be defined as, reach any one of the scheduled time in these three, it can also as needed be defined as being that must simultaneously meet three, can also be defined as meeting the different situations such as any two.Implementing result mentioned here both can be that task can also be task groups.
3. task type:The affiliated type of task, divided according to trigger condition, type include it is following it is several in it is a kind of need reach the scheduled time start timing type task, the sequence type task that can be just performed after there is predetermined implementing result is needed, as long as and needing to meet both the above condition simultaneously or meet the Hybrid tasks of any of which condition.
4. task definition:Task needs the function of performing.
5. the criterion of task action result:Define that what situation belongs to that tasks carrying is correct or perform incorrect, i.e., Mission Success still fails;The criterion can be defined according to actual needs, such as it is to perform correctly, otherwise to be incorrect that can define when obtaining a numerical value;Define for another example and reach desired effects within a certain period of time to perform correctly, otherwise to be incorrect.In practical application, can flexibly it define.In the task of execution, the implementing result of task is judged by task center.
6. the priority of task:The key element is only when task center when independently executing mode using just existing, and more urgent or more important task, preferential Grade is higher.
The task that is mutually related is included in one task groups.Each task groups include following key element: 1. task group identification:For uniquely identifying task groups;
2. task groups content:I.e. which task is task groups include;
3. the criterion of task groups implementing result:Any situation defined belong to task groups and perform correct or perform incorrect, i.e. task groups success or failure;The criterion is defined according to the combination of each task action result in group, such as one task groups have three tasks, it is that task groups are performed correctly that can define when three tasks are carried out correct, and when having any one tasks carrying incorrect, task groups perform incorrect;Even if being performed correctly as long as any two of which can also be defined and perform correct task groups.In actual applications, it can come flexibly to define as needed.It should be noted that in some cases, even if also having task to be not carried out in task groups, task groups may have implementing result." when any one tasks carrying is incorrect, task groups perform incorrect " is such as defined, as long as occurring performing incorrect task at this moment organizing, task action result is just incorrect.The implementing result of task groups is also to be judged by task center.
4. task set type:The trigger condition for occupying task in group is divided into timing type task groups, sequence type task groups and Hybrid tasks group.
When task or task groups perform incorrect, the task of re-executing or task groups can be set by defining trigger condition, there are two tasks of X, Y in such as task groups, task Y trigger condition is " task X performs correct " and any one in " task Y performs incorrect ";And one of task X trigger condition is:This task groups performs incorrect;When task groups execution is incorrect, task X, Y will be re-executed, that is, re-executes the task groups;When task Y execution is incorrect, bifurcation will be re-executed.
User, can be according to flexible selection task the need for system operatio in planning tasks, self-defined corresponding task and task groups in different situations.
It is a kind of to realize the method for being automatically performed self-defining operation, comprise the following steps:
(a) user defines the task groups of at least one task and is sent to task center, and each task includes task number, task definition, trigger condition, task type and task action result, can also carry the priority of task;
(b) task center receives user-defined task groups, and issues the instruction of increase task groups to task pool, and task pool preserves task groups, and successfully feeds back to user by whether task groups increase;
The step of the above two is that task center increases the flow of task groups, as shown in Figure 2. (c) after system work, task center monitors whether to meet the task groups of trigger condition in task pool, if then performing step(d ) ;Do not continue to(C ) ;
Generally, system can start to perform corresponding timing type task groups when reaching some time first.
(d) task center performs the task groups for meeting trigger condition, obtains task groups implementing result, implementing result is fed back to user by task center;When occurring representing that task groups perform correct implementing result, task center issues the instruction for deleting the task groups to task pool, and task pool deletes the task groups;Return(c ) .
