CN101420120B - Method for dynamically simulating 1000kV line protection experiment - Google Patents

Method for dynamically simulating 1000kV line protection experiment Download PDF

Info

Publication number
CN101420120B
CN101420120B CN2008102278459A CN200810227845A CN101420120B CN 101420120 B CN101420120 B CN 101420120B CN 2008102278459 A CN2008102278459 A CN 2008102278459A CN 200810227845 A CN200810227845 A CN 200810227845A CN 101420120 B CN101420120 B CN 101420120B
Authority
CN
China
Prior art keywords
fault
test
phase
carry out
metallicity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2008102278459A
Other languages
Chinese (zh)
Other versions
CN101420120A (en
Inventor
周泽昕
周春霞
张晓莉
杜丁香
董明会
詹荣荣
詹智华
贾琰
李仲青
李明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
Original Assignee
China Electric Power Research Institute Co Ltd CEPRI
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Electric Power Research Institute Co Ltd CEPRI filed Critical China Electric Power Research Institute Co Ltd CEPRI
Priority to CN2008102278459A priority Critical patent/CN101420120B/en
Publication of CN101420120A publication Critical patent/CN101420120A/en
Application granted granted Critical
Publication of CN101420120B publication Critical patent/CN101420120B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Emergency Protection Circuit Devices (AREA)

Abstract

The invention establishes a 1,000kV circuit protection dynamic analog system and provides a method of dynamic analog 1,000kV circuit protection test based on the research of system characteristics of a 1,000kV extra-high voltage alternating current test demonstration project in order to provide conditions for an extra-high voltage protective relaying device test and understand the adaptability ofthe circuit protective relaying device to the 1,000kV system, according to actual situation and parameter of southeast Shanxi-Nanyang-Jingmen alternating current ultra-high voltage test demonstrationproject, by adopting self designed analog elements, and aiming at protective relaying devices with different types.

Description

A kind of method of dynamic analog 1000kV route protection test
Technical field
The present invention relates to a kind of method of dynamic analog 1000kV route protection test, belong to circuit on power system reaying protection test field.
Background technology
For optimizing the energy resources configuration, saving circuit corridor land used, China is developing the UHV transmission technology, has wherein built the southeast-Nanyang, Shanxi-Jingmen 1000kV extra-high-voltage alternating current experiment and demonstration engineering.System performance for research 1000kV extra-high-voltage alternating current experiment and demonstration engineering; for the test of ultra high voltage protective relaying device provides condition; understand the adaptability of circuit relay protection device to the 1000kV system; actual conditions and parameter according to the southeast-Nanyang, Shanxi-Jingmen AC extra high voltage experiment and demonstration engineering; utilize analog element: high impedance linea angulata road reactance component; high quality factor simulation shunt reactor and CVT etc.; at dissimilar protective relaying devices; set up 1000kV route protection dynamic simulator system, designed the method for dynamic analog 1000kV route protection test.
Summary of the invention
The southeast-Nanyang, Shanxi-Jingmen ultra-high voltage AC transmission engineering is a national grid major test demonstration project.At present, domestic except that China Electric Power Research Institute still do not have a test method that can satisfy accurate simulation 1000kV route protection dynamic simulator system Model Design scheme and route protection.For accurately simulating the situation of 1000kV system; guarantee the quality of 1000kV protective relaying device dynamic simulation test; is carrying out prototype system on the basis of labor China Electric Power Research Institute dynamic model experiment chamber; set up the dynamic simulator system that to simulate 1000kV extra-high-voltage alternating current experiment and demonstration engineering; designed and developed the circuit element model (the line impedance angle is the highest can to reach 88.4 °) that satisfies the 1000kV systematic function; transformer model; the shunt reactor model element; neutral point reactor model element; circuit shunt reactor model element that can the simulated interior fault; the current transformer of different no-load voltage ratios; capacitance type potential transformer; research and design the test method; in this system, can finish the dynamic simulation test of the route protection of 1000kV experiment and demonstration engineering; for research 1000kV transmission system transient characterisitics provide scientific basis to the influence of protective relaying device, be 1000kV transmission system relaying Design of device; type selecting; operation provides experimental condition.
The present invention proposes a kind of method of dynamic analog 1000kV route protection test; it is characterized in that at first design system model; adopt four generators to simulate the valve system that waits of a side in the model; protective device is installed in the both sides of two circuits respectively; two ends and centre at test circuit are provided with eight fault points altogether; the fault that each fault point all is used to simulate various types of metallicity or produces through the transition resistive short; voltage signal uses no-load voltage ratio to provide as the capacitance type potential transformer CVT in the line side of 1000kV/0.1kV; the no-load voltage ratio of each current transformer is 4000A/1A, and the analogue test project of carrying out then comprises:
(1), carry out transient state and surmount test and test 70% place operate time, the defencive function of only adjusting the distance detects, instantaneous voltage phase angle at the beginning of the capacity of short circuit of valve systems such as control and the short circuit, the various metallicity faults of analog line distal point;
(2), carry out static state and surmount test, the defencive function of only adjusting the distance detects, the capacity of short circuit of valve systems such as control and short circuit be instantaneous voltage phase angle just, the various metallicity faults of analog line distal point;
(3), carry out metallicity transient fault test on the circuit, metallicity instantaneity single-phase earthing, two phase ground, line to line fault, three-phase ground connection and three phase short circuit fault in the simulation protection zone;
(4), distinguish metallicity Test to Failure on the outer bus, the instantaneous single-phase earthing of metallicity, two phase ground, line to line fault, three-phase ground connection and three phase short circuit fault on the bus outside the simulation protection zone;
(5), the metallicity permanent fault of carrying out in the protection zone is tested;
(6), carry out the developing fault test, same fault point is developed into another phase earth fault through different time by single phase ground fault in the simulation protection zone, simulation region is outer-Nei single phase ground fault in different time develops into the protected circuit outlet area-outer different name phase single phase ground fault, the i.e. outer single phase ground fault of simulation region single phase ground fault different name phase single phase ground fault outside different time develops into the protected circuit outlet area in different name phase single phase ground fault and the simulation region in different time develops into the protected circuit outlet area;
(7), carry out the transition resistance Test to Failure, simulation in the district of 600 Ω~300 Ω transition resistances outside single phase ground fault and the district three-phase through the small resistor short-circuit fault test;
(8), carry out the system stability failure test, simulation reaches the power system oscillation procedure fault entirely mutually, and is reaching in the power system oscillation process the inside and outside metallic short circuit fault of generating region more entirely mutually;
(9), carry out the system frequency excursion test, analogue system frequency shift (FS) ± 2Hz, the inside and outside various metallic short circuit faults of simulation region;
(10), carry out the system operation Test to Failure, by operating power side switch, hand closes nonloaded line five times, and by operating power side switch, hand closes faulty line;
(11), under the single-side power mode, simulate each internal fault external fault;
(12), carry out the disconnection fault test;
(13), carry out under the different operating modes of each passage influence test to protective device;
(14), carry out DC power supply and intermittently reach the dc voltage fluctuation test.
1000kV route protection model system real simulated of the present invention following system performance:
(1.1), 1000kV system aperiodic damping time constant is about 110ms, this characteristic shows that 1000kV system aperiodic damping time constant may cause the transient state of distance protection to surmount more greatly.
(1.2), the 1000kV system is approximately 2160A (under the 1100kV voltage conditions) without the charging current of all fronts (654km) of the anti-compensation of height; All fronts charging current through the anti-compensation of height is approximately 250A (under the 1050kV voltage conditions).Compensativity is about 88%.
(1.3), 1000kV dynamic model system is abundant than 500kV system, 750kV system harmonics content, and the size of harmonic content is relevant with the position of system power, fault point.For the outlet short circuit of protection installation place, harmonic content is less; No matter be where the fault point is positioned at, the harmonic wave of Nanyang side very abundant (nine times and all to have next time)
(1.4), after the mains side switch disconnects, 1000kV dynamic model system voltage decays to time of zero and is approximately about 2s
Can be the very true comprehensive examination of the pilot project of method of the present invention 1000kV transmission system relaying device is at the action behavior of contingent various complicated electric power system faults, for 1000kV transmission system relaying Design of device, type selecting, operation provide important reference frame.
Description of drawings
Fig. 1 is the flow chart of the method for dynamic analog 1000kV route protection test;
Fig. 2 is the winding diagram of the designed system model of the method for dynamic analog 1000kV route protection test.
Embodiment
1, the research and development of system model design
The system equivalent figure of this project is referring to shown in Figure 2, and the southeast, Shanxi to Nanyang switchyard, Nanyang switchyard to Jingmen circuit are the 1000kV transmission line; The southeast, Shanxi-Nanyang switchyard extra high voltage line length is 363km, and Nanyang switchyard-Jingmen extra high voltage line length is 291km.1000kV bus maximum capacity of short circuit in the southeast, Shanxi is 10500MVA (maximum operational mode), and minimum capacity of short circuit is 4000MVA (minimum operational mode).Jingmen system is valve systems such as Central China net, and the maximum capacity of short circuit of 1000kV bus is that 10750MVA is a maximum operational mode, and minimum capacity of short circuit is that 9700MVA is a minimum operational mode.
In order better to simulate 1000kV transmission line system, China Electric Power Research Institute has designed a collection of new element new equipment voluntarily, has built the 1000kV transmission line model of design voluntarily.Adopt #3, #4, four generators of #6, #11 to simulate valve systems such as the southeast, Shanxi side in the model, with valve systems such as the infinitely great power supply simulation of 3W Jingmen.Wherein the southeast, Shanxi is connected to load transformer, and the rated capacity of load transformer is 11990MVA, and institute's on-load heap(ed) capacity is 7995MW.The major parameter of generator is referring to table 1-1, and line parameter circuit value is referring to table 1-2, table 1-3.
Table 1-1 generating set major parameter
3G 4G 6G 11G
Unit capacity 900MVA 900MVA 900MVA 900MVA
Cosφ 0.85 0.85 0.85 0.85
X’d∑ 0.316 0.323 0.314 0.312
X″d∑ 0.251 0.241 0.251 0.194
The table southeast, 1-2 Shanxi-Nanyang circuit major parameter (every 100km parameter)
Un X1 φ1 C1 X0 φ0 C0
1000kV 26.3Ω 88.35° 1.397μF 83.06Ω 79.5° 0.93μF
1-3 Nanyang-Jingmen circuit major parameter (every 100km parameter)
Un X1 φ1 C1 X0 φ0 C0
1000kV 26.3Ω 88.25° 1.383μF 78.21Ω 78.7° 0.895μF
The Nanyang switchyard adopts the double breaker scheme mode.The southeast, Shanxi-Nanyang switchyard circuit and Nanyang switchyard-circuit both sides, Jingmen all dispose shunt reactor, and its neutral point is through little reactance grounded.Be followed successively by 960Mvar, 720Mvar, 720Mvar, 600Mvar from the capacity of the southeast, Shanxi to Jingmen shunt reactor, the reactance value of the little reactance of neutral point is respectively: 280 Ω, 327 Ω, 334 Ω, 440 Ω.
The circuit winding diagram is referring to shown in Figure 2; protective device is installed in the southeast-Nanyang, Shanxi and Nanyang-circuit both sides, Jingmen respectively; two ends and centre at test circuit are provided with eight fault points altogether; its numbering is respectively K7, K9, K11, K1, K2, K3, K4, K10, and various types of metallicity can be simulated or through transition resistive short fault in each fault point.Voltage signal is that the line side capacitance type potential transformer (CVT) of 1000kV/0.1kV provides by no-load voltage ratio.The no-load voltage ratio of each current transformer is 4000A/1A.
At different pilot projects, system model is considered six kinds of operational modes, and details is referring to table 1-4.
Table 1-4 operational mode
Figure G2008102278459D00041
2, the method for route protection test
According to the failure condition that 1000kV transmission system actual capabilities take place, China Electric Power Research Institute has designed a kind of method of dynamic analog 1000kV route protection test.
Pilot project comprises: (1), transient state surmount test and test 70% place operate time (defencive function of only adjusting the distance detects), and the meaning that the defencive function of only adjusting the distance here detects is that this test defencive function of only adjusting the distance detects.Distance protection is a kind of by calculating the protection action behavior is determined in the protective device installation place to the distance of fault point principle.If the fault point that calculates distance in the protection range of setting action outside protection range, then be failure to actuate.Test so will surmount with operate time its transient state.Transient state surmounts in the transient process that is meant after fault, because the fault point that the harmonic wave composition conference in the electric current and voltage calculates distance protection is inaccurate apart from the distance of protection installation place, off-limits situation occurs.
(2), static state surmounts test (defencive function of only adjusting the distance detects)
(3), metallicity transient fault on the circuit
(4), metallicity fault on the outer bus in district
(5), permanent fault on the circuit
(6), developing fault
(7), through the transition Resistance Fault
(8), system stability destroys
(9), system frequency excursion
(10), system operation
(11), single-side power mode
(12), TV broken string (only distance protection)
(13), TA broken string (only differential protection)
(14), the different operating modes of passage are to the influence test of protective device
(15), DC power supply intermittently reaches the dc voltage fluctuation test
Concrete pilot project content is:
Transient state surmounts test and 70% place's test operate time (defencive function of only adjusting the distance detects)
Content of the test: mode six and mode five times, the capacity of short circuit of valve systems such as control and short circuit be instantaneous voltage phase angle just, and the various metallicity faults of the terminal K1 of analog line (K7) point are carried out record to the range finding result in the test, referring to table 2-1.
Table 2-1 transient state surmounts pilot project
Figure G2008102278459D00061
Test requirements document:
1. the Chao Yue of transient state ≦ 5%
2. 70% Dong of place makes Shi Jian ≦ 30ms.
Static state surmounts test (defencive function of only adjusting the distance detects)
Content of the test: in mode once, the capacity of short circuit of valve systems such as control and short circuit be instantaneous voltage phase angle just, the various metallicity faults of the terminal K3 of analog line (K9) point.Detailed programs are referring to table 2-2.
Table 2-2 static state surmounts pilot project
Figure G2008102278459D00071
Test requirements document: the southeast, Shanxi lateral extent one segment protect does not surmount.
Metallicity transient fault on the circuit
Content of the test:
1. respectively mode one and mode two times, metallicity instantaneity single-phase earthing, two phase ground, line to line fault, three-phase ground connection and three phase short circuit fault in the simulation protection zone.Detailed programs are referring to table 2-3.
Table 2-3 metallicity Test to Failure project
Figure G2008102278459D00072
Table 1-11 metallicity Test to Failure project (continuing)
Figure G2008102278459D00073
Test requirements document:
1. protect not tripping.Not super scope malfunction.
2. should satisfy operate time: optical-fiber longitudinal difference protection: full Xian ≦ 30ms.
Fiber distance protection: nearly fault Duan ≦ 20ms, fault Duan ≦ 40ms far away.
3. single phase ground fault, protection should select action mutually, do not answer malfunction after the single-phase tripping of protection action overlaps again.
Distinguish metallicity fault on the outer bus
Content of the test:
Respectively mode one, mode two times, the instantaneous single-phase earthing of metallicity, two phase ground, line to line fault, three-phase ground connection and three phase short circuit fault on the bus outside the simulation protection zone.Trouble duration is 120ms.Detailed programs are referring to table 2-4.
Table 2-4 external area error pilot project
Figure G2008102278459D00082
Figure G2008102278459D00091
Test requirements document: protect not malfunction.
Permanent fault on the circuit
Content of the test: in mode once, metallicity permanent fault in the simulation protection zone, by laboratory procedure controller control reclosing process, coincidence system is a single-pole reclosing, be Jingmen side 1s reclosing time, Nanyang side 1.1s; Nanyang side 1s, the southeast, Shanxi side 1.1s.Detailed programs are referring to table 2-5.
Table 2-5 permanent fault pilot project
Test requirements document: after coinciding with permanent fault, the protection excision permanent fault that should be able to accelerate motion, not tripping.
Developing fault
Content of the test:
1. once, same fault point is developed into another phase earth fault through different time by single phase ground fault in the simulation protection zone in mode.Detailed programs are referring to table 2-6.
Table 2-6 developing fault pilot project
Figure G2008102278459D00093
Figure G2008102278459D00101
2. once in mode; outer (interior) single phase ground fault of simulation region in different time develops into the protected circuit outlet area (outside) different name phase single phase ground fault; the time interval of breaking down in succession is 0ms~200ms; when the simulation external area error; simulation adjacent lines protection correct operation is tripping both sides switch in succession; nearly fault end 50ms, fault end 110ms far away.Detailed programs are referring to table 2-6 (continuing).
Table 2-6 developing fault pilot project (continuing)
Figure G2008102278459D00102
Figure G2008102278459D00111
Test requirements document:
1. for changeing troubles inside the sample space in the district, protection should be in three-phase tripping operation after the second time fault.
2. develop into troubles inside the sample space for the outer bus in district, develop into troubles inside the sample space after, install and not answer tripping.
3. two sections alternate developing faults of line different name of Nanyang switchyard side, the tripping three-phase is answered in the both sides protection.
Through the transition Resistance Fault
Content of the test: carry out following test two times in mode one and mode respectively, dual mode totally 48 times.
1. simulate single phase ground fault in the district of 600 Ω~300 Ω transition resistances.Detailed programs are referring to table 2-7.
Table 2-7 is through transition resistance test project
Figure G2008102278459D00112
2. the outer three-phase in district is through the small resistor short trouble.Detailed programs are referring to table 2-8.
Show outside the 2-8 district through transition resistance test project
Figure G2008102278459D00113
Figure G2008102278459D00121
Test requirements document:
1. in the district of transition resistance during single phase ground fault, differential current should be able to be excised fault greater than the 800A differential protection, and differential protection should be able to select action mutually.
2. the district is outer through the small resistor short circuit, and malfunction is not answered in distance protection.
System stability destroys
Content of the test: mode three times:
1. (be 300ms~1.5s) cycle of oscillation to simulate the full phase oscillation that quiet steady destruction causes.
2. simulate phase fault, protection action, the power system oscillation that the tripping of line switching A phase causes because of K7 point A.
3. simulate because of the southeast, Shanxi side switch A steals mutually and jump the power system oscillation that causes.
4. reaching in the power system oscillation process the inside and outside metallic short circuit fault of generating region more entirely mutually.Detailed programs are referring to table 2-9.
Test to Failure project again in table 2-9 vibration and the vibration
Figure G2008102278459D00122
Test requirements document:
1. be failure to actuate in the full phase oscillation process.
2. be failure to actuate in the power system oscillation process.
3. troubles inside the sample space should move in the full phase oscillation process, and distinguish outer unbalanced fault should not malfunction, when distinguishing the external symmetry fault and being excised fast, protects and does not answer malfunction.
4. various troubles inside the sample spaces take place in the power system oscillation process should be able to three-phase action excision fault.
5. various external area errors take place in the power system oscillation process is failure to actuate.
System frequency excursion
Content of the test: mode four times, analogue system frequency shift (FS) ± 2Hz, the inside and outside various metallic short circuits of simulation region.
Detailed programs are referring to table 2-10.
Table 2-10 frequency shift (FS) pilot project
Figure G2008102278459D00132
Table 2-10 frequency shift (FS) pilot project (continuing)
Table 2-10 frequency shift (FS) pilot project (continuing)
Figure G2008102278459D00151
Test requirements document:
1. troubles inside the sample space is protected not tripping.
2. external area error is protected not malfunction.
System operation
Content of the test:
1. by operating power side switch, hand closes nonloaded line five times.The back branch that is incorporated into the power networks is harmonious and draws 5SK, 6SK.
2. by operating power side switch, hand closes faulty line.Detailed programs are referring to table 2-11.
Table 2-11 system operation test project
Figure G2008102278459D00152
Test requirements document:
1. hand closes nonloaded line, and misoperation is not answered in protection.
2. hand closes faulty line, should accelerate motion three-phase tripping operation of protection, operate time should≤40ms.
The single-side power mode
Content of the test:
1. mode five times, simulate following internal fault external fault, referring to table 2-12.
Table 2-12 single-side power mode pilot project
Figure G2008102278459D00153
Figure G2008102278459D00161
Test requirements document:
1. troubles inside the sample space is answered correct operation.
TV break (only distance protection)
Pilot system: mode one.Content of the test:
1. simulating the southeast, Shanxi side CVT A breaks mutually.
2. simulate the southeast, Shanxi side CVT three-phase broken string.
3. simulate the southeast, Shanxi side CVT A phase flashover broken string.
4. simulate the internal fault external fault after the southeast, Shanxi side CVT A breaks mutually.Detailed programs are referring to table 2-13.
Table 2-13 TV broken string pilot project
Figure G2008102278459D00162
Test requirements document: behind the broken string, protect not malfunction, send alarm signal, the relevant protection of locking.
TA break (only differential protection)
Content of the test:
1. under the situation of circuit band different capacity, simulation Jingmen side 19TAA breaks mutually.Detailed programs are referring to table 2-14.
Table 2-14 TA broken string pilot project
Figure G2008102278459D00171
2. simulate the internal fault external fault after Jingmen side 19TA A breaks mutually.Detailed programs are referring to table 2-15.
Table 2-15 TA broken string pilot project
Figure G2008102278459D00172
Table 2-15 TA broken string pilot project (continuing)
Test requirements document:
1. when load current reaches differential protection spill current startup value, should send alarm signal behind the broken string.When load current during, do not do examination less than differential protection spill current startup value.
2. broken string back simulated failure protects action behavior consistent with the device design.
The different operating modes of passage are to the influence test of protective device
Content of the test:
In mode once, under the different operating mode situation of analog channel, to the influence of protective device.Comprise:
1. passage error code and interruption, test STM-1 passage error performance is to the influence of protective device action behavior.The error rate of passage is controlled at 10 -2~10 -9Between.
Table 2-16 passage error code pilot project
Figure G2008102278459D00174
Figure G2008102278459D00181
Require: in the error rate less than 10 -6The time, the protective device action behavior should be correct; Protective device should be because of the malfunction of passage error code; Passage interrupts protection should be alarmed, and the corresponding protection of locking.
2. communication channel delay and passage switch, and channel time delay and passage handoff procedure are to the influence of protective device in test STM-16 passage, the STM-4 passage.
Table 2-17 communication channel delay and passage switching tests project
Require: under the situation of passage switching and channel time delay, the protective device action behavior is correct.
3. channel pressure test loads the influence to the protective device action behavior of in various degree error code, alarm equal pressure in the STM-1 passage.
The test of table 2-18 channel pressure
Figure G2008102278459D00183
DC power supply intermittently reaches the dc voltage fluctuation test
Content of the test: once carry out in mode
1. the DC power supply of drawing protective device.
2. the quick repeatedly DC power supply of drawing protective device.
3. the direct voltage of adjusting protective device fluctuates between 80%~110%.
Test requirements document: protect not malfunction.
3, system debug
By mensuration, detect whether each parameter meets the requirements to model parameter.
4, test detects
Insert protective relaying device, carry out the detection of pilot project according to test method.
5, finish
Judged for result of the test that according to State Grid's product examination criteria and professional etiquette the test of passing through of satisfying standard detects, the then obstructed overtesting that does not satisfy standard detects, and needs to revise to treat to detect again.
Invention has been described according to specific exemplary embodiment herein.It will be conspicuous carrying out suitable replacement to one skilled in the art or revise under not departing from the scope of the present invention.Exemplary embodiment only is illustrative, rather than to the restriction of scope of the present invention, scope of the present invention is by appended claim definition.

Claims (1)

1. the method for dynamic analog 1000kV route protection test; it is characterized in that at first design system model; adopt four generators to simulate the valve system that waits of a side in the model; protective device is installed in the both sides of two circuits respectively; two ends and centre at test circuit are provided with eight fault points altogether; the fault that each fault point all is used to simulate various types of metallicity or produces through the transition resistive short; voltage signal uses no-load voltage ratio to provide as the capacitance type potential transformer CVT in the line side of 1000kV/0.1kV; the no-load voltage ratio of each current transformer is 4000A/1A, and the analogue test project of carrying out then comprises:
(1), carry out transient state and surmount test and test 70% place operate time, the defencive function of only adjusting the distance detects, instantaneous voltage phase angle at the beginning of the capacity of short circuit of valve systems such as control and the short circuit, the various metallicity faults of analog line distal point;
(2), carry out static state and surmount test, the defencive function of only adjusting the distance detects, the capacity of short circuit of valve systems such as control and short circuit be instantaneous voltage phase angle just, the various metallicity faults of analog line distal point;
(3), carry out metallicity transient fault test on the circuit, metallicity instantaneity single-phase earthing, two phase ground, line to line fault, three-phase ground connection and three phase short circuit fault in the simulation protection zone;
(4), distinguish metallicity Test to Failure on the outer bus, the instantaneous single-phase earthing of metallicity, two phase ground, line to line fault, three-phase ground connection and three phase short circuit fault on the bus outside the simulation protection zone;
(5), the metallicity permanent fault of carrying out in the protection zone is tested;
(6), carry out the developing fault test, same fault point is developed into another phase earth fault through different time by single phase ground fault in the simulation protection zone, the outer single phase ground fault different name phase single phase ground fault in different time develops into the protected circuit outlet area of simulation region, and single phase ground fault different name phase single phase ground fault outside different time develops into the protected circuit outlet area in the simulation region;
(7), carry out the transition resistance Test to Failure, simulation in the district of 600 Ω~300 Ω transition resistances outside single phase ground fault and the district three-phase through the small resistor short-circuit fault test;
(8), carry out the system stability failure test, simulation reaches the power system oscillation procedure fault entirely mutually, and is reaching in the power system oscillation process the inside and outside metallic short circuit fault of generating region more entirely mutually;
(9), carry out the system frequency excursion test, analogue system frequency shift (FS) ± 2Hz, the inside and outside various metallic short circuit faults of simulation region;
(10), carry out the system operation Test to Failure, by operating power side switch, hand closes nonloaded line five times, and by operating power side switch, hand closes faulty line;
(11), under the single-side power mode, simulate each internal fault external fault;
(12), carry out the disconnection fault test;
(13), carry out under the different operating modes of each passage influence test to protective device;
(14), carry out DC power supply and intermittently reach the dc voltage fluctuation test.
CN2008102278459A 2008-12-01 2008-12-01 Method for dynamically simulating 1000kV line protection experiment Active CN101420120B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008102278459A CN101420120B (en) 2008-12-01 2008-12-01 Method for dynamically simulating 1000kV line protection experiment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008102278459A CN101420120B (en) 2008-12-01 2008-12-01 Method for dynamically simulating 1000kV line protection experiment

Publications (2)

Publication Number Publication Date
CN101420120A CN101420120A (en) 2009-04-29
CN101420120B true CN101420120B (en) 2010-09-01

Family

ID=40630786

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008102278459A Active CN101420120B (en) 2008-12-01 2008-12-01 Method for dynamically simulating 1000kV line protection experiment

Country Status (1)

Country Link
CN (1) CN101420120B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101930049B (en) * 2009-06-24 2014-06-11 上海市电力公司 On-line local discharging monitoring method of ultrahigh voltage cable
CN102565592B (en) * 2012-01-18 2015-09-30 绍兴电力局 A kind of technology-systematization verification short-circuit test method for intelligent substation
CN102593865B (en) * 2012-02-23 2014-02-12 中国电力科学研究院 Dynamic simulation system and simulation method for accessing wind power into power grids
CN103760450B (en) * 2014-01-28 2016-06-08 国网上海市电力公司 Multiple-circuit on same tower distance protection based on RTDS surmounts range test method
CN105301369B (en) * 2015-10-20 2017-12-26 国家电网公司 A kind of bus protection compound voltage lockout function test method
CN108535634B (en) * 2018-05-16 2023-11-03 中国电力科学研究院有限公司 Test method and system suitable for half-wavelength transmission line protection device
CN108872771A (en) * 2018-07-11 2018-11-23 云南电网有限责任公司电力科学研究院 A kind of transformer preventive trial equivalent method
CN111025182A (en) * 2019-11-21 2020-04-17 国网河南省电力公司商丘供电公司 STM32F103T 6-based instantaneous ground fault finder

Also Published As

Publication number Publication date
CN101420120A (en) 2009-04-29

Similar Documents

Publication Publication Date Title
CN101420120B (en) Method for dynamically simulating 1000kV line protection experiment
Smeets et al. Switching in electrical transmission and distribution systems
CN101304170B (en) System debug method for high voltage direct current transmission project
Brunello et al. Shunt capacitor bank fundamentals and protection
CN102967826B (en) Test method for electric endurance of switching capacitor set beaker of extra-high voltage project
CN104535882B (en) A kind of D.C. isolation monitoring device
Yi-Ying et al. Studying on measures of restraining DC current through transformer neutrals
Bak et al. Vacuum circuit breaker modelling for the assessment of transient recovery voltages: Application to various network configurations
WO2018109889A1 (en) Testing apparatus for dc circuit breaker
CN108241105B (en) Testing method of arc grounding line selection device based on RTDS
Kakilli System analysis with the MVA Method for symmetrical three-phase faults
Jakominich et al. Real time digital power system simulator design considerations and relay performance evaluation
CN106501674A (en) Medium voltage distribution network single-phase earth fault positioning device and its Fault Locating Method
Almalki et al. Capacitor bank switching transient analysis using frequency dependent network equivalents
Pattanapakdee et al. Failure of riser pole arrester due to station service transformer ferroresonance
CN110632412B (en) Test method of series compensation protection device
Srisongkram et al. Investigation on dielectric failure of high voltage equipment in substation caused by capacitor bank switching
Shen et al. Grounding transformer application, modeling, and simulation
Riechert et al. Compact switchgear for meshed offshore HVDC networks–between vision and reality
Wang et al. A leakage protection method for low-voltage power supply systems based on flexible regulation of the neutral point voltage
Ristanovic et al. Design and implementation of scenarios for evaluating and testing distance relays
Alshehri et al. Distance protection performance in AC power system with back-to-back converter interface
Bonetti et al. The IEC 60255-121: 2014 Standard: its impact on distance relay performance specification, verification and comparison
CN211627790U (en) Low-voltage transformer area electric leakage fault troubleshooting device
Ibrahim et al. Lightning and Surge Arrester Simulation in Power Distribution System

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Effective date: 20130129

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20130129

Address after: 100192 Beijing city Haidian District Qinghe small Camp Road No. 15 China Electric Power Research Institute of the Ministry of science and technology

Patentee after: China Electric Power Research Institute

Patentee after: State Grid Corporation of China

Address before: 100192 Beijing city Haidian District Qinghe small Camp Road No. 15 China Electric Power Research Institute of the Ministry of science and technology

Patentee before: China Electric Power Research Institute