CN101451880B - Weighting discharger for loose cement - Google Patents

Weighting discharger for loose cement Download PDF

Info

Publication number
CN101451880B
CN101451880B CN2007101932925A CN200710193292A CN101451880B CN 101451880 B CN101451880 B CN 101451880B CN 2007101932925 A CN2007101932925 A CN 2007101932925A CN 200710193292 A CN200710193292 A CN 200710193292A CN 101451880 B CN101451880 B CN 101451880B
Authority
CN
China
Prior art keywords
hopper
support
discharge shutter
bulk cement
track bracket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2007101932925A
Other languages
Chinese (zh)
Other versions
CN101451880A (en
Inventor
温兴亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2007101932925A priority Critical patent/CN101451880B/en
Publication of CN101451880A publication Critical patent/CN101451880A/en
Application granted granted Critical
Publication of CN101451880B publication Critical patent/CN101451880B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Filling Or Emptying Of Bunkers, Hoppers, And Tanks (AREA)
  • Preparation Of Clay, And Manufacture Of Mixtures Containing Clay Or Cement (AREA)

Abstract

The invention relates to a metering rover for bulk cement applicable for bulk cement jar belonging to the bulk cement technology field, composed of five sections of a support track bracket, an upper hoper, a lower hopper, a discharge shutter, a support bearing suspension screw. The support track bracket is connected with a flange disc of the lower hopper of the bulk cement jar. The upper and lower hoppers are suspended on the support track bracket via four support bearing suspension screws. The lower hopper is sleeved externally on the upper hopper. Accurate meter can be adjusted by nut on the support bearing suspension screw. The discharge shutter is supported by two carrier roller bearings and rolling shaft bearings. The two carrier roller bearings are fixed on the support track bracket; two rolling shaft bearings are fixed at the lower part of the discharge shutter. The invention solves a problem of un-intuitional meter and hardly adjustment in the metering technology, characterized in accurate metering, simple structure, easy operation, convenient manufacturing and dust-proof environment.

