CN101476336B - 深埋地下透水通道封堵方法 - Google Patents
深埋地下透水通道封堵方法 Download PDFInfo
- Publication number
- CN101476336B CN101476336B CN200810246320XA CN200810246320A CN101476336B CN 101476336 B CN101476336 B CN 101476336B CN 200810246320X A CN200810246320X A CN 200810246320XA CN 200810246320 A CN200810246320 A CN 200810246320A CN 101476336 B CN101476336 B CN 101476336B
- Authority
- CN
- China
- Prior art keywords
- calking
- hole
- water
- shutoff
- permeable passage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
一种深埋地下透水通道封堵方法,采用的技术方案是首先测量主透水通道出露点的流速、流量;向透水通道分上游、中游和下游钻三个封堵孔,以不超过孔径的1/3选择封堵材料的粒径;在上游孔内用高压风向孔内吹投封堵石料;在中游孔用高压风向进行模袋混凝土封堵;在下游孔用高压风进行投注石料封堵;待出漏点渗水明显减少后,在上游孔和中游孔进行膏浆灌浆,直至彻底封堵渗水。本发明所提供的地下透水通道封堵方法,通过采用设置上游孔、中游孔和下游孔的方法,用石料、模袋混凝土膏浆灌浆相结合进行地下透水通道的封堵,钻孔封堵针对性强,大大提高了封堵效率,同时减少封堵工作量,也降低了封堵成本。
Description
技术领域
本发明涉及地下透水通道封堵处理技术领域。
技术背景
在基础建设或煤矿开采过程中,经常会在地下洞室开挖、煤层开采或矿物探采施工中遭遇到打通透水体的情况,轻者工程设施受损,严重的导致地下工程或矿井设施完全报废甚至重大生命财产损失。
发明内容
本发明的目的就是要提供一种可快速对地下深埋透水通道进行封堵的方法。
本发明的目的是这样实现的:一种深埋地下透水通道封堵方法,
测量主透水通道出露点的流速、流量;
向透水通道分上游、中游和下游钻三个封堵孔,即上游孔、中游孔和下游孔;
以不超过孔径的1/3选择封堵材料的粒径;
在上游孔内用高压风向孔内吹投封堵石料;
在中游孔用高压风进行模袋混凝土封堵;
在下游孔用高压风进行投注石料封堵;
待出漏点渗水明显减少后,在上游孔和中游孔进行膏浆灌浆,直至彻底封堵渗水;
在下游孔侧再次吹填封堵石料,加强封堵体,完成封堵作业。
模袋混凝土是用编织袋装普通标号普通混凝土。
膏浆灌浆所用的浆液是以重量比计水∶水泥为1∶1或3∶1。
膏浆灌浆所用的浆液是以重量比计为水∶水玻璃为1∶1或3∶1。
在上游孔、中游孔和下游孔内加装护壁钢套。
本发明所提供的深埋地下透水通道封堵方法,通过采用设置上游孔、中游孔和下游孔的方法,用石料、模袋混凝土膏浆灌浆相结合进行地下透水通道的封堵,钻孔封堵针对性强,大大提高了封堵效率,同时减少封堵工作量,也降低了封堵成本。
附图说明
下面结合附图和实施例对发明作进一步说明。
图1是本发明的工作原理图。
具体实施方式
实施例:
通过测量得到主透水通道出露点的流速为流速0.5m/s、流量为2.5m3/s;
向透水通道分上游、中游和下游钻三个封堵孔,即上游孔1、中游孔2和下游孔3,孔径为100毫米,孔深80m,在上游孔1、中游孔2和下游孔3内加装护壁钢套4。
选择15-25毫米粒径的石料,
在上游孔1内用高压风向孔内吹投封堵石料;
在中游孔2内用高压风向进行模袋混凝土封堵,模袋混凝土5是用编织袋装普通标号普通混凝土;
在下游孔3用高压风进行投注石料封堵,形成投注石料区6;
待出漏点渗水明显减少后,在上游孔1和中游孔2进行膏浆灌浆,直至彻底封堵渗水;
在下游孔3侧再次吹填封堵石料,加强封堵体,形成二次投注石料区7完成封堵作业。
膏浆灌浆所用的浆液以重量比计水∶水泥为1∶1或3∶1。或者以重量比计水∶水玻璃为1∶1或3∶1。
Claims (5)
1.一种深埋地下透水通道封堵方法,其特征在于:
测量主透水通道出露点的流速、流量;
向透水通道分上游、中游和下游钻三个封堵孔,即上游孔(1)、中游孔(2)和下游孔(3);
以不超过孔径的1/3选择封堵材料的粒径;
在上游孔(1)内用高压风向孔内吹投封堵石料;
在中游孔(2)用高压风进行模袋混凝土封堵;
在下游孔(3)用高压风进行投注石料封堵;
待出漏点渗水明显减少后,在上游孔(1)和中游孔(2)进行膏浆灌浆,直至彻底封堵渗水;
在下游孔(3)侧再次吹填封堵石料,加强封堵体,完成封堵作业。
2.根据权利要求1所述的深埋地下透水通道封堵方法,其特征在于:模袋混凝土是用编织袋装普通标号普通混凝土。
3.根据权利要求1所述的深埋地下透水通道封堵方法,其特征在于:膏浆灌浆所用的浆液是以重量比计水:水泥为1∶1或3∶1。
4.根据权利要求1所述的深埋地下透水通道封堵方法,其特征在于:膏浆灌浆所用的浆液是以重量比计为水:水玻璃为1∶1或3∶1。