Task center can also require that task pool deletes corresponding task groups when being connected to user command.Task center is issued to task pool after the instruction for deleting task groups, and user is successfully fed back to by whether task groups delete.
Operation of the task center to task groups is actually decomposed into the operation to each task in task groups.The operation at least includes definition, additions and deletions, monitoring and performs one of them or its any combination.When one or more tasks meet trigger condition in task groups, that is, think that the task groups meet trigger condition;Task center is according to the trigger condition of each task in task groups, the implementing result of such as upper a task or task groups success or failure one by one, or be to reach predetermined time, then or meet two above condition simultaneously, to determine whether task groups need startup.The implementing result of task can also be fed back to user by task center.Because the task in a task groups is mutually related, so when can also be set in the implementing result for obtaining task, first look in the task groups where it whether the implementing result in need is triggered, and meet the task of trigger condition;If not provided, going to monitor task pool again.
The trigger condition and type of the task, task center are performed to be had in the superincumbent description of the implementing result of mode and task and task groups of task, is repeated no more.
Further it is illustrated with the application example of the present invention below, this exemplary application is in CDMA (CDMAs)Channel board edition upgrading in system.
A usual BTS is made up of multiple channel boards, describes to assume that a BTS has two channel boards in this example for convenience.Mission planning is carried out first, the liter Grade of channel board at least needs version loading, non-volatile, the Ge Bu Sudden of board resetting three, version rollback is also needed to when edition upgrading failure, therefore defines the task groups being made up of version loading tasks, non-volatile task, board resetting task, version rollback task. Wherein version loading tasks are timing type tasks, and its trigger condition is to reach the scheduled time.Other tasks are all sequence type task;The trigger condition of non-volatile task is the success of version loading tasks, that is, it is that non-volatile Mission Success, the trigger condition of version rollback task are board resetting mission failures to perform the correct and trigger condition of board resetting task, that is, is performed unsuccessful.
The task groups are performed correct when version loading tasks, non-volatile task, board resetting task all succeed;When have in this three one it is incorrect when, perform it is incorrect.
Because the traversal of task in the traversal and task groups of task groups in task pool implements essentially identical, only the flow of description upgrading task groups is realized here, as shown in Figure 3:
Bu Sudden 1, task Spot detection are arrived to timer, and the trigger condition of version loading tasks is met, and are initiated the instruction of version loading tasks, are performed version loading tasks;
Step 2, task center judge whether version loading tasks perform correctly, and the trigger condition of non-volatile task is met if correct, perform step 3;Otherwise, step 8 is performed;
Non-volatile assignment instructions are initiated at step 3, task center, perform non-volatile task;Bu Sudden 4, task center judge whether non-volatile task performs correctly, and the trigger condition of board resetting task is met if correct, perform step 5;Otherwise, Bu Sudden 8 are performed;
Board resetting assignment instructions are initiated at step 5, task center, perform board resetting task;Step 6, task center judge whether board resetting task performs correctly, and the trigger condition of version rollback task is met if failure, perform step 7;Otherwise, step 8 is performed;
Bu Sudden 7, task center perform version rollback task;
Step 8, the implementing result for feeding back to user task.Certainly, the implementing result for feeding back to user task group can also be set to here.
If it is desired to setting is re-executed when the task groups perform incorrect, then the trigger condition of version loading tasks can be set to meet any one following trigger condition:Reach the scheduled time, or the task groups perform it is incorrect.
Industrial applicibility
The advantage of the invention is that User Defined task and task groups further realize operating process standard Change, operating process are intelligent, and it is avoided as much as the artificial shortcoming frequently intervened and progressively allows part operation to realize unattended duty function, so that user is using more flexible and convenient, technical scheme is not only applicable to the task groups of a module, the task groups suitable for a veneer or multiple veneers, is also applied for task groups of a base station or multiple base stations etc..Research and development and implementation of the present invention to other similar functions have reference.

Claims (1)

  1. Claims
    1st, a kind of NMS for being automatically performed self-defining operation, it is characterised in that including:Task pool, is the task container for depositing user-defined Ren Wu Group, and the instruction issued according to task center increases task groups;
    Task center, be perform and management role group Logical processing unit, for receiving user-defined task groups and issuing the task groups in the instructions of increase task groups, monitoring task pool to task pool and execution meets the task groups of trigger condition.
    2nd, the system as claimed in claim 1, it is characterised in that:According to the instruction task groups are deleted according to user's life business pond is blunt in the task center.
    3rd, the system as claimed in claim 1, it is characterised in that:The implementing result is fed back to user by the task center after the implementing result of task groups is obtained.
    4th, system as claimed in claim 2, it is characterised in that:The task groups at least include a task, and the operation to task groups is actually decomposed into the operation to each task in task groups;The operation to each task at least includes definition, increase, deletes, monitors, performing one of them, or any combination wherein;When the task center has the one or more task to meet trigger condition in task groups, it is believed that the task groups meet trigger condition.
    5th, system as claimed in claim 4, it is characterised in that the trigger condition of the task include it is following it is several in one kind or its any combination:There is predetermined implementing result, reach the scheduled time;The type of the task is divided into following several:As long as needing to obtain sequence type task that predetermined implementing result could perform, needing the timing type task started in the scheduled time, need while meeting both the above condition or meeting the Hybrid tasks of any of which condition;
    The task center when obtaining predetermined implementing result, or reach the scheduled time when, or not only obtained predetermined implementing result again arrival the scheduled time when, start to perform corresponding task.
    6th, system as claimed in claim 4, it is characterised in that task center is according to a kind of execution task in following two modes:
    Parallel action method, task pool is monitored while the task of execution, the task just parallel execution for meeting trigger condition occurs;Or Mode is independently executed, it is once to perform the meeting trigger condition of the task, obtain starting to monitor task pool again after implementing result;During using independently executing mode, when two or more tasks meets trigger condition simultaneously, the task center is performed successively from high to low according to the priority of task.
    7th, system as claimed in claim 4, it is characterised in that:The implementing result is fed back to user by the task center after the implementing result for the task that obtains.
    8th, a kind of method for being automatically performed self-defining operation, it is characterised in that the described method comprises the following steps:
    (a) user defines task groups and is sent to task center;
    (b) task center receives user-defined task groups, and issues to task pool the instruction of increase task groups;Task pool preserves task groups;
    (c) whether there are the task groups for meeting trigger condition in tasks center monitors task pool, if then starting step(D), if it is not, continuing(c ) ;
    ) task center performs and meet the task groups of trigger condition, obtains implementing result;Return(c ).
    9th, method as claimed in claim 8, it is characterised in that the step(D) also include:The implementing result of task groups is fed back to user by task center.
    10th, method as claimed in claim 8, it is characterised in that:Appoint business Group instruction according to user instruction or the correct implementing result of expression task groups execution issue deletion to task pool, the task pool deletion task groups in the task center.
    11st, method as claimed in claim 8, it is characterised in that:The task groups at least include a task;Each task at least includes following key element:Task identification, task definition, the criterion of trigger conditions and task action result;
    The operation to task groups is actually decomposed into the operation to each task in task groups;The operation to each task at least includes definition, increase, deletes, monitors, performing one of them, or any combination wherein;When the task center has the one or more task to meet trigger condition in task groups, it is believed that the task groups meet trigger condition.
    12nd, method as claimed in claim 11, it is characterised in that the trigger condition of the task includes one kind or its any combination in following situations:There is predetermined implementing result, reach the scheduled time;The type of the task is divided into following several:Need to obtain the sequence type that predetermined implementing result could be performed As long as the timing type task that task, needs start in the scheduled time, needs meet both the above condition simultaneously or meet the Hybrid tasks of any of which condition.
    13rd, method as claimed in claim 11, it is characterised in that task center is according to a kind of execution task in following two modes:
    Parallel action method, task pool is monitored while the task of execution, the task just parallel execution for meeting trigger condition occurs;Or
    Mode is independently executed, it is once to perform the meeting trigger condition of the task, obtain starting to monitor task pool again after implementing result;During using independently executing mode, when two or more tasks meets trigger condition simultaneously, the task center is performed successively from high to low according to the priority of task.
    14th, method as claimed in claim 11, it is characterised in that:The implementing result of task is fed back to user by task center.
    15th, method as claimed in claim 10, it is characterised in that:Task center is issued to task pool after the instruction of adding and deleting task group, and by task groups, whether additions and deletions are successful
CN 200680055524 2006-11-14 2006-11-14 A network managing system for completing customized operation automatically and a method thereof Active CN101502149B (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/CN2006/003053 WO2008058422A1 (en) 2006-11-14 2006-11-14 A network managing system for completing customized operation automatically and a method thereof

