CN101377746A - System and method for updating arranged task - Google Patents
System and method for updating arranged task Download PDFInfo
- Publication number
- CN101377746A CN101377746A CNA200710201568XA CN200710201568A CN101377746A CN 101377746 A CN101377746 A CN 101377746A CN A200710201568X A CNA200710201568X A CN A200710201568XA CN 200710201568 A CN200710201568 A CN 200710201568A CN 101377746 A CN101377746 A CN 101377746A
- Authority
- CN
- China
- Prior art keywords
- task
- internal memory
- list
- task list
- file
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 21
- 238000010586 diagram Methods 0.000 description 5
- 238000012217 deletion Methods 0.000 description 4
- 230000037430 deletion Effects 0.000 description 4
- 239000012467 final product Substances 0.000 description 2
- 230000008676 import Effects 0.000 description 2
- 238000004590 computer program Methods 0.000 description 1
- 230000006870 function Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for program control, e.g. control units
- G06F9/06—Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
- G06F9/46—Multiprogramming arrangements
- G06F9/48—Program initiating; Program switching, e.g. by interrupt
- G06F9/4806—Task transfer initiation or dispatching
- G06F9/4843—Task transfer initiation or dispatching by program, e.g. task dispatcher, supervisor, operating system
- G06F9/485—Task life-cycle, e.g. stopping, restarting, resuming execution
Landscapes
- Engineering & Computer Science (AREA)
- Software Systems (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Information Retrieval, Db Structures And Fs Structures Therefor (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention provides a scheduled task update method, which comprises the following steps: a scheduled task file is set; a task list is generated according to the set scheduled task file, which comprises at least one scheduled task; the attribute parameters of the scheduled tasks in the task list are read, which comprise the serial number of each scheduled task; whether the original task list in the memory is blank is determined based on the presence of scheduled tasks to be called in the memory; when the original task list in the memory is not blank, the scheduled tasks in the task list generated are compared with the scheduled tasks in the original task list in the memory according to the serial numbers, and difference is determined; when the scheduled tasks in the task list generated are different from the scheduled tasks in the original list in the memory, the original task list in the memory is updated to be the generated task list. In addition, the invention further provides a scheduled task update system.
Description
Technical field
The present invention relates to a kind of scheduled task update system and method.
Background technology
In application program system, as the Webpage material download system, the execution scheduling that the common program of downloading all is a predefined is arranged and is managed.And in the scheduling of setting in advance, unavoidable because a variety of causes need be adjusted and upgrade the scheduling of original setting, such as deletion, add some schedulings.Generally speaking, original scheduling is adjusted and when upgrading, need be closed and restart after the whole executive routine or in the process that original scheduling is carried out, manually delete, add scheduling, not only time-consuming but also loaded down with trivial details.
Summary of the invention
In view of above content, be necessary to provide a kind of scheduled task update system, it can upgrade newly-installed scheduling automatically, has improved scheduling and has upgraded the efficient of carrying out.
In view of above content, also be necessary to provide a kind of updating arranged task method, it can upgrade newly-installed scheduling automatically, has improved scheduling and has upgraded the efficient of carrying out.
A kind of scheduled task update system, this system comprises main frame, described main frame comprises: module is set, is used to be provided with the arranged task file; Generation module is used for generating task list according to the arranged task file that is provided with, and comprises an arranged task in this task list at least; Read module is used for reading the property parameters of this task list arranged task, and described property parameters comprises the numbering of each arranged task; Whether judge module is used for existing the arranged task that can Gong call to judge whether original task list is empty in its internal memory according to described internal memory; Comparison module, be used for when the original task list of described internal memory when empty, according to described numbering, the arranged task of original task list in arranged task in the task list of this generation and the described internal memory is compared, determine whether different; Update module, the result who is used for working as above-mentioned comparison is updated to original task list in the described internal memory task list of described generation for not simultaneously.
A kind of updating arranged task method, this method comprises the steps: to be provided with the arranged task file; Generate task list according to the arranged task file that is provided with, comprise an arranged task in this task list at least; Read the property parameters of arranged task in this task list, described property parameters comprises the numbering of each arranged task; Judge according to whether there being the arranged task that can Gong call in the described internal memory whether original task list is empty in its internal memory; When original task list in the described internal memory when not being empty, according to described numbering, the arranged task of original task list in arranged task in the task list of this generation and the described internal memory is compared, determine whether different; When the result of above-mentioned comparison for not simultaneously, original task list in the described internal memory is updated to the task list of described generation.
Compared to prior art, described scheduled task update system and method, it can upgrade newly-installed scheduling automatically, has improved scheduling and has upgraded the efficient of carrying out.
Description of drawings
Fig. 1 is the hardware structure figure of scheduled task update system preferred embodiment of the present invention.
Fig. 2 is the functional block diagram of main frame shown in Fig. 1.
Fig. 3 is the process flow diagram of updating arranged task method of the present invention preferred embodiment.
Embodiment
As shown in Figure 1, be the system architecture diagram of scheduled task update system preferred embodiment of the present invention.This system mainly comprises display 1, main frame 2, keyboard 3 and mouse 4, and described main frame 2 is preserved the arranged task file.Described arranged task file comprises can carry out script file and property file.Describedly carry out the file that script file is meant the script order (as: Xquery order) that can trigger the operation of this arranged task.Described property file comprises the parameters such as numbering of start time, concluding time, frequency and each task correspondence that task is carried out.Described numbering is used to distinguish different arranged tasks.The corresponding arranged task of each numbering, identical task has identical numbering.Described main frame 2 is connected with display 1, keyboard 3 and mouse 4, the Input/Output Device when described display 1, keyboard 3 and mouse 4 are used as updating arranged task.
As shown in Figure 2, be the functional block diagram of main frame shown in Fig. 12.Described main frame 2 comprises and module 210, generation module 211, read module 212, judge module 213, comparison module 214, update module 215 are set, import module 216 and execution module 217.The alleged module of the present invention is to finish the computer program code segments of a specific function, be more suitable in describing the implementation of software in computing machine than program, therefore below the present invention to all describing in the software description with module.
Wherein, the described module 210 that is provided with is used to be provided with the arranged task file and it is stored in main frame 2.Described arranged task file comprises can carry out script file and property file.Describedly carry out the file that script file is meant the script order (as: Xquery order) that can trigger the operation of this arranged task.Described property file comprises the parameters such as numbering of start time, concluding time, frequency and each task correspondence that arranged task is carried out.Described numbering is used to distinguish different arranged tasks.The corresponding arranged task of each numbering, identical task has identical numbering.
Described generation module 211 is used for generating a task list according to the arranged task file that is provided with.Described task list gathers all arranged tasks, when some arranged tasks need be carried out, calls arranged task corresponding in this task list and gets final product.
Described read module 212 is used for reading the property parameters of this task list arranged task.Described property parameters comprises the parameters such as numbering of start time, concluding time, frequency and each task correspondence that arranged task is carried out.
Whether described judge module 213 is used for existing the arranged task that can Gong call to judge whether original task list is empty in the internal memory of main frame 2 according to the internal memory of main frame 2.When arranged task need be carried out, can carry out by the arranged task under the task list in the invoke memory.Particularly, as if the arranged task that does not have in the internal memory of main frame 2 Gong to call, then original task list is empty in the internal memory, if the arranged task that can Gong call is arranged, then original task list is not empty in the internal memory.
Described comparison module 214 is used for by the arranged task property parameters, and the arranged task of original task list in the internal memory of arranged task in this task list and main frame 2 is compared, and determines whether different.Particularly, after generating task list, each arranged task all has a numbering, and the numbering by arranged task compares, if numbering is identical, and arranged task unanimity then, if numbering is different, then arranged task is inconsistent.
Described update module 215 is used for the result according to described comparison, and original task list is updated to the task list of described generation in the internal memory with main frame 2.Particularly, in this preferred embodiment, the mode of upgrading is the result after according to comparison carry out, in the task list of supposing to generate two arranged task A and B are arranged, task list has two arranged task B and C in the internal memory, and then the numbering of the task by both sides confirms have arranged task B identical, and then B continues to remain in the internal memory, A is added in the internal memory, and the C in the internal memory is deleted.In the task list of supposing to generate two arranged task A and B are arranged, task list has two arranged task C and D in the internal memory, then the numbering of the arranged task by both sides confirms there is not same task, then A and B are added in the internal memory, and with original C and D deletion in the internal memory.
Described importing module 216 is used for when the original task list of the internal memory of described main frame 2 is sky, and the arranged task in the arranged task tabulation of described generation is imported in the internal memory of described main frame 2.
Described execution module 217 is used for the arranged task of invoke memory task list and carries out.
As shown in Figure 3, be the process flow diagram of updating arranged task method of the present invention preferred embodiment.At first, step S10, at first, the user is provided with module 210 by parameter the arranged task file is set.Described arranged task file comprises that one can be carried out script file and property file.Describedly carry out the file that script file is meant the script order (as: Xquery order) that can trigger the operation of this arranged task.Described property file comprises the parameters such as numbering of start time, concluding time, frequency and each arranged task correspondence that arranged task is carried out.Described numbering is used to distinguish different arranged tasks.The corresponding arranged task of each numbering, identical arranged task has identical numbering.
Step S11, generation module 211 generates a task list according to the arranged task file that is provided with.Described task list gathers all arranged tasks, when some arranged tasks need be carried out, calls arranged task corresponding in this task list and gets final product.
Step S12, read module 212 reads the property parameters of arranged task in this task list.Described property parameters comprises the numbering of each task in the task list.Described numbering is used to distinguish different tasks.The corresponding task of each numbering, identical task has identical numbering.
Step S13, whether judge module 213 is according to existing the arranged task that can Gong call to judge whether original task list is empty in its internal memory in the internal memory of described main frame 2.When arranged task need be carried out, can carry out by the arranged task under the task list in the invoke memory.Particularly, as if the arranged task that does not have in the internal memory of main frame 2 Gong to call, then original task list is empty in the internal memory, if the arranged task that can Gong call is arranged, then original task list is not empty in the internal memory.
Step S14, comparison module 214 be by the arranged task property parameters, and the task of original task list in the internal memory of task in this task list and main frame 2 is compared, and determines whether different.Particularly, each arranged task all has a numbering, each arranged task also all has corresponding numbering in the task list in the internal memory of described main frame 2, numbering by the both sides arranged task compares, if numbering is identical, arranged task unanimity then, if numbering is different, then arranged task is inconsistent.
Step S15, update module 215 is according to the result of described comparison, and original task list is updated to the task list of described generation in the internal memory with main frame 2.Particularly, in this preferred embodiment, the mode of upgrading is the result after according to comparison carry out, suppose to generate in the new task list two task A and B are arranged, task list has two task B and C in the internal memory, and then the numbering of the task by both sides confirms have task B identical, and then the task B in the internal memory continues to remain in the internal memory, A is added in the internal memory, and the C in the internal memory is deleted.Suppose to generate in the new task list two task A and B are arranged, task list has two task C and D in the internal memory, then the numbering of the task by both sides is confirmed to find there is not same task, then task A and B are added in the internal memory, and with original task C and D deletion in the internal memory.Suppose to generate in the new task list two task A and B are arranged, task list has two task A in the internal memory, then pass through the numbering of the task on both sides and confirm to find same task A, then the task A in the internal memory continues to remain in the internal memory, and with original task B deletion in the internal memory.
Step S16, described execution module 217 be used for calling described main frame 2 the internal memory task list arranged task and carry out.
Step S17 when original task list in the internal memory of main frame 2 is sky, imports module 216 arranged task in the task list of described generation is imported in the internal memory of described main frame 2.
Claims (10)
- [claim 1] a kind of scheduled task update system, this system comprises main frame, it is characterized in that, described main frame comprises:Module is set, is used to be provided with the arranged task file;Generation module is used for generating task list according to the arranged task file that is provided with, and comprises an arranged task in this task list at least;Read module is used for reading the property parameters of this task list arranged task, and described property parameters comprises the numbering of each arranged task;Whether judge module is used for existing the arranged task that can Gong call to judge whether original task list is empty in its internal memory according to internal memory;Comparison module, be used for when the original task list of described internal memory when empty, according to the numbering of the arranged task in the described task list, the arranged task of original task list in described arranged task and the described internal memory is compared, determine whether different; AndUpdate module, the result who is used for working as above-mentioned comparison is updated to original task list in the described internal memory task list of described generation for not simultaneously.
- [claim 2] scheduled task update system as claimed in claim 1, it is characterized in that, described arranged task file comprises can carry out script file and property file, describedly carries out the file that script file is meant the script order that can trigger the operation of this arranged task.
- [claim 3] scheduled task update system as claimed in claim 1 is characterized in that, the property parameters of described arranged task also comprises start time, concluding time and the frequency that arranged task is carried out.
- [claim 4] scheduled task update system as claimed in claim 1, it is characterized in that, described main frame also comprises the importing module, is used for when the original task list of described internal memory is sky the arranged task in the task list of described generation directly being imported in the internal memory.
- [claim 5] scheduled task update system as claimed in claim 1 is characterized in that described main frame also comprises execution module, is used for calling the arranged task of described internal memory task list and carrying out.
- [claim 6] a kind of updating arranged task method is characterised in that this method comprises the steps:The arranged task file is set;Generate task list according to the arranged task file that is provided with, comprise an arranged task in this task list at least;Read the property parameters of arranged task in this task list, described property parameters comprises the numbering of each arranged task;Judge according to whether there being the arranged task that can Gong call in the internal memory whether original task list is empty in its internal memory;When original task list in the described internal memory when not being empty, according to the numbering of the arranged task in the described task list, the arranged task of original task list in described arranged task and the described internal memory is compared, determine whether different; AndWhen the result of above-mentioned comparison for not simultaneously, the original task list in the described internal memory is updated to the task list of described generation.
- [claim 7] updating arranged task method as claimed in claim 6, it is characterized in that, described arranged task file comprises can carry out script file and property file, describedly carries out the file that script file is meant the script order that can trigger the operation of this arranged task.
- [claim 8] updating arranged task method as claimed in claim 6 is characterized in that, the property parameters of described arranged task also comprises start time, concluding time and the frequency that arranged task is carried out.
- [claim 9] updating arranged task method as claimed in claim 6 is characterized in that described method also comprises step, when original task list in the internal memory is sky, the arranged task in the task list of described generation is directly imported in the internal memory.
- [claim 10] updating arranged task method as claimed in claim 6 is characterized in that described method also comprises step, calls the arranged task and the execution of task list in the described internal memory.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNA200710201568XA CN101377746A (en) | 2007-08-31 | 2007-08-31 | System and method for updating arranged task |
US12/189,122 US20090064172A1 (en) | 2007-08-31 | 2008-08-08 | System and method for task scheduling |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNA200710201568XA CN101377746A (en) | 2007-08-31 | 2007-08-31 | System and method for updating arranged task |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101377746A true CN101377746A (en) | 2009-03-04 |
Family
ID=40409583
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNA200710201568XA Pending CN101377746A (en) | 2007-08-31 | 2007-08-31 | System and method for updating arranged task |
Country Status (2)
Country | Link |
---|---|
US (1) | US20090064172A1 (en) |
CN (1) | CN101377746A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102081524A (en) * | 2009-11-27 | 2011-06-01 | 英业达股份有限公司 | Electronic device and control method thereof |
CN106302763A (en) * | 2016-08-19 | 2017-01-04 | 北京拓盛智联技术有限公司 | A kind of establishment task minute wheel method for down loading and system |
CN111580733A (en) * | 2020-05-15 | 2020-08-25 | 中国工商银行股份有限公司 | Task processing method and device, computing equipment and medium |
CN112685145A (en) * | 2019-10-18 | 2021-04-20 | 上海哔哩哔哩科技有限公司 | Task management method and device and computer equipment |
CN114240021A (en) * | 2021-10-30 | 2022-03-25 | 中冶华天工程技术有限公司 | Automatic feeding scheduling method for steel yard |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TW200933484A (en) * | 2008-01-17 | 2009-08-01 | Wistron Corp | Method and system for automated schedule control |
CN107977830B (en) * | 2017-12-18 | 2021-07-09 | 东软集团股份有限公司 | Countersigning task creating method and device, computer and storage medium |
CN108804215B (en) * | 2018-06-12 | 2021-06-22 | 北京奇艺世纪科技有限公司 | Task processing method and device and electronic equipment |
Family Cites Families (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4914657A (en) * | 1987-04-15 | 1990-04-03 | Allied-Signal Inc. | Operations controller for a fault tolerant multiple node processing system |
US6519767B1 (en) * | 1995-06-07 | 2003-02-11 | Microsoft Corporation | Compiler and method for automatically building version compatible object applications |
US7065762B1 (en) * | 1999-03-22 | 2006-06-20 | Cisco Technology, Inc. | Method, apparatus and computer program product for borrowed-virtual-time scheduling |
US7028299B1 (en) * | 2000-06-30 | 2006-04-11 | Intel Corporation | Task-based multiprocessing system |
US20030182414A1 (en) * | 2003-05-13 | 2003-09-25 | O'neill Patrick J. | System and method for updating and distributing information |
US6918115B2 (en) * | 2001-02-16 | 2005-07-12 | Microsoft Corporation | Method and apparatus for synchronization of periodic processes |
US7953853B2 (en) * | 2001-07-09 | 2011-05-31 | International Business Machines Corporation | System and method for providing access and utilization of context information |
US7051036B2 (en) * | 2001-12-03 | 2006-05-23 | Kraft Foods Holdings, Inc. | Computer-implemented system and method for project development |
US20060156284A1 (en) * | 2002-10-07 | 2006-07-13 | Edss., Inc. | Architecture of Ticc-Ppde, a new paradigm for parallel programming |
US7784044B2 (en) * | 2002-12-02 | 2010-08-24 | Microsoft Corporation | Patching of in-use functions on a running computer system |
GB0308121D0 (en) * | 2003-04-09 | 2003-05-14 | Ibm | Method and apparatus for data logging |
US7287127B2 (en) * | 2004-08-05 | 2007-10-23 | International Business Machines Corporation | Adaptive scheduler using inherent knowledge of operating system subsystems for managing resources in a data processing system |
US8005710B2 (en) * | 2004-09-28 | 2011-08-23 | Microsoft Corporation | Methods and systems for caching and synchronizing project data |
US20060271929A1 (en) * | 2005-05-27 | 2006-11-30 | Computer Associates Think, Inc. | Method and system for providing job forecasting in a computer system |
US7464293B2 (en) * | 2006-03-10 | 2008-12-09 | Yahoo! Inc. | System and method for automated recovery after an error in a batch processing system caused by malformatted or unsupported data |
US7958511B1 (en) * | 2006-11-01 | 2011-06-07 | Oracle America, Inc. | Mechanism for estimating the computing resources needed to execute a job |
-
2007
- 2007-08-31 CN CNA200710201568XA patent/CN101377746A/en active Pending
-
2008
- 2008-08-08 US US12/189,122 patent/US20090064172A1/en not_active Abandoned
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102081524A (en) * | 2009-11-27 | 2011-06-01 | 英业达股份有限公司 | Electronic device and control method thereof |
CN106302763A (en) * | 2016-08-19 | 2017-01-04 | 北京拓盛智联技术有限公司 | A kind of establishment task minute wheel method for down loading and system |
CN112685145A (en) * | 2019-10-18 | 2021-04-20 | 上海哔哩哔哩科技有限公司 | Task management method and device and computer equipment |
CN111580733A (en) * | 2020-05-15 | 2020-08-25 | 中国工商银行股份有限公司 | Task processing method and device, computing equipment and medium |
CN114240021A (en) * | 2021-10-30 | 2022-03-25 | 中冶华天工程技术有限公司 | Automatic feeding scheduling method for steel yard |
Also Published As
Publication number | Publication date |
---|---|
US20090064172A1 (en) | 2009-03-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101377746A (en) | System and method for updating arranged task | |
US20140289700A1 (en) | Methods and Systems for Visual Code Refactoring | |
WO2003107180B1 (en) | Providing dynamic model-code associativity | |
KR20070049095A (en) | Servicing a component-base software product | |
CN102436503A (en) | Data condition filtering and screening method and screener | |
JP2007122135A (en) | Development support device, development support method and development support program | |
CN111068328A (en) | Game advertisement configuration table generation method, terminal device and medium | |
CN106599167B (en) | System and method for supporting increment updating of database | |
US20090024424A1 (en) | System and method for dynamic linking of business processes | |
CN112487019B (en) | Method and system for analyzing dynamic SQL (structured query language) of OpenGauss database | |
CN112052029B (en) | Configuration method and system of USB device management software and computer device | |
CN107423093B (en) | Control method and apparatus, computer apparatus, and computer-readable storage medium | |
CN107203304B (en) | Method and device for realizing functional interface of application by using pressure | |
CN101055599A (en) | Mould design alteration processing system and method | |
CN104462106A (en) | Data updating method and system | |
JP7294609B2 (en) | Program, Method, and Device for Supporting Software Operation Scenario Generation | |
CN109960522B (en) | Software upgrading method and device | |
CN106445662A (en) | Method for transplanting application procedure and terminal equipment | |
CN108345461B (en) | Application updating method and device and computer readable storage medium | |
CN106897074B (en) | Data processing method and system for VR development platform | |
TWI386851B (en) | System and method for scheduling task updating | |
CN111400319A (en) | Method, device and equipment for realizing data processing framework and computer storage medium | |
CN110347447B (en) | Tax return environment batch management method and system | |
CN110221821A (en) | A kind of project function decoupling method and electronic equipment educated based on programming | |
CN114064177B (en) | Application program hiding method and device, storage medium and terminal equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Open date: 20090304 |