5.根据权利要求1所述的深埋地下透水通道封堵方法,其特征在于:在上游孔(1)、中游孔(2)和下游孔(3)内加装护壁钢套(4)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200810246320XA CN101476336B (zh) | 2008-12-26 | 2008-12-26 | 深埋地下透水通道封堵方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200810246320XA CN101476336B (zh) | 2008-12-26 | 2008-12-26 | 深埋地下透水通道封堵方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101476336A CN101476336A (zh) | 2009-07-08 |
CN101476336B true CN101476336B (zh) | 2012-05-30 |
Family
ID=40837111
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN200810246320XA Active CN101476336B (zh) | 2008-12-26 | 2008-12-26 | 深埋地下透水通道封堵方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101476336B (zh) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101881015B (zh) * | 2010-05-31 | 2011-06-15 | 长江水利委员会长江勘测规划设计研究院 | 气动抛投散粒体地洞堵水的方法 |
CN109610412B (zh) * | 2018-11-29 | 2020-12-04 | 云南省红河州水利水电勘察设计研究院 | 一种岩溶地区地下暗河封堵结构及封堵方法 |
CN110042840A (zh) * | 2019-05-24 | 2019-07-23 | 中水北方勘测设计研究有限责任公司 | 一种陡倾角块状镶嵌结构岩体的帷幕注浆方法 |
-
2008
- 2008-12-26 CN CN200810246320XA patent/CN101476336B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN101476336A (zh) | 2009-07-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102121395B (zh) | 低渗透单一煤层瓦斯综合治理一体化的方法 | |
CN102635327B (zh) | 破碎煤岩体注浆方法及系统 | |
CN109322699B (zh) | 一种矿井下污染隔离封堵技术 | |
CN106703692A (zh) | 一种地面定向顺层钻孔注浆加固薄层灰岩的方法 | |
CN105952475A (zh) | 一种煤矿残采区冒落废巷注浆加固工艺与方法 | |
CN110130936B (zh) | 一种盾构掘进过程中突遇未处理溶洞或裂隙的施工方法 | |
CN103510957A (zh) | 一种组合式石门揭煤方法 | |
CN104033160A (zh) | 一种适用于软土地层的浅埋暗挖隧道新型支护方法 | |
CN101526003B (zh) | 高压大流量稳定地下涌水封堵处理方法 | |
CN106837382B (zh) | 一种地铁隧道围岩地面预注浆加固工艺 | |
CN114472462B (zh) | 一种井下-井上联动煤矸石处置系统及处置方法 | |
CN111335943A (zh) | 一种利用顶板垮落碎胀充填与定向钻孔点源式间隔注浆减损方法 | |
CN105351001A (zh) | 一种基于沿空留巷区域加固瓦斯抽采的方法 | |
CN202023532U (zh) | 一种煤矿注浆加固用封孔器 | |
CN101476336B (zh) | 深埋地下透水通道封堵方法 | |
CN111156031A (zh) | 一种综采工作面构造区深孔分阶段增压注浆方法 | |
CN112855073B (zh) | 一种石门揭煤过程中利用微生物固化煤层的装置及方法 | |
CN104712288A (zh) | 泥质胶结软弱岩土体高能气体致裂注浆方法 | |
CN214697785U (zh) | 一种石门揭煤过程中利用微生物固化煤层的装置 | |
CN204511371U (zh) | 煤矿井下双液注浆孔底混合器 | |
CN111485936B (zh) | 一种提高瓦斯抽采效果的封孔方法 | |
CN100494630C (zh) | 软煤巷道高压涌水条件下快速构筑水闸墙的方法 | |
CN103174135A (zh) | 不达标后注浆灌注桩的修补方法 | |
CN202531098U (zh) | 破碎煤岩体注浆系统 | |
CN109555536B (zh) | 一种分层分序多浆液联合减压截断注浆控制方法及系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |