The present invention relates to a kind of multiple new superhigh intensity resistance to deformation, wear-resisting oil well pipe and technology thereof, belong to the manufacturing and the multiple new technical field of oil well pipe in the petroleum production engineering.
Background technology
When oil and gas development, existing oil well pipe bears the synergy of multiple load and different corrosive mediums at work, greatly reduces the application life of oil well pipe, and oil well pipe needs periodic replacement, each oil field changes a large amount of waste and old oil well pipes for many years, causes the serious wasting of resources.
At present, the reparation of old oil well pipe is just simply repeated to choose button, can not fundamentally improve the oil well pipe performance, time-consuming, effort, influence oil field operation.Therefore, new again old oil well pipe, make it reach certain high strength tension, resistance to compression, anti-deformation, be to make full use of idle old oil well pipe resource, reduce the important measures of oilfield exploitation cost.
Summary of the invention
The purpose of this invention is to provide a kind of multiple new superhigh intensity resistance to deformation, wear-resisting oil well pipe and technology thereof,, make old oil well pipe have excellent high strength tension, resistance to compression and anti-deformation by rational technological process.
The present invention is a kind of multiple fresh oil well casing that there is the intensive treatment layer on weld seam position intensity, surface of having strengthened.This oil well pipe is connected and composed by oil well pipe body and external upset (EU) termination, two ends, and wherein the two ends jumping-up wall thickness external upset (EU) of oil well pipe body is connected with external upset (EU) termination, two ends; The surface Hardening Treatment layer of oil well pipe body has three kinds of modes, first kind of mode is the intensive treatment layer that external surface has high-frequency quenching, the second way is the intensive treatment layer that there is plasma quenching on inside and outside surface, and the third mode is the intensive treatment layer that there is laser quenching on inside and outside surface.
Technology of the present invention mainly is by selecting pipe, cleaning, aligning, flaw detection, scale, planar end surface, tube head jumping-up, big stove tempering, friction welding, weld seam fine finishining, weld seam tempering, weld seam nondestructive inspection, surface Hardening Treatment operation to make old oil well pipe reach the purpose of high strength tension, resistance to compression, resistance to deformation.At first retired old oil well pipe is advanced line EAC successively, clean, aligning, flaw detection, scale, planar end surface, carry out the tube head jumping-up then, needing oil well pipe body two ends the welding position jumping-up to make its wall thickness external upset (EU) is 1.02~3 times of body wall thickness, integral body is carried out big stove tempering behind the tube head jumping-up, the heat affected zone that produces when eliminating the heating of old oil well pipe internal stress and tube head jumping-up, friction welding is carried out with the external upset (EU) termination again in the oil well pipe two ends after the big stove tempering, mainly pass through nondestructive inspection successively before the welding of external upset (EU) termination, the cutting thread treatment process, after finishing, oil well pipe two ends and the friction welding of external upset (EU) termination carry out weld seam fine finishining successively, the weld seam tempering, the weld seam nondestructive inspection, then qualified oil well pipe is carried out surface Hardening Treatment, surface Hardening Treatment has three kinds of modes, first kind of mode is with high-frequency quenching machine the oil well pipe external surface to be carried out high-frequency quenching, the processing depth of hardening zone is 0.05~3mm, hardness HRC20~60; The second way is with the plasma quenching lathe plasma quenching to be carried out on the inside and outside surface of oil well pipe, and the processing depth of hardening zone is 0.03~2mm, and quench-hardened case is net distribution on the inside and outside surface of oil well pipe body, hardness HRC20~60; The third mode is with laser hardening machine laser quenching to be carried out on the inside and outside surface of oil well pipe, and the processing depth of hardening zone is 0.1~2mm, hardness HRC20~60.
Employing the invention has the beneficial effects as follows:
1, multiple fresh oil well casing is owing to increased the wall thickness of friction welding position, two ends body, guaranteed the intensity of the intensity at this position greater than the oil well pipe body, thereby overcome the deadly defect of pure friction welding oil well pipe weld seam weakness, so the fracture accident of the soldering oil well casing welded seam area of can reducing friction, thereby application life of prolongation oil well pipe.
2, multiple grease hole tube-surface carries out intensive treatment, no matter be that external surface carries out high-frequency quenching, plasma quenching is carried out on inside and outside surface, still laser quenching is carried out on inside and outside surface, has all improved the oil well pipe surface strength, has prolonged the application life of oil well pipe.
Description of drawings
Fig. 1 is a process chart of the present invention.
Fig. 2 is the structural representation of the multiple fresh oil well casing of the present invention.
Among Fig. 2: 1, external upset (EU) termination, 2, weld seam, 3, the oil well pipe body.
The specific embodiment
Below in conjunction with embodiment the present invention is further described.At first retired old oil well pipe is advanced line EAC, should reject out, remaining oil well pipe is put on the purpose-built washing equipment cleans, remove surfaces externally and internally greasy dirt, dirt the oil well pipe of fracture, seriously corroded.Adopt straightener that oil well pipe is carried out straightening processing afterwards, to reach the straightness accuracy requirement.Pipe for oil well use magnetic flux leakage testing device behind the aligning is carried out integral body flaw detection, with inspection body defectiveness whether.Carry out scale, planar end surface to detecting qualified oil well pipe.Pipe for oil well use horizontal forging and upsetting machine behind the planar end surface is carried out the tube head jumping-up, need oil well pipe body two ends the welding position jumping-up to make its wall thickness thickening 1.02~3 times for the body wall thickness, two ends tube head upsetting length is 50~300mm.Then the big stove of the pipe for oil well use behind the jumping-up is carried out whole tempering, 500~650 ℃ of temperatures, temperature retention time 40~150 minutes, 20~100/h of tempering speed.To pass through nondestructive inspection, cutting thread operation before the external upset (EU) termination welding, at first the external upset end head be carried out nondestructive inspection, whether expect defectiveness, carry out cutting thread and process detecting qualified pipe material afterwards with inspection external upset (EU) termination pipe.Carry out friction welding with the oil well pipe body and the external upset (EU) termination of friction-welding machine after to tempering then, rotating speed is 950~1500rpm, friction pressure 30 * 10
6~60 * 10
6N/m
2, fraction time 10~35s, upset speed 3~10mm/s, upset retention time 10~30s, 1000~1400 ℃ of face of weld temperature, speed of welding are 40~70 terminations/h, butt welded seam jet hardening when 800~950 ℃ of face of weld temperature after friction welding is finished, spray flow 0.5~6m
3/ h.Carry out weld seam fine finishining with special equipment after oil well pipe body and the friction welding of external upset (EU) termination are finished, remove the unnecessary crimping that oil well pipe surfaces externally and internally weld seam is extruded.Oil well pipe after the butt welded seam fine finishining carries out the tempering of intermediate frequency weld seam, temperature retention time 2~6 minutes, 400~650 ℃ of heating-up temperatures.Oil well pipe after the tempering of intermediate frequency weld seam is carried out surface Hardening Treatment, surface Hardening Treatment has three kinds of modes, first kind of mode is with high-frequency quenching machine the oil well pipe external surface to be carried out high-frequency quenching, its oil well pipe speed of travel is 0.3~5m/min, the high frequency frequency is 20~50khz, jet hardening during oil well pipe to 500 to be heated~1000 ℃, spray flow 0.5~6m
3/ h, depth of hardening zone 0.05~3mm, hardness HRC20~60; The second way is with the plasma quenching lathe plasma quenching to be carried out on the inside and outside surface of oil well pipe, and the plasma arc energy density is 1000~100000w/cm
2, sweep length 0.5~30mm, inside and outside plasma gun moves axially speed 0.5~100mm/s along oil well pipe, oil well pipe rotary speed 5~150rpm, spray flow 0.5~6m
3/ h, the processing depth of hardening zone is 0.03~2mm, quench-hardened case is net distribution on the inside and outside surface of oil well pipe body, single grid table area scope 1~400mm
2, hardness HRC20~60; The third mode is with laser hardening machine laser quenching to be carried out on the inside and outside surface of oil well pipe, before the laser quenching of oil well pipe body, surfaces externally and internally will carry out melanism earlier to be handled, melanism is shone the oil well pipe surfaces externally and internally with laser beam after handling, and laser beam power density is 1500~50000w/cm
2, sweep length 0.5~30mm, inside and outside probe moves axially speed 0.5~30mm/s along oil well pipe, oil well pipe rotary speed 5~150rpm, spray flow 0.5~6m
3/ h, the processing depth of hardening zone is 0.1~2mm, hardness HRC20~60.