Description

Weighting discharger for loose cement
Technical field
The present invention relates to the bulk cement equipment technical field, weighting discharger for loose cement is applied to the metering and the discharging of various building ground bulk cement tank.
Background technology
In bulk cement is applied, require the bulk cement accurate measurement directly perceived; The weighting discharger for loose cement that on existing building ground, uses, owing to adopted fixing volume, and the unit weight of each producer's cement can not be adjusted when variant, does not also know whether fill, and causes metering inaccurate; The just discharger that has does not have metering, has plenty of the electronics metering but costs an arm and a leg and need power supply, safeguards inconvenience, the failure rate height.
Summary of the invention
The objective of the invention is to overcome above-mentioned deficiency, a kind of weighting discharger for loose cement that volume adjusted, loading and unloading light, dustless operation, accurate measurement are applied to bulk cement tank intuitively of being convenient to is provided.
Purpose of the present invention can reach like this, is applied to the weighting discharger for loose cement of bulk cement tank, hangs screw rod five parts by support track bracket, elevating hopper, hopper, discharge shutter, spring bearing and forms.Support track bracket has two tracks that are parallel to each other and is connected in four cross bars between two tracks that are parallel to each other; These four cross bars are divided into three parts with two tracks that are parallel to each other, and the centre is a square flange hole, and size is the same with the flange size of bulk cement tank feed opening, connect with bulk cement tank with the ring flange attachment bolt; Bulk cement can be from this orifice flow to the upper and lower hopper that measures discharger; Between the square flange hole of centre and bulk cement tank feed opening, establish a maintenance flashboard, sealed with sealing strip when need not to overhaul at ordinary times; Two other is a slot, the both sides of square flange hole in the middle of laying respectively at, about symmetrically, the slot on the left side is near one of centre square flange hole below welding and middle square flange hole size seal pad of a size, whether remaining do not have the part of sealing to fill for the bulk cement that the discharging workman observes in the hopper, so be called view window; Four spacing track strips of two inboard welding of the track that is parallel to each other are the reinforcement of two tracks that are parallel to each other, and can guarantee that again spring bearing rolls along predetermined track.
Elevating hopper is made up of two support rails, tetrahedron, feed flashboard, dust collecting sleeve; The two ends of two support rails have one for hanging the circular hole that screw rod passes; The elevating hopper tetrahedron is converted into end face with steel plate and the bottom surface all communicates, welding two support rails in the outside before and after the elevating hopper tetrahedron top, left side of welding cuts away the feed flashboard of a square hole (littler 1 centimetre than the square flange hole length of side in the middle of the support track bracket) above elevating hopper tetrahedron and two support rails; Bore the external dust collecting sleeve of vent port at elevating hopper tetrahedron right flank.
Hopper is made up of two support rails and hopper tetrahedron, and the two ends of two support rails have one for hanging the circular hole that screw rod passes; The hopper tetrahedron is converted into end face with steel plate and communicates, and the bottom surface is converted into one and falls trapezoidal tetrahedron.Welding two support rails in the outside before and after the hopper tetrahedron top, hopper is socketed in the outside of elevating hopper.
Discharge shutter is made up of discharging track, rolling bearing, Idler bearing, discharge shutter; The discharging track is welded on by four angle steel below four corner angle of hopper, and rolling bearing is fixed on the both sides of discharge shutter by a steel bar that is welded on the discharge shutter below, and rolls on the discharging track; Idler bearing is fixed on the discharging track support by a steel bar, and discharge shutter just can slide on Idler bearing; Discharge shutter is to be made of a steel plate that is converted into the U type, so not only has been convenient to discharging but also not yielding; The discharging track is arranged to certain small inclination, is convenient to the rolling and the discharging of rolling bearing.
Spring bearing hangs screw rod and is made up of spring bearing, setting nut, suspension screw rod; Spring bearing is installed on the steel bar and hangs screw rod and connects to be placed on the support track bracket and roll; Hang screw rod and be punctured in the circular hole of two support rails of upper and lower hopper, and screw on the setting nut just gap and the bucket capacity of scalable and support track bracket respectively.
The present invention compared with prior art has following advantage:
1, feed and discharge shutter have used rolling bearing, and charging and discharging are all very light.
2, whether the cement in the hopper can be observed and fill, thus accurate measurement.
3, simple in structure, processing ease, cost of manufacture is low, dustless operation.
Description of drawings:
Accompanying drawing 1: the front view that is structural representation of the present invention
1 is that spring bearing 2 is that support track bracket 3 is that setting nut 4 is that suspension screw rod 5 is that dust collecting sleeve 6 is that sealing strip 7 is that rolling bearing 8 is that discharging track 9 is that Idler bearing 10 is that discharge shutter 11 is that hopper 12 is that hopper support rail 13 is that elevating hopper support rail 14 is that view window 15 is that seal pad 16 is that maintenance flashboard 17 is that elevating hopper 18 is that ring flange attachment bolt 19 is that feed flashboard 20 is limit guide rail bars among the figure.
Accompanying drawing 2: the left view that is structural representation of the present invention
1 is that spring bearing 2 is that support track bracket 3 is that setting nut 4 is that suspension screw rod 5 is that dust collecting sleeve 6 is that sealing strip 7 is that rolling bearing 8 is that discharging track 9 is that Idler bearing 10 is that discharge shutter 11 is that hopper 12 is that hopper support rail 13 is that elevating hopper support rail 17 is that elevating hopper 19 is that feed flashboard 20 is limit guide rail bars among the figure.
Accompanying drawing 3: the vertical view that is structural representation of the present invention
1 is that spring bearing 2 is that support track bracket 3 is that setting nut 4 is that suspension screw rod 6 is that sealing strip 13 is that elevating hopper support rail 14 is that view window 15 is that seal pad 18 is that ring flange attachment bolt 19 is that feed flashboard 20 is limit guide rail bars among the figure.
Embodiment:
The present invention is further described in conjunction with the accompanying drawings.
Weighting discharger for loose cement hangs screw rod 4 five parts by support track bracket 2, elevating hopper 17, hopper 11, discharge shutter 10, spring bearing and forms.
Support track bracket 2 has two tracks that are parallel to each other and is connected in four cross bars between two tracks that are parallel to each other; These four cross bars are divided into three parts with two tracks that are parallel to each other, and the centre is a square flange hole, and size is the same with the ring flange size of bulk cement tank feed opening, connect with bulk cement tank with ring flange attachment bolt 18; Bulk cement can be from this orifice flow to the volume that measures discharger elevating hopper 17 and hopper 11 sockets; Between the square flange hole of centre and bulk cement tank feed opening, establish a maintenance flashboard 16, sealed with sealing strip when need not to overhaul at ordinary times; Two other is a slot, the both sides of square flange hole in the middle of laying respectively at, about symmetrically, the slot on the left side is near one of the square flange hole in centre below welding and the same seal pad 15 of middle square flange hole size, whether remaining do not have the part of sealing to fill for the bulk cement that the discharging workman observes in the hopper, so be called view window 14; Four limit guide rail bars 20 of two inboard welding of the track that is parallel to each other are the reinforcement of two tracks that are parallel to each other, and can guarantee that again spring bearing 1 rolls along predetermined track.
Elevating hopper 17 is made up of two elevating hopper support rails 13, feed flashboard 19, dust collecting sleeve 5; The two ends of two elevating hopper support rails 13 have one for hanging the circular hole that screw rod passes; The tetrahedron of elevating hopper 17 is converted into end face with steel plate and the bottom surface all communicates, the tetrahedron of elevating hopper 17 is by welding two elevating hopper support rails 13 in the outside before and after the top, and left side of welding cuts away the feed flashboard 19 of a square hole (littler 1 centimetre than the square flange hole length of side in the middle of the support track bracket) above the tetrahedron of elevating hopper 17 and two elevating hopper support rails 13; Bore the external dust collecting sleeve 5 of vent port at elevating hopper 17 tetrahedron right flank places.
Hopper 11 is made up of the tetrahedron of two hopper support rails 12, hopper 11; The two ends of two hopper support rails 12 have one for hanging the circular hole that screw rod passes; The tetrahedron of hopper 11 is converted into end face with steel plate and communicates, and the bottom surface is converted into one and falls trapezoidal tetrahedron, welding two hopper support rails 12 in the outside before and after the tetrahedron top of hopper 11, and hopper 11 is socketed in the outside of elevating hopper 17.
Discharge shutter 10 is made up of discharging track 8, rolling bearing 7, Idler bearing 9; Discharging track 8 is welded on four corner angle belows of hopper 11 by four angle steel; Rolling bearing 7 is fixed on the both sides of discharge shutter 10 by a steel bar that is welded on discharge shutter 10 belows, and rolls on discharging track 8; Idler bearing 9 is fixed on the support of discharging track 8 by a steel bar, and discharge shutter 10 just can slide on Idler bearing 9; Discharge shutter 10 is to be made of a steel plate that is converted into the U type, so not only has been convenient to discharging but also not yielding; Discharging track 8 is arranged to certain inclination angle, is convenient to the rolling and the discharging of rolling bearing 7.
Spring bearing hangs screw rod 4 and is made up of spring bearing 1, setting nut 3, suspension screw rod 4; Spring bearing 1 is installed on the steel bar and hangs the connection of screw rod 4 snap closes and is placed on rolling on the support track bracket 2; Hang screw rod 4 and be punctured in the circular hole of elevating hopper support rail 13 and hopper support rail 12, and screw on the setting nut 3 just gap and the bucket capacity of scalable and support track bracket 2 respectively.
When the metering discharger is pushed into accompanying drawing 1 to the right, bulk cement on the bulk pot flows in the hopper of elevating hopper 17 and hopper 11 sockets formation, air in the metering discharger hopper enters into dust collecting sleeve 5 by the aperture with elevating hopper 17, in charging and discharging owing to there being sealing strip 6 flexible sealings not produce airborne dust, by the time after bulk cement is filled, catch the steel bar that spring bearing 1 is installed to spur left, feed flashboard 19 has just sealed feed opening simultaneously, when the metering discharger being moved to, just can see from view window 14 whether bulk cement is filled, just filled discharge shutter 10 pull left, rolling bearing 7 glides easily along the discharging track 8 that a small inclination is arranged, and simultaneously bulk cement is discharged in the trolley.After discharging is finished, discharge shutter 10 is pushed back the position to the right, rolling bearing 7 puts in place along the up easily top of the discharging track 8 that an inclination angle is arranged, and will measure discharger and be pushed into the continuation charging of accompanying drawing 1 position to the right.
When just beginning because the bulk cement unit weight difference of each kind of different manufacturers, so carry out weight to the bulk cement in the metering discharger demarcates, can regulate the size of measuring the discharger bucket capacity by setting nut 3 and proofread and correct the weight of bulk cement, thereby reach accurate measurement.
In order to overhaul task such as maintenance such as spring bearing 1 grade, default one overhauls flashboard 16 manholes between bulk cement tank feed opening and support track bracket 2, and the time spent is not sealed with sealing strip usually.

Claims (2)

1. be applied to the weighting discharger for loose cement in the bulk cement tank, it is characterized in that, this metering discharger hangs screw rod (4) five parts by support track bracket (2), elevating hopper (17), hopper (11), discharge shutter (10), spring bearing and forms; Support track bracket (2) connects with the ring flange of bulk cement tank feed opening by ring flange attachment bolt (18); Hopper (11) hangs screw rod (4) by four spring bearings and is socketed in elevating hopper (17) outside, elevating hopper (17), hopper (11) hang screw rod (4) by described four spring bearings and are suspended on the support track bracket (2), reach accurate measurement by the setting nut of regulating on four bearing suspension screw rods (4) (3); Discharge shutter (10) is supported by two Idler bearings (9) and two rolling bearings (7), discharging track (8) is welded on below four corner angle of hopper (11) by four angle steel, and two Idler bearings (9) are fixed on the discharging track support by a steel bar; Two rolling bearings (7) are fixed on the both sides of discharge shutter (10) by being welded on a following steel bar of discharge shutter (10), and roll on discharging track (8).
2. the weighting discharger for loose cement that is applied in the bulk cement tank according to claim 1 is characterized in that, has a view window (14) and a maintenance flashboard (16) is set on support track bracket (2); Fixed flexible sealing strip (6) around support track bracket (2) the ring flange end opening; Discharging track (8) has a small inclination to be convenient to the downslide of rolling bearing (7) and discharge shutter (10) to drive that to be about to hopper (11) bottom surface on the rolling bearing (7) airtight; At the top of elevating hopper (17) and elevating hopper support rail (13) welding a slice feed flashboard (19), link at vent port of elevating hopper (17) right flank brill and dust collecting sleeve (5).
CN2007101932925A 2007-11-30 2007-11-30 Weighting discharger for loose cement Expired - Fee Related CN101451880B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2007101932925A CN101451880B (en) 2007-11-30 2007-11-30 Weighting discharger for loose cement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2007101932925A CN101451880B (en) 2007-11-30 2007-11-30 Weighting discharger for loose cement

Publications (2)

Publication Number Publication Date
CN101451880A CN101451880A (en) 2009-06-10
CN101451880B true CN101451880B (en) 2010-12-22

Family

ID=40734247

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2007101932925A Expired - Fee Related CN101451880B (en) 2007-11-30 2007-11-30 Weighting discharger for loose cement

Country Status (1)

Country Link
CN (1) CN101451880B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107128618B (en) * 2017-06-26 2020-07-28 辽宁科技大学 Indoor simulated ore drawing device and method capable of automatically adjusting height

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2560604Y (en) * 2002-07-18 2003-07-16 温兴亮 In-situ bulk cement metering charging device
CN1575409A (en) * 2001-11-06 2005-02-02 大和制衡株式会社 Volumetric feeder for powder or granular material and combination balance powder and granular material

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1575409A (en) * 2001-11-06 2005-02-02 大和制衡株式会社 Volumetric feeder for powder or granular material and combination balance powder and granular material
CN2560604Y (en) * 2002-07-18 2003-07-16 温兴亮 In-situ bulk cement metering charging device

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
JP特开2001-225953A 2001.08.21
JP特开2007-126275A 2007.05.24

Also Published As

Publication number Publication date
CN101451880A (en) 2009-06-10

Similar Documents

Publication Publication Date Title
WO2022007447A1 (en) Automatic precise loading system and loading method
AU2017396540B2 (en) Self-detection device for liner plate of hoisting container and detection method
CN203269113U (en) Program control metering quick-loading device
CN201964938U (en) Automatic metering device for loading and unloading storage bin
CN102358524A (en) Quick quantitative entrucking system
CN104355141B (en) A kind of Bulk Grain is weighed loading station
CN103245404B (en) Movable type weighing and metering hopper
CN105865590A (en) Metering method and device and feeding system with metering device
CN101451880B (en) Weighting discharger for loose cement
CN204184961U (en) A kind of Bulk Grain is weighed loading station
CN110834967A (en) Continuous mixing station stock bin configured with online sampling device and sampling method
CN201187787Y (en) Enclosed belt conveyor
CN109029631A (en) A kind of drop shaft material-level detecting device and its material level detection method
CN202429686U (en) Weighing bin with hanger frame
CN208653584U (en) A kind of drop shaft material-level detecting device
CN208054094U (en) A kind of new type water hopper dredger
CN112141555A (en) Limestone bin stock level control device
CN202853874U (en) Soil wind erosion desertification monitoring sand sampler
CN113847951A (en) Energy-concerving and environment-protective monitoring facilities based on groundwater investigation
CN103273570B (en) Aluminum powder batching machine
CN219750907U (en) Suspension walking type spiral conveying system capable of weighing
CN220165246U (en) Anti-blocking accurate metering feeding device
CN216593716U (en) Measure accurate and firm reliable weighbridge
CN210014832U (en) Quantitative feeding rotor scale
CN212609492U (en) Anti-overflow paint packaging machine who leaks

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20101222

Termination date: 20121130