CN100456866C - Base station simulator and base station testing method - Google Patents

Base station simulator and base station testing method Download PDF

Info

Publication number
CN100456866C
CN100456866C CNB2005101114585A CN200510111458A CN100456866C CN 100456866 C CN100456866 C CN 100456866C CN B2005101114585 A CNB2005101114585 A CN B2005101114585A CN 200510111458 A CN200510111458 A CN 200510111458A CN 100456866 C CN100456866 C CN 100456866C
Authority
CN
China
Prior art keywords
base station
module
command
interface module
simulator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB2005101114585A
Other languages
Chinese (zh)
Other versions
CN1878376A (en
Inventor
徐泽平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Juxin Technology Co Ltd
Original Assignee
Juxin Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Juxin Technology Co Ltd filed Critical Juxin Technology Co Ltd
Priority to CNB2005101114585A priority Critical patent/CN100456866C/en
Publication of CN1878376A publication Critical patent/CN1878376A/en
Application granted granted Critical
Publication of CN100456866C publication Critical patent/CN100456866C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The present invention relates to the technology of wireless communication and discloses a base station simulator and a base station testing method. The simulation of a great deal of base station operation and maintenance can be realized only by utilizing less material costs. In the present invention, one simulator simulates the operation and the maintenance functions of multiple BS devices by means that the simulator is butted with a BSC. The simulator comprises an interface module, an order interpretation device, a response module, a switching module and a control module. A TCL resolver is used in the simulator. Operation and maintenance orders are analyzed according to TCL scripts, and a relative response is given.

Description

Base station simulator and base station test method
Technical field
The present invention relates to wireless communication technology, particularly the method for testing of base station and the equipment relevant with test.
Background technology
Since the eighties, analog mobile communication system was born, mobile communication obtained develop rapidly in the whole world in the short more than ten years, developed into 3-G (Generation Three mobile communication system) (TheThird Generation is called for short " 3G ") from first generation analogue system.At present, second generation digital system mainly comprises global system for mobile communications (Global System for mobile Communication, be called for short " GSM ") and code division multiple access (Code Division Multiple Access, be called for short " CDMA ") etc., wherein, CDMA occupies critical role in mobile communication, in 3G, comparatively Cheng Shu three big standards all belong to the category of CDMA especially.
In the CMDA communication system, subscriber equipment (User Equipment, be called for short " UE ") communicate via a wireless access network (Radio Access Network is called for short " RAN ") and one or more core net (Core Network is called for short " CN ").Wherein, UE can be mobile phone, also can be to have the notebook computer of portable terminal or be installed in mobile communication equipment on the vehicle, these equipment can carry out voice and/or data communication service with wireless access network, for example: make a phone call, fax, online browsing, and send and receive e-mail or the like.
Wherein, RAN covers the geographic area be divided into cell area, and each cell area provides service by a base station (Base Station is called for short " BS "), promptly provides wireless coverage in the one's respective area by this BS.BS communicates by letter with UE in the sub-district by BS equipment, carries out various control functions such as network resource management, channel switch by control appliance.The control appliance of BS is called base station controller (BaseStation Controller is called for short " BSC ").BSC is connected with BS equipment by the asynchronous transfer mode internetworking agreement of (AsynchronousTransfer Mode is called for short " ATM ") (IP OVER ATM is called for short " IPOA ") interface.
BSC is by the Network Management Equipment centralized control, and it is again a very important function of Network Management Equipment that many BS parallel work-flow is safeguarded.In order to verify whether BSC or Network Management Equipment possess commercial standard (CS), can to support the Operation and Maintenance function that many BS are parallel, must adopt environment near the online practical operation situation of product that it is carried out high traffic and test, this also be product issue must be through link.
At present, for many BS Operation and Maintenance function of Network Management Equipment or BSC being carried out the high traffic test, generally be to use a plurality of real BS to participate in test.
Use a plurality of real BS equipment to be connected with the BSC or the Network Management Equipment of system under test (SUT), the operational maintenance command of the many BS of operation judges according to the response message of many BS operational maintenance command whether this function obtains correct realization on Network Management Equipment.
In actual applications, there is following problem in such scheme: testing cost height, network environment complexity, BS limited amount.
Cause the main cause of this situation to be, this test participates in finishing by using real BS equipment.And the general zone that distributes of real BS equipment is wider, can't finish the test to BSC in a machine room.
Summary of the invention
In view of this, main purpose of the present invention is to provide a kind of wireless communication technology, utilizes less Material Cost just can realize the simulation that a large amount of base station operations are safeguarded as long as make.
For achieving the above object, the invention provides a kind of base station simulator, comprise:
At least one interface module is connected with base station controller, is used to provide the physical layer interface access function;
Command interpretation and respond module are used for handling according to the script that sets in advance, and returning corresponding response command by described interface module to described base station controller by the base station operation maintenance command of described interface module reception from base station controller.
Wherein, described command interpretation and respond module have two at least;
Described base station simulator also comprises Switching Module, is used for transmitting various command between each described interface module and command interpretation and respond module.
In addition, described Switching Module is an Ethernet switch.
In addition, also comprise control module, be used to provide one of following function or its combination in any:
The monitoring that the parameter of operation interface, configuration described interface module and command interpretation and respond module or script, control test process is provided, obtains information in test result and the test process to the user.
In addition, described interface module also is used to provide the function of file transfer protocol (FTP) client, so that download the file of appointment from described base station controller according to the indication of described command interpretation and respond module.
In addition, described command interpretation and respond module are based on the explanation actuator of appointed language, and described script uses this appointed language to describe.
In addition, described appointed language comprises:
Tool Command Language or Python.
In addition, be connected by IP interface or all-IP interface between described interface module and the described base station controller based on asynchronous transfer mode.
The present invention also provides a kind of base station test method, comprises following steps:
Network Management Equipment sends the base station operation maintenance command by base station controller to base station simulator;
The interface module of described base station simulator is transmitted to command interpretation and respond module after receiving described base station operation maintenance command;
Described command interpretation and respond module are handled according to the script that sets in advance, and return corresponding response command by described interface module to described base station controller;
Described base station controller is transmitted to described Network Management Equipment with the response command of receiving.
Wherein, pass through Switching Module repeating base station operational maintenance command and response command thereof between described interface module and command interpretation and the respond module.
By relatively finding that the main distinction of technical scheme of the present invention and prior art is, dock with BSC by simulator, a simulator is simulated the Operation and Maintenance function of a plurality of BS equipment.Simulator comprises interface module, command interpretation and respond module, Switching Module and control module.
In simulator, use the TCL resolver according to TCL script parse operation maintenance command and give corresponding response.
Difference on this technical scheme, brought comparatively significantly beneficial effect, promptly test because use simulator to replace real BS, just can realize the simulation that a large amount of base station operations are safeguarded so only need less Material Cost, satisfy base station controller or Network Management Equipment and safeguard the requirement that high traffic is tested for many base station operations, cost is low, Test Networking is simple.
Because in simulator, used the TCL resolver according to TCL script parse operation maintenance command and give corresponding response, and the TCL script can be revised easily according to test request, so strengthened the extensibility that operational maintenance command is supported, for example can support the unsupported newer command of present BS like a cork.
Description of drawings
Fig. 1 uses many base station operations to safeguard that simulator finishes the systematic schematic diagram of test among the present invention;
Fig. 2 is a structure chart of safeguarding simulator according to many base station operations of first embodiment of the invention;
Fig. 3 safeguards the flow chart of simulator to the operational maintenance command response according to many base station operations of second embodiment of the invention.
Embodiment
For making the purpose, technical solutions and advantages of the present invention clearer, the present invention is described in further detail below in conjunction with accompanying drawing.
The invention provides a kind of many BS Operation and Maintenance simulator and replace real BS equipment to finish the method for BSC or Network Management Equipment test, its design principle as shown in Figure 1.
This many BS Operation and Maintenance simulator comprises one or more interface modules, command interpretation and respond module, Switching Module, control module.
Wherein, be connected with BSC, and the function of physical layer interface path and file transfer protocol (FTP) client is provided by interface module.This connection is based on the IPOA interface and connects, and as shown in Figure 2, also can be the all-IP interface.Like this, by a plurality of interface modules and IPOA interface, can be connected with a plurality of BSC.
Receive the BS operational maintenance command of BSC by command interpretation and respond module, and handle, return corresponding response command then according to the script that sets in advance.In simulation system, command interpretation and respond module can be one or more, and it is based on the explanation actuator of appointed language, and script uses the language description of appointment, for example, and TCL or Python.If have only a command interpretation and respond module, then simulator can further be simplified, and promptly no longer needs Switching Module, is directly linked to each other with each interface module by command interpretation and respond module.
Command interpretation and respond module are to be connected with BSC by interface module, thereby realize the reception and the response of order.And interface module also is to finish the download of BSC specified file according to the indication of command interpretation and respond module.
Order forwarding work between each interface module and command interpretation and respond module is then finished by Switching Module.This Switching Module can be that Ethernet switch also can be other switching equipment.
At last, by control module to the user of this analogue system provide operation interface, configuration interface module and command interpretation and respond module parameter or script, control test process, obtain test result and to test process in the monitoring of information.
According to above-mentioned principle, the system configuration of many BS Operation and Maintenance simulator of first embodiment of the invention as shown in Figure 2.In this embodiment, each interface module is a hardware interface plate, is connected simulation BS equipment with BSC by the IPOA interface; Pass through ethernet communication between each module, so used Ethernet switch module in return; Realize command interpretation and respond module with the TCL actuator, this TCL actuator is used to carry out the TCL script.Because in the method for testing of prior art, operational maintenance command can send to BS equipment by the IPOA passage by BSC or Network Management Equipment, and this operational maintenance command is to follow the printable character string of consolidation form.Can correctly identify the operational maintenance command that to carry out the high traffic test by the TCL script, the response that the operational maintenance command response message format is produced this operational maintenance command by the TCL script according to BS equipment then, thereby the response of alternative real BS equipment of the prior art.Therefore, only need realize simulation, and not need to adopt special BS equipment, simplify the Test Networking environment, reduce testing cost by the TCL script to true BS operation of equipment maintenance function.And,, also strengthened the extensibility that operational maintenance command is supported by method in conjunction with TCL resolver and TCL script.
The system configuration of many BS Operation and Maintenance simulator of first execution mode of the present invention as shown in Figure 2.
The method of work of many BS Operation and Maintenance simulator of second embodiment of the invention as shown in Figure 3.
In step 301, Network Management Equipment sends the order of BS Operation and Maintenance to BSC.
In step 302, BSC is transmitted to order the interface module of simulator.
In step 303, interface module passes to Switching Module with order.
In step 304, order is transmitted to command interpretation and respond module by Switching Module.
In step 305, command interpretation and respond module are handled the order of receiving, and are provided corresponding response command according to the script that sets in advance.
Step 306 is transmission to the Operation and Maintenance response command to step 308, is corresponding with step 301 to the transmission of step 303 pair operational maintenance command.Last response command is returned to the Network Management Equipment that sends the BS operational maintenance command.
Though pass through with reference to some of the preferred embodiment of the invention, the present invention is illustrated and describes, but those of ordinary skill in the art should be understood that and can do various changes to it in the form and details, and without departing from the spirit and scope of the present invention.

Claims (8)

1. a base station simulator is characterized in that, comprises:
At least one interface module is connected with base station controller, is used to provide the physical layer interface access function;
At least two command interpretations and respond module, be used for by the base station operation maintenance command of described interface module reception from base station controller, handle according to the script that sets in advance, and return corresponding response command to described base station controller by described interface module;
Switching Module is used for transmitting various command between each described interface module and command interpretation and respond module.
2. base station simulator according to claim 1 is characterized in that described interface module has a plurality of, and each interface module is connected with a base station controller respectively.
3. base station simulator according to claim 2 is characterized in that described Switching Module is an Ethernet switch.
4. according to each described base station simulator in the claim 1 to 3, it is characterized in that, also comprise control module, be used to provide one of following function or its combination in any:
The monitoring that the parameter of operation interface, configuration described interface module and command interpretation and respond module or script, control test process is provided, obtains information in test result and the test process to the user.
5. base station simulator according to claim 4 is characterized in that described interface module also is used to provide the function of file transfer protocol (FTP) client, so that download the file of appointment from described base station controller according to the indication of described command interpretation and respond module.
6. base station simulator according to claim 4 is characterized in that, described command interpretation and respond module are based on the explanation actuator of appointed language, and described script uses this appointed language to describe.
7. base station simulator according to claim 6 is characterized in that, described appointed language comprises:
Tool Command Language or Python.
8. base station simulator according to claim 4 is characterized in that, is connected by IP interface or all-IP interface based on asynchronous transfer mode between described interface module and the described base station controller.
CNB2005101114585A 2005-12-13 2005-12-13 Base station simulator and base station testing method Expired - Fee Related CN100456866C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2005101114585A CN100456866C (en) 2005-12-13 2005-12-13 Base station simulator and base station testing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2005101114585A CN100456866C (en) 2005-12-13 2005-12-13 Base station simulator and base station testing method

Publications (2)

Publication Number Publication Date
CN1878376A CN1878376A (en) 2006-12-13
CN100456866C true CN100456866C (en) 2009-01-28

Family

ID=37510630

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2005101114585A Expired - Fee Related CN100456866C (en) 2005-12-13 2005-12-13 Base station simulator and base station testing method

Country Status (1)

Country Link
CN (1) CN100456866C (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102291745A (en) * 2011-08-09 2011-12-21 北京星网锐捷网络技术有限公司 Method and device for testing multiple access points (AP)
CN102917386B (en) * 2012-11-06 2015-04-01 北京北方烽火科技有限公司 Device and method for consistency protocol verification of interfaces S1 of LTE (Long Term Evolution) wireless network

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1179253A (en) * 1995-01-30 1998-04-15 艾利森电话股份有限公司 Loading softward into field test equipment
US5818903A (en) * 1996-09-24 1998-10-06 Electronics And Telecommunications Research Institute CDMA mobile automatic call simulating method and simulator therefor
CN1378396A (en) * 2001-03-30 2002-11-06 深圳市中兴通讯股份有限公司 Large traffic volume test platform of base station subsystem
CN1494249A (en) * 2002-10-31 2004-05-05 深圳市中兴通讯股份有限公司 Base station controller/base station receiving/transmitting information apparatus imitator in CDMA system
CN1494338A (en) * 2002-10-31 2004-05-05 深圳市中兴通讯股份有限公司上海第二 Large telephone traffic volume simulation testing system of base station controller

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1179253A (en) * 1995-01-30 1998-04-15 艾利森电话股份有限公司 Loading softward into field test equipment
US5818903A (en) * 1996-09-24 1998-10-06 Electronics And Telecommunications Research Institute CDMA mobile automatic call simulating method and simulator therefor
CN1378396A (en) * 2001-03-30 2002-11-06 深圳市中兴通讯股份有限公司 Large traffic volume test platform of base station subsystem
CN1494249A (en) * 2002-10-31 2004-05-05 深圳市中兴通讯股份有限公司 Base station controller/base station receiving/transmitting information apparatus imitator in CDMA system
CN1494338A (en) * 2002-10-31 2004-05-05 深圳市中兴通讯股份有限公司上海第二 Large telephone traffic volume simulation testing system of base station controller

Also Published As

Publication number Publication date
CN1878376A (en) 2006-12-13

Similar Documents

Publication Publication Date Title
CN100566448C (en) Be used in data communication system, selecting the method and apparatus of serving sector
CN100431372C (en) Device and method for terminal consistency test in mobile communication system
CN100385864C (en) Protocol conformance measuring device and method
CN101925101A (en) Method and device for information collection and statistic analysis in process of user calling
CN101287266B (en) Test system and method for mobile phone
CN101808356B (en) Protocol simulation system for TD-SCDMA terminal protocol conformance tests
CN106911523A (en) The method and system that mobile interchange network users are positioned by LTE indulging in the internet
CN101437260A (en) System and method for automatization test of WCDMA physical layer
CN103313292B (en) Inter-system measuring method based on single baseband chip dual link framework
CN101384061A (en) Systems and methods for mobile phone validation
CN102355678A (en) Wireless network channel simulator as well as system and method for testing wireless network equipment
CN100377538C (en) Construction of protocol testing platform for supporting TD SCDMA terminal protocol
CN100472988C (en) System and method for detecting base-station NodcB
CN100456866C (en) Base station simulator and base station testing method
CN101827379A (en) General-purpose interoperability test system and test method thereof
CN101150832B (en) Dynamic management method, device and system for WIMAX communication resource
CN1937461B (en) Terminal test device based on terminal management business
CN100401693C (en) Performance detecting device and its method for radio network controller
CN101351014B (en) Test system for anolog base station controller and test method
CN100359971C (en) Reglation testing axiliary interface device of radio base station and testing system using it
CN101207525B (en) System and apparatus for testing wireless network controller signaling processing module
CN202231869U (en) Mobile signal automatic dial testing terminal and system
Zhongmei et al. A study for application research of 5G data acquisition and testing
CN102340813B (en) Method and device for creating test environment of base station in high-load operation state
CN100508636C (en) Detecting device and method for RNC air interface

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: JUXIN SCIENCE CO., LTD.

Free format text: FORMER OWNER: HUAWEI TECHNOLOGY CO., LTD.

Effective date: 20080829

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20080829

Address after: 2, Xincheng Avenue, Songshan science and Technology Industrial Park, Guangdong, Dongguan Province, China: 523808

Applicant after: Juxin Technology Co., Ltd.

Address before: Bantian HUAWEI headquarters office building, Longgang District, Guangdong, Shenzhen Province, China: 518129

Applicant before: Huawei Technologies Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090128

Termination date: 20161213

CF01 Termination of patent right due to non-payment of annual fee