CN101381200A - Tin pot base production method of float glass production line - Google Patents

Tin pot base production method of float glass production line Download PDF

Info

Publication number
CN101381200A
CN101381200A CNA2007100455914A CN200710045591A CN101381200A CN 101381200 A CN101381200 A CN 101381200A CN A2007100455914 A CNA2007100455914 A CN A2007100455914A CN 200710045591 A CN200710045591 A CN 200710045591A CN 101381200 A CN101381200 A CN 101381200A
Authority
CN
China
Prior art keywords
welding
wide plate
production line
underframe
assembling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2007100455914A
Other languages
Chinese (zh)
Other versions
CN101381200B (en
Inventor
叶俊
尹卫民
符根旺
叶方徽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Group Corp Ltd
Shanghai Baoye Metallurgy Engineering Co Ltd
Original Assignee
Shanghai Baoye Construction Industrial Furnace Engineering & Technology Co Ltd
Shanghai Baoye Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Construction Industrial Furnace Engineering & Technology Co Ltd, Shanghai Baoye Construction Co Ltd filed Critical Shanghai Baoye Construction Industrial Furnace Engineering & Technology Co Ltd
Priority to CN2007100455914A priority Critical patent/CN101381200B/en
Publication of CN101381200A publication Critical patent/CN101381200A/en
Application granted granted Critical
Publication of CN101381200B publication Critical patent/CN101381200B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Butt Welding And Welding Of Specific Article (AREA)
  • Arc Welding In General (AREA)

Abstract

The invention relates to a method for manufacturing a tin bath bottom shell of a float glass production line. The method comprises the following: a step 1 of prophase preparation, which is to work out a manufacturing process and proposal according to a drawing as well as manufacturing standards and requirements, draw a typesetting drawing of folding the edge of a bottom plate, obtain the reasonable order size of a wide plate and customize materials; a step 2 of folding the edge of the wide plate, which is to determine accurate blanking size, form a welding groove via cutting blanking, plate leveling and edge planing, fold the edges of two ends of the wide plate and use an assembled die to fold the edges and control the radius of a fillet; a step 3 of assembling a bottom frame, which is to assemble a platform first, assemble and weld the bottom frame then, calibrate and polish after welding is over; and a step 4 of assembling the wide plate and the bottom frame, which is to assemble the bottom frame calibrated on the platform in the step 3 together with the wide plate, weld, calibrate, spray sand, paint, number and package. The method ensures that users can directly obtain every part of the production line and only need to splice the parts, thereby guaranteeing the manufacturing quality of the production line.

Description

The making method of floatation glass production line tin pot base
Technical field
The present invention relates to floatation glass production line, relate in particular to the making method of floatation glass production line equipment.
Background technology
As everyone knows, in float glass, as the core of float glass, the tin pot base structure is crucial Thermal Equipment, and its workmanship quality directly affects the quality of glass and the work-ing life of molten tin bath.It belongs to high long ratio and the less slim equipment of depth-width ratio, and the making precision is higher, and difficulty is bigger.
Therefore, existing method all is by the part of user from manufacturer's purchase production line various piece, is assembled into entrance, standard paragraphs and lifting section then voluntarily, then various piece is stitched together.Because the manufacturer as glass is not strong point on Construction of Steel Structure, the assembling splicing is difficult to guarantee construction quality voluntarily, and seepage takes place easily, welding unfairness problem, influencing the workmanship of whole production line, and directly cause its product---the quality of float glass is low.
Summary of the invention
The present invention is intended to solve the above-mentioned defective of prior art, and a kind of making method of floatation glass production line tin pot base is provided, and makes the user can directly obtain the production line various piece, only need splice, thereby guarantee the production line workmanship.
A kind of making method of floatation glass production line tin pot base, it comprises subordinate's step:
Step 1, early-stage preparations:
According to drawing and production standard and requirement establishment manufacture craft, scheme; Draw base plate flanging composing figure, draw rational wide plate order size, custom materials;
Step 2, wide plate flanging: determine the blanking accurate dimension after cutting stock, smooth one-tenth flat board, dig the limit to form bevel for welding and, to use assembling die flanging control fillet radius with wide plate two ends flanging;
Step 3, underframe assembling: platform of assembling earlier, carry out underframe assembling and welding then, proofread and correct after welding finishes and polish;
Step 4, wide plate and underframe assembly unit: underframe and wide plate after proofreading and correct on the described platform of step 3 assemble, and the welding correction, then sandblast paint numbering packing.
The making method of described floatation glass production line tin pot base, described step 2 comprises the following steps:
A, determine that blanking accurate dimension, wide plate width are that 2800mm-3200mm flanging deviation is 0-3mm;
B, the blanking of employing numerical control bull torch-cutting machine;
C, the dull and stereotyped arbor press of employing seven rollers carry out flat board;
D, utilize plate edge planing machine with bevel for welding machine-shaping;
E, the large-scale seaming machine of employing are converted into 90 ° with the wide plate two ends, use assembling die flanging control fillet radius to be 12-15mm.
The making method of described floatation glass production line tin pot base, described step 3 comprises the following steps:
A, assembly platform: adopt rolling H 600*200 to set up assembly platform, machining is set on the platform adjusts bearing, and leveling;
B, underframe assembling: underframe is divided into two joint small frame monomer assemblings,
Assemble: because factor Vierendeel girders such as welding distortion rule of thumb should be considered the accurate blanking of enough surpluses, check underframe assembling physical dimension with steel ruler during assembling and spot welding, and check its planeness and correction with spirit-leveling instrument and guiding ruler;
Welding: adopt two people to be symmetrically welded during the underframe welding, earlier weldering girder joint, weldering time beam splice again;
Proofread and correct: check underframe length and width, Diagonal Dimension and planeness deviation, and correction and grinding process after welding is finished.
The making method of described floatation glass production line tin pot base is characterized in that: described step 4 comprises following process:
A, assembly platform: machining bearing leveling again on the assembly platform, roughness control is in 1mm;
B, assembly unit: will remove the foreign material on wide plate and the framework before placing, two little underframes about after proofreading and correct are relay on assembly platform, locate according to size, and two underframes are welded together with will strengthen channel-section steel temporarily, and check the framework integral smoothness with spirit-leveling instrument, after reaching the permissible variation scope wide plate is placed on the framework, make the main beam in frame position in wide plate length direction both sides, simultaneously wide plate and underframe are accurately held out against also spot welding with framework and base plate behind the location, and with sidepiece gusset and wide plate and underframe tack-weld (control assembling back drain pan inner width size and diagonal lines, flanging wide plate verticality and planeness);
C, welding: CO is adopted in framework and wide plate welding 2Shielded welding, during welding therefrom the mind-set zygomorphy be interrupted the welding welding setting and should be consistent, welding bead length and answer consistent and uniform at interval.Direct and the wide plate interruption welding of band steel is strengthened in reversible deformation between two frameworks, reduces welding distortion as far as possible;
D, correction: drain pan structural entity length and width, Diagonal Dimension deviation are checked in the welding back; The drain pan side plays height and perpendicularity deviation; And drain pan planeness deviation, and proofread and correct grinding process;
E, sandblast paint: drain pan adopts derusting by sandblast, and the surface ought to be carried out by standard GB 8923-88 " steel surface rusty degree and derusting grade before the application ", reached more than the Sa2.5 level (containing); Guarantee that internal surface is smooth smooth;
F, numbering packing indicate on the drain pan that glass flows is to numbering with member.
The making method of floatation glass production line tin pot base, the roughness control of described assembly platform is in 1mm.
The making method of described floatation glass production line tin pot base, in the b assembly unit of described step 4, the frame plane degree for after guaranteeing to weld carries out reversible deformation to main beam in frame according to processing requirement in advance before welding, to reach the purpose of control welding distortion;
The making method of described floatation glass production line tin pot base among the c of described step 4, during welding, adopts welding 50mm 150mm at interval.
The making method of described floatation glass production line drain pan tin pot base, when the e sandblast of described step 4 was painted, internal surface need be added a cover protection cloth during the structure oil paint coating, and controlled oil paint coating thickness and degree of uniformity with film gauge.
The present invention adopts the whole flanging technology of wide plate, reduces the wide plate splicing welding joint, improves drain pan structural entity leakage performance; Adopt assembly platform and adjustable machining bearing to carry out assembling of drain pan structure and pre-assembly unit, improve the drain pan planeness; Adopt intermittent welding and special weldprocedure to reduce the drain pan welding distortion, guarantee drain pan integral manufacturing precision.Thereby guaranteed the workmanship of floatation glass production line on the whole.
Embodiment
Provide the specific embodiment of the present invention below
A kind of making method of floatation glass production line tin pot base, it comprises subordinate's step:
Step 1, early-stage preparations:
According to drawing and production standard and requirement establishment manufacture craft, scheme; Draw base plate flanging composing figure, draw rational wide plate order size, and establishment material order plan;
Step 2, the wide plate flanging:
A, setting-out number material: cutting when considering to make, welding, allowance for shrinkage when digging process redundancy such as limit, flanging and assembly unit are determined the blanking accurate dimension;
B, blanking cutting: adopt the blanking of numerical control bull torch-cutting machine;
C, flat board: adopt the dull and stereotyped arbor press of seven rollers to carry out flat board (control base plate planeness);
D, plane limit: utilize plate edge planing machine with bevel for welding machine-shaping (control weldquality);
E, flanging: adopt the large-scale seaming machine of 800t that the wide plate two ends is converted into 90 °, use assembling die flanging control fillet radius; (according to device parameter performance and empirical value accurately rule, accurately contraposition, flanging)---behind the control flanging in empty size;
Step 3, the underframe assembling:
A, assembly platform: adopt rolling H 600*200 to set up assembly platform, machining is set on the platform adjusts bearing, and leveling, roughness control is in 1mm;
B, underframe assembling: underframe is divided into two joint small frame monomer assemblings,
Assemble: because factor Vierendeel girders such as welding distortion rule of thumb should be considered the accurate blanking of enough surpluses, check underframe assembling physical dimension with steel ruler during assembling and spot welding, and check its planeness and correction with spirit-leveling instrument and guiding ruler;
Welding: adopt two people to be symmetrically welded during the underframe welding, earlier weldering girder joint, weldering time beam splice again.Frame plane degree for after guaranteeing to weld can carry out reversible deformation to main beam in frame in advance according to processing requirement and welding experience before welding, to reach the purpose of control welding distortion;
Proofread and correct: check underframe length and width, Diagonal Dimension and planeness deviation, and correction and grinding process after welding is finished.
Step 4, wide plate and underframe assembly unit:
A, assembly platform: the leveling again of machining bearing---roughness control is in 1mm on the assembly platform;
B, assembly unit: will remove the foreign material on wide plate and the framework before placing, two little underframes about after proofreading and correct are relay on assembly platform, locate according to size, and two underframes are welded together with will strengthen channel-section steel temporarily, and check the framework integral smoothness with spirit-leveling instrument, after reaching the permissible variation scope wide plate is placed on the framework, make the main beam in frame position in wide plate length direction both sides, simultaneously wide plate and underframe are accurately held out against also spot welding with framework and base plate behind the location, and with sidepiece gusset and wide plate and underframe tack-weld (control assembling back drain pan inner width size and diagonal lines, flanging wide plate verticality and planeness);
C, welding: the CO2 shielded welding is adopted in framework and wide plate welding, therefrom mind-set zygomorphy interruption welding during welding (the general welding 50mm interval 150mm that adopts).Welding setting should be consistent, and consistent and uniform is answered at welding bead length and interval.Direct and the wide plate interruption welding of band steel is strengthened in reversible deformation between two frameworks, reduces welding distortion as far as possible;
D, correction: drain pan structural entity length and width, Diagonal Dimension deviation are checked in the welding back; The drain pan side plays height and perpendicularity deviation; And drain pan planeness deviation, and proofread and correct grinding process;
E, sandblast paint: drain pan adopts derusting by sandblast, and the surface ought to (GB8923-88) be carried out by national standard " steel surface rusty degree and derusting grade before the application ", reached more than the Sa2.5 level (containing).The tin pot base internal surface is forbidden oil paint coating, and does not allow adhering to of impurity such as welding slag to occur, guarantees that internal surface is smooth smooth.Should even comprehensively, non-foaming, trickling during drain pan outside application.---(internal surface should be added a cover protection cloth during drain pan structure oil paint coating, and controls oil paint coating thickness and degree of uniformity with film gauge);
F, numbering packing: indicate glass flows on the drain pan to numbering with member, drain pan structure non-packed gets final product, and accomplishes codes and standards.

Claims (8)

1. the making method of a floatation glass production line tin pot base, it comprises the steps:
Step 1, early-stage preparations:
According to drawing and production standard and requirement establishment manufacture craft, scheme; Draw base plate flanging composing figure, draw rational wide plate order size, custom materials;
Step 2, wide plate flanging: determine the blanking accurate dimension after cutting stock, smooth one-tenth flat board, dig the limit to form bevel for welding and, to use assembling die flanging control fillet radius with wide plate two ends flanging;
Step 3, underframe assembling: platform of assembling earlier, carry out underframe assembling and welding then, proofread and correct after welding finishes and polish;
Step 4, wide plate and underframe assembly unit: underframe and wide plate after proofreading and correct on the described platform of step 3 assemble, and the welding correction, then sandblast paint numbering packing.
2. the making method of floatation glass production line tin pot base according to claim 1 is characterized in that: described step 2 comprises the following steps:
A, determine that blanking accurate dimension, wide plate width are that 2800mm-3200mm flanging deviation is 0-3mm;
B, the blanking of employing numerical control bull torch-cutting machine;
C, the dull and stereotyped arbor press of employing seven rollers carry out flat board;
D, utilize plate edge planing machine with bevel for welding machine-shaping;
E, the large-scale seaming machine of employing are converted into 90 ° with the wide plate two ends, use assembling die flanging control fillet radius to be 12-15mm.
3. the making method of floatation glass production line tin pot base according to claim 1 is characterized in that: described step 3 comprises the following steps:
A, assembly platform: adopt rolling H 600*200 to set up assembly platform, machining is set on the platform adjusts bearing, and leveling;
B, underframe assembling: underframe is divided into two joint small frame monomer assemblings,
Assemble: because factor Vierendeel girders such as welding distortion rule of thumb should be considered the accurate blanking of enough surpluses, check underframe assembling physical dimension with steel ruler during assembling and spot welding, and check its planeness and correction with spirit-leveling instrument and guiding ruler;
Welding: adopt two people to be symmetrically welded during the underframe welding, earlier weldering girder joint, weldering time beam splice again;
Proofread and correct: check underframe length and width, Diagonal Dimension and planeness deviation, and correction and grinding process after welding is finished.
4. the making method of floatation glass production line tin pot base according to claim 1 is characterized in that: described step 4 comprises following process:
A, assembly platform: machining bearing leveling again on the assembly platform, roughness control is in 1mm;
B, assembly unit: will remove the foreign material on wide plate and the framework before placing, two little underframes about after proofreading and correct are relay on assembly platform, locate according to size, and two underframes are welded together with will strengthen channel-section steel temporarily, and check the framework integral smoothness with spirit-leveling instrument, after reaching the permissible variation scope wide plate is placed on the framework, make the main beam in frame position in wide plate length direction both sides, simultaneously wide plate and underframe are accurately held out against also spot welding with framework and base plate behind the location, and with sidepiece gusset and wide plate and underframe tack-weld (control assembling back drain pan inner width size and diagonal lines, flanging wide plate verticality and planeness);
C, welding: CO is adopted in framework and wide plate welding 2Shielded welding, during welding therefrom the mind-set zygomorphy be interrupted the welding welding setting and should be consistent, welding bead length and answer consistent and uniform at interval.Direct and the wide plate interruption welding of band steel is strengthened in reversible deformation between two frameworks, reduces welding distortion as far as possible;
D, correction: drain pan structural entity length and width, Diagonal Dimension deviation are checked in the welding back; The drain pan side plays height and perpendicularity deviation; And drain pan planeness deviation, and proofread and correct grinding process;
E, sandblast paint: drain pan adopts derusting by sandblast, and the surface ought to be carried out by standard GB 8923-88 " steel surface rusty degree and derusting grade before the application ", reached more than the Sa2.5 level (containing); Guarantee that internal surface is smooth smooth;
F, numbering packing indicate on the drain pan that glass flows is to numbering with member.
5. according to the making method of claim 1,3 and 4 described arbitrary floatation glass production line tin pot bases, it is characterized in that the roughness control of described assembly platform is in 1mm.
6. according to the making method of claim 1 or 4 described floatation glass production line tin pot bases, it is characterized in that, in the b assembly unit of described step 4, for the frame plane degree after guaranteeing to weld, before welding, in advance main beam in frame is carried out reversible deformation according to processing requirement, to reach the purpose of control welding distortion.
7. according to the making method of claim 1 or 4 described floatation glass production line tin pot bases, it is characterized in that, among the c of described step 4, during welding, adopt welding 50mm 150mm at interval.
8. according to the making method of claim 1 or 4 described floatation glass production line drain pan tin pot bases, it is characterized in that, when the e sandblast of described step 4 was painted, internal surface need be added a cover protection cloth during the structure oil paint coating, and controlled oil paint coating thickness and degree of uniformity with film gauge.
CN2007100455914A 2007-09-04 2007-09-04 Tin pot base production method of float glass production line Expired - Fee Related CN101381200B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2007100455914A CN101381200B (en) 2007-09-04 2007-09-04 Tin pot base production method of float glass production line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2007100455914A CN101381200B (en) 2007-09-04 2007-09-04 Tin pot base production method of float glass production line

Publications (2)

Publication Number Publication Date
CN101381200A true CN101381200A (en) 2009-03-11
CN101381200B CN101381200B (en) 2011-04-20

Family

ID=40461284

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2007100455914A Expired - Fee Related CN101381200B (en) 2007-09-04 2007-09-04 Tin pot base production method of float glass production line

Country Status (1)

Country Link
CN (1) CN101381200B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102266936A (en) * 2010-06-02 2011-12-07 鞍钢重型机械有限责任公司 Fabrication method of hot metal ladle
CN103508659A (en) * 2012-10-15 2014-01-15 中国有色金属工业第六冶金建设有限公司 Molten tin bath manufacturing and installing process
CN104058577A (en) * 2014-07-08 2014-09-24 七冶建设有限责任公司 Tin bath production and installation method for float glass line
CN104249239A (en) * 2013-06-28 2014-12-31 上海宝冶建设工业炉工程技术有限公司 Manufacture method of inner sleeve of lime sleeve kiln
CN105414896A (en) * 2015-12-09 2016-03-23 青岛齐星铁塔有限公司 Blanking machining technique for welding platform angle iron frame
CN110455152A (en) * 2019-07-29 2019-11-15 江苏振江新能源装备股份有限公司 The comprehensive detecting tool and its detection method of wind-driven generator split-type stator piece
CN113263274A (en) * 2021-04-12 2021-08-17 宝鸡拓普达钛业有限公司 Titanium plate welding method applied to rectangular frame structure

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2651244Y (en) * 2003-11-06 2004-10-27 中国凯盛国际工程公司 Steel structure of molten tin bath bottom
CN2839272Y (en) * 2005-08-22 2006-11-22 秦皇岛玻璃工业研究设计院 Float glass tin tank bottom structure

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102266936A (en) * 2010-06-02 2011-12-07 鞍钢重型机械有限责任公司 Fabrication method of hot metal ladle
CN103508659A (en) * 2012-10-15 2014-01-15 中国有色金属工业第六冶金建设有限公司 Molten tin bath manufacturing and installing process
CN104249239A (en) * 2013-06-28 2014-12-31 上海宝冶建设工业炉工程技术有限公司 Manufacture method of inner sleeve of lime sleeve kiln
CN104058577A (en) * 2014-07-08 2014-09-24 七冶建设有限责任公司 Tin bath production and installation method for float glass line
CN105414896A (en) * 2015-12-09 2016-03-23 青岛齐星铁塔有限公司 Blanking machining technique for welding platform angle iron frame
CN110455152A (en) * 2019-07-29 2019-11-15 江苏振江新能源装备股份有限公司 The comprehensive detecting tool and its detection method of wind-driven generator split-type stator piece
CN113263274A (en) * 2021-04-12 2021-08-17 宝鸡拓普达钛业有限公司 Titanium plate welding method applied to rectangular frame structure
CN113263274B (en) * 2021-04-12 2023-12-05 宝鸡拓普达钛业有限公司 Titanium plate welding method applied to rectangular frame structure

Also Published As

Publication number Publication date
CN101381200B (en) 2011-04-20

Similar Documents

Publication Publication Date Title
CN101381200B (en) Tin pot base production method of float glass production line
CN101524804B (en) Steel member manufacturing method
CN103321296B (en) Annular double-layer truss and manufacture method thereof
CN102513664B (en) Actual ship assembly welding process for ultra-large high-precision base
CN107825083A (en) A kind of wedge bracket structure construction technology
CN100423889C (en) Integral welding method for ensuring axiality of two side gudgeons in large sized structural member
CN102764956B (en) Production process of steel moulding plate
CN102489947B (en) Bottom chord tube manufacturing process of girder of steel tube concrete truss beam bridge
CN108687489A (en) A kind of large size hopper production method
CN103061448B (en) A kind of box-shaped secondary member and packaging technology thereof
CN102848091A (en) Ship double bottom block assembly welding technology
CN104695624A (en) Large-cross-section box column and processing technology thereof
CN110695617A (en) Machining process of section steel column
CN106741607A (en) A kind of method that boat segmental installs container buried base frame
CN104849144B (en) Method for detecting strain strengthening non-homogeneous deformation of stainless steel welded joint
CN104191176A (en) Method for manufacturing low-temperature flow weighing container
CN104805961A (en) Steel column provided with thick plates, special-shaped skew bracket and truss layer and manufacturing method of steel column
CN103009009A (en) Welding method for ultra-large type three-section transformer oil tank
CN102886655B (en) Manufacturing process of upper and lower ring beams
CN106760203A (en) A kind of complicated Steel for Large Steel Column component and processing method
CN103481022A (en) Manufacturing method of pier column template
CN115352594A (en) Ship full-width steel superstructure sectional construction method
CN115383407B (en) Machining and manufacturing method of wall-mounted cross crane beam
CN106514096A (en) Rudder manufacturing auxiliary tool and method
CN216758699U (en) Door frame hole cutting special machine for manufacturing wind power tower cylinder

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: SHANGHAI BAOYE GROUP CORP., LTD.

Free format text: FORMER NAME: BAOYE CONSTRUCTION CO., LTD., SHANGHAI

CP03 Change of name, title or address

Address after: 200941 Fuyuan Road, Shanghai, No. 2457, No.

Co-patentee after: SHANGHAI BAOYE CONSTRUCTION INDUSTRIAL FURNACE ENGINEERING TECHNOLOGY Co.,Ltd.

Patentee after: SHANGHAI BAOYE GROUP Corp.,Ltd.

Address before: 200941 Shanghai City, Baoshan District Road, No. four yuan, 168

Co-patentee before: SHANGHAI BAOYE CONSTRUCTION INDUSTRIAL FURNACE ENGINEERING TECHNOLOGY Co.,Ltd.

Patentee before: SHANGHAI BAOYE GROUP Corp.,Ltd.

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: No. 2457 Fuyuan Road, Baoshan District, Shanghai, 2004

Patentee after: SHANGHAI BAOYE GROUP Corp.,Ltd.

Patentee after: SHANGHAI BAOYE METALLURGY ENGINEERING Co.,Ltd.

Address before: No. 2457 Fuyuan Road, Baoshan District, Shanghai, 2004

Patentee before: SHANGHAI BAOYE GROUP Corp.,Ltd.

Patentee before: SHANGHAI BAOYE CONSTRUCTION INDUSTRIAL FURNACE ENGINEERING TECHNOLOGY Co.,Ltd.