CN101307590A - 锚索锚固工法 - Google Patents

锚索锚固工法 Download PDF

Info

Publication number
CN101307590A
CN101307590A CNA2008101378553A CN200810137855A CN101307590A CN 101307590 A CN101307590 A CN 101307590A CN A2008101378553 A CNA2008101378553 A CN A2008101378553A CN 200810137855 A CN200810137855 A CN 200810137855A CN 101307590 A CN101307590 A CN 101307590A
Authority
CN
China
Prior art keywords
boring
cut
steel
cable
pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2008101378553A
Other languages
English (en)
Inventor
孙玥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNA2008101378553A priority Critical patent/CN101307590A/zh
Publication of CN101307590A publication Critical patent/CN101307590A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

本发明涉及一种锚索锚固工法。其特征是:无粘结钢绞线底端安置一个钢材质制作的压剪筒,压剪筒前端安装承压板;在实施锚索钻孔时,所述的锚索结构用在硬岩时采用圆柱状钻孔、用在软岩或土体时采用底部扩大头钻孔、用在易塌孔地层时采用自钻式钻头与压剪筒相组合。本工法的有益效果是:安装工艺简便、有效地控制成本、提高了锚索工作状态的安全度。

Description

锚索锚固工法
技术领域
本发明涉及一种锚索锚固工法。
背景技术
目前,大吨位的锚索采用压力分散型锚索。现有的压力分散型锚索是采用多个锚头来分散压力(几何分散),锚固体采用水泥砂浆。多个锚头放置在钻孔内不同位置(现有规范规定锚头间距2-3m)。采用多个锚头的目的是分散锚固体侧壁剪应力和锚固体轴向压应力。
现有的几何分散锚索结构安装不便,工艺复杂、成本浪费,更重要的缺陷是各级钢绞线长度不同导致锚索工作状态不好,使安全度降低。
发明内容
本发明的目的是提供一种锚索锚固工法。
本发明的目的是这样实现的:
无粘结钢绞线底端安置一个钢材质制作的压剪筒,压剪筒前端安装承压板;在实施锚索钻孔时,所述的锚索结构用在硬岩时采用圆柱状钻孔、用在软岩或土体时采用底部扩大头钻孔、用在易塌孔地层时采用自钻式钻头与压剪筒相组合。
锚索施工之前先钻孔,在无粘结钢绞线底端安置一个钢制压剪筒,然后在钢制压剪筒前端安装承压板,将安装完毕的压剪筒锚索置入钻孔中。
锚索施工之前先钻孔,钻孔完成后孔底扩孔形成扩大头,在无粘结钢绞线底端安置一个钢制压剪筒,然后在钢制压剪筒前端安装承压板,将安装完毕的压剪筒锚索置入钻孔中。
钻孔前先组装压剪筒锚索,即在无粘结钢绞线前端安置钢制压剪筒,在钢制压剪筒前端安置有中孔的承载板,将无粘结钢绞线固定在承载板上,压剪筒锚索组装完毕;钻孔时,钻杆穿过承载板中孔与自钻孔钻头连接,当自钻孔钻头向前钻孔时,压剪筒锚索自动跟进钻孔内。
本发明中,锚索锚固体由钢材质制作的压剪筒代替传统的水泥砂浆。钢材质的压剪筒刚度(弹性模量)远大于水泥砂浆的刚度(弹性模量),这就使压剪筒锚索锚固工法中锚固体与钻孔壁间剪应力峰值降低3倍。从锚索安装工艺角度,安装1个压剪筒的工艺比传统的安装多个锚头的工艺简便的多。从成本角度,1个压剪筒替代了传统工艺中的3个水泥砂浆锚固体,控制了成本。由于钢材质的抗压强度远大于水泥砂浆抗压强度,压剪筒锚索锚固体也避免了被压坏的可能性。从锚索工作状态角度,这也是最重要的角度,压剪筒锚索克服了现有几何分散型锚索因钢绞线长度不同带来的锚索工作状态不好,从而降低安全度的缺陷。1个压剪筒相当于3个水泥砂浆锚固体分散剪应力和轴向压力作用。
附图说明
下面结合附图对本发明作进一步说明:
图1是硬岩中压剪筒锚索结构图;
图2是软岩或土体中压剪筒锚索结构图;
图3是易塌孔地层中压剪筒锚索结构图。
具体实施方式
无粘结钢绞线3底端安置一个钢材质制作的压剪筒2,压剪筒2前端安装承压板1;在实施锚索钻孔时,所述的锚索结构用在硬岩时采用圆柱状钻孔、用在软岩或土体时采用底部扩大头钻孔、用在易塌孔地层时采用自钻式钻头与压剪筒相组合。
图1:锚索施工之前先钻孔4,在无粘结钢绞线3底端安置一个钢制压剪筒2,然后在钢制压剪筒2前端安装承压板1,将安装完毕的压剪筒锚索置入钻孔4中。
图2:锚索施工之前先钻孔4,钻孔4完成后孔底扩孔形成扩大头,在无粘结钢绞线3底端安置一个钢制压剪筒2,然后在钢制压剪筒2前端安装承压板1,将安装完毕的压剪筒锚索置入钻孔4中。
图3:钻孔前先组装压剪筒锚索,即在无粘结钢绞线3前端安置钢制压剪筒2,在钢制压剪筒2前端安置有中孔的承载板1,将无粘结钢绞线3固定在承载板1上,压剪筒锚索组装完毕;钻孔时,钻杆穿过承载板1中孔与自钻孔钻头5连接,当自钻孔钻头5向前钻孔时,压剪筒锚索自动跟进钻孔4内。

Claims (4)

1、锚索锚固工法,其特征在于:无粘结钢绞线(3)底端安置一个钢材质制作的压剪筒(2),压剪筒(2)前端安装承压板(1);在实施锚索钻孔时,所述的锚索结构用在硬岩时采用圆柱状钻孔、用在软岩或土体时采用底部扩大头钻孔、用在易塌孔地层时采用自钻式钻头与压剪筒相组合。
2、根据权利要求1所述的锚索锚固工法,其特征在于:在硬岩中钻孔采用圆柱状钻孔,锚索施工之前先钻孔(4),在无粘结钢绞线(3)底端安置一个钢制压剪筒(2),然后在钢制压剪筒(2)前端安装承压板(1),将安装完毕的压剪筒锚索置入钻孔(4)中。
3、根据权利要求1所述的锚索锚固工法,其特征在于:在软岩或土体中钻孔时采用底部扩大头钻孔,锚索施工之前先钻孔(4),钻孔(4)完成后孔底扩孔形成扩大头,在无粘结钢绞线(3)底端安置一个钢制压剪筒(2),然后在钢制压剪筒(2)前端安装承压板(1),将安装完毕的压剪筒锚索置入钻孔(4)中。
4、根据权利要求1所述的锚索锚固工法,其特征在于:在易塌孔地层钻孔时,采用自钻式钻头与压剪筒相组合,钻孔前先组装压剪筒锚索,即在无粘结钢绞线(3)前端安置钢制压剪筒(2),在钢制压剪筒(2)前端安置有中孔的承载板(1),将无粘结钢绞线(3)固定在承载板(1)上,压剪筒锚索组装完毕;钻孔时,钻杆穿过承载板(1)中孔与自钻孔钻头(5)链接,当自钻孔钻头(5)向前钻孔时,压剪筒锚索自动跟进钻孔(4)内。
CNA2008101378553A 2008-07-03 2008-07-03 锚索锚固工法 Pending CN101307590A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2008101378553A CN101307590A (zh) 2008-07-03 2008-07-03 锚索锚固工法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2008101378553A CN101307590A (zh) 2008-07-03 2008-07-03 锚索锚固工法

Publications (1)

Publication Number Publication Date
CN101307590A true CN101307590A (zh) 2008-11-19

Family

ID=40124233

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2008101378553A Pending CN101307590A (zh) 2008-07-03 2008-07-03 锚索锚固工法

Country Status (1)

Country Link
CN (1) CN101307590A (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102352630A (zh) * 2011-08-31 2012-02-15 中国新兴建设开发总公司 全螺纹纤维树脂杆体土钉墙及其施工方法
CN108071112A (zh) * 2016-11-17 2018-05-25 中铁西北科学研究院有限公司深圳南方分院 锚索锚固段的防护结构及其防护方法
CN108086334A (zh) * 2017-12-13 2018-05-29 大连交通大学 一种可回收的快速预应力锚索及其施工方法
CN116335013A (zh) * 2023-05-25 2023-06-27 西南交通大学 一种抢险救灾用便携式模块化快速渡河装置

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102352630A (zh) * 2011-08-31 2012-02-15 中国新兴建设开发总公司 全螺纹纤维树脂杆体土钉墙及其施工方法
CN108071112A (zh) * 2016-11-17 2018-05-25 中铁西北科学研究院有限公司深圳南方分院 锚索锚固段的防护结构及其防护方法
CN108086334A (zh) * 2017-12-13 2018-05-29 大连交通大学 一种可回收的快速预应力锚索及其施工方法
CN116335013A (zh) * 2023-05-25 2023-06-27 西南交通大学 一种抢险救灾用便携式模块化快速渡河装置
CN116335013B (zh) * 2023-05-25 2023-08-01 西南交通大学 一种抢险救灾用便携式模块化快速渡河装置

Similar Documents

Publication Publication Date Title
CN107829767B (zh) 一种分段装配式让压中空注浆锚杆及其施工方法
CN102562107A (zh) 特别是用于采矿工程和隧道工程的锚栓组件
AU2007214341B2 (en) Rock Bolt
CN101413397A (zh) 自钻孔岩石锚杆
CN101307590A (zh) 锚索锚固工法
KR100958696B1 (ko) 쐐기력을 이용한 프리텐션 네일공법
CN101761074A (zh) 提高管桩端承力及抗拔力的方法
CN106638319A (zh) 用于精轧螺纹钢筋锚具套筒紧固器
CN206467574U (zh) 用于精轧螺纹钢筋锚具套筒紧固器
CN203546717U (zh) 一种可回收预应力锚杆
CN2905900Y (zh) 自钻式注浆锚杆
CN101749041A (zh) 双锚固锚杆及其施工方法
CN211228556U (zh) 路基边坡防护结构
CN101538856A (zh) 一种扩大头锚杆的施工方法
CN105421867A (zh) 活套地锚装置及安装方法
CN102678145A (zh) 一种高效的树脂锚杆施工新方法
CN212054747U (zh) 一种防变形可拆卸注浆锚杆
CN211775814U (zh) 一种钢绞线对拉加固模板的加固锚具装置
CN201521103U (zh) 幕墙施工脚手架连墙件装置
CN2903182Y (zh) 自钻式预应力锚杆
WO2018096508A1 (en) Self-drilling rock bolt with internal mixer
CN220226940U (zh) 一种带有螺旋钻头的自钻式注浆锚杆
CN205259181U (zh) 井架揽风绳地锚装置
CN2934357Y (zh) 锚索与钻头对接装置
EP1541770A2 (en) Anchoring assembly

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20081119