CN101437260A - System and method for automatization test of WCDMA physical layer - Google Patents
System and method for automatization test of WCDMA physical layer Download PDFInfo
- Publication number
- CN101437260A CN101437260A CNA2007101772216A CN200710177221A CN101437260A CN 101437260 A CN101437260 A CN 101437260A CN A2007101772216 A CNA2007101772216 A CN A2007101772216A CN 200710177221 A CN200710177221 A CN 200710177221A CN 101437260 A CN101437260 A CN 101437260A
- Authority
- CN
- China
- Prior art keywords
- case
- base station
- module
- side test
- physical layer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Mobile Radio Communication Systems (AREA)
Abstract
The invention discloses a system for automatically testing a WCDMA physical layer and a method thereof, wherein the system comprises a physical layer developing and testing board, a simulating base station and a control computer. The physical layer developing and testing board is used for automatically testing the WCDMA physical layer through operating a foreground control module; the simulating base station is connected with the physical layer developing and testing board and is used for executing a test case at the base station side; and the control computer is connected with the physical layer developing and testing board and the simulating base station, and is used for configuring the test case at the base station side and/or a test case at UE side through operating a background control module, controlling the foreground control module to execute the test case at the UE side and controlling the simulating base station to execute the test case at the base station side. The system and the method realize the automatic testing on the functions and properties of software and hardware of the WCDMA physical layer.
Description
Technical field
The present invention relates to the WCDMA system of communication field, particularly relate to a kind of system and method thereof of the WCDMA physical layer being carried out automatic test.
Background technology
Current, the 3G (Third Generation) Moblie technology has become the research focus of domestic and international moving communicating field, wherein based on 3GPP (the 3rd Generation Partnership Project in Europe, third generation partner program) WCDMA (Wideband Code Division Multiplex Address, the Wideband Code Division Multiple Access (WCDMA)) standard of standardization body's formulation is the most extensive.
The terminal of a WCDMA (being also referred to as user equipment (UE) (User Equipment)) divide to go up from agreement can branch physical layer (PHY, Physical Layer, layer 1), data link layer (layer 2) and network layer (layer 3).From control plane, layer 2 comprises two sublayers: medium access control (MediumAccess Control, MAC) protocol layer and Radio Link control (Radio Link Control, RLC) protocol layer, layer 3 comprises Radio Resource control (Radio Resource Control, RRC) protocol layer.Physical layer is in the bottom of Radio interface protocols model, and it provides, and bit stream transmits needed all functions in the physical medium, realizes synchronously, the encoding and decoding of process such as measurement, access, power control and up-downgoing data handle.Design a model according to general WCDMA, MAC and RRC etc. run on CPU (CentralProcessing Unit, central processing unit) on, belong to protocol stack (Protocol Stack, PS) part, and PHY runs on the DSP (Digital Signal Processing, digital signal processor) more, to satisfy a large amount of demands of computing fast.
For the project of WCDMA terminal chip, at ASIC (Application SpecialIntegrated Circuit, application-specific integrated circuit (ASIC)) She Ji early stage, it is can't integrate the base station system that inserts reality with the protocol stack of UE side to test that physical layer software and hardware function is not tested under the sufficient situation.Therefore must carry out special test to physical layer.3GPP does not specify the method for testing physical layer function and performance in this case, and generally the test environment at physical layer must comprise terminal UE 110 and base station 120 two parts, as shown in Figure 1.Terminal UE 110 is by being divided into UE protocol stack or testing tool 130 and unit under test UE physical layer 140.The commercial anolog base station equipment of industry can be chosen in base station 120 in this case, and UE physical layer testing tool 130 then needs developer oneself design owing to there is not commercial instrument.
Summary of the invention
Technical problem to be solved by this invention is to provide a kind of the WCDMA physical layer is carried out the system and the method thereof of automatic test, is used to realize the function and the performance of the software and hardware of WCDMA physical layer are carried out automatic test.
To achieve these goals, the invention provides and a kind of the WCDMA physical layer is carried out the system of automatic test, it is characterized in that this system comprises:
Physical layer developing and testing board is used for by the operation foreground control module WCDMA physical layer being tested automatically;
Anolog base station connects described physical layer developing and testing board, is used to carry out the base station side test case;
The control computer, connect described physical layer developing and testing board, described anolog base station, be used for disposing described base station side test case and/or UE side test use-case by the operation background administration module, control described foreground control module and carry out described UE side test use-case, and control described anolog base station and carry out described base station side test case.
Described system, wherein, described physical layer developing and testing board further comprises:
Described WCDMA physical layer is tested unit;
The CPU processing module is used for testing automatically by moving the described WCDMA physical layer of described foreground control module.
Described system, wherein, described foreground control module further comprises:
The foreground communication module is used to receive control command and the described UE side test use-case that described background administration module sends;
UE daily record maintenance module connects described foreground communication module, the UE side test use-case execution journal when being used to write down described foreground control module and carrying out described UE side test use-case, and be sent to described background administration module in real time by described foreground communication module;
The sequence maintenance module connects described foreground communication module, described UE daily record maintenance module, is used to resolve described UE side test use-case;
The sequence Executive Module connects described UE daily record maintenance module, described sequence maintenance module, is used to carry out the described UE side test use-case through resolving, and sends message or receives feedback message from described WCDMA physical layer to described WCDMA physical layer.
Described system, wherein, described background administration module further comprises:
Human-computer interface module is used for disposing/showing the parameter of described UE side test use-case, described base station side test case and UE side test use-case, base station side test case message, shows the operating state of described foreground control module in real time;
UE use-case configuration module connects described human-computer interface module, the parameter that is used for generating described UE side test use-case and disposes described UE side test use-case;
The backstage communication module connects described foreground communication module, described UE use-case configuration module, is used for described UE side test use-case is sent to described foreground communication module, receives the described UE side test use-case execution journal that described foreground communication module sends;
Results analyses module, connect described backstage communication module, be used for discerning automatically the stopping criterion and the pass criteria of described base station side test case, described UE side test use-case, and described UE side test use-case execution journal, base station side test case execution journal are analyzed and drawn test result;
Anolog base station use-case configuration module connects described human-computer interface module, the parameter that is used for generating described base station side test case and disposes described base station side test case;
The anolog base station control module connects described backstage communication module, described anolog base station use-case configuration module, described anolog base station, is used to control described anolog base station and carries out described base station side test case;
Anolog base station daily record maintenance module; Connect described anolog base station control module, described results analyses module, be used to write down the base station side test case execution journal when carrying out described base station side test case.
Described system wherein, carries out communication by serial ports, network interface or USB between described foreground control module, the described background administration module.
Described system, wherein, described physical layer developing and testing board is connected with described control computer by serial ports, is connected with described anolog base station by radio frequency cable; Described anolog base station is connected with described control computer by network interface.
Described system, wherein, described physical layer developing and testing board is carried out test contents to described WCDMA physical layer and is comprised: each module that the procedural test of described WCDMA physical layer, the test of the up-downgoing data service when described WCDMA physical layer is in different rates, described WCDMA physical layer are in the performance test under the different channels condition, described WCDMA physical layer inside to described WCDMA physical layer institute operation processor resource take in the situation one or.
To achieve these goals, the invention provides and a kind of the WCDMA physical layer is carried out the method for automatic test, it is characterized in that this method comprises:
Step 1, the control computer is by operation background administration module configurating base station side test use-case, UE side test use-case;
Step 2, described control computer is controlled described foreground control module and is carried out described UE side test use-case by moving described background administration module, and control anolog base station and carry out described base station side test case, to finish the automatic test of physical layer developing and testing board to the WCDMA physical layer.
Described method wherein, in the described step 2, further comprises:
When described background administration module downloads to described foreground control module with described UE side test use-case, issue action command to described foreground control module, start described foreground control module and carry out described UE side test use-case, and issue another action command and start described anolog base station to described anolog base station control module and carry out described base station side test case.
Described method wherein, in the described step 2, further comprises:
When described foreground control module receives the action command that described background administration module sends, be sent to described WCDMA physical layer after described UE side test use-case resolved, trigger the work of described WCDMA physical layer; Or
When described foreground control module receives ceasing and desisting order of described background administration module transmission, stop to carry out described UE side test use-case.
Described method wherein, in the described step 2, further comprises:
Described foreground control module is in the process of carrying out described UE side test use-case, ruuning situation with described foreground control module reports described background administration module in real time, and judge whether the stopping rule in the described UE side test use-case satisfies stop condition, if satisfy, notify described background administration module to stop the execution of described foreground control module and described anolog base station, and the UE side test use-case execution journal and/or the base station side test case execution journal that obtain analyzed, judge described UE side test use-case, can whether the pass criteria in the described base station side test case meets the demands, pass through with the execution that obtains current test case.
Useful technique effect of the present invention is:
The system and the method thereof that are specifically designed to physical layer software and hardware automatic test proposed by the invention, test case be can discern automatically and stopping criterion and pass criteria whether satisfied, thereby the automation that can realize the substantive test use-case is carried out continuously, reduce the test job amount effectively, improved testing efficiency.
Describe the present invention below in conjunction with the drawings and specific embodiments, but not as a limitation of the invention.
Description of drawings
Fig. 1 is existing WCDMA test system structure schematic diagram;
Fig. 2 is the present invention carries out automatic test to the WCDMA physical layer a system construction drawing;
Fig. 3 is each module distribution schematic diagram of test macro of the present invention;
Fig. 4 is the present invention carries out automatic test to the WCDMA physical layer a method flow diagram.
Embodiment
Below in conjunction with the drawings and specific embodiments technical scheme of the present invention is made further more detailed description.
As shown in Figure 2, be the present invention carries out automatic test to the WCDMA physical layer system construction drawing.The figure shows the hardware environment of WCDMA physical layer test macro 200 test WCDMA physical layers, WCDMA physical layer test macro 200 comprises: physical layer developing and testing board 210, anolog base station 220, control computer 230.
Physical layer developing and testing board 210 is connected by serial ports with control computer 230, comprises CPU processing module 211, WCDMA physical layer (layer 1) 212.Wherein, CPU processing module 211 adopts ARM (Advanced RISC Microprocessor, senior risc microcontroller), is mainly used in the foreground control module of operation WCDMA physical layer test macro 200; WCDMA physical layer 212 and CPU processing module 211 are carried out the mutual of message and data by internal bus.Wherein RISC (ReducedInstruction Set Computing) is a reduced instruction set computer.
Divide from function, WCDMA physical layer 212, promptly unit under test (Device Under Test, DUT); CPU processing module 211 and run on the UE control section 240 that background administration module on the control computer 230 has constituted WCDMA physical layer test macro 200 is used for substituting real protocol stack PS and gives information to WCDMA physical layer 212 and drive and process control; Anolog base station 220 and run on the base stations control part 250 that anolog base station control module on the control computer 230 has constituted WCDMA physical layer test macro 200.The base stations control part 250 of the UE control section 240 of WCDMA physical layer test macro 200 and WCDMA physical layer test macro 200 cooperatively interacts, constituted complete physical layer test platform, carried out every function and the performance that different test cases are tested physical layer by configuration.
In order to improve the automaticity of this platform, the control module that anolog base station 220 is carried is integrated in the WCDMA physical layer test macro 200, control base station side simultaneously and UE side test use-case is carried out synchronously by the unified scheduling of this system, and the implementation status of anolog base station 220 and UE can be saved as daily record, automatically analyze, give the user test result intuitively.
As shown in Figure 3, for each module distribution schematic diagram of test macro of the present invention, in conjunction with Fig. 2, this figure has provided the distribution schematic diagram for foreground control module 310, background administration module 320 each module in the WCDMA physical layer test macro 200.
Both cooperate foreground control module 310, background administration module 320 and realize all functions.Wherein, foreground control module 310 is mainly used in parsing and execution, log record and the maintenance function that realizes test case.Background administration module 320 is mainly used in the execution of configuration, control foreground control module 310 and the anolog base station 220 of realizing test case and parameter, to the real-time demonstration and the automatic analytic function of result of test case execution journal.
Communication mechanism between foreground control module 310, the background administration module 320 can pass through serial ports, network interface, USB modes such as (Universal Serial Bus, USBs).
UE daily record maintenance module 311 is used to write down the operating state of foreground control module 310, sends or receive the situation of message, and in real time these information is sent to background administration module 320 by foreground communication module 312 and analyze.
After receiving the UE side test use-case of downloading from background administration module 320 when foreground communication module 312, give sequence maintenance module 313 and resolve, UE side test use-case is converted into the physical layer message that can carry out, the test instruction that can carry out at once; After the starting command that receives background administration module 320, ready physical layer message is sent to WCDMA physical layer 212 by sequence Executive Module 314, to trigger 212 work of WCDMA physical layer; Also will receive feedback message with time series Executive Module 314, and these message will be sent to background administration module 320 by UE daily record maintenance module 311 from WCDMA physical layer 212.Receive from after the ceasing and desisting order of background administration module 320 when foreground communication module 312, will stop the execution of sequence Executive Module 314.
Human-computer interface module 321 is mainly used in the concrete parameter of each message in configuration/demonstration test case and the test case, and the operating state of display foreground control module 310 makes the user can recognize the ruuning situation of test case intuitively in real time.
UE use-case configuration module 322, be used to carry out the configuration of test case, generate UE side test use-case, and the execution sequence, the concrete parameter of each message of each message in can flexible configuration UE side test use-case, comprise the stopping criterion of UE side test use-case and pass criteria etc.; Can these two criterions be realize the key of automatic test.Through big quantitative analysis and summary, formulated following stopping criterions:
Stopping criterion 1: stop (all message in the test case all send or finish receiving, and use-case stops automatically) naturally;
Stopping criterion 2: specify Block Error Rate (Block Error Ratio, BLER) statistics numbers (when descending BLER statistics reaches the number of appointment, test case stops automatically);
Stopping criterion 3: specify message number (all message count of transmitting-receiving reach to specify number and stop when test case is carried out).
Above these stopping criterions are judged in program, when the stop condition of setting satisfies, stopped the execution of current test case, continue to carry out next test case, can be realized that in this way many test cases carry out continuously.
Because test case of the present invention is one to one at WCDMA physical layer test macro 200 and anolog base station 220, therefore all can expect at its execution result of each test case.Therefore defined following pass criteria:
Pass criteria 1: the actual execution sequence of test case and result are consistent with expection, be considered as by; This rule is applicable to the various procedural tests of the physical layer of protocol requirement;
The data sum of pass criteria 2:UE transmission/reception is consistent with the data of base station reception/transmission sum, and BLER is less than the value of appointment, be considered as by; This rule is applicable to the multiple-rate business of protocol requirement and the performance test under the various channel condition.
Results analyses module 324 is used for discerning automatically stopping criterion and the pass criteria that test case disposes, and UE side test use-case execution journal and base station side test case execution journal are analyzed, and provides test result intuitively.
Anolog base station use-case configuration module 325 is used for generating automatically the base station side test case, and the concrete parameter in can configurating base station side test use-case; The cell parameter collocation method of traditional base station side is the hand-coding corresponding script, and the compiling generation can be downloaded the dynamic library file of execution.The requirement that this mode is understood agreement the operator is than higher, and requires base station side and UE side to mate fully, in case misinterpretation or have the omission all can't correct execution.In order to overcome this defective, by poring over agreement, extract typical scene, as script template.According to different test cases and configuration parameter, revise the parameter in the template, the base station side test case script and the compiling that can generate anolog base station 220 are automatically finished.
Anolog base station control module 326 is used to control anolog base station 220 and carries out the base station side test case, can start or stop the execution of base station side test case at any time according to the actual implementation status of UE side test use-case.
Anolog base station daily record maintenance module 327 is used to write down the concrete implementation status of base station side test case and the dynamic change situation of power and other measured values, is recorded as journal file, is convenient to results analyses module 324 and analyzes;
When background administration module 320 downloads to foreground control module 310 by backstage communication module 323 with UE side test use-case, issue action command to foreground control module 310, start foreground control module 310 and carry out UE side test use-case, and issue another action command to anolog base station control module 326 startup anolog base stations 220 execution base station side test cases, specific as follows:
The UE side test use-case that is disposed when UE use-case configuration module 322 is downloaded to the foreground communication module 312 of foreground control module 310 by backstage communication module 323, anolog base station control module 326 starts simultaneously, the corresponding base station side test use-case that triggering is carried out by 325 configurations of anolog base station use-case configuration module by anolog base station 220, after anolog base station 220 was ready, the starting command that backstage communication module 323 sends anolog base station control module 326 started the execution of UE side test use-case to foreground control module 310.
Whether sequence Executive Module 314 stopping criterion in the real-time judge UE side test use-case in the process of carrying out UE side test use-case satisfies, when stop condition satisfies, notice background administration module 320 sends to cease and desist order and stops the execution of UE side test use-case to foreground control module 310, sending simultaneously ceases and desist order stops anolog base station 220 execution base station side test cases to anolog base station control module 326, start 324 pairs of UE side tests of results analyses module use-case execution journal then and/or base station side test case execution journal is analyzed, and judge whether pass criteria meets the demands, and whether passes through with the execution of judging current test case.In the process that UE side test use-case is carried out, background administration module 320 can receive the running state information from foreground control module 310 feedbacks in real time, and is shown on the human-computer interface module 321.
