CN101429863A - Oil-gas-water well energy-gathering composite perforation process method - Google Patents
Oil-gas-water well energy-gathering composite perforation process method Download PDFInfo
- Publication number
- CN101429863A CN101429863A CNA200810229696XA CN200810229696A CN101429863A CN 101429863 A CN101429863 A CN 101429863A CN A200810229696X A CNA200810229696X A CN A200810229696XA CN 200810229696 A CN200810229696 A CN 200810229696A CN 101429863 A CN101429863 A CN 101429863A
- Authority
- CN
- China
- Prior art keywords
- built
- composite
- oil
- perforation
- water well
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 23
- 239000002131 composite material Substances 0.000 title claims abstract description 22
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 10
- 239000003814 drug Substances 0.000 claims description 8
- 239000000843 powder Substances 0.000 claims description 3
- 239000003721 gunpowder Substances 0.000 claims description 2
- 230000000694 effects Effects 0.000 abstract description 6
- 230000000295 complement effect Effects 0.000 abstract description 2
- 230000009286 beneficial effect Effects 0.000 abstract 1
- 239000003795 chemical substances by application Substances 0.000 abstract 1
- 230000007547 defect Effects 0.000 abstract 1
- 238000005516 engineering process Methods 0.000 description 4
- 238000004519 manufacturing process Methods 0.000 description 4
- 239000003921 oil Substances 0.000 description 4
- 238000004458 analytical method Methods 0.000 description 2
- 230000005540 biological transmission Effects 0.000 description 2
- 239000012530 fluid Substances 0.000 description 2
- 230000001186 cumulative effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000002349 favourable effect Effects 0.000 description 1
Images
Landscapes
- Fats And Perfumes (AREA)
Abstract
The invention relates to an oil-gas-water well energy-gathering composite perforation process method, which combines the built-in and the lower hanging type composite perforation process, wherein a joint and a lower ignition charge are arranged at the lower part of the original built-in composite perforation device, the lower ignition charge adopts an ignition mode of combining a core pipe and an ignition charge column, and the pressure value generated by the ignition charge is adjusted by adjusting the number of the ignition charge columns; when oil-water well perforation operation is carried out, a built-in composite perforator is utilized to perforate a target layer at first, then a lower fire hanging agent is ignited, and the stratum is continuously loaded to form secondary pressure impact, so that the aims of improving the length of a crack and improving the flow conductivity are fulfilled. The energy-gathering composite perforation process provided by the invention is easy to implement and reliable in operation, has the advantages of built-in and hanging-down perforation processes, can complement the defects of the built-in and hanging-down perforation processes, and can achieve the good effects of improving the pressure raising speed, prolonging the action time of gas pressure and being beneficial to crack extension.
Description
Technical field:
The present invention relates to a kind of process that is used for the perforating job of oilfield well.
Background technology:
Perforating job is an important step in oilfield well completion and the manufacturing process.Composite gun perforation is that the gas that produces by powder burning in the perforating job process carries out pressure break to the stratum around the pit shaft and makes the seam effect, annotates to adopt and tells on to improve oil-water well.According to the action effect analysis of power, adopt production effect to improve the oil-water well notes.Action effect analysis according to power, the rate of rise of gas helps the generation in crack soon, action time is long more favourable more to fracture extension, and still, the on-the-spot at present built-in and following hanging two kinds of composite gun perforation process that adopt usually all can't satisfy the requirement of this two aspect simultaneously.
Summary of the invention:
The object of the present invention is to provide a kind of built-in and following hanging composite gun perforation process advantage but also can remedy both sides' deficiency, can prolong the gas pressure oil-water well energy-gathering composite perforating process of action time separately that not only can keep.
Technical scheme of the present invention is as follows: this kind energy-gathering composite perforating technology is with built-in and following the two use in conjunction of hanging composite gun perforation process, original built-in composite perforator bottom field joint and under the medicine of being furious, the medicine of being furious down adopts the sparking mode of core pipe and the combination of igniting powder column, regulates the force value that gunpowder produces by point of adjustment stick quantity; During the oil-water well perforating job, utilize built-in composite perforator at first to the target zone perforation, the medicine of being furious that ignites down then continues to load to the stratum, forms secondary pressure and impacts, thereby reach the purpose that improves fracture length and flow conductivity.
Energy-gathering composite perforating technology provided by the invention is easy to implement, reliable operation, the advantage that this technology has built-in and following hanging gun perforation process concurrently again can complementary its weak point, utilizes it to reach and improves the rate of rise and prolong gas pressure action time, help the good result of fracture extension.
Description of drawings:
The gun perforation process pipe string structure schematic diagram that accompanying drawing adopts for the present invention.
The specific embodiment:
Below in conjunction with accompanying drawing enforcement of the present invention is illustrated.
As shown in the figure, the gun perforation process pipe string that adopts during the invention process adopts cable transmission, from top to bottom for built-in perforator 1, joint 2, be furious medicine 3 and screen casing 4 down, wherein, the medicine 3 of being furious down is arranged in the screen casing 4.
Embodiment: 3365 meters of 20 well well depths are breathed out in certain oil field, adopt 76 rifles 76 to play cumulative composite cable transmission means perforation, cascode is opened 32.8 meters, 47 tons of day production fluids, 42 tons of day produce oils, 2540 cubic metres of daily gas, effect are better than adopting the offset well Ha20-1Jing (11.2 tons of day production fluids, 5.6 tons of day produce oils) of conventional gun perforation process greatly.
Claims (1)
1, a kind of oil gas water well energy-gathering composite perforating process, it is characterized in that: this kind energy-gathering composite perforating process is with built-in and following the two use in conjunction of hanging composite gun perforation process, original built-in composite perforator bottom field joint and under the medicine of being furious, the medicine of being furious down adopts the sparking mode of core pipe and the combination of igniting powder column, regulates the force value that gunpowder produces by point of adjustment stick quantity; During the oil-water well perforating job, utilize built-in composite perforator at first to the target zone perforation, the medicine of being furious that ignites down then continues to load to the stratum, forms secondary pressure and impacts, thereby reach the purpose that improves fracture length and flow conductivity.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNA200810229696XA CN101429863A (en) | 2008-12-15 | 2008-12-15 | Oil-gas-water well energy-gathering composite perforation process method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNA200810229696XA CN101429863A (en) | 2008-12-15 | 2008-12-15 | Oil-gas-water well energy-gathering composite perforation process method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101429863A true CN101429863A (en) | 2009-05-13 |
Family
ID=40645477
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNA200810229696XA Pending CN101429863A (en) | 2008-12-15 | 2008-12-15 | Oil-gas-water well energy-gathering composite perforation process method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101429863A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101749000B (en) * | 2010-01-18 | 2012-10-03 | 张宣来 | Energy-concentrated bullet blasting and perforating process |
CN108625828A (en) * | 2018-03-28 | 2018-10-09 | 中国石油大学(北京) | Predict the method and device of perforation blast load output size |
-
2008
- 2008-12-15 CN CNA200810229696XA patent/CN101429863A/en active Pending
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101749000B (en) * | 2010-01-18 | 2012-10-03 | 张宣来 | Energy-concentrated bullet blasting and perforating process |
CN108625828A (en) * | 2018-03-28 | 2018-10-09 | 中国石油大学(北京) | Predict the method and device of perforation blast load output size |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN113294134B (en) | Hydraulic fracturing and methane in-situ blasting synergistic fracturing permeability-increasing method | |
CN201620848U (en) | Vertical well orientation multi-pulse increase-benefit perforating device | |
CN102031952B (en) | Multi-stage perforation supercharging method | |
CN104278978B (en) | Soluble bridge plug fracturing process pipe column and fracturing method thereof | |
CN109025941B (en) | Deflagration fracturing and hydraulic impact fracturing combined pipe column and combined method | |
CN101598522B (en) | Delivery and initiation device for deflagration and fracturing liquid explosive in hydraulic fracture and application thereof | |
CN101215964A (en) | Coal seam depth deflagration method | |
CN201531259U (en) | Perforating bullet of high perforation density deep penetration perforator for oil and gas well | |
CN101737028A (en) | Coalbed methane high-power pulse fracturing developing device | |
WO2006045248A1 (en) | A high-energy gas fracture tool for through-tubing operation | |
CN103787801B (en) | For the priming explosive of reservoir aerodynamic force volume increase | |
CN102052066B (en) | Dynamic seal pressing method and device for improving complex perforation pressing crack effect | |
CN206581900U (en) | A kind of multistage ignites the safe tubing string of explosion fracturing step by step | |
CN101737027B (en) | High energy gas fracturing device of oil reservoirs of horizontal well | |
CN101429863A (en) | Oil-gas-water well energy-gathering composite perforation process method | |
CN204782953U (en) | Outer directional multistage pulse increase perforator | |
CN107401401A (en) | A kind of horizontal well explosion fracturing modernization system and method | |
CN201225138Y (en) | Oil conduit transportation perforation press control on-off machine | |
CN2779059Y (en) | Energy gathered bullet composite blast perforation apparatus | |
CN101435324A (en) | Sectional type oil pipe transmission composite perforation process | |
CN201256350Y (en) | Oil pipe conveying perforation linear electricity generator | |
CN103225498B (en) | Multi-stage composite deep penetration perforating device | |
CN202850957U (en) | Perforating bullet with big fragments and deep penetration | |
CN105041273A (en) | External directional, orientation and perforation-angle-fixed multistage pulse enhanced-perforator | |
CN201152169Y (en) | Solid dynamic target support fracturing and unblocking device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Open date: 20090513 |