CN101413244B - Earth work grille for reinforcing highway foundation and its use method - Google Patents

Earth work grille for reinforcing highway foundation and its use method Download PDF

Info

Publication number
CN101413244B
CN101413244B CN2008101718907A CN200810171890A CN101413244B CN 101413244 B CN101413244 B CN 101413244B CN 2008101718907 A CN2008101718907 A CN 2008101718907A CN 200810171890 A CN200810171890 A CN 200810171890A CN 101413244 B CN101413244 B CN 101413244B
Authority
CN
China
Prior art keywords
grid
grille
soil
gsz
strength
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2008101718907A
Other languages
Chinese (zh)
Other versions
CN101413244A (en
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Institute of Geology and Geophysics of CAS
Original Assignee
Institute of Geology and Geophysics of CAS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Institute of Geology and Geophysics of CAS filed Critical Institute of Geology and Geophysics of CAS
Priority to CN2008101718907A priority Critical patent/CN101413244B/en
Publication of CN101413244A publication Critical patent/CN101413244A/en
Application granted granted Critical
Publication of CN101413244B publication Critical patent/CN101413244B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention provides a geotechnical grille for reinforcing highway subgrade, as well as an application method thereof. A grille net is formed by vertically and horizontally weaving high-strength and high-modulus polyvinyl chloride polymers, so as to increase the tensile strength of reinforced belts; an outer layer of the grille is coated with a modified rubber coating; rubber is mixed with anti-aging agent, antioxidant, light screener and other master batches, so as to increase the creep resistance and corrosion resistance of the reinforced belts; surface layers of the longitudinal and transverse reinforced belts of the grille are provided with coil-shaped embossed threads so as to increase friction force with soil; meshes of the grille are round so as to reduce stress concentration andincrease the extensibility of the reinforced belts; and nodes of the reinforced belts of the grille are provided with bilateral strengthening columns, so as to stop the slippage between soil body andthe grille, increase the shearing resistance of the subgrade, balance settlement and prevent the grille from being pulled out of the subgrade. The geotechnical grille has the advantages that the grille is high in the strength of polymer materials, little in creep because of the modified rubber smeared outside, high in tensile strength and low in tensile strain, and the round meshes, the threads of the reinforced belts and the strengthening columns fully occlude the soil body so as to form a space compound strengthening structure, thereby improving the entire shearing strength and settlement balancing performance of the subgrade.

Description

A kind of GSZ that adopts carries out the method that highway subgrade strengthens
Technical field
The present invention relates to a kind of highway subgrade intensity that can make increases, and makes the GSZ and the method for using thereof of the balanced sedimentation of roadbed, belongs to technical field of civil engineering.
Background technology
In highway subgrade, side slope protection, dam construction are built, often be employed in the method that adds geosynthetics in the soil body, commonly used like GSZ.Through the embedding anchoring of grid and soil block and the frictional force between the grid and the soil body, strengthen the intensity of the soil body and reach the purpose of balanced sedimentation, especially in highway subgrade, be used widely.High-strength polymer also is furnished with in length and breadth that the GSZ of muscle and pore structure is applied in the civil engineerings such as road and rail roadbed, slope seepage control landslide, river levee shore protection, has increased the engineering life-span.GSZ can be divided into plastic grill and fabric grid at present.The plastics GSZ, technology is simpler, and is cheap, but long-time use can show serious creep, causes the degeneration of structural stability.The fabric GSZ, performance is good, and creep-resistant property is strong, but technology is loaded down with trivial details, involves great expense.The subject matter that present GSZ is used for highway subgrade is: the grid of horizontal arrangement; Be prone in the flat motion of water in soil; Can not play effective reinforcement effect to the soil body; After the long-time operation of highway, be not that grid broken be exactly that grid is drawn out roadbed, thereby cause side slope protection that secondary destruction is taken place.
Summary of the invention
Technical problem to be solved by this invention is, overcomes the problem that exists in the existing GSZ technology, and a kind of high-strength earth work grille net is provided, and should prevent that grid from being broken, and prevents that again grid is drawn out roadbed.
Technical solution of the present invention is characterized in that, grid is worked out by the high-strength and high-modulus polyvinyl chloride polymer in length and breadth, with the tensile strength of strength bar band; The grid skin is surrounded by the modified rubber coating, is mixed with masterbatch such as age resister, antioxidant and photomask agent in the rubber, with the creep resistance and the corrosion resistance of strength bar band; There is round embossing screw thread on the vertical horizontal bar band top layer of grid, with the frictional force of increase with earth; The grid mesh is circular, concentrates strength bar band extensibility to reduce stress; There is bilateral " reinforcing prop " at grid muscle band node place, and one-sided length forms netted composite construction with the soil body about 3cm, slides to stop between the soil body and grid, strengthens the roadbed shear behavior, and balanced sedimentation prevents that grid is drawn out roadbed.
Method for using of the present invention: (1) spreads loose earth to the embankment surface, and compacted depth is controlled at 30~50cm; (2) after the compacting; To be somebody's turn to do " reinforcing prop " GSZ edge direction vertical with direction of traffic spreads to the embankment surface; Curb leaves and is not less than 2m length grid; Be used for anti-package, lap length that grid follows the car direction when laying otherwise, " reinforcing prop " dislocation lap joint is enclosed within grid circular net intraocular less than 20cm; (3) artificial grid is strained in length and breadth, and " reinforcing prop " is knocked in the compacted soil, re-lay second layer soil, and roll with rubber hammer, at this moment " reinforcing prop ", grid mesh with the abundant interlock of the soil body; (4) with embankment both sides grid anti-package to curb, with new laying grid overlap joint, and will " reinforcing prop " misplace and be enclosed within the grid, with rubber hammer " reinforcing prop " knocked in compacted soil, re-lay the 3rd layer of soil.
Advantage of the present invention: (1) high-strength and high-modulus polyvinyl chloride polymer strength of materials is big, and skin scribbles modified rubber, and creep is little, and the performance of high tensile, low tensile strain is arranged; (2) the circular mesh of grid has reduced stress and has concentrated, and the grid muscle has round embossing screw thread; Improved frictional force with the soil body; Node place " reinforcing prop " embeds the soil body, has stoped the slip between the grid and the soil body, and circular mesh, muscle is threaded and " reinforcing prop " and the abundant interlock of the soil body; Form the space compound reinforcement, improved the integral anti-shearing intensity of roadbed and the performance of balanced sedimentation; (3) grid lap-joint can utilize " reinforcing prop " to be inserted in the grid intraocular, does not re-use the iron wire binding, thereby has avoided grid to be prone to situation about being bitten broken by iron wire; (4) low price of existing plastic grill has the high-performance of fabric grid again, and construction is simple, and is workable.
The present invention is suitable for highway embankment, slope project, foundation engineering isolith geotechnique journey field.
Description of drawings
Fig. 1 is a kind of plan view that is used for the GSZ of highway subgrade enhancing.Among the figure: the circular mesh of 1 grid, 2 grid reinforcing props, 3 round embossing screw threads.
Fig. 2 is the A-A sectional view of this invention grille plane figure.Among the figure: 2 grid reinforcing props.
Fig. 3 is the drawing of 3 round embossing screw threads among this invention grille plane figure.Among the figure: 2 grid reinforcing props.
Fig. 4 is that this invention grid is used to reinforce the sketch map of highway subgrade.Among the figure: 4 " reinforcing prop " GSZ.
The specific embodiment
Embodiment: (1) should invent GSZ and be laid on the embankment after original ground is laid the thick compacted soil of 30cm, and the ultra shop of curb 2~3m is used for back bag; (2) follow that lap length is 20~30cm between car direction grid, reinforcing prop 2 is inserted in the grid mesh 1, play the purpose of mutual build-in; (3) edge is in length and breadth to the tension grid; With rubber hammer reinforcing prop is knocked in the compacted soil earlier and fixed, will loosen the soil is laid on the grid again, after having rolled; The part of the ultra shop of first floor grid oppositely returned wrap the curb position, and knock in the compacted soil reinforcing prop fixing with rubber hammer; (4) second layer grid is layered on the compacted soil, the ultra shop of curb 2~3m, and return after the bag grid overlaps each other with curb, knock in the compacted soil reinforcing prop fixing with rubber hammer; (5) will loosen the soil again and be laid on the grid, by (3) with (4) one step process compacting soil body, lay grid; (6) roadbed such as Fig. 3 after reinforcing, side slope can be laid planting soil in both sides, hangs the net grass-seed of sowing grass seeds by duster, the greening side slope, the reinforcing prop on the side slope can play the effect that solid soil is hung net.

Claims (1)

1. one kind is adopted GSZ to carry out the method that highway subgrade strengthens; GSZ is worked out by the high-strength and high-modulus polyvinyl chloride polymer in length and breadth, and the GSZ skin is surrounded by the modified rubber coating, is mixed with age resister, antioxidant and photomask agent masterbatch in the rubber; Grid mesh (1) is circular; There is bilateral reinforcing prop (2) at grid muscle band node place, one-sided length 3cm, and there is round embossing screw thread (3) on the vertical horizontal bar band top layer of grid; GSZ is used for the enhancing of highway subgrade, it is characterized in that:
(1), after original ground is laid the thick compacted soil of 30~50cm, GSZ is laid on the embankment, the ultra shop of curb is not less than 2m, is used for back wrapping;
(2), follow that lap length is not less than 20cm between car direction GSZ, reinforcing prop (2) dislocation lap joint is inserted in the GSZ mesh (1), play the purpose of mutual build-in;
(3), the edge is in length and breadth to the tension grid; With rubber hammer reinforcing prop is knocked in the compacted soil earlier and fixed, will loosen the soil is laid on the grid again, after having rolled; The part of the ultra shop of first floor grid oppositely returned wrap the curb position, and knock in the compacted soil reinforcing prop fixing with rubber hammer;
(4), second layer grid is layered on the compacted soil, the ultra shop of curb is not less than 2m, and returns after the bag grid overlaps each other with curb, knocks in the compacted soil reinforcing prop fixing with rubber hammer;
(5), again will loosen the soil is laid on the grid, by the 3rd and the 4th one step process compacting soil body, lays grid;
(6), the roadbed after reinforcing, side slope is laid planting soil in both sides, hangs the net grass-seed of sowing grass seeds by duster, the greening side slope.
CN2008101718907A 2008-11-17 2008-11-17 Earth work grille for reinforcing highway foundation and its use method Expired - Fee Related CN101413244B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008101718907A CN101413244B (en) 2008-11-17 2008-11-17 Earth work grille for reinforcing highway foundation and its use method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008101718907A CN101413244B (en) 2008-11-17 2008-11-17 Earth work grille for reinforcing highway foundation and its use method

Publications (2)

Publication Number Publication Date
CN101413244A CN101413244A (en) 2009-04-22
CN101413244B true CN101413244B (en) 2012-02-22

Family

ID=40593962

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008101718907A Expired - Fee Related CN101413244B (en) 2008-11-17 2008-11-17 Earth work grille for reinforcing highway foundation and its use method

Country Status (1)

Country Link
CN (1) CN101413244B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101851894B (en) * 2010-07-01 2012-07-25 中国科学院地质与地球物理研究所 Protection method for improving salt expansion or dissolution sink of salty soil
CN101962948A (en) * 2010-08-23 2011-02-02 泰安路德工程材料有限公司 Multi-directional stretching plastic geogrid and manufacturing method thereof
CN102286959B (en) * 2011-06-14 2013-03-20 中国水电顾问集团华东勘测设计研究院 Reinforced-clay seepage prevention structure and construction method thereof
CN106703001A (en) * 2016-11-04 2017-05-24 泰安市科闰新材料有限公司 Honeycomb geocell and production method thereof
CN108374472A (en) * 2018-02-22 2018-08-07 洛阳市政建设集团有限公司 Earth-filling method and application around inspection shaft
CN114737436A (en) * 2022-04-02 2022-07-12 中能建路桥工程有限公司 Treatment method for cement concrete pavement cracks

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5267816A (en) * 1989-09-14 1993-12-07 Netlon Limited Geogrids
CN1168904A (en) * 1997-06-03 1997-12-31 丹阳鼎泰工程材料有限公司 Fiber reinforced grating for earth engineering
CN2384981Y (en) * 1999-08-17 2000-06-28 郑邦君 Tie bar grate net for civil engineering
CN1384253A (en) * 2002-05-27 2002-12-11 甘国工 Earthwork lattice of silane crosslinked stretch oriented high-strength polymer

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5267816A (en) * 1989-09-14 1993-12-07 Netlon Limited Geogrids
CN1168904A (en) * 1997-06-03 1997-12-31 丹阳鼎泰工程材料有限公司 Fiber reinforced grating for earth engineering
CN2384981Y (en) * 1999-08-17 2000-06-28 郑邦君 Tie bar grate net for civil engineering
CN1384253A (en) * 2002-05-27 2002-12-11 甘国工 Earthwork lattice of silane crosslinked stretch oriented high-strength polymer

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
李志清等.《土工格栅在加固高速公路路堤中的应用研究》.《岩土力学》.2008,第29卷(第3期),795-799. *
薛敏.《塑料土工格栅的生产开发》.《现代塑料加工应用》.2004,第16卷(第6期),58-59. *
郭荣,戴光旭.《土工合成材料及其在工程中的应用》.《云南交通科技》.2000,第16卷(第1期),16-20. *

Also Published As

Publication number Publication date
CN101413244A (en) 2009-04-22

Similar Documents

Publication Publication Date Title
CN101413244B (en) Earth work grille for reinforcing highway foundation and its use method
CN107905089A (en) A kind of reinforcement platform back of the body for preventing bumping at bridge-head and its construction method
CN109469040B (en) Earth work net frame and application thereof
CN2703793Y (en) Composite earthwork cellular chamber
CN205591066U (en) Fine grained soil is received sloping embankment and is filled structure
CN201722587U (en) Novel high-strength geogrid
CN213805480U (en) Gabion retaining wall
CN206768787U (en) The soil stabilization system of slip casting bamboo grid and monkey grass reinforcement
CN206157760U (en) Honeycomb geotechnique check room retaining wall with ecological recovery function
CN206319297U (en) The individual layer ecology bag ecological revetment system that ecological revetment is constituted with ecology bag and by it
CN218292029U (en) Full-flexible composite reinforced earth retaining wall structure
JP6533907B1 (en) Composite sheet and bag made of the composite sheet
CN201485764U (en) Earthquake-resistant packaged reinforced soil structure
CN203741814U (en) Blocking structure used after soft soil roadbed drainage prepressing
CN206428542U (en) A kind of grid reinforcement cushion
RU122100U1 (en) GEOPLATFORM FOR REINFORCING ROAD FILLS
CN202543884U (en) Composite reinforced water drainage type geogrid
CN202766944U (en) Enhanced subgrade drainage system of three-dimensional composite geonet
CN214832546U (en) Layered reinforced clay structure
CN203129156U (en) High steep reinforcement side slope structure
CN107893351A (en) A kind of construction method based on geonet Reinforced subgrade
CN212248171U (en) Offshore artificial island structure suitable for silt foundation
CN201095740Y (en) Large-scale filling bag capable of multiple filling
CN107761663A (en) A kind of sheep pile wharf structure and its construction method
CN104452667A (en) River channel reinforced retaining wall structure and construction method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120222

Termination date: 20181117

CF01 Termination of patent right due to non-payment of annual fee