This lift-on/lift-off system of summary of the invention is to by being hung vertical weight because of insufficient rigidity, needs many suspension centres liftings and sets up.1993 once in the many suspension centre liftings of chimney tower; Transfer according to power between suspension centre; Tower body insufficient rigidity, stressed clear and definite many suspension centres Hoisting Program have been proposed to overcome (referring to woods Chinese fourth .85m chimney tower three many suspension centres of yoke plate sliding methods liftings; Science and technology, 1994 (2) are built in Fujian): 14-15) use same thinking now again, utilize between suspension centre the transfer of power to set up this lift-on/lift-off system.
This lift-on/lift-off system is different with existing delivery hoisting method; Its secondary machine not only is provided with suspension centre under vertical weight center of gravity; But more than the vertical weight center of gravity with below; One or more suspension centres are set simultaneously; Because hoisting crane forms when requiring vertical lifting (hoisting force active line non-perpendicularity is not more than 3 °) thereby lifting, is positioned at the main suspension centre on the weight center of gravity, and be positioned at all the time between the point of resultant force (being secondary machine hoisting force active line and vertical weight crossing point of axes) of the secondary machine hoisting force under the weight center of gravity and lift.
Description of drawings Fig. 1 sends the lifting suspension centre for the many suspension centres of hoisting crane scheme drawing is set.Among Fig. 1: 1 is the lifted weight thing, and 2 is three yoke plates, and A is the main frame suspension centre, and B, C are secondary machine suspension centre, α
1Be rope angle between level of following suspension centre B, G is the weight center of gravity.
Below in conjunction with the description of drawings once foundation and the practice of this lift-on/lift-off system.Among Fig. 1; Main frame is provided with main suspension centre at the slightly high A place of lifted weight thing center of gravity; Secondary machine then connects with two suspension centres of B, C of the upper and lower setting of lifted weight thing center of gravity respectively through three yoke plates and Current Collector Sleave; Stressed simultaneously, the insufficient rigidity lifting that overcome the lifted weight thing of each suspension centre of major and minor machine during lifting, because suspension hook keeps the vertical state in the lifting, thereby along with main frame promotes and the folloing of secondary machine; The intersection point F of secondary machine hoisting force active line N-N and B, C two suspension centre lines moves to B point direction gradually, and angle reaches α between lifted weight thing axis and level when main frame rises to
1During the complementary angle of value, F point overlaps with B point, and the C point does not stress fully, and a B point is stressed, reach at this moment later on and existing delivery hoisting method roughly the same, repeat no more.
Also have, secondary in case of necessity machine also can when the suspension centre number of secondary machine setting surpasses 2, will be adjusted through Current Collector Sleave before the lifting through Current Collector Sleave respectively at more than one suspension centre is set more than the lifted weight thing center of gravity and when as follows, make each suspension centre be in normal strained condition.