CN101397358B - Method for preparing modified asphalt - Google Patents

Method for preparing modified asphalt Download PDF

Info

Publication number
CN101397358B
CN101397358B CN2008101550982A CN200810155098A CN101397358B CN 101397358 B CN101397358 B CN 101397358B CN 2008101550982 A CN2008101550982 A CN 2008101550982A CN 200810155098 A CN200810155098 A CN 200810155098A CN 101397358 B CN101397358 B CN 101397358B
Authority
CN
China
Prior art keywords
asphalt
pitch
modified asphalt
unsaturated double
bond compounds
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2008101550982A
Other languages
Chinese (zh)
Other versions
CN101397358A (en
Inventor
应珏
翟洪金
应军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningwu Jurong Italy AI Technology Development Co. Ltd.
Original Assignee
NINGWU CHEMICAL CO Ltd JURONG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NINGWU CHEMICAL CO Ltd JURONG filed Critical NINGWU CHEMICAL CO Ltd JURONG
Priority to CN2008101550982A priority Critical patent/CN101397358B/en
Publication of CN101397358A publication Critical patent/CN101397358A/en
Application granted granted Critical
Publication of CN101397358B publication Critical patent/CN101397358B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a preparation method of modified asphalt. The modified asphalt is produced by asphalt and an undersaturation double bond compound which are reacted under the action of an evocating agent; the method comprises the following steps: firstly, the asphalt is put into a reaction kettle; the evocating agent is added into the reaction kettle; the weight of the evocating agent is 0.05-1 percent of the weight of the asphalt; the undersaturation double bond compound with the weight of 1-10 percent of that of the asphalt and 0.1-1 percent of N-phenyl maleimide are added into the reaction kettle at the temperature of 80-160 DEG C; and the pressure remains 0.1-0.4 MPa. The reaction is carried out for 3-6 hours; the reaction product is deaerated and filtered, and then the modified asphalt is obtained. The chemically modified asphalt provided by the method has good performance, which greatly improves the shortcomings that the common asphalt has strong temperature sensibility, low viscosity, poor flexility and the like. The modified asphalt can meet the use performance of roads and prolong the service life of roads; when the modified asphalt is used in road maintaining, maintenance, the time of traffic closing is shortened, the construction condition is improved and the construction efficiency is increased.

Description

A kind of modified asphalt preparation method
Technical field
The present invention relates to a kind of modified asphalt preparation method, belong to the pitch chemical modification technique.
Background technology
Pitch is widely used in road pavement, pavement maintenance and maintenance, compares with cement concrete pavement, and bituminous pavement has advantages such as no seam, driving is comfortable, vibration is little, noise is low.But plain asphalt is strong to temperature sensitivity, viscosity is low, snappiness is poor, has brought many inconvenience to use.In order to overcome the shortcoming of plain asphalt, both at home and abroad asphalt modification to be studied, modifying asphalt is to add properties-correcting agent in pitch, and the performance of pitch or asphalt is improved.Wherein, properties-correcting agent mostly is: rubber, resin, high molecular polymer, levigated rubber powder or other fillers etc.The shortcoming of this asphalt modification method is: carry out physical blending in the pitch owing to just simply properties-correcting agent is added, thereby the easy stratified problem of segregation that produces, though and for problems such as bituminous is strong to temperature sensitivity, viscosity is low, snappiness differences improvement is arranged, the not basic change from the molecular structure.
Summary of the invention
In order to overcome the problem that existing modifying asphalt exists, the purpose of this invention is to provide a kind of modified asphalt preparation method, this preparation method directly carries out chemical modification with plain asphalt, and the chemical modified bitumen that makes can satisfy the road use properties, prolongs road work-ing life.
The objective of the invention is to be achieved through the following technical solutions:
A kind of modified asphalt preparation method is characterized in that it under the initiator effect, with the reaction of pitch and unsaturated double-bond compounds and make, comprises the steps:
1. pitch is dropped in the reactor.Described pitch can be one or more mixtures in petroleum pitch, oxidized bitumen, coal-tar pitch or the lake pitch, is preferably petroleum pitch.
2. in aforesaid reaction vessel, add initiator; The weight of initiator is bituminous 0.05~1%.Described initiator is one or more mixtures in Potassium Persulphate, ammonium persulphate, benzoyl peroxide, Diisopropyl azodicarboxylate, the azo-bis-iso-dimethyl.
3. add unsaturated double-bond compounds and 0.1~1%N-phenyl maleimide of pitch weight 1~10% under 80~160 ℃ of temperature in aforesaid reaction vessel, pressure maintains 0.1~0.4MPa, reacts 3-6 hour.Described unsaturated double-bond compounds is divided into two classes, and category-A is vinylformic acid, first class vinylformic acid, toxilic acid, maleic anhydride, and category-B is vinyl cyanide, vinylbenzene, alpha-methyl styrene, acrylamide, first class methyl acrylate, first class glycidyl acrylate; Wherein category-A unsaturated double-bond compounds can be wherein one or more, and category-B unsaturated double-bond compounds can be wherein one or more.The weight ratio of category-A unsaturated double-bond compounds and category-B unsaturated double-bond compounds is 1:0.05~0.2.Wherein, the effect of N-phenylmaleimide is to improve product stability and improve the product workability.
4. above-mentioned reaction product is outgased, filters, obtain modifying asphalt.
The present invention at first drops into pitch in the reactor, and stirred autoclave finishes until final reaction, because thickness or be solid during pitch low temperature should be heated to earlier about 100 ℃ when reactor feed, squeezes in the reactor with bitumenpump again.Add initiator then, add N-phenylmaleimide and unsaturated double-bond compounds again, reaction is 3-6 hour under certain temperature and pressure, makes the modifying asphalt of excellent property after removing small molecules and filter operations such as removing impurity through vacuum then.
The present invention reacts with the specific unsaturated double-bond compounds that contains under the initiator effect, the modifying asphalt that makes can improve anti-flowability under the asphalt high-temperature and the flexible under the low temperature effectively, has also overcome simultaneously the stratified problem of segregation easily takes place in the physical modification method that adds properties-correcting agent in the former oriented pitch.The present invention has greatly improved, the shortcomings such as viscosity low, snappiness difference strong to temperature sensitivity of plain asphalt, can satisfy the road use properties, prolongs road work-ing life; When being used for pavement maintenance, maintenance, can shortening and close traffic time, improve execution conditions, improve operating efficiency.
Embodiment
The present invention is further illustrated below by specific embodiment, but each embodiment all is not to concrete restriction of the present invention.
Embodiment 1
With the 100 parts of (quality of petroleum pitch that are warmed up to 90-130 ℃, add reactor down together), add 0.3 part of benzoyl peroxide, add 1 part of 9 parts in first class vinylformic acid, 1 part of vinylbenzene and N-phenylmaleimide again, 120-135 ℃ of the control that heats up, and feed N2 and make reactor pressure remain on 0.2MPa, reacted 3 hours, the 20min that outgases then obtains the modifying asphalt that low-temperature flexibility is greatly improved after the filtration.
Embodiment 2
With the 100 parts of adding reactors of petroleum pitch that are warmed up to 90-130 ℃, add 0.05 part of ammonium persulphate, add 0.1 part of 1 part of maleic anhydride, 0.05 part of first class glycidyl acrylate and N-phenylmaleimide again, 130-160 ℃ of control heats up, and feeding N2 makes reactor pressure remain on 0.4MPa, reacted 6 hours, the 20min that outgases then obtains the modifying asphalt that high temperature rheology can greatly improve after the filtration.
Embodiment 3
With the 100 parts of adding reactors of oxidized bitumen that are warmed up to 80-100 ℃, add 0.1 part of Potassium Persulphate, add 0.2 part of 1 part in vinylformic acid, 0.2 part of alpha-methyl styrene and N-phenylmaleimide again, 120-150 ℃ of control heats up, and feeding N2 makes reactor pressure remain on 0.1MPa, reacted 4 hours, the 20min that outgases then obtains modifying asphalt after the filtration.
Embodiment 4
With the 100 parts of adding reactors of coal-tar pitch that are warmed up to 110 ℃, added 0.15 part of Diisopropyl azodicarboxylate, add 0.5 part of 0.8 part in vinylformic acid, 0.2 part of alpha-methyl styrene and N-phenylmaleimide again, 120-150 ℃ of control heats up, and feeding N2 makes reactor pressure remain on 0.2MPa, reacted 4 hours, the 20min that outgases then obtains modifying asphalt after the filtration.
Embodiment 5
With the 100 parts of adding reactors of coal-tar pitch that are warmed up to 110 ℃, add 1 part of azo-bis-iso-dimethyl, add 0.7 part of 0.8 part of toxilic acid, 0.2 part of methyl methacrylate and N-phenylmaleimide again, 120-150 ℃ of control heats up, and feeding N2 makes reactor pressure remain on 0.3MPa, reacted 3.5 hours, the 20min that outgases then obtains modifying asphalt after the filtration.
Embodiment 6
With the 100 parts of adding reactors of lake pitch that are warmed up to 130 ℃, add 1 part of benzoyl peroxide, add 0.3 part of 7 parts of maleic anhydrides, 1 part of acrylamide, 0.4 part of methyl acrylate and N-phenylmaleimide again, 130-150 ℃ of control heats up, and feeding N2 makes reactor pressure remain on 0.2MPa, reacted 3 hours, the 20min that outgases then obtains modifying asphalt after the filtration.
Embodiment 7
With the 100 parts of adding reactors of lake pitch that are warmed up to 110 ℃, add 0.1 part of Potassium Persulphate, 0.1 part of azo-bis-iso-dimethyl, add 0.2 part of 4 parts in vinylformic acid, 2 parts of maleic anhydrides, 0.4 part of vinyl cyanide, 0.4 part of glycidyl acrylate and N-phenylmaleimide again, 120-150 ℃ of control heats up, and feeding N2 makes reactor pressure remain on 0.1MPa, reacted 5 hours, the 20min that outgases then obtains modifying asphalt after the filtration.

Claims (3)

1. a modified asphalt preparation method is characterized in that it under the initiator effect, with the reaction of pitch and unsaturated double-bond compounds and make, comprises the steps:
1. pitch is dropped in the reactor;
2. in aforesaid reaction vessel, add initiator; The weight of initiator is bituminous 0.05~1%;
3. add unsaturated double-bond compounds and 0.1~1%N-phenyl maleimide of pitch weight 1~10% under 80~160 ℃ of temperature in aforesaid reaction vessel, pressure maintains 0.1~0.4MPa, reacts 3-6 hour; Described unsaturated double-bond compounds is divided into two classes, and wherein, category-A unsaturated double-bond compounds is one or more mixtures in vinylformic acid, methacrylic acid, toxilic acid, the maleic anhydride; Category-B unsaturated double-bond compounds is one or more mixtures in vinyl cyanide, vinylbenzene, alpha-methyl styrene, acrylamide, methyl methacrylate, the glycidyl methacrylate; The weight ratio of category-A unsaturated double-bond compounds and category-B unsaturated double-bond compounds is 1: 0.05~0.2;
4. above-mentioned reaction product is outgased, filters, obtain modifying asphalt.
2. modified asphalt preparation method according to claim 1 is characterized in that: step 1. in, described pitch is one or more mixtures in petroleum pitch, coal-tar pitch or the lake pitch.
3. modified asphalt preparation method according to claim 1, it is characterized in that: step 2. in, described initiator is one or more mixtures in Potassium Persulphate, ammonium persulphate, benzoyl peroxide, Diisopropyl azodicarboxylate, the azo-bis-iso-dimethyl.
CN2008101550982A 2008-10-31 2008-10-31 Method for preparing modified asphalt Expired - Fee Related CN101397358B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008101550982A CN101397358B (en) 2008-10-31 2008-10-31 Method for preparing modified asphalt

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008101550982A CN101397358B (en) 2008-10-31 2008-10-31 Method for preparing modified asphalt

Publications (2)

Publication Number Publication Date
CN101397358A CN101397358A (en) 2009-04-01
CN101397358B true CN101397358B (en) 2010-08-25

Family

ID=40516219

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008101550982A Expired - Fee Related CN101397358B (en) 2008-10-31 2008-10-31 Method for preparing modified asphalt

Country Status (1)

Country Link
CN (1) CN101397358B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102850494A (en) * 2012-08-27 2013-01-02 句容宁武科技开发有限公司 Preparation method of chemically modified asphalt

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102850506B (en) * 2012-08-27 2014-04-16 句容宁武科技开发有限公司 Preparation method of polyurethane modified asphalt
CN103305016B (en) * 2013-06-27 2015-07-15 句容宁武科技开发有限公司 Preparation method of bi-component thermosetting epoxy asphalt composite material
CN103305017B (en) * 2013-06-27 2015-04-01 句容宁武科技开发有限公司 Preparation method of pavement material with self-adapting pavement temperature adjustment function
CN103275503B (en) * 2013-06-27 2015-10-21 杨凌领航新材料科技开发有限公司 A kind of two-component thermosetting bituminous epoxy matrix material of intermediate temperature setting
CN106867266B (en) * 2017-01-20 2019-06-18 青岛科凯达橡塑有限公司 A kind of asphalt cold repairing additive and its preparation method and application
CN106810889B (en) * 2017-01-20 2019-06-21 青岛科凯达橡塑有限公司 A kind of asphalt cold repairing and preparation method thereof
CN109053123A (en) * 2018-10-18 2018-12-21 铜陵丰泽建材科技有限公司 A kind of preparation method of high-strength insulation energy air-entrained concrete building block
CN111040361B (en) * 2019-12-26 2021-06-25 中路交科科技股份有限公司 Permeable regenerated sand-containing fog sealing layer material and preparation method thereof
CN112961295B (en) * 2021-03-04 2022-11-18 苏州科技大学 Methyl methacrylate-butyl acrylate in-situ copolymerization modified asphalt
CN112898510B (en) * 2021-03-04 2022-11-18 苏州科技大学 Vinyl acetate-butyl acrylate in-situ copolymerization modified asphalt
CN112898509B (en) * 2021-03-04 2022-11-18 苏州科技大学 Styrene-butyl acrylate in-situ copolymerization modified asphalt
CN117417645A (en) * 2023-11-28 2024-01-19 河南金欧特实业集团股份有限公司 Solid waste rubber powder modified emulsified asphalt for permeable pavement and preparation method and application thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102850494A (en) * 2012-08-27 2013-01-02 句容宁武科技开发有限公司 Preparation method of chemically modified asphalt
CN102850494B (en) * 2012-08-27 2014-09-03 句容宁武科技开发有限公司 Preparation method of chemically modified asphalt

Also Published As

Publication number Publication date
CN101397358A (en) 2009-04-01

Similar Documents

Publication Publication Date Title
CN101397358B (en) Method for preparing modified asphalt
CN110713695B (en) Ultrahigh-toughness epoxy resin material for hot-mix epoxy asphalt and preparation method thereof
CN103834423B (en) Modified coal tar pitch and preparation method thereof
CN106496438A (en) A kind of amidatioon graphene oxide modified polycarboxylic acid water reducer and preparation method thereof
CN102491680A (en) Modified acrylic resin mortar composition and preparation method thereof
CN103848935A (en) Oil-absorptive resin and oil-absorptive expanding rubber comprising same
CN108821672A (en) A method of utilizing graphene oxide intensifying regenerating concrete
CN104592458A (en) An asphalt preparing method
CN102863807A (en) Epoxy asphalt and preparation method thereof, as well as concrete containing same
CN110407509A (en) It is a kind of can microwave heating regeneration repair bituminous concrete microcapsules and preparation method
US6503968B1 (en) Asphalt modifier of styrene-butadiene-styrene block copolymer and styrene-butadiene latex
CN103601418B (en) A kind of for watering Interface enhancer and application thereof prepared by formula ground surface material
CN116445144B (en) Low-shrinkage high-strength plant-based resin plugging agent and preparation method thereof
CN102199265A (en) Long carbon chain nylon modified phenolic resin and preparation method thereof
CN103834421A (en) Environment-friendly type modified coal asphalt and preparation method thereof
CN104152136B (en) Method for preparing ultra-low-density fracturing and propping agent by using white clay
CN109021948A (en) A kind of preparation method of novel heavy crude thinner
CN102086279A (en) Particle additive suitable for bituminous pavement and preparation and using methods thereof
CN108395708A (en) Caulking material of Colorful Asphalt Pavement and preparation method thereof
CN102850506B (en) Preparation method of polyurethane modified asphalt
CN108948259A (en) Modified graphene oxide for cement-base composite material lacks lamella water phase uniform dispersion and its preparation method and application
CN113502139A (en) Low-temperature-resistant slow-bonding prestressed tendon
CN114804726A (en) EME-14 high-modulus asphalt concrete and preparation method thereof
CN116023792A (en) Hyperbranched polymer grafted carbon nanotube modified epoxy asphalt and preparation method thereof
CN102850494B (en) Preparation method of chemically modified asphalt

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: JURONG NINGWU HIGH-TECH. DEVELOPMENT CO., LTD.

Free format text: FORMER OWNER: NINGWU CHEMICAL CO., LTD., JURONG

Effective date: 20110707

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20110707

Address after: 212400, Jiangsu, Jurong Province, the edge of the town

Patentee after: Jurong Ningwu High-tech. Development Co., Ltd.

Address before: 212400, Jiangsu, Jurong Province, the edge of the town

Patentee before: Ningwu Chemical Co., Ltd., Jurong

ASS Succession or assignment of patent right

Owner name: JURONG NINGWU YIAI TECHNOLOGY DEVELOPMENT CO., LTD

Free format text: FORMER OWNER: JURONG NINGWU HIGH-TECH. DEVELOPMENT CO., LTD.

Effective date: 20111017

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20111017

Address after: 212400, Jiangsu, Jurong Province, the edge of the town

Patentee after: Ningwu Jurong Italy AI Technology Development Co. Ltd.

Address before: 212400, Jiangsu, Jurong Province, the edge of the town

Patentee before: Jurong Ningwu High-tech. Development Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100825

Termination date: 20191031

CF01 Termination of patent right due to non-payment of annual fee