CN101397800B - Deep pile survey mark burying method - Google Patents

Deep pile survey mark burying method Download PDF

Info

Publication number
CN101397800B
CN101397800B CN200810196977XA CN200810196977A CN101397800B CN 101397800 B CN101397800 B CN 101397800B CN 200810196977X A CN200810196977X A CN 200810196977XA CN 200810196977 A CN200810196977 A CN 200810196977A CN 101397800 B CN101397800 B CN 101397800B
Authority
CN
China
Prior art keywords
deep pile
pile
depth
concrete
stake
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN200810196977XA
Other languages
Chinese (zh)
Other versions
CN101397800A (en
Inventor
何丞杰
董昌济
邓克寰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Surveying Geotechnical Research Institute Co Ltd of MCC
Original Assignee
Wuhan Surveying Geotechnical Research Institute Co Ltd of MCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Surveying Geotechnical Research Institute Co Ltd of MCC filed Critical Wuhan Surveying Geotechnical Research Institute Co Ltd of MCC
Priority to CN200810196977XA priority Critical patent/CN101397800B/en
Publication of CN101397800A publication Critical patent/CN101397800A/en
Application granted granted Critical
Publication of CN101397800B publication Critical patent/CN101397800B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The invention discloses a method for embedding a deep pile survey marker, which includes the follow steps: (1) the embedding depth of a deep pile (1) is designed; (2) marker embedment is carried out; (3) the top of the deep pile (1) is embedded into a stainless steel survey marker core (2) and the upper part of the deep pile (1) is sheathed with a steel outer sleeve (3); (4) silver sand (4) is filled between the steel outer sleeve (3) and the deep pile (1) so as to separate the steel outer sleeve (3) and the deep pile (1); (5) the top of the steel outer sleeve (3) is connected with the bottom of a protection pot (5) which is sheathed outside the stainless steel survey marker core (2); and (6) a concrete reinforcing bar is installed outside the steel outer sleeve (3), and then concrete (7) is poured; and after the concrete is well maintained, a ground part of a platform outside the concrete (7) is decorated by marble (8). The method has the advantages that: silver sand is filled between an upper platform and the deep pile so as to separate the upper platform and the deep pile to ensure that the deadweight of the upper platform is not transferred to the deep pile, namely that the deep pile is in a stable state without any load. When the upper platform is bumped by an external force, the stainless steel survey marker core is not influenced, which is of significance to construction survey with high precision in industrial factories.

Description

Deep pile survey mark burying method
Technical field
The present invention relates to the exploration engineering field, a kind of specifically deep pile survey mark burying method.
Background technology
The stability of measuring the control point is the prerequisite that guarantees to measure the achievement reliability, regulation and stipulation is shallow embedding (degree of depth is about the 1m) technology and the requirement at general control point at present, for the general measure control point in area is buried underground preferably for foundation condition, basic feasible solution.
But, for coastal soft foundation and the very thick area of weak soil layer, as the Baosteel in Shanghai, the Guangdong Yu Feng steel mill in Zhuhai, the Binhai New District of Tianjin, the Shoudu Iron and Steel Co of Cao Feidian etc., these coastal area weak soil layers generally very dark (the Baosteel weak soil layer in Shanghai reach more than 400 meter dark), adopt conventional shallow embedding technology stability relatively poor if measure the control point sign, the control point sign is easy to generate horizontal movement and sinking, and the accuracy and the reliability of achievement measured in influence.
Summary of the invention
The objective of the invention is to develop a kind of deep pile survey mark burying method of measuring control point stability, guaranteeing to measure the achievement reliability that improves.
Deep pile survey mark burying method of the present invention, its step is as follows:
The depth of burying of 1. dark stake 1 should be according to the design of geological mapping data, and the bottom of dark stake 1 requires to reach 2~5m in the bearing stratum of ground, with mainly build, the Pile Foundations Design degree of depth of structure is identical;
2. dark pile constructing process can be selected following method construction according to the degree of depth and foundation soil stability:
The a hand excavated pile about diameter 1.2m, is applicable to that the degree of depth buries underground less than the sign of 20m;
B diameter 400~550mm PHC stake is squeezed into, and is applicable to that the sign of the degree of depth 20~50m is buried underground;
The c bored pile, diameter 1~1.2m adopts mud off, is applicable to that the degree of depth buries underground greater than the sign of 50m;
3. dark stake 1 top embeds stainless steel and measures mark core 2, and dark stake 1 top puts steel sleeve pipe 3;
4. adopt fine sand 4 to fill between steel sleeve pipe 3 and the dark stake 1, make the two separation;
5. the top of steel sleeve pipe 3 links to each other with the bottom of protective pot 5, and protective pot 5 is enclosed within the outside that stainless steel is measured mark core 2, stainless steel is measured mark core 2 play a protective role;
6. load onto reinforcing bar 6 in the outside of steel sleeve pipe 3, fluid concrete 7 then, and after concrete curing was good, the platform face portion outside concrete seven was decorated with marble 8.
A hinged cover is arranged above the protective pot 5.
In the industrial working construction, the generally experiment stake that will squeeze into some earlier, some stake may not can be used, and at this moment can use as dark stake control point to use, and saves and buries cost underground.
The advantage of deep pile survey mark burying method of the present invention is: adopt fine sand to fill between upper brace and the dark stake, make the two separation, the deadweight of guaranteeing upper brace can not passed in the dark stake, promptly dark stake is in complete uncharge stable state, when upper brace is collided by external force, stainless steel is measured the mark core and not influenced by it, and this point has its significance in the construction survey of industrial working high accuracy.
Description of drawings
Fig. 1 is the structural representation of deep pile survey mark burying.
The specific embodiment
Embodiment one
According to shown in Figure 1, a kind of deep pile survey mark burying method, its step is as follows:
The depth of burying of 1. dark stake 1 should be according to the design of geological mapping data, and the bottom of dark stake 1 requires to reach 2~5m in the bearing stratum of ground, with mainly build, the Pile Foundations Design degree of depth of structure is identical;
2. bored pile, diameter 1m adopts mud off, is applicable to that the degree of depth buries underground greater than the sign of 50m;
3. dark stake 1 top embeds stainless steel and measures mark core 2, and dark stake 1 top puts steel sleeve pipe 3;
4. adopt fine sand 4 to fill between steel sleeve pipe 3 and the dark stake 1, make the two separation;
5. the top of steel sleeve pipe 3 links to each other with the bottom of protective pot 5, and protective pot 5 is enclosed within the outside that stainless steel is measured mark core 2;
6. load onto reinforcing bar 6 in the outside of steel sleeve pipe 3, fluid concrete 7 then, and after concrete curing was good, the platform face portion outside concrete seven was decorated with marble 8.
A hinged cover is arranged above the protective pot 5.
Embodiment two
According to shown in Figure 1, a kind of deep pile survey mark burying method, its step is as follows:
The depth of burying of 1. dark stake 1 should be according to the design of geological mapping data, and the bottom of dark stake 1 requires to reach 2~5m in the bearing stratum of ground, with mainly build, the Pile Foundations Design degree of depth of structure is identical;
2. diameter 400~550mm PHC stake is squeezed into, and is applicable to that the sign of the degree of depth 20~50m is buried underground;
3. dark stake 1 top embeds stainless steel and measures mark core 2, and dark stake 1 top puts steel sleeve pipe 3;
4. adopt fine sand 4 to fill between steel sleeve pipe 3 and the dark stake 1, make the two separation;
5. the top of steel sleeve pipe 3 links to each other with the bottom of protective pot 5, and protective pot 5 is enclosed within the outside that stainless steel is measured mark core 2;
6. load onto reinforcing bar 6 in the outside of steel sleeve pipe 3, fluid concrete 7 then, and after concrete curing was good, the platform face portion outside concrete seven was decorated with marble 8.
A hinged cover is arranged above the protective pot 5.

Claims (1)

1. deep pile survey mark burying method, it is characterized in that: its step is as follows:
The depth of burying of 1. dark stake (1) should be according to the design of geological mapping data, and the bottom of dark stake (1) requires to reach 2~5m in the bearing stratum of ground, with mainly build, the Pile Foundations Design degree of depth of structure is identical;
2. dark pile constructing process is selected following method construction according to the degree of depth and foundation soil stability:
The a hand excavated pile about diameter 1.2m, is applicable to that the degree of depth buries underground less than the sign of 20m;
B diameter 400~550mmPHC stake is squeezed into, and is applicable to that the sign of the degree of depth 20~50m is buried underground;
The c bored pile, diameter 1~1.2m adopts mud off, is applicable to that the degree of depth buries underground greater than the sign of 50m;
3. dark stake (1) top embeds stainless steel and measures mark core (2), and dark stake (1) top puts steel sleeve pipe (3);
4. adopt fine sand (4) to fill between steel sleeve pipe (3) and the dark stake (1), make the two separation;
5. the top of steel sleeve pipe (3) links to each other with the bottom of protective pot (5), and protective pot (5) is enclosed within the outside that stainless steel is measured mark core (2);
6. load onto reinforcing bar (6) in the outside of steel sleeve pipe (3), fluid concrete (7) then, after concrete curing was good, the platform face portion outside concrete (7) was decorated with marble (8).
CN200810196977XA 2008-09-17 2008-09-17 Deep pile survey mark burying method Active CN101397800B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200810196977XA CN101397800B (en) 2008-09-17 2008-09-17 Deep pile survey mark burying method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200810196977XA CN101397800B (en) 2008-09-17 2008-09-17 Deep pile survey mark burying method

Publications (2)

Publication Number Publication Date
CN101397800A CN101397800A (en) 2009-04-01
CN101397800B true CN101397800B (en) 2010-04-21

Family

ID=40516624

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200810196977XA Active CN101397800B (en) 2008-09-17 2008-09-17 Deep pile survey mark burying method

Country Status (1)

Country Link
CN (1) CN101397800B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102465525B (en) * 2010-11-11 2015-11-25 铁道第三勘察设计院集团有限公司 The Deep Embedded Piles of freezing and defrosting area plane vertical control point and method for embedding thereof
CN105862901B (en) * 2016-06-01 2018-04-20 青岛市勘察测绘研究院 Docking formula bedrock survey mark and its construction method
CN108411901A (en) * 2018-03-16 2018-08-17 昆明水啸科技有限公司 A kind of non-concrete fills pile and pile-driving method
CN110542365B (en) * 2019-09-04 2021-03-02 山东普泰工程检测鉴定有限公司 Soil-wood pile foundation construction pile foundation hole fixed-point detection device
CN111174755B (en) * 2020-01-09 2022-02-15 青岛市勘察测绘研究院 Expansive soil area plane elevation measurement control point device and installation method
CN112595298B (en) * 2020-11-26 2022-05-20 武汉致远市政建设工程有限公司 Identification device for measuring control point
CN113029054B (en) * 2021-04-09 2022-10-25 中国海洋大学 Device and method for monitoring pile foundation scouring depth in real time

Also Published As

Publication number Publication date
CN101397800A (en) 2009-04-01

Similar Documents

Publication Publication Date Title
CN101397800B (en) Deep pile survey mark burying method
Meng et al. Observed behaviors of a long and deep excavation and collinear underlying tunnels in Shenzhen granite residual soil
Liu et al. Observed performance of a deep multistrutted excavation in Shanghai soft clays
CN104018512B (en) The caisson sinking construction method dynamic to environment micro-turbulence
CN102221332A (en) Fiber grating multi-point sensing device for unconsolidated strata as well as monitoring system and method
CN102635113A (en) Construction method for hydraulic vibrating sinking pipe cast-in-place piles
CN103243747A (en) Deviation rectifying method of prestressed concrete pipe pile foundation
CN105019485B (en) A kind of excavation of foundation pit dead load test on pile foundation detection method
CN103422495B (en) A kind of hollow bored pipe and construction method thereof
Bian et al. Centrifuge testing and numerical modeling of single pile and long-pile groups adjacent to surcharge loads in silt soil
CN205502092U (en) Testing arrangement of bored concrete pile burden frictional resistance neutral point in deep back filling
CN109113049B (en) Prefabricated pile with adjustable post-construction stress deformation and construction method thereof
CN107063178B (en) Concrete leveling markstone with displacement sensor and elevation observation and calculation method thereof
CN103267464A (en) Tool for measuring concrete pouring height
CN203274729U (en) Soft soil area horizontal elevation measuring control point
CN211285728U (en) One-hole multi-standard layered settlement monitoring system adopting composite anchor rod
Peng et al. Field Tests′ Study of Deviation Correction of Building near Excavation
CN102278975B (en) Non-contact soft soil large deformation displacement meter
Zhang et al. Experimental Study on Bending Moment of Double‐Row Steel Pipe Piles in Foundation Excavation
CN110607810B (en) One-hole multi-standard layered settlement monitoring system adopting composite anchor rod
CN201809776U (en) Batter post chuck pile foundation
CN202767123U (en) Fill foundation creep normal position testing device
CN101458013A (en) Laying method of soil source heat pump vertical buried tube heat exchanger between foundation piles
Liu et al. Numerical simulation analysis of supporting stability of cast-in-place piles in pipe jacking
Sepehrmanesh et al. Impact of EPB Tunneling on Pile Foundations and Existing Tunnels

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant