CN101397812B - 湿法赤泥堆场的溢流式回水井及其加高方法 - Google Patents

湿法赤泥堆场的溢流式回水井及其加高方法 Download PDF

Info

Publication number
CN101397812B
CN101397812B CN2007101572012A CN200710157201A CN101397812B CN 101397812 B CN101397812 B CN 101397812B CN 2007101572012 A CN2007101572012 A CN 2007101572012A CN 200710157201 A CN200710157201 A CN 200710157201A CN 101397812 B CN101397812 B CN 101397812B
Authority
CN
China
Prior art keywords
red mud
lengths
holes
well
overflow
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2007101572012A
Other languages
English (en)
Other versions
CN101397812A (zh
Inventor
乔英卉
贾瑞学
邱通国
刘敬
Original Assignee
Shenyang Aluminum and Magnesium Engineering and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Aluminum and Magnesium Engineering and Research Institute Co Ltd filed Critical Shenyang Aluminum and Magnesium Engineering and Research Institute Co Ltd
Priority to CN2007101572012A priority Critical patent/CN101397812B/zh
Publication of CN101397812A publication Critical patent/CN101397812A/zh
Application granted granted Critical
Publication of CN101397812B publication Critical patent/CN101397812B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本发明公开了一种尾矿堆场回水井及其加高方法,尤其涉及一种适应于湿法烧结法赤泥堆场溢流式回水井及其加高方法。它包括井基础、水平管路、钢筋混凝土井身和溢流孔,其中钢筋混凝土井身的上端混凝土筒壁内设有埋件,埋件与其上端设置的带孔的钢管段连接,带孔的钢管段的上端经过法兰连接另外一段带孔的钢管段,以此类推逐段设置带孔的钢管段,各段带孔的钢管段的外部套有砂管。本发明回水质量澄清,不但能回收堆场表面的澄清水,而且也能回收堆场内部的渗流水;加高回水井的质量轻,对原有基础的影响不大;逐段加高的施工工艺不但施工简单,而且还节约成本。

Description

湿法赤泥堆场的溢流式回水井及其加高方法
技术领域
本发明涉及一种尾矿堆场回水井及其加高方法,尤其涉及一种适应于湿法烧结法赤泥堆场溢流式回水井及其加高方法。
背景技术
目前对湿法赤泥堆场库区内部积水所采用的回收方式是溢流式回水。即采用钢筋混凝土井身8,井壁上每隔一定高度预留溢流孔9,随着水面的升高,澄清水通过溢流孔进入回水井,水面将到未澄清水时采用木塞把溢流孔封闭。澄清水再上升,直到通过上层的溢流孔进入回水井回水。井身下是井基础6,其与水平管路7相连,将自由水收集并汇至回水泵房。
烧结法赤泥强度的形成,常常受到排水固结的好坏、筑坝速度的快慢和气候条件的变化等因素的影响,一般的烧结法赤泥堆场的服务年限为10年左右。考虑到烧结法赤泥随着时间的推移,强度会缓慢增长,一般在10年左右,请勘查部门对坝体进行安全评价,看坝体是否有加高的可能。如果具有加高的可能性,回水井的加高方式就是一个问题。
烧结法赤泥堆场是指库区内排放烧结法赤泥,烧结法赤泥中赤泥固体与赤泥附液的体积比是1∶4。烧结法赤泥中粗颗粒较多,排放到堆场中经过一段时间,赤泥附液会从赤泥中分离,形成澄清的液体,溢流式回水井的四周均为赤泥附液,给回水井的加高带来困难。
发明内容
本发明所要解决的技术问题是:提供一种适应于烧结法赤泥堆场的回水井及其加高方法,本发明适用于烧结法赤泥堆场的回水井的加高,其回水质量澄清,不但能回收堆场表面的澄清水,而且也能回收堆场内部的渗流水,回水井分期建设,减少建设成本,且结构简单、工作可靠、施工方便。
为了解决上述技术问题,本发明是这样实现,湿法赤泥堆场的溢流式回水井的加高方法,它包括下述工艺步骤:先将原有回水井的顶部钢筋混凝土井身8的混凝土筒壁凿毛,再灌注一段含埋件5的混凝土筒壁,然后将带孔的钢管段1的钢管的下端与埋件5连接,带孔的钢管段1的上端经过法兰3连接另外一段相同结构的带孔的钢管段,各段带孔的钢管段1的外部套有砂管2,依次连接使湿法赤泥堆场的溢流式回水井逐渐加高。
湿法赤泥堆场的溢流式回水井,它包括井基础6、水平管路7、钢筋混凝土井身8和溢流孔9,其中钢筋混凝土井身8的上端混凝土筒壁内设有埋件5,埋件5与其上端设置的带孔的钢管段1连接,带孔的钢管段1的上端经过法兰3连接另外一段相同结构的带孔的钢管段,以此类推逐段设置带孔的钢管段,各段带孔的钢管段1的外部套有砂管2。
所述的带孔的钢管1的长度为80-150cm。
所述的砂管2是存在很多缝隙石子做的水工材料,它将粗颗粒物质挡在砂管2的外侧,而赤泥附液和能被赤泥附液带走的细颗粒流入回水井。
所述的砂管2的厚度为45-80cm。
所述的埋件5与其上端设置的带孔4的钢管段1焊接连接。
所述的埋件5是由上端的环形钢板和设置在环形钢板下端的钢筋构成。
所述的埋件5的截面为“π”字形。
本发明烧结法赤泥堆场的渗流式回水井优于原有方式回水效果,优点如下:回水质量澄清,不但能回收堆场表面的澄清水,而且也能回收堆场内部的渗流水;加高回水井的质量轻,对原有基础的影响不大;逐段加高的施工工艺不但施工简单,而且还节约成本。随着烧结法赤泥堆场液面的升高,回水井也不断加高。
附图说明
图1是本发明加高后的溢流式回水井的结构示意图。
图2是本发明埋件5的俯视结构图。
图3是图2的1-1剖视结构图。
图中,1、钢管段;2、砂管;3、法兰;4、孔;5、埋件;6、井基础;7、水平管路;8、钢筋混凝土井身;9、溢流孔。
具体实施方式
湿法赤泥堆场的溢流式回水井的加高方法,它包括下述工艺步骤:先将原有回水井的顶部钢筋混凝土井身8的混凝土筒壁凿毛,再灌注一段含埋件5的混凝土筒壁,然后将带孔4的钢管段1的钢管的下端与埋件5连接,带孔4的钢管段1的上端经过法兰3连接另外一段相同结构的带孔4的钢管段,各段带孔的钢管段1的外部套有砂管2,依次连接使湿法赤泥堆场的溢流式回水井逐渐加高。
如图1所示,本发明湿法赤泥堆场的溢流式回水井,其结构如下:钢筋混凝土井身8的混凝土筒壁上每隔一定高度设有预留的溢流孔9,随着水面的升高,澄清水通过溢流孔9进入回水井,水面将到未澄清水时采用木塞把溢流孔封闭。澄清水再上升,直到通过上层的溢流孔进入回水井回水。钢筋混凝土井身8的下端为井基础6,井基础6与水平管路7相连,将自由水收集并汇至回水泵房。钢筋混凝土井身8的上端混凝土筒壁内设有埋件5,埋件5与其上端设置的带孔的钢管段1焊接,带孔的钢管段1的上端经过法兰3连接另外一段相同结构的带孔的钢管段,以此类推逐段设置带孔的钢管段,各段带孔的钢管段1的外部套有砂管2。
上述的带孔的钢管1的长度为80-150cm。砂管2是存在很多缝隙石子做的水工材料,它将粗颗粒物质挡在砂管2的外侧,而赤泥附液和能被赤泥附液带走的细颗粒流入回水井。砂管2的厚度为45-80cm。
上述的埋件5是由上端的环形钢板和设置在环形钢板下端的钢筋构成。埋件5的截面为“π”字形。

Claims (8)

1.湿法赤泥堆场的溢流式回水井的加高方法,其特征在于它包括下述工艺步骤:先将原有回水井的顶部钢筋混凝土井身(8)的混凝土筒壁凿毛,再灌注一段含埋件(5)的混凝土筒壁,然后将带孔的钢管段(1)的钢管的下端与埋件(5)连接,带孔的钢管段(1)的上端经过法兰(3)连接另外一段相同结构的带孔的钢管段,各段带孔的钢管段(1)的外部套有砂管(2),依次连接使湿法赤泥堆场的溢流式回水井逐渐加高。
2.湿法赤泥堆场的溢流式回水井,它包括井基础(6)、水平管路(7)、钢筋混凝土井身(8)和溢流孔(9),其特征在于钢筋混凝土井身(8)的上端混凝土筒壁内设有埋件(5),埋件(5)与埋件(5)上端设置的带孔(4)的钢管段(1)连接,带孔(4)的钢管段(1)的上端经过法兰(3)连接另外一段带孔的钢管段,以此类推逐段设置带孔的钢管段,各段带孔的钢管段(1)的外部套有砂管(2)。
3.根据权利要求2所述的湿法赤泥堆场的溢流式回水井,其特征在于所述的带孔(4)的钢管段(1)的长度为80-150cm。
4.根据权利要求2所述的湿法赤泥堆场的溢流式回水井,其特征在于所述的砂管(2)是存在很多缝隙石子做的水工材料,它将粗颗粒物质挡在砂管(2)的外侧,而赤泥附液和能被赤泥附液带走的细颗粒流入回水井。
5.根据权利要求2所述的湿法赤泥堆场的溢流式回水井,其特征在于所述的砂管(2)的厚度为45-80cm。
6.根据权利要求2所述的湿法赤泥堆场的溢流式回水井,其特征在于所述的埋件(5)与其上端设置的带孔(4)的钢管段(1)焊接连接。
7.根据权利要求2所述的湿法赤泥堆场的溢流式回水井,其特征在于所述的埋件(5)是由上端的环形钢板和设置在环形钢板下端的钢筋构成。
8.根据权利要求2所述的湿法赤泥堆场的溢流式回水井,其特征在于所述的埋件(5)的截面为“π”字形。
CN2007101572012A 2007-09-29 2007-09-29 湿法赤泥堆场的溢流式回水井及其加高方法 Expired - Fee Related CN101397812B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2007101572012A CN101397812B (zh) 2007-09-29 2007-09-29 湿法赤泥堆场的溢流式回水井及其加高方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2007101572012A CN101397812B (zh) 2007-09-29 2007-09-29 湿法赤泥堆场的溢流式回水井及其加高方法

Publications (2)

Publication Number Publication Date
CN101397812A CN101397812A (zh) 2009-04-01
CN101397812B true CN101397812B (zh) 2010-06-02

Family

ID=40516635

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2007101572012A Expired - Fee Related CN101397812B (zh) 2007-09-29 2007-09-29 湿法赤泥堆场的溢流式回水井及其加高方法

Country Status (1)

Country Link
CN (1) CN101397812B (zh)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SE430705B (sv) * 1982-04-28 1983-12-05 Skanska Cementgjuteriet Ab Dagvattenbrunn med flytkroppsforsett vattenlas
CN2868381Y (zh) * 2006-01-18 2007-02-14 贵阳铝镁设计研究院 湿法堆场回水井的溢流装置
CN1924203A (zh) * 2006-02-27 2007-03-07 贵阳铝镁设计研究院 赤泥堆场水平防渗层与排水竖井的连接方法及构造
CN1995568A (zh) * 2006-12-20 2007-07-11 中国矿业大学 垃圾填埋场生物气与渗滤液一体化抽排系统
CN201144458Y (zh) * 2007-11-06 2008-11-05 沈阳铝镁设计研究院 湿法赤泥堆场的溢流式回水井

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SE430705B (sv) * 1982-04-28 1983-12-05 Skanska Cementgjuteriet Ab Dagvattenbrunn med flytkroppsforsett vattenlas
CN2868381Y (zh) * 2006-01-18 2007-02-14 贵阳铝镁设计研究院 湿法堆场回水井的溢流装置
CN1924203A (zh) * 2006-02-27 2007-03-07 贵阳铝镁设计研究院 赤泥堆场水平防渗层与排水竖井的连接方法及构造
CN1995568A (zh) * 2006-12-20 2007-07-11 中国矿业大学 垃圾填埋场生物气与渗滤液一体化抽排系统
CN201144458Y (zh) * 2007-11-06 2008-11-05 沈阳铝镁设计研究院 湿法赤泥堆场的溢流式回水井

Also Published As

Publication number Publication date
CN101397812A (zh) 2009-04-01

Similar Documents

Publication Publication Date Title
CN102505684B (zh) 一种空心劲芯浆固散体材料桩及其施工方法
CN201775991U (zh) 沉淀箱
CN203729424U (zh) 顶管施工改型骑马检查井
CN211472605U (zh) 一种地下室底板抗浮装置
CN101906797A (zh) 一种塑料模块组合水池
CN201144458Y (zh) 湿法赤泥堆场的溢流式回水井
CN101565952A (zh) 一种防止地坑式建筑基础上浮的方法及结构
CN101397812B (zh) 湿法赤泥堆场的溢流式回水井及其加高方法
AU2008286149B2 (en) Damming method for permeable red mud dam with red mud from sintering process
CN212054564U (zh) 钻孔泥浆循环系统
CN109339006B (zh) 一种高效锥式水力消力井及其施工方法
CN204571433U (zh) 防冲蚀硫酸槽
CN204898831U (zh) 一种新型塑料检查井
CN203891785U (zh) 水文水井管内投砾专用接头管总成
CN105735252A (zh) 多孔管无砂透水混凝土桩及其安装结构、施工方法
CN109183851A (zh) 一种壳式沉管的水下安装方法
CN201620037U (zh) 氧化铝厂湿法生产车间的事故应急设施
CN204543668U (zh) 一种水下气冲排泥设备
CN201074205Y (zh) 干法堆场的渗流式回水井
CN210621642U (zh) 一种用于消力池高速水流区的排水结构
CN206233254U (zh) 一种地下集水装置
CN203429781U (zh) 泵站底座及泵站
CN203270768U (zh) 一种下水道井盖
CN201495618U (zh) 赤泥堆场的辐射式排渗井
CN212772433U (zh) 快速封堵建筑基坑降水井封盖

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: SHENYANG ALUMINUM + MAGNESIUM ENGINEERING + RESEAR

Free format text: FORMER NAME: SHENYANG ALUMINIUM AND MAGNESIUM DESIGN INST.

CP01 Change in the name or title of a patent holder

Address after: 110001 Heping Street, Heping District, Liaoning, Shenyang, No. 184

Patentee after: Shenyang Aluminum & Magnesium Engineering & Research Institute Co., Ltd.

Address before: 110001 Heping Street, Heping District, Liaoning, Shenyang, No. 184

Patentee before: Shenyang Aluminium and Magnesium Design Institute

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100602

Termination date: 20200929

CF01 Termination of patent right due to non-payment of annual fee