CN101451381B - Recycled concrete shear wall with cross reinforcement conversion layer and its production method - Google Patents

Recycled concrete shear wall with cross reinforcement conversion layer and its production method Download PDF

Info

Publication number
CN101451381B
CN101451381B CN2008102405242A CN200810240524A CN101451381B CN 101451381 B CN101451381 B CN 101451381B CN 2008102405242 A CN2008102405242 A CN 2008102405242A CN 200810240524 A CN200810240524 A CN 200810240524A CN 101451381 B CN101451381 B CN 101451381B
Authority
CN
China
Prior art keywords
shear wall
wall
reinforcement
shear
conversion layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2008102405242A
Other languages
Chinese (zh)
Other versions
CN101451381A (en
Inventor
曹万林
张建伟
刘强
张亚齐
尹海鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cangzhou architectural design and Research Institute Co Ltd
Beijing University of Technology
Original Assignee
Beijing University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing University of Technology filed Critical Beijing University of Technology
Priority to CN2008102405242A priority Critical patent/CN101451381B/en
Publication of CN101451381A publication Critical patent/CN101451381A/en
Application granted granted Critical
Publication of CN101451381B publication Critical patent/CN101451381B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Abstract

The invention relates to a regenerated concrete shear wall provided with a cross reinforcement conversion layer, which belongs to shear wall structure, wherein the lower part of the shear wall adopts common concrete, and the upper part of the shear wall adopts regenerated concrete; the thickness of the intermediate conversion layer is 3 times that of the shear wall, and an X-shaped reinforced sway brace is arranged inside the intermediate conversion layer; and the reinforced sway brace is connected with a reinforcement mat of the shear wall, and a hidden brace is formed inside the concrete shear wall. The regenerated concrete shear wall provided with the cross reinforcement conversion layer gives full play to the advantages of two types of concrete, and utilizes a regenerated concrete structure to optimize the structural design and guarantee the structural performance. The lower part of the shear wall with larger shearing force adopts the common concrete with stable performance, and the upper part of the shear wall with smaller shearing force adopts the regenerated concrete with slightly poor performance. A cross reinforcement is arranged on the conversion layer of which the stiffness is suddenly changed, so that shearing resistant slippage between different concrete layers can be prevented, and simultaneously variation of the shearing resistant bearing capacity of the shear wall has a transitional process.

Description

Band cross reinforcement conversion layer regeneration concrete shear force wall and preparation method thereof
Technical field
The present invention relates to a kind of band cross reinforcement conversion layer regeneration concrete shear force wall and preparation method thereof, belong to a kind of shear wall structure system.
Background technology
At present, the quantity of China's building waste has accounted for 30%~40% of municipal refuse total amount, and wherein most important component is a discarded concrete; Meanwhile a large amount of natural sandstone aggregates are constantly exploited, and it is exhausted that the natural aggregate resource also will be tending towards.The regeneration concrete technology be one with after waste concrete block fragmentation, cleaning, the classification, make Aggregate of recycled concrete according to certain ratio mixing, partly or entirely replace natural aggregate to be mixed with concrete technology in the aggregate of making then, this The Application of Technology meets the requirement of human social.
In building structure, shear wall is the core antidetonation parts of building structure, is bearing the geological process of overall structure 80%, therefore, the regeneration concrete technology is applied to shear wall structure has broad prospects.Studies show that regeneration concrete intensity is low with respect to ordinary concrete, the bearing capacity catagen speed is also faster than ordinary concrete, and under geological process, the story shear on shear wall structure top is less than the story shear of bottom simultaneously.Thereby shear wall structure adopts bottom ordinary concrete, top regeneration concrete, can satisfy the seismic design requirement of the shear wall structure dwelling house that has a large capacity and a wide range, and has tangible environmental benefit simultaneously.Yet, shear wall adopt up and down that the different performance concrete forms the conversion layer place, the shear stiffness sudden change appears easily, form weak part, thereby influence the anti-seismic performance of total, so the problem of key is how conversion layer to be handled.Cross reinforcement is set at the conversion layer place not only can prevents shearing resistance slippage between the different layer of concrete, also can change the process that individual transition be arranged simultaneously the shear-carrying capacity of shear wall.
Summary of the invention
Technical problem to be solved by this invention is in order to satisfy the requirement of existing standard seismic design, solves a large amount of discarded concrete difficult treatment and problem that the ecological environment that causes thus goes from bad to worse.In order to reach this purpose, the present invention proposes a kind of band cross reinforcement conversion layer regeneration concrete shear force wall and corresponding preparation method thereof.
The technical solution used in the present invention is: ordinary concrete is adopted in the shear wall bottom, and regeneration concrete is adopted on shear wall top, and the shear wall middle part is provided with conversion layer, and the conversion layer height is got 3 times shear wall thickness of wall body; The steel mesh reinforcement that configuration two rows are made up of transversely distributed steelbar and vertical distribution reinforcement respectively in the shear wall sockets with socketing reinforcing bar between the two placing of reinforcement nets; At shear wall conversion layer place, two placing of reinforcement net inboards are provided with the reinforcing bar bearing diagonal, and the reinforcing bar bearing diagonal is connected with the shear force wall reinforcing steel bar net, support inner the formation secretly of concrete shear force wall.
Described band cross reinforcement conversion layer regeneration concrete shear force wall, it is characterized in that: the reinforcing bar bearing diagonal that is provided with at shear wall conversion layer place is X-shaped, length in the shear wall of top is stretched into more than or equal to 2 times shear wall thickness of wall body in reinforcing bar bearing diagonal upper end, and with shear wall in the steel mesh reinforcement bind; Length in the shear wall of bottom is stretched into more than or equal to 2 times shear wall thickness of wall body in reinforcing bar bearing diagonal lower end, and with shear wall in the steel mesh reinforcement bind.
According to technical scheme of the present invention, adopt the preparation method of above-mentioned band cross reinforcement conversion layer regeneration concrete shear force wall, its order is as follows:
1) reinforcing bar of configuration shear wall both sides frame columns;
2) the configuration shear wall by transversely distributed steelbar and the vertical two placing of reinforcement nets formed of distribution reinforcement;
3) be connected at the inboard configuration reinforcement bearing diagonal of conversion layer two placing of reinforcement nets, and with the shear force wall reinforcing steel bar net, support inner the formation secretly of concrete shear force wall;
4) at the cast-in-place ordinary concrete in shear wall bottom;
5), thereby form band cross reinforcement conversion layer regeneration concrete shear force wall at the cast-in-place regeneration concrete in shear wall top.
Described preparation method, it is characterized in that: during configuration reinforcement bearing diagonal in step 4), length in the shear wall of top is stretched into more than or equal to 2 times shear wall thickness of wall body in reinforcing bar bearing diagonal upper end, and with shear wall in steel mesh reinforcement bind mutually, length in the shear wall of bottom is stretched into more than or equal to 2 times shear wall thickness of wall body in reinforcing bar bearing diagonal lower end, and with shear wall in steel mesh reinforcement bind mutually, in antidetonation, form the power consumption section.
Band cross reinforcement conversion layer regeneration concrete shear force wall is given full play to two kinds of concrete advantages, has utilized the regeneration concrete structure, has optimized structure design, has guaranteed structural performance.Be subjected to the bigger shear wall bottom of shearing, adopting the ordinary concrete of stable performance, and be subjected to the less shear wall top of shearing, adopting the poor slightly regeneration concrete of performance.At the conversion layer place of rigidity sudden change, cross reinforcement is set can prevents shearing resistance slippage between the different layer of concrete, the shear-carrying capacity to shear wall changes the process that individual transition is arranged simultaneously.
Description of drawings
Fig. 1 is the structural reinforcement schematic diagram of an element of construction of band cross reinforcement conversion layer regeneration concrete shear force wall of the present invention;
Fig. 2 is the sectional drawing of the A-A of Fig. 1 of the present invention.
Among the figure: 1-ordinary concrete, 2-regeneration concrete, 3-conversion layer, 4-reinforcing bar bearing diagonal, 5-steel mesh reinforcement.
The specific embodiment
The form of structure of band cross reinforcement conversion layer regeneration concrete shear force wall is shown in Fig. 1-2, ordinary concrete 1 is adopted in its underpart, regeneration concrete 2 is adopted on top, in 3 two steel mesh reinforcement 5 inboards of conversion layer, shear wall middle part X-shaped reinforcing bar bearing diagonal 4 is set, its length is stretched in the shear wall of top more than or equal to 2 times of thickness of wall body, with steel mesh reinforcement 5 binds in the shear wall in its upper end; Its length in the shear wall of bottom is stretched into more than or equal to 2 times thickness of wall body in its lower end, and with shear wall in steel mesh reinforcement 5 binds.Other constructional reinforcement has: the connecting lacing wire that is less than or equal to 600mm with spacing between two steel mesh reinforcements 5 of shear wall links to each other.
Its making step is as follows:
1) reinforcing bar of configuration shear wall both sides frame columns;
2) the configuration shear wall by transversely distributed steelbar and the vertical two placing of reinforcement nets 5 formed of distribution reinforcement;
3) in conversion layer two placing of reinforcement nets 5, X-shaped reinforcing bar bearing diagonal 4 is set, and is connected with shear force wall reinforcing steel bar net 5;
4) the cast-in-place ordinary concrete 1 in the shear wall bottom;
5) the cast-in-place regeneration concrete 2 on shear wall top promptly constitutes band cross reinforcement conversion layer regeneration concrete shear force wall.

Claims (4)

1. be with the cross reinforcement conversion layer regeneration concrete shear force wall for one kind, it is characterized in that: ordinary concrete (1) is adopted in the shear wall bottom, regeneration concrete (2) is adopted on shear wall top, and the shear wall middle part is provided with conversion layer (3), and conversion layer (3) is highly got 3 times shear wall thickness of wall body; The steel mesh reinforcement (5) that configuration two rows are made up of transversely distributed steelbar and vertical distribution reinforcement respectively in the shear wall sockets with socketing reinforcing bar between the two placing of reinforcement nets (5); In shear wall conversion layer (3) two placing of reinforcement net inboards reinforcing bar bearing diagonal (4) is set, reinforcing bar bearing diagonal (4) is connected with shear force wall reinforcing steel bar net (5), supports inner the formation secretly of concrete shear force wall.
2. band cross reinforcement conversion layer regeneration concrete shear force wall according to claim 1, it is characterized in that: be X-shaped at the inboard reinforcing bar bearing diagonal (4) that is provided with of shear wall conversion layer place steel mesh reinforcement, length in the shear wall of top is stretched into more than or equal to 2 times shear wall thickness of wall body in reinforcing bar bearing diagonal (4) upper end, and with shear wall in steel mesh reinforcement (5) bind; Length in the shear wall of bottom is stretched into more than or equal to 2 times shear wall thickness of wall body in reinforcing bar bearing diagonal (4) lower end, and with shear wall in steel mesh reinforcement (5) bind.
3. the preparation method of a band cross reinforcement conversion layer regeneration concrete shear force wall according to claim 2, production order is as follows:
1) reinforcing bar of configuration shear wall both sides frame columns;
2) the configuration shear wall by transversely distributed steelbar and the vertical two placing of reinforcement nets (5) formed of distribution reinforcement;
3) configuration reinforcement bearing diagonal (4) in conversion layer two placing of reinforcement nets (5), and be connected with shear force wall reinforcing steel bar net (5) forms dark the support in that concrete shear force wall is inner;
4) at the cast-in-place ordinary concrete in shear wall bottom (1);
5), thereby form band cross reinforcement conversion layer regeneration concrete shear force wall at the cast-in-place regeneration concrete in shear wall top (2).
4. preparation method according to claim 3, it is characterized in that: in step 3) during configuration reinforcement bearing diagonal (4), length in the shear wall of top is stretched into more than or equal to 2 times shear wall thickness of wall body in reinforcing bar bearing diagonal (4) upper end, and with shear wall in steel mesh reinforcement (5) bind mutually, length in the shear wall of bottom is stretched into more than or equal to 2 times shear wall thickness of wall body in reinforcing bar bearing diagonal (4) lower end, and with shear wall in steel mesh reinforcement (5) bind mutually, in antidetonation, form the power consumption section.
CN2008102405242A 2008-12-19 2008-12-19 Recycled concrete shear wall with cross reinforcement conversion layer and its production method Expired - Fee Related CN101451381B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008102405242A CN101451381B (en) 2008-12-19 2008-12-19 Recycled concrete shear wall with cross reinforcement conversion layer and its production method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008102405242A CN101451381B (en) 2008-12-19 2008-12-19 Recycled concrete shear wall with cross reinforcement conversion layer and its production method

Publications (2)

Publication Number Publication Date
CN101451381A CN101451381A (en) 2009-06-10
CN101451381B true CN101451381B (en) 2010-08-18

Family

ID=40733845

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008102405242A Expired - Fee Related CN101451381B (en) 2008-12-19 2008-12-19 Recycled concrete shear wall with cross reinforcement conversion layer and its production method

Country Status (1)

Country Link
CN (1) CN101451381B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101798852B (en) * 2010-04-07 2012-07-25 湖南大学 Variable cross-section dual seismic shear wall system and construction method thereof
CN103711229B (en) * 2012-10-08 2016-04-13 中国石油化工集团公司 Steel concrete antiknock wall wall steel bar collocation method
CN104018622A (en) * 2014-06-07 2014-09-03 王睿敏 Reinforcement mesh easy to automatically produce for shear wall, production method of reinforcement mesh and formed shear wall
CN112922195A (en) * 2021-04-09 2021-06-08 中信国安建工集团有限公司 Full-shear wall explosion-proof structure and construction method

Also Published As

Publication number Publication date
CN101451381A (en) 2009-06-10

Similar Documents

Publication Publication Date Title
CN103967214B (en) Multi-cavity steel tube concrete embedded round steel pipe regeneration concrete band batten plate coupled column
CN2791146Y (en) Steel-skeleton high-strength compsoite column
CN101761154A (en) Shear wall with inbuilt continuous-row steel tube concrete core column and soft steel energy consumption bond and manufacturing method thereof
CN101451381B (en) Recycled concrete shear wall with cross reinforcement conversion layer and its production method
CN202073208U (en) Concrete-filled steel tube shear wall
CN202298983U (en) Concrete composite shear wall
CN208072162U (en) A kind of raw bamboo fills out core bamboo-concrete combined board
CN101424104B (en) Thickness changeable shear wall with oblique reinforcing bar transition layer and construction method thereof
CN201343797Y (en) Recycled concrete shear wall with X-shaped reinforcing bar in conversion layer
CN201358529Y (en) Steel-truss-steel-plate-concrete combination shear wall
CN108360359A (en) A kind of raw bamboo fills out core bamboo-concrete slab
CN202787542U (en) Netlike reinforcing composite foam cement slab
CN204703528U (en) The vertical hanging assembling structure of the complete prefabricated wire mesh frame sandwich wallboard of a kind of assembling
CN201343796Y (en) Steel pipe concrete-steel support-steel plate enclosed concrete shear wall
CN208472930U (en) A kind of concrete structure building containing bamboo
CN101117821B (en) Steel pipe coal gangue concrete beam column joint
CN202519813U (en) Concealed bracing energy-intensive low shear wall structure system with built-in steel plates and steel bars
CN104047428A (en) Method for enhancing ductility of high-strength concrete pier stud
CN102425231A (en) Reinforcement lightweight aggregate concrete flat beam structure
CN203583777U (en) Prestressed round-pile core-filled concrete column
CN207032667U (en) A kind of double-layer high-strength stirrup restraint reinforcing bar regeneration concrete coupled column
CN202689337U (en) FRP (Fiber Reinforced Plastic), concrete and hollow raw bamboo rectangular beam
CN203034332U (en) Terrace structure
CN204139460U (en) Regeneration concrete T-steel pipe hetermorphiscal column
CN204139458U (en) Regeneration concrete ten shape steel tube hetermorphiscal column

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: BEIJING UNIVERSITY OF TECHNOLOGY

Effective date: 20130104

Owner name: CANGZHOU INSTITUTE OF ARCHITECTURAL DESIGN CO., LT

Free format text: FORMER OWNER: BEIJING UNIVERSITY OF TECHNOLOGY

Effective date: 20130104

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Cao Wanlin

Inventor after: Tian Baofa

Inventor after: Jia Hongsong

Inventor after: Cui Yuguo

Inventor after: Zhang Defeng

Inventor after: Zhang Jianwei

Inventor after: Liu Qiang

Inventor after: Zhang Yaqi

Inventor after: Yin Haipeng

Inventor before: Cao Wanlin

Inventor before: Zhang Jianwei

Inventor before: Liu Qiang

Inventor before: Zhang Yaqi

Inventor before: Yin Haipeng

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: CAO WANLIN ZHANG JIANWEI LIU QIANG ZHANG YAQI YIN HAIPENG TO: CAO WANLIN TIAN BAOFA JIA HONGSONG CUI YUGUO ZHANG DEFENG ZHANG JIANWEI LIU QIANG ZHANG YAQI YIN HAIPENG

Free format text: CORRECT: ADDRESS; FROM: 100124 CHAOYANG, BEIJING TO: 061000 CANGZHOU, HEBEI PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20130104

Address after: 061000 No. 116 West Central Street, Canal District, Hebei, Cangzhou

Patentee after: Cangzhou architectural design and Research Institute Co Ltd

Patentee after: Beijing University of Technology

Address before: 100124 Chaoyang District, Beijing Ping Park, No. 100

Patentee before: Beijing University of Technology

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100818

Termination date: 20121219