CN101444882B CN2008100337414A CN200810033741A CN101444882B CN 101444882 B CN101444882 B CN 101444882B CN 2008100337414 A CN2008100337414 A CN 2008100337414A CN 200810033741 A CN200810033741 A CN 200810033741A CN 101444882 B CN101444882 B CN 101444882B
Authority
CN
China
Prior art keywords
pipe
end socket
half end
latter half
point
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2008100337414A
Other languages
Chinese (zh)
Other versions
CN101444882A (en
Inventor
顾卫红
邓建国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Boiler Works Co Ltd
Original Assignee
Shanghai Boiler Works Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Boiler Works Co Ltd filed Critical Shanghai Boiler Works Co Ltd
Priority to CN2008100337414A priority Critical patent/CN101444882B/en
Publication of CN101444882A publication Critical patent/CN101444882A/en
Application granted granted Critical
Publication of CN101444882B publication Critical patent/CN101444882B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The invention relates to a technique for producing a spherical distributor, the technique is characterized in that a pipe joint and an inner long pipe are respectively arranged inside and outside the top part of an end enclosure in the upper half part; planes are grinded at each A-B position needed to be drilled for drilling and locating; the fall size of A point and B point is obtained by measuring and is used as the fall size for processing the incline at the position of the orifice of an inclined jointing pipe; then the inclined jointing pipe is processed; a tapered pipe is arranged at the bottom part of an end enclosure in the lower half part; then an inner short pipe is arranged in the bottom part of the end enclosure in the lower half part to lead the tapered pipe, the inner short pipe, the pipe joint and the inner long pipe to be arranged on the same line; moreover, an inner piece is welded in the end enclosure of the lower half part; the tapered pipe is respectively welded with each hole in a circle in the end enclosure of the lower half part; finally the end enclosure of the upper half part and the end enclosure of the lower half part are jointed; an automatic-welding circular seam is employed between the end enclosure of the upper half part and the end enclosure of the lower half part. The technique for producing the spherical distributor has the advantages of solving the problem of localization and saving the producing cost.

Description

A kind of spherical distributor manufacturing process
Technical field
The present invention relates to a kind of spherical distributor manufacturing process, relate in particular to the manufacturing process of the spherical distributor of a kind of boiler water-cooling system, belong to spherical distributor manufacturing process technology field.
Background technology
At present, use to some extent in three boilers that have only German Ba Buke company to make for spherical distributor, each producer of domestic boiler industry did not make distributor of the same type, and the applicant knows nothing for the technology that German Ba Buke company makes spherical distributor, make spherical distributor, boring on the dome head, pipe joint groove and the processing after sphere cooperates, the establishment of order is installed in case rubbish falls into, after the distributor water pressure test pipe joint surplus to remove be to make the key issue that will solve, the problem that exists is at present, as shown in Figure 1:
1. the boring on the dome head: inclined pipe 3 is a ball inclined-plane with end socket 2 contact positions, and directly drill can not be located on the ball inclined-plane;
2. pipe joint groove and processing after sphere cooperates: because of end socket 2 usefulness steel plates are suppressed, there is some difference for the drop at inclined pipe 3 groove places and figure paper size, drop by hole outer wall A point and B point place on the theory calculating end socket is 8mm, and the pipe joint groove is difficult to cooperate with sphere;
3. determine erection sequence, prevent that foreign material from falling into: because distributor is sphere, in a single day foreign material fall in the ball, do not have the possibility of cleaning, so erection sequence is extremely important.
Summary of the invention
The purpose of this invention is to provide a kind of spherical distributor manufacturing process.
For realizing above purpose, technical scheme of the present invention provides a kind of spherical distributor manufacturing process, it is characterized in that, its spherical distributor manufacturing process is:
The first step. difference mounting pipe joint and interior long tube inside and outside the first half end socket top are positioned on the diameter of the first half end socket pipe joint, interior long tube;
Second step. enclose the position of 26 the need punchings of evenly drawing from the inclined pipe pore centerline one at circumferential weld 58mm-61mm place at the latter half end socket, a diameter is polished than the location of holing, the plane of the little 8mm-12mm in inclined pipe aperture by the minimum point B point place of the outer wall in hole on peak A point-the latter half end socket of the outer wall in hole on the latter half end socket that each need be holed, lathe is fixed on the large-diameter steel pipe with the four paws anchor clamps, the latter half end socket is fixed with the four paws anchor clamps, large-diameter steel pipe places on the turning rolls, the drive end socket rotates, drill bit is beaten on the plane that polishes and just can not skidded, and boring just can be finished;
The 3rd goes on foot. and the hole of drilled the latter half end socket is closed pounce on platform, be against the latter half end socket outer wall with angle square, measure A point and B point with ruler again, obtain the drop size that A point and B are ordered, the drop size that actual measurement A point and B are ordered is as the drop size of processing the inclined-plane of locating in the inclined pipe aperture, with the inclined-plane of milling machine processing inclined pipe, groove is processed with boring machine;
The 4th step. outside the latter half end socket bottom, reduced pipe is installed, clamp reduced pipe with deflection machine then, short tube in the latter half end socket bottom, installing, make reduced pipe and interior short tube and pipe joint and interior long tube on same straight line, first plectane is installed again, and in the latter half end socket welding center plectane with holes, make center plectane with holes be in the latter half end socket one circle each circle hole below, and vertical with interior long tube with reduced pipe, interior short tube, pipe joint;
The 5th step. inclined pipe is connect with each eyelet welding that the latter half end socket one encloses respectively, use location mandril to guarantee installation dimension;
The 6th step. at last that the first half end socket and the latter half end socket is involutory, adopt weldering girth weld automatically between the first half end socket and the latter half end socket;
The 7th step. the mouth of pipe at inclined pipe, pipe joint and the reduced pipe of spherical distributor is installed water pressure test shrouding, carries out the water pressure test of spherical distributor;
The 8th step. remove water pressure test shrouding with portable cutters, remove surplus with the blade row of band locating piece again, the pipe end groove of processing inclined pipe, pipe joint and reduced pipe.
The present invention carries out the drill bit location by the A-B place polishing one that need hole at each than the plane of the little 8mm-10mm in inclined pipe aperture, has solved spherical distributor dome head boring problem in manufacture process; By obtaining the drop size that A point and B are ordered, the drop size that actual measurement A point and B are ordered has solved the matching problem of inclined pipe groove and end socket as the drop size of processing the inclined-plane of locating in the inclined pipe aperture; Solve the problem that inner anti-rubbish falls into by optimization that order is installed and the blade row removal pipe joint surplus that adopts the band locating piece.
Advantage of the present invention is the problem that has solved production domesticization, has saved manufacturing cost.
Description of drawings
Fig. 1 is spherical dispensing arrangement schematic diagram;
Fig. 2 is spherical distributor A-A cutaway view;
Fig. 3 is spherical distributor B-B cutaway view;
The specific embodiment
The invention will be further described below in conjunction with drawings and Examples.
Embodiment
As shown in Figure 1, 2, 3, be spherical dispensing arrangement schematic diagram, the invention will be further described by the manufacturing to 16 spherical distributors in Baosteel 4# unit 350MW tower type gas, the oil burning boiler for present embodiment.
A kind of spherical distributor manufacturing process is:
The first step. at diameter mounting pipe joint 4 and interior long tube 6 respectively inside and outside the first half end socket 1 top of 508mm, pipe joint 4, interior long tube 6 are positioned on the diameter of the first half end socket 1, pipe joint 4 is identical with interior long tube 6 diameters, diameter is 100mm, pipe joint 4 length are 148mm, and interior long tube 6 length are 248mm;
Second step. enclose the position of 26 the need punchings of evenly drawing at the latter half end socket 2 from the inclined pipe 3 pore centerline one at circumferential weld 60mm place, polishing diameter in the minimum point B place of the outer wall in hole is than the location of holing, the plane of the little 10mm in inclined pipe 3 apertures on peak A-the latter half end socket of the outer wall in hole on the latter half end socket that each need be holed, lathe is fixed on the large-diameter steel pipe with the four paws anchor clamps, the latter half end socket 2 usefulness four paws anchor clamps are fixed, large-diameter steel pipe places on the turning rolls, the drive end socket rotates, drill bit is beaten on the plane that polishes and just can not skidded, and boring 10 just can be finished; The aperture of the aperture in described hole 10 and inclined pipe 3 is complementary, and diameter is 30mm, and inclined pipe 3 length are 81mm-110mm;
The 3rd goes on foot. and the latter half end socket 2 is closed pounce on platform, be against the latter half end socket 2 outer walls with angle square, measure A point and B point with ruler again, obtain the drop that A point and B order and be of a size of 8mm, the drop size that actual measurement A point and B are ordered is as the drop size of processing the inclined-plane of locating in inclined pipe 3 apertures, with the inclined-plane of milling machine processing inclined pipe 3, groove is processed with boring machine;
The 4th step. outside the latter half end socket 2 bottoms, reduced pipe 5 is installed, clamp reduced pipe 5 with deflection machine then, short tube 7 in the latter half end socket 2 bottoms, installing, make reduced pipe 5 and interior short tube 7 and pipe joint 4 and interior long tube 6 on same straight line, described reduced pipe 5 adds the isosceles cone for cylinder, the cylinder internal diameter is 45mm, height is 68mm-78mm, isosceles cone outlet internal diameter is 30mm, height is 58mm-68mm, first plectane 8 is installed again, first plectane 8 is made by steel plate, diameter 78mm, and in the latter half end socket 2 welding center plectane 9 with holes, make center plectane 9 with holes be in the latter half end socket 2 one circle each circle hole 10 below, and with reduced pipe 5, interior short tube 7, pipe joint 4 is vertical with interior long tube 6; Center plectane with holes 9 is made by steel plate, center-hole diameter 102mm, plectane diameter 384mm, short tube 7 and pipe joint 4 and in long tube 6 diameters identical, be φ 100mm, interior short tube 7 is long to be 128mm.
The 5th step. inclined pipe 3 is welded with each hole 10 of the latter half end socket 2 one circles respectively, use location mandril to guarantee installation dimension;
The 6th step. at last that the first half end socket 1 and the latter half end socket 2 is involutory, adopt weldering girth weld automatically between the first half end socket 1 and the latter half end socket 2;
The 7th step. the mouth of pipe at inclined pipe 3, pipe joint 4 and the reduced pipe 5 of spherical distributor is installed water pressure test shrouding, carries out the water pressure test of spherical distributor;
The 8th step. pipe joint goes surplus---and pipe joint 3 is removed surplus after the water pressure test, remove water pressure test shrouding with portable cutters, remove surplus, processing tube hipped end mouth with the blade row of band locating piece again, locating piece had both played the blade row location, can prevent that again iron filings from falling in the container.
The blade row of described locating piece is made up of the row of scraping, scraper, screw, nut, locating piece, and each scraper is located in the row of scraping respectively, and fixes by screw, nut and locating piece respectively.

