CN101338569B - 一种预应力式建筑物基础加固的方法 - Google Patents
一种预应力式建筑物基础加固的方法 Download PDFInfo
- Publication number
- CN101338569B CN101338569B CN2007100181806A CN200710018180A CN101338569B CN 101338569 B CN101338569 B CN 101338569B CN 2007100181806 A CN2007100181806 A CN 2007100181806A CN 200710018180 A CN200710018180 A CN 200710018180A CN 101338569 B CN101338569 B CN 101338569B
- Authority
- CN
- China
- Prior art keywords
- lift
- foundation
- pressure
- design load
- stress type
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
本发明在对既有建筑物基础加固时,加固部分的承载力由顶升装置的预加应力来控制,并在加固完成后仍然保持,不仅适用于建筑物基础承载力不足的加固,对于基础稳定性不够的加固更具有明显的效果,例如桥梁墩台等有运动荷载作用的建筑物基础加固。
Description
本发明涉及一种既有建筑物基础加固的方法。
传统基础加固方法是:在基础承载力或稳定性不足时,采用加宽基础,加宽部分为上下两部分,上部与既有建筑物基础连结,下部为增建承受土压力的基础部分,上下两部分接触面间留有空隙,其间布置若干千斤顶,待混凝土达到设计强度后,顶升千斤顶使加固部分基础与原有基础产生相同的压力,然后用混凝土填实千斤顶周围空挡,待其凝固后取出千斤顶,并以混凝土砂浆捣实该空隙。
这种加固方法的缺点是,它无法保证加固部分基础产生足够的承载力。首先,以混凝土砂浆填实空隙来替换千斤顶,这个填实程度是不可控的,从产生承载力的角度看,很难做到等价替换;再一方面,随着时间的推移,基础土压力有一个逐渐平衡的过程,在这个过程中基础下沉,以达到最终稳定的平衡状态,导致加固部分基础的承载力释放。
本发明的目的在于克服传统基础加固方法的不足,而提供一种能够使加固部分基础的承载力始终保持在设计值的既有建筑物基础加固方法。
本发明的技术解决方案是:在传统基础加固方法的基础上用强度足够、结构简单可靠并能长期保持稳定承压力的顶升装置来替代上述方案中的顶升用千斤顶,其特殊之处在于,上述顶升装置将作为所加固基础的一部分置于基础中永久性地参与基础承压,并将顶升装置产生的预压承载力始终保持在设计值。
上述技术解决方案中的顶升装置所产生顶升力的设置需要一个过程,要不断调节顶升力以补充任何因素造成的顶升力下降,直至最终稳定在设计值上。
上述技术解决方案中的顶升装置所产生顶升力的数值可通过测试顶升装置的应力获得。通过逐步地调节顶升力,直至最终稳定在设计值上。
上述技术解决方案中的顶升装置在施工过程中可先用一种可显示压力值的顶升器材来预调顶升力,通过逐步地调节顶升力,直至最终稳定在设计值上,然后用本案所述顶升装置进行加载至可显示压力值的顶升器示值为零,取出可显示压力值的顶升器。
附图描述了本发明的一个优选实施例。
参见附图,加固基础的上部3通过牵钉6及被加固的既有建筑物基础1上的开槽与既有建筑物基础相连结,加固基础的下部4承受地基2的压力,顶升装置5为3和4施加预压应力。
待3、4部分混凝土达到设计强度后,用带压力显示器的液压式千斤顶置于3、4间并调节其压力值,使其达到设计值。通过连续观测压力变化并调节其压力值,使其最终稳定在设计值为止。
用简单易制的高强度螺旋式顶升器5置于液压式千斤顶近旁,顶升5同时观察液压式千斤顶的压力显示器,当示值为零时停止顶升5并取出液压式千斤顶。
以混凝土砂浆捣实3、4间空隙,待其凝固后即可进行基础填埋。
结合以上实施例可以看出,本发明的优点在于:基础加固完成后,由于顶升装置的作用,加固部分基础的实际承载力等于预压承载力,保证了施工质量。
值得强调的是,本发明不仅适用于建筑物基础承载力不足的加固,对于基础稳定性不够的加固更具有明显的效果,例如桥梁墩台等有运动荷载作用的建筑物基础加固。
Claims (4)
1.一种预应力式建筑物基础加固的方法,采用加宽基础,加宽部分为上下两部分,上部与既有建筑物基础连结,下部为增建承受土压力的基础部分,上下两部分接触面间留有空隙,其间布置若干顶升装置,待加宽部分混凝土达到设计强度后,顶升顶升装置使加宽基础产生达到设计值的压力,然后用混凝土填实顶升装置周围空挡,并以混凝土砂浆捣实该空隙,其特征在于:上述顶升装置将作为所加宽基础的一部分置于基础中永久性地参与基础承压,并将顶升装置产生的预压承载力始终保持在设计值。
2.根据权利要求1所述的一种预应力式建筑物基础加固的方法,其特征在于:所述顶升装置所产生顶升力的设置需要一个过程,要不断调节顶升力以补充任何因素造成的顶升力下降,直至最终稳定在设计值上。
3.根据权利要求1或2所述的一种预应力式建筑物基础加固的方法,其特征在于:所述顶升装置所产生顶升力的数值通过测试顶升装置的应力获得,通过逐步地调节顶升力,直至最终稳定在设计值上。
4.根据权利要求1或2所述的一种预应力式建筑物基础加固的方法,其特征在于:所述顶升装置在施工过程中先用一种带压力显示的顶升器材来预调顶升力,通过逐步地调节顶升力,直至最终稳定在设计值上,然后用所述顶升装置进行加载至压力显示值为零,取出带压力显示的顶升器。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2007100181806A CN101338569B (zh) | 2007-07-03 | 2007-07-03 | 一种预应力式建筑物基础加固的方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2007100181806A CN101338569B (zh) | 2007-07-03 | 2007-07-03 | 一种预应力式建筑物基础加固的方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101338569A CN101338569A (zh) | 2009-01-07 |
CN101338569B true CN101338569B (zh) | 2010-08-18 |
Family
ID=40212727
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2007100181806A Expired - Fee Related CN101338569B (zh) | 2007-07-03 | 2007-07-03 | 一种预应力式建筑物基础加固的方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101338569B (zh) |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2150612A (en) * | 1983-11-30 | 1985-07-03 | Arthur Joseph Steel | A system for underpinning a wall foundation |
CN1888331A (zh) * | 2006-07-28 | 2007-01-03 | 谭新平 | 导坑式人工挖孔桩对建筑物基础的加固与托换方法及复合支撑桩 |
-
2007
- 2007-07-03 CN CN2007100181806A patent/CN101338569B/zh not_active Expired - Fee Related
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2150612A (en) * | 1983-11-30 | 1985-07-03 | Arthur Joseph Steel | A system for underpinning a wall foundation |
CN1888331A (zh) * | 2006-07-28 | 2007-01-03 | 谭新平 | 导坑式人工挖孔桩对建筑物基础的加固与托换方法及复合支撑桩 |
Also Published As
Publication number | Publication date |
---|---|
CN101338569A (zh) | 2009-01-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201202084Y (zh) | 一种波形钢腹板预应力混凝土组合箱梁节段 | |
RU2382146C1 (ru) | Способ выправления крена здания, возведенного на свайном фундаменте | |
CN101736686A (zh) | 自锚式混合梁斜拉悬吊协作体系桥 | |
CN203923924U (zh) | 0号段托架预压装置 | |
CN201826249U (zh) | 自锚式混合梁斜拉悬吊协作体系桥 | |
CN102322025B (zh) | 预应力加固拓宽的桥梁结构 | |
CN108978434A (zh) | 一种新型钢-混组合连续箱梁桥及其无支架工业化施工方法 | |
CN101696589A (zh) | 一种新型组合石梁 | |
CN101440598B (zh) | 钢箱-砼组合箱板拱结构及其施工方法 | |
CN102787595A (zh) | 一种双重作用自应力组合抗拔桩及成桩方法 | |
CN104674660A (zh) | 一种新型空心板铰缝结构及其施工方法 | |
CN104929381A (zh) | 钢支托无粘结钢绞线下撑式预应力加固楼板的方法 | |
CN107143087A (zh) | 一种叠合柱及其制作方法 | |
CN103898834A (zh) | 一种钢管混凝土组合梁与桁架式索塔斜拉桥及其施工方法 | |
CN202787099U (zh) | 加固混凝土盖梁的体外预应力结构 | |
CN208293400U (zh) | 一种超高性能混凝土-部分钢梁组合盖梁 | |
CN101338569B (zh) | 一种预应力式建筑物基础加固的方法 | |
CN206376178U (zh) | 一种钢混梁刚构拱桥 | |
CN204059756U (zh) | 一种预应力钢管混凝土桁片及其构建的桁架 | |
CN202936804U (zh) | 后张法预应力桩 | |
CN102051929A (zh) | 配置钢骨的砌块砌体墙及制造方法 | |
CN104675017A (zh) | 一种新型的预应力连续竹木梁推广装置 | |
CN205003027U (zh) | 桁式拱桥考虑腹杆节点应力幅值的实验加载装置 | |
CN101245626A (zh) | 一种叠合用预制板 | |
CN209384243U (zh) | 一种预应力支护桩及桩墙 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20100818 Termination date: 20110703 |