WCDMA physical layer test macro 200 can be realized the test scene of 3GPP agreement regulation, and can control anolog base station 220 and the execution of UE physical layer synchronization, realizes that the continuous execution of batch and the result of substantive test use-case analyzes automatically.
Use WCDMA physical layer test macro 200 to test, can satisfy following testing requirement:
1) test of the various processes of the physical layer of agreement regulation, as Cell searching, access at random, paging, power control, reshuffle, soft handover, direct-cut operation etc.;
2) the up-downgoing data service test of the various speed of agreement regulation comprises voice-and-data business etc.;
3) performance test under the various channel conditions (static state, multipath, decline) of agreement regulation;
4) other functions are as analyzing the situation etc. that takies of the processor resource that inner each module of physical layer moves physical layer.
As shown in Figure 4, be the present invention carries out automatic test to the WCDMA physical layer method flow diagram.In conjunction with Fig. 2,3, these flow process concrete steps are as follows:
Step S401 by the many groups of human-computer interface module 321 configurations base station side test case, the UE side test use-case of operation background administration module 320, and is provided with corresponding stopping criterion and pass criteria;
Step S402 downloads to foreground control module 310 by backstage communication module 323 and foreground communication module 312 with UE side test use-case; Foreground control module 310 313 pairs of UE side tests of initiating sequence maintenance module use-case is at once resolved, and is converted into executable test instruction;
Step S403 sends fill order by backstage communication module 323 and foreground communication module 312 to foreground control module 310, starts foreground control module 310 and begins to carry out UE side test use-case;
Step S404 starts anolog base station 220 by anolog base station control module 326 and carries out the base station side test case;
Step S405, the UE side test use-case that sequence Executive Module 314 in the foreground control module 310 is carried out through resolving, UE daily record maintenance module 311 is given background administration module 320 with the operation result real-time report, and background administration module 320 saves as UE side test use-case execution journal with these results;
Step S406, anolog base station 220 is carried out the base station side test case, and the record operation result saves as base station side test case execution journal;
Whether step S407, the sequence Executive Module 314 in the foreground control module 310 real-time judge stopping criterion when operation satisfies, if do not satisfy, continues execution in step S405; If satisfy, then execution in step S408;
Step S408, foreground control module 310 notice background administration modules 320 stopping criterions satisfy, background administration module 320 ceases and desist order transmission to foreground control module 310, stop to carry out UE side test use-case, send simultaneously and cease and desist order to anolog base station control module 326, control anolog base station 220 is carried out the base station side test case;
Step S409,324 pairs of UE side tests of results analyses module use-case execution journal and base station side test case execution journal in the background administration module 320 are analyzed, and judge whether pass criteria meets the demands; The execution result that provides the current test case of user by or do not pass through;
Step S410, if also have test case to need to carry out, then execution in step S402 begins to download the next test case of execution; Otherwise all test cases are finished.
By top embodiment as can be known the present invention propose a kind of anolog base station and UE both sides test case can controlled simultaneously and carry out, and can discern the method whether test case satisfies stopping criterion and pass criteria automatically, can realize that by such mechanism the automation of substantive test use-case carries out continuously, reduce the test job amount effectively, improved testing efficiency.
The system and the method thereof that are specifically designed to physical layer software and hardware automatic test proposed by the invention help to improve testing efficiency, reduce the test job amount.
Certainly; the present invention also can have other various embodiments; under the situation that does not deviate from spirit of the present invention and essence thereof; those of ordinary skill in the art work as can make various corresponding changes and distortion according to the present invention, but these corresponding changes and distortion all should belong to the protection range of the appended claim of the present invention.
Claims (11)
1, a kind of the WCDMA physical layer is carried out the system of automatic test, it is characterized in that this system comprises:
Physical layer developing and testing board is used for by the operation foreground control module WCDMA physical layer being tested automatically;
Anolog base station connects described physical layer developing and testing board, is used to carry out the base station side test case;
The control computer, connect described physical layer developing and testing board, described anolog base station, be used for disposing described base station side test case and/or UE side test use-case by the operation background administration module, control described foreground control module and carry out described UE side test use-case, and control described anolog base station and carry out described base station side test case.
2, system according to claim 1 is characterized in that, described physical layer developing and testing board further comprises:
Described WCDMA physical layer is tested unit;
The CPU processing module is used for testing automatically by moving the described WCDMA physical layer of described foreground control module.
3, system according to claim 2 is characterized in that, described foreground control module further comprises:
The foreground communication module is used to receive control command and the described UE side test use-case that described background administration module sends;
UE daily record maintenance module connects described foreground communication module, the UE side test use-case execution journal when being used to write down described foreground control module and carrying out described UE side test use-case, and be sent to described background administration module in real time by described foreground communication module;
The sequence maintenance module connects described foreground communication module, described UE daily record maintenance module, is used to resolve described UE side test use-case;
The sequence Executive Module connects described UE daily record maintenance module, described sequence maintenance module, is used to carry out the described UE side test use-case through resolving, and sends message or receives feedback message from described WCDMA physical layer to described WCDMA physical layer.
4, according to claim 2 or 3 described systems, it is characterized in that described background administration module further comprises:
Human-computer interface module is used for disposing/showing the parameter of described UE side test use-case, described base station side test case and UE side test use-case, base station side test case message, shows the operating state of described foreground control module in real time;
UE use-case configuration module connects described human-computer interface module, the parameter that is used for generating described UE side test use-case and disposes described UE side test use-case;
The backstage communication module connects described foreground communication module, described UE use-case configuration module, is used for described UE side test use-case is sent to described foreground communication module, receives the described UE side test use-case execution journal that described foreground communication module sends;
Results analyses module, connect described backstage communication module, be used for discerning automatically the stopping criterion and the pass criteria of described base station side test case, described UE side test use-case, and described UE side test use-case execution journal, base station side test case execution journal are analyzed and drawn test result;
Anolog base station use-case configuration module connects described human-computer interface module, the parameter that is used for generating described base station side test case and disposes described base station side test case;
The anolog base station control module connects described backstage communication module, described anolog base station use-case configuration module, described anolog base station, is used to control described anolog base station and carries out described base station side test case;
Anolog base station daily record maintenance module; Connect described anolog base station control module, described results analyses module, be used to write down the base station side test case execution journal when carrying out described base station side test case.
5, according to claim 1,2 or 3 described systems, it is characterized in that, carry out communication by serial ports, network interface or USB between described foreground control module, the described background administration module.
According to claim 1,2 or 3 described systems, it is characterized in that 6, described physical layer developing and testing board is connected with described control computer by serial ports, is connected with described anolog base station by radio frequency cable; Described anolog base station is connected with described control computer by network interface.
7, according to claim 1,2 or 3 described systems, it is characterized in that described physical layer developing and testing board is carried out test contents to described WCDMA physical layer and comprised: each module that the procedural test of described WCDMA physical layer, the up-downgoing data service when described WCDMA physical layer is in different rates test, described WCDMA physical layer are in the performance test under the different channels condition, described WCDMA physical layer inside to described WCDMA physical layer institute operation processor resource take in the situation one or.
8, a kind of the WCDMA physical layer is carried out the method for automatic test, it is characterized in that this method comprises:
Step 1, the control computer is by operation background administration module configurating base station side test use-case, UE side test use-case;
Step 2, described control computer is controlled described foreground control module and is carried out described UE side test use-case by moving described background administration module, and control anolog base station and carry out described base station side test case, to finish the automatic test of physical layer developing and testing board to the WCDMA physical layer.
9, according to right 8 described methods, it is characterized in that, in the described step 2, further comprise:
When described background administration module downloads to described foreground control module with described UE side test use-case, issue action command to described foreground control module, start described foreground control module and carry out described UE side test use-case, and issue another action command and start described anolog base station to described anolog base station control module and carry out described base station side test case.
10, according to right 8 described methods, it is characterized in that, in the described step 2, further comprise:
When described foreground control module receives the action command that described background administration module sends, be sent to described WCDMA physical layer after described UE side test use-case resolved, trigger the work of described WCDMA physical layer; Or
When described foreground control module receives ceasing and desisting order of described background administration module transmission, stop to carry out described UE side test use-case.
11, according to right 8,9 or 10 described methods, it is characterized in that, in the described step 2, further comprise:
Described foreground control module is in the process of carrying out described UE side test use-case, ruuning situation with described foreground control module reports described background administration module in real time, and judge whether the stopping rule in the described UE side test use-case satisfies stop condition, if satisfy, notify described background administration module to stop the execution of described foreground control module and described anolog base station, and the UE side test use-case execution journal and/or the base station side test case execution journal that obtain analyzed, judge described UE side test use-case, can whether the pass criteria in the described base station side test case meets the demands, pass through with the execution that obtains current test case.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNA2007101772216A CN101437260A (en) | 2007-11-12 | 2007-11-12 | System and method for automatization test of WCDMA physical layer |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNA2007101772216A CN101437260A (en) | 2007-11-12 | 2007-11-12 | System and method for automatization test of WCDMA physical layer |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101437260A true CN101437260A (en) | 2009-05-20 |
Family
ID=40711432
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNA2007101772216A Pending CN101437260A (en) | 2007-11-12 | 2007-11-12 | System and method for automatization test of WCDMA physical layer |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101437260A (en) |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102104557A (en) * | 2009-12-18 | 2011-06-22 | 上海贝尔股份有限公司 | Baseband circuit and application method thereof |
CN102448098A (en) * | 2010-09-30 | 2012-05-09 | 重庆重邮信科通信技术有限公司 | Physical layer test system and method based on ARM (advanced RISC (reduced instruction set computer) machine) and DSP (digital signal processing) multi-core structure |
CN102572911A (en) * | 2010-12-28 | 2012-07-11 | 上海贝尔股份有限公司 | Long term evolution (LTE) base band terminal simulation system based on peripheral component interconnect express (PCI-E) interface |
CN102567162A (en) * | 2010-12-31 | 2012-07-11 | 重庆重邮信科通信技术有限公司 | DSP (Digital Signal Processor) core-based physical layer system verification device and method |
CN103139822A (en) * | 2013-03-27 | 2013-06-05 | 武汉邮电科学研究院 | Method of carrying out automated testing on wireless communication system physical layer |
CN103207821A (en) * | 2013-05-03 | 2013-07-17 | 北京百度网讯科技有限公司 | CPU (Central Processing Unit) performance evaluation method and device |
CN103248440A (en) * | 2013-04-18 | 2013-08-14 | 北京邮电大学 | Terminal test system and method |
CN103987078A (en) * | 2014-04-04 | 2014-08-13 | 京信通信系统(中国)有限公司 | Base station physical layer test method and system |
CN105335259A (en) * | 2014-08-01 | 2016-02-17 | 北京安兔兔科技有限公司 | Method and device for determining whether malicious behaviors exist in performance evaluation process of electronic equipment |
CN106685766A (en) * | 2017-01-17 | 2017-05-17 | 重庆邮电大学 | Method and system for testing physical layer protocol conformance |
WO2017113912A1 (en) * | 2015-12-30 | 2017-07-06 | 中兴通讯股份有限公司 | Physical layer software automation test method and device |
CN110505649A (en) * | 2018-05-17 | 2019-11-26 | 大唐移动通信设备有限公司 | A kind of automated testing method and system |
CN113220580A (en) * | 2021-05-18 | 2021-08-06 | Oppo广东移动通信有限公司 | Test method and device, equipment and storage medium |
CN113835413A (en) * | 2021-09-22 | 2021-12-24 | 交控科技股份有限公司 | Interlocking automation test system, method, device and storage medium |
-
2007
- 2007-11-12 CN CNA2007101772216A patent/CN101437260A/en active Pending
Cited By (21)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102104557A (en) * | 2009-12-18 | 2011-06-22 | 上海贝尔股份有限公司 | Baseband circuit and application method thereof |
CN102448098A (en) * | 2010-09-30 | 2012-05-09 | 重庆重邮信科通信技术有限公司 | Physical layer test system and method based on ARM (advanced RISC (reduced instruction set computer) machine) and DSP (digital signal processing) multi-core structure |
CN102448098B (en) * | 2010-09-30 | 2016-05-04 | 重庆重邮信科通信技术有限公司 | Based on physical layer test macro and the method for ARM and DSP coenocytism |
CN102572911B (en) * | 2010-12-28 | 2016-04-06 | 上海贝尔股份有限公司 | A kind of LTE base band terminal simulation system based on PCI-E interface |
CN102572911A (en) * | 2010-12-28 | 2012-07-11 | 上海贝尔股份有限公司 | Long term evolution (LTE) base band terminal simulation system based on peripheral component interconnect express (PCI-E) interface |
CN102567162A (en) * | 2010-12-31 | 2012-07-11 | 重庆重邮信科通信技术有限公司 | DSP (Digital Signal Processor) core-based physical layer system verification device and method |
CN103139822A (en) * | 2013-03-27 | 2013-06-05 | 武汉邮电科学研究院 | Method of carrying out automated testing on wireless communication system physical layer |
CN103139822B (en) * | 2013-03-27 | 2016-08-31 | 武汉邮电科学研究院 | A kind of method that wireless communication system physical layer is carried out automatic test |
CN103248440A (en) * | 2013-04-18 | 2013-08-14 | 北京邮电大学 | Terminal test system and method |
CN103248440B (en) * | 2013-04-18 | 2015-08-05 | 北京邮电大学 | Terminal test system and method |
CN103207821A (en) * | 2013-05-03 | 2013-07-17 | 北京百度网讯科技有限公司 | CPU (Central Processing Unit) performance evaluation method and device |
CN103987078A (en) * | 2014-04-04 | 2014-08-13 | 京信通信系统(中国)有限公司 | Base station physical layer test method and system |
CN105335259A (en) * | 2014-08-01 | 2016-02-17 | 北京安兔兔科技有限公司 | Method and device for determining whether malicious behaviors exist in performance evaluation process of electronic equipment |
CN105335259B (en) * | 2014-08-01 | 2019-03-15 | 北京安兔兔科技有限公司 | Determine that electronic equipment performance evaluating whether there is the method and device of malicious act in the process |
WO2017113912A1 (en) * | 2015-12-30 | 2017-07-06 | 中兴通讯股份有限公司 | Physical layer software automation test method and device |
CN106685766A (en) * | 2017-01-17 | 2017-05-17 | 重庆邮电大学 | Method and system for testing physical layer protocol conformance |
CN106685766B (en) * | 2017-01-17 | 2019-09-03 | 重庆邮电大学 | A kind of physical layer protocol conformance test method and system |
CN110505649A (en) * | 2018-05-17 | 2019-11-26 | 大唐移动通信设备有限公司 | A kind of automated testing method and system |
CN110505649B (en) * | 2018-05-17 | 2021-04-23 | 大唐移动通信设备有限公司 | Automatic testing method and system |
CN113220580A (en) * | 2021-05-18 | 2021-08-06 | Oppo广东移动通信有限公司 | Test method and device, equipment and storage medium |
CN113835413A (en) * | 2021-09-22 | 2021-12-24 | 交控科技股份有限公司 | Interlocking automation test system, method, device and storage medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101437260A (en) | System and method for automatization test of WCDMA physical layer | |
KR101019918B1 (en) | Apparatus and process for a universal diagnostic monitor module on a wireless device | |
KR100948217B1 (en) | Apparatus and methods for product acceptance testing on a wireless device | |
Uusitalo et al. | Hexa-X the European 6G flagship project | |
KR101026029B1 (en) | Apparatus and method for managing battery performance of a wireless device | |
US9069749B1 (en) | Open RF test pack | |
KR20070116277A (en) | Apparatus and methods for determining network access performance of a wireless device | |
CN104424092A (en) | Page loading time length testing method and device | |
CN102413489A (en) | Automatic test method for WiFi (Wireless Fidelity) network connection of mobile phone | |
CN1260993C (en) | Collection of internal infor mation of mobile communication terminal by external module | |
CN1713658A (en) | Testing system and method for mobile telephones | |
CN101800910B (en) | Simulation system, PC side simulator and mobile phone side agent client | |
WO2016070934A1 (en) | Improving voice call performance testing | |
CN102750143A (en) | Digital signal processing (DSP) developing method based on matrix laboratory (MATLAB) component object model (COM) component calling | |
WO2019036851A1 (en) | Channel state information measurement and feedback method and related product | |
CN111104281B (en) | Game performance monitoring method, device, system and storage medium | |
CN101296462A (en) | Method and system for batch execution of mobile terminal software automatic test | |
CN114302436B (en) | Physical layer testing method and device, chip and module equipment | |
CN112929914A (en) | System and method for network link simulation auxiliary test | |
CN100456866C (en) | Base station simulator and base station testing method | |
Díaz-Zayas et al. | Remote control and instrumentation of Android devices | |
CN102256273A (en) | Automatic testing method for multilink communication of time division_machine-to-machine/man (TD_M2M) wireless module | |
CN103929733A (en) | Equipment capacity transmission device and method for Internet of things | |
CN102790994A (en) | Terminal network test system and multiterminal network test system | |
CN103444214A (en) | Method, apparatus and computer program product for security configuration coordination during a cell update procedure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Open date: 20090520 |