Claims (1)

1. a spherical distributor manufacturing process is characterized in that, its spherical distributor manufacturing process is:
The first step. inside and outside mounting pipe joint (4) and interior long tube (6) respectively at the first half end socket (1) top are positioned on the diameter of the first half end socket (1) pipe joint (4), interior long tube (6);
Second step. enclose the position of 26 the need punchings of evenly drawing from inclined pipe (3) the pore centerline one at circumferential weld 58mm-61mm place at the latter half end socket (2), polishing diameter in the minimum point B point place of the outer wall in hole is than the location of holing, the plane of inclined pipe (3) the little 8mm-12mm in aperture on peak A point-the latter half end socket of the outer wall in hole on the latter half end socket that each need be holed, lathe is fixed on the large-diameter steel pipe with the four paws anchor clamps, the latter half end socket (2) is fixed with the four paws anchor clamps, large-diameter steel pipe places on the turning rolls, the drive end socket rotates, drill bit is beaten on the plane that polishes and just can not skidded, and boring (10) just can be finished;
The 3rd goes on foot. and the hole (10) of the latter half end socket (2) is closed pounce on platform, be against the latter half end socket (2) outer wall with angle square, measure A point and B point with ruler again, obtain the drop size that A point and B are ordered, the drop size that actual measurement A point and B are ordered is as the drop size of processing the inclined-plane of locating in inclined pipe (3) aperture, process the inclined-plane of inclined pipe (3) with milling machine, groove is processed with boring machine;
The 4th step. outside the latter half end socket (2) bottom, reduced pipe (5) is installed, clamp reduced pipe (5) with deflection machine then, short tube (7) in the latter half end socket (2) bottom, installing, make reduced pipe (5) and interior short tube (7) and pipe joint (4) and interior long tube (6) on same straight line, first plectane (8) is installed again, and in the latter half end socket (2) welding center plectane with holes (9), make center plectane with holes (9) be in the latter half end socket (2) a circle each hole (10) below, and with reduced pipe (5), interior short tube (7), pipe joint (4) is vertical with interior long tube (6);
The 5th step. inclined pipe (3) is welded with each hole (10) of the latter half end socket (2) one circles respectively, use location mandril to guarantee installation dimension;
The 6th step. at last that the first half end socket (1) and the latter half end socket (2) is involutory, adopt weldering girth weld automatically between the first half end socket (1) and the latter half end socket (2);
The 7th step. the mouth of pipe installation water pressure test shrouding at inclined pipe (3), pipe joint (4) and the reduced pipe (5) of spherical distributor, carry out the water pressure test of spherical distributor;
The 8th step. remove water pressure test shrouding with portable cutters, remove surplus, the hipped end mouth of processing tube inclined pipe (3), pipe joint (4) and reduced pipe (5) with the blade row of band locating piece again.
CN2008100337414A 2008-02-21 2008-02-21 Technique for producing spherical distributor Active CN101444882B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008100337414A CN101444882B (en) 2008-02-21 2008-02-21 Technique for producing spherical distributor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008100337414A CN101444882B (en) 2008-02-21 2008-02-21 Technique for producing spherical distributor

Publications (2)

Publication Number Publication Date
CN101444882A CN101444882A (en) 2009-06-03
CN101444882B true CN101444882B (en) 2011-01-26

Family

ID=40740927

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008100337414A Active CN101444882B (en) 2008-02-21 2008-02-21 Technique for producing spherical distributor

Country Status (1)

Country Link
CN (1) CN101444882B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101800087B (en) * 2010-03-02 2012-02-08 清华大学 High-temperature pebble-bed reactor fuel element multidirectional distributor
CN102430917B (en) * 2011-08-31 2013-05-15 上海锅炉厂有限公司 Method for assembling and detecting barrel connecting pipe
CN102886613B (en) * 2012-09-20 2015-09-02 苏州天沃科技股份有限公司 The welding method of furnace cover of gasification furnace upper connecting tube

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB679625A (en) * 1949-06-07 1952-09-24 Babcock & Wilcox Ltd Improvements in or relating to pressure vessels
CN85200808U (en) * 1985-04-01 1986-05-28 吉林化学工业公司设计院 Ball-shaped divider for coiled pipe waste heat exchanger
US6289585B1 (en) * 2000-03-10 2001-09-18 Adrian Staruszkiewicz Method of attaching pipes

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB679625A (en) * 1949-06-07 1952-09-24 Babcock & Wilcox Ltd Improvements in or relating to pressure vessels
CN85200808U (en) * 1985-04-01 1986-05-28 吉林化学工业公司设计院 Ball-shaped divider for coiled pipe waste heat exchanger
US6289585B1 (en) * 2000-03-10 2001-09-18 Adrian Staruszkiewicz Method of attaching pipes

Also Published As

Publication number Publication date
CN101444882A (en) 2009-06-03

Similar Documents

Publication Publication Date Title
CN101444882B (en) Technique for producing spherical distributor
CN202845859U (en) Guide sleeve for tube sheet deep hole working
CN100467931C (en) Method for making arrangement type rustless steel water separator
CN103018128B (en) Different-layer unsaturated soil total suction in situ measurement device and manufacturing method thereof
CN105290846B (en) A kind of clamping device of plate-type flange disk
CN105397400B (en) Butt joint device for pipe connectors
CN205309834U (en) Clamping jig of board -like ring flange
CN206246899U (en) Pressure vessel heavy wall reinforcement adapter and pressure vessel
CN201016775Y (en) Water level measuring cylinder for industrial water settling chamber
CN204125489U (en) Refrigerating unit under the online off working state of macrotype axes series parts under worst hot case
CN201183183Y (en) Flange welding locater
CN2399587Y (en) Connecting ring of metal tube
CN204711380U (en) Austenitic stainless steel Circumferential Welds In Cylinders welding back side argon-filled protection device
CN106040455A (en) Cellular nozzle
CN104175073A (en) Stern roller machining technology
CN209614016U (en) Work-piece extractor in dedicated pipe
CN201407000Y (en) Centralizer ensuring pore-forming accuracy of drilling machine
CN206263295U (en) A kind of guiding transition sleeve for connecting wrapping body and fairlead
CN203849113U (en) Simple low-pressure single tube pressure test tool
CN202721080U (en) Liquid level switch installation structure
CN217686831U (en) Device for repairing leakage of heat exchanger
CN209510240U (en) A kind of guiding device
CN216421920U (en) Automatic tool setting device of numerical control lathe
CN219112705U (en) Pipe orifice expansion equipment for seamless steel pipe production
CN114012226B (en) Dust remover ash removal cylindrical gas storage tank for welding stud and stud mounting method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant