CN101353134B - Crane multiple hoisting point delivery hoisting method - Google Patents

Crane multiple hoisting point delivery hoisting method Download PDF

Info

Publication number
CN101353134B
CN101353134B CN2008100717131A CN200810071713A CN101353134B CN 101353134 B CN101353134 B CN 101353134B CN 2008100717131 A CN2008100717131 A CN 2008100717131A CN 200810071713 A CN200810071713 A CN 200810071713A CN 101353134 B CN101353134 B CN 101353134B
Authority
CN
China
Prior art keywords
lifting
hoisting
crane
suspension centre
gravity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2008100717131A
Other languages
Chinese (zh)
Other versions
CN101353134A (en
Inventor
林汉丁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Industrial Equipment Installation Co., Ltd.
Original Assignee
林汉丁
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 林汉丁 filed Critical 林汉丁
Priority to CN2008100717131A priority Critical patent/CN101353134B/en
Publication of CN101353134A publication Critical patent/CN101353134A/en
Application granted granted Critical
Publication of CN101353134B publication Critical patent/CN101353134B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention provides a delivering and lifting method of cranes by a plurality of lifting points, which comprises a method for delivering and lifting heavy objects by a main crane and an auxiliary crane. The delivering and lifting method is characterized in that the auxiliary crane is positioned above the gravity center of a hoisted heavy object, and one or more than one lifting point is arranged below the gravity center of the heavy object, thus with the main crane and the auxiliary crane being forced simultaneously for starting lift, the delivering and lifting method with a plurality of lifting points is realized. The lifting method is applicable to lifting the vertical heavy objects which has insufficient rigidity and requires a plurality of lifting points for starting lift.

Description

Crane multiple hoisting point delivery hoisting method
Technical field crane multiple hoisting point delivery hoisting method (this lift-on/lift-off system, down together) belongs to the method for hoisting crane lifting, and exactly it is a kind of method of hoisting crane lifting weight.
The existing method of using always when lifting is hoisting crane hanging vertical type weight of sending of background technology; Its practice is in the slightly high position of lifted weight thing center of gravity main suspension centre to be set; By main hoisting crane (main frame, down together) lifting, and the suspension centre of sending is set under the weight center of gravity;
Figure GA20187017200810071713101D00011
secondary hoisting crane (secondary machine; Lifting down together), vertical weight is by the stressed lifting simultaneously of major and minor machine, along with the lifting of main frame; Secondary machine is followd forward ... But existing hoisting crane delivery hoisting method can not be used for the lifting of the vertical weight of the many suspension centre liftings of needs.
This lift-on/lift-off system of summary of the invention is to by being hung vertical weight because of insufficient rigidity, needs many suspension centres liftings and sets up.1993 once in the many suspension centre liftings of chimney tower; Transfer according to power between suspension centre; Tower body insufficient rigidity, stressed clear and definite many suspension centres Hoisting Program have been proposed to overcome (referring to woods Chinese fourth .85m chimney tower three many suspension centres of yoke plate sliding methods liftings; Science and technology, 1994 (2) are built in Fujian): 14-15) use same thinking now again, utilize between suspension centre the transfer of power to set up this lift-on/lift-off system.
This lift-on/lift-off system is different with existing delivery hoisting method; Its secondary machine not only is provided with suspension centre under vertical weight center of gravity; But more than the vertical weight center of gravity with below; One or more suspension centres are set simultaneously; Because hoisting crane forms when requiring vertical lifting (hoisting force active line non-perpendicularity is not more than 3 °) thereby lifting, is positioned at the main suspension centre on the weight center of gravity, and be positioned at all the time between the point of resultant force (being secondary machine hoisting force active line and vertical weight crossing point of axes) of the secondary machine hoisting force under the weight center of gravity and lift.
Description of drawings Fig. 1 sends the lifting suspension centre for the many suspension centres of hoisting crane scheme drawing is set.Among Fig. 1: 1 is the lifted weight thing, and 2 is three yoke plates, and A is the main frame suspension centre, and B, C are secondary machine suspension centre, α 1Be rope angle between level of following suspension centre B, G is the weight center of gravity.
Below in conjunction with the description of drawings once foundation and the practice of this lift-on/lift-off system.Among Fig. 1; Main frame is provided with main suspension centre at the slightly high A place of lifted weight thing center of gravity; Secondary machine then connects with two suspension centres of B, C of the upper and lower setting of lifted weight thing center of gravity respectively through three yoke plates and Current Collector Sleave; Stressed simultaneously, the insufficient rigidity lifting that overcome the lifted weight thing of each suspension centre of major and minor machine during lifting, because suspension hook keeps the vertical state in the lifting, thereby along with main frame promotes and the folloing of secondary machine; The intersection point F of secondary machine hoisting force active line N-N and B, C two suspension centre lines moves to B point direction gradually, and angle reaches α between lifted weight thing axis and level when main frame rises to 1During the complementary angle of value, F point overlaps with B point, and the C point does not stress fully, and a B point is stressed, reach at this moment later on and existing delivery hoisting method roughly the same, repeat no more.
Also have, secondary in case of necessity machine also can when the suspension centre number of secondary machine setting surpasses 2, will be adjusted through Current Collector Sleave before the lifting through Current Collector Sleave respectively at more than one suspension centre is set more than the lifted weight thing center of gravity and when as follows, make each suspension centre be in normal strained condition.
The practical implementation method is by being hung vertical weight and field condition; Confirm the main suspension centre of main frame, select to confirm each suspension centre of secondary machine again by this lift-on/lift-off system, promptly hung upper and lower one or more suspension centres of selecting simultaneously of vertical weight center of gravity; Again by the major and minor machine hoisting point position that is provided with; Calculate lifted weight thing stressed in lifting, must make the lifted weight thing and the dangerous section place is stressed meets the requirements, through preferred position and the quantity of confirming suspension centre.When the suspension centre number of secondary machine surpasses 2; Will be before the lifting through the Current Collector Sleave adjustment; Make each suspension centre be in normal strained condition; All the other and existing delivery hoisting method roughly the same,
Figure GA20187017200810071713101D00021
do not give unnecessary details.

Claims (2)

1. crane multiple hoisting point delivery hoisting method comprises having the method that major and minor hoisting crane is sent the lifting weight now, it is characterized in that, secondary hoisting crane is provided with one or more suspension centres simultaneously by more than the weight center of gravity of hanging and below the center of gravity.
2. according to right 1 described crane multiple hoisting point delivery hoisting method,,, finally have only following suspension centre stressed with the stressed suspension centre direction transfer downwards gradually of each suspension centre that secondary hoisting crane connects along with the lifting of main hoisting crane.
CN2008100717131A 2008-09-08 2008-09-08 Crane multiple hoisting point delivery hoisting method Active CN101353134B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008100717131A CN101353134B (en) 2008-09-08 2008-09-08 Crane multiple hoisting point delivery hoisting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008100717131A CN101353134B (en) 2008-09-08 2008-09-08 Crane multiple hoisting point delivery hoisting method

Publications (2)

Publication Number Publication Date
CN101353134A CN101353134A (en) 2009-01-28
CN101353134B true CN101353134B (en) 2012-01-25

Family

ID=40306198

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008100717131A Active CN101353134B (en) 2008-09-08 2008-09-08 Crane multiple hoisting point delivery hoisting method

Country Status (1)

Country Link
CN (1) CN101353134B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105569357A (en) * 2015-12-15 2016-05-11 安徽伟宏钢结构集团股份有限公司 Hoisting method of large steel member

Also Published As

Publication number Publication date
CN101353134A (en) 2009-01-28

Similar Documents

Publication Publication Date Title
CN101301981B (en) Hoisting method
CN102328881B (en) Device and method for hoisting entire oversized steel reinforcement cage in one step
CN102261067A (en) Method for installing reinforcement cage of large-diameter ultra-long pile
CN204324676U (en) Anchor ear lifting device
CN101994318A (en) Lifting frame, hoisting system and hoisting method for vertically and rotatably hoisting steel reinforcement cage
CN203639095U (en) Inner-side-column lifting device for reverse installation method
CN204456109U (en) A kind of steel pipe pile lifting piling construction tackling system
CN201626764U (en) Coke oven fire door hanger
CN202670988U (en) Multi-lifting-point self-forming equalizing beam
CN101353134B (en) Crane multiple hoisting point delivery hoisting method
CN202471402U (en) Loading test apparatus for large-scale module on nuclear power station nuclear island
CN201825670U (en) Lifting appliance used for generator stator
CN201825642U (en) Thin steel plate lifting appliance
CN201962679U (en) Lifting bracket used for vertically and aswirl lifting steel reinforcement cage and lifting system
CN203319500U (en) Reinforcing cage abutting-joint adjusting device
CN101590983B (en) Curved beam gate-type mast slipping method
CN103264953B (en) Butt-joint adjusting device of steel bar cage
CN203847334U (en) Built-in fitting
CN101590979A (en) The hoisting crane constant-rear lifting and hoisting force short-delivery hoisting method
CN203187370U (en) Inner mast hoisting device
CN204297905U (en) A kind of lifting device of precast concrete
CN101357737B (en) Constant hoisting force conveying method for crane with multi-hoisting points
CN201914830U (en) Rope separator of tower hoist
CN103101843B (en) A kind of lifting appliance
CN202116180U (en) Special support lifting beam for large-diameter barrel equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: FUJIAN INDUSTRIAL EQUIPMENT INSTALLATION CO., LTD.

Free format text: FORMER OWNER: LIN HANDING

Effective date: 20120919

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20120919

Address after: Fuxin Road Gulou District of Fuzhou city of Fujian Province, No. 297 350011

Patentee after: Fujian Industrial Equipment Installation Co., Ltd.

Address before: 350011, Room 403, building 3, building No. 297, Fu Xin West Road, Gulou District, Fujian, Fuzhou

Patentee before: Lin Handing