Publications (2)

Publication Number Publication Date
CN101502149A true CN101502149A (en) 2009-08-05
CN101502149B CN101502149B (en) 2012-05-30

Family

ID=39401300

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200680055524 Active CN101502149B (en) 2006-11-14 2006-11-14 A network managing system for completing customized operation automatically and a method thereof

Country Status (2)

Country Link
CN (1) CN101502149B (en)
WO (1) WO2008058422A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101883372A (en) * 2010-06-28 2010-11-10 中兴通讯股份有限公司 Automatically updating method and device of wireless communication equipment
CN102572896A (en) * 2012-02-23 2012-07-11 中兴通讯股份有限公司 Upgrading method and upgrading device for wireless communication system

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108228329A (en) * 2018-02-02 2018-06-29 观相科技(上海)有限公司 A kind of packet scheduling system
CN112579279B (en) * 2020-12-25 2024-02-09 广州威茨热能技术有限公司 Boiler controller serial communication method, storage device and mobile terminal

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050120352A1 (en) * 2003-11-28 2005-06-02 Sun Microsystems, Inc. Meta directory server providing users the ability to customize work-flows
US20050223046A1 (en) * 2004-04-06 2005-10-06 Smith Rick A Method and system for balancing and scheduling database maintenance tasks
CN100512139C (en) * 2004-11-11 2009-07-08 中兴通讯股份有限公司 Real-time data inspection method based on multi-customer end and multi-task
CN1851735A (en) * 2005-09-09 2006-10-25 华为技术有限公司 Method and device for making mobile terminal automatic execute task

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101883372A (en) * 2010-06-28 2010-11-10 中兴通讯股份有限公司 Automatically updating method and device of wireless communication equipment
CN102572896A (en) * 2012-02-23 2012-07-11 中兴通讯股份有限公司 Upgrading method and upgrading device for wireless communication system
CN102572896B (en) * 2012-02-23 2018-11-09 南京中兴新软件有限责任公司 A kind of wireless telecommunication system upgrade method and update device

Also Published As

Publication number Publication date
CN101502149B (en) 2012-05-30
WO2008058422A1 (en) 2008-05-22

Similar Documents

Publication Publication Date Title
CN101888655A (en) Method and device for configuring network element data in template way in network management system
CN101404568A (en) Double-network card hot backup redundancy method
CN102970699B (en) A kind of fault handling method and distributed base station
CN101150830B (en) Software packet upgrade method and device
CN113051137B (en) Design method of extensible server remote health management system
CN101502149A (en) A network managing system for completing customized operation automatically and a method thereof
CN104077159A (en) Small cell system parameter attribute configuration method and device
CN102158875A (en) Equipment information acquiring method and system
CN101651558B (en) Power saving management method and system
CN102869032B (en) Device and method for monitoring and alarming power supply of base station
CN101022633B (en) Allocation data recovering method, system and device
CN107529180B (en) Base station cloud test environment construction device and method
CN101738980B (en) Machine tool embedded parameter backup device
CN100563356C (en) The message tracing method of distributed management system
CN106372857A (en) Method and system for automatically establishing project
CN101202644A (en) Data backup and recovery method
CN113194124B (en) Distributed real-time database-based DCS background multi-node directory synchronization method
CN103354505A (en) Method for batch upgrading of electronic device cluster software
CN104753703A (en) Method and system for controlling network topology
CN103441872A (en) Failure recovery method, device and communication system of user side equipment
CN109828489B (en) General type comprehensive monitoring preposed communication controller software
CN101155061B (en) Master/standby control method
CN102142993B (en) Method for implementing network management system of communication system
CN102316485B (en) Method, system and equipment for modifying cell parameters
CN101420788B (en) Communication interface board parameter configuring method in mobile communication base station system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant