CN101303244A - 发电厂冷却塔端差方法 - Google Patents
发电厂冷却塔端差方法 Download PDFInfo
- Publication number
- CN101303244A CN101303244A CNA2008100553589A CN200810055358A CN101303244A CN 101303244 A CN101303244 A CN 101303244A CN A2008100553589 A CNA2008100553589 A CN A2008100553589A CN 200810055358 A CN200810055358 A CN 200810055358A CN 101303244 A CN101303244 A CN 101303244A
- Authority
- CN
- China
- Prior art keywords
- tower
- temperature
- cooling tower
- air
- cooling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000001816 cooling Methods 0.000 title claims abstract description 66
- 238000000034 method Methods 0.000 title claims abstract description 20
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 22
- 238000012360 testing method Methods 0.000 claims abstract description 12
- 230000000694 effects Effects 0.000 abstract description 9
- 230000008901 benefit Effects 0.000 abstract description 2
- 238000004364 calculation method Methods 0.000 description 3
- 238000013461 design Methods 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 3
- 230000007613 environmental effect Effects 0.000 description 2
- 238000011156 evaluation Methods 0.000 description 2
- 238000005259 measurement Methods 0.000 description 2
- 238000012797 qualification Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000012937 correction Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005265 energy consumption Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000945 filler Substances 0.000 description 1
- 239000012467 final product Substances 0.000 description 1
- 230000008676 import Effects 0.000 description 1
- 238000011056 performance test Methods 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 210000000697 sensory organ Anatomy 0.000 description 1
- 238000010998 test method Methods 0.000 description 1
Images
Landscapes
- Air Conditioning Control Device (AREA)
Abstract
Description
进塔空气干球温度℃ | 34.00 |
进塔空气湿球温度℃ | 22.10 |
出塔循环水温度℃ | 34.60 |
进塔空气焓kJ/kg | 15.473114 |
冷却塔端差℃ | 8.55 |
进塔空气特征温度℃ | 26.05 |
进塔空气干球温度℃ | 30.00 |
进塔空气湿球温度℃ | 22.38 |
出塔循环水温度℃ | 31.80 |
进塔空气焓kJ/kg | 15.698183 |
冷却塔端差℃ | 5.35 |
进塔空气特征温度 | 26.45 |
进塔空气干球温度℃ | 28.90 |
进塔空气湿球温度℃ | 25.40 |
出塔循环水温度℃ | 31.20 |
进塔空气焓kJ/kg | 18.860697 |
冷却塔端差℃ | 1.78 |
进塔空气特征温度℃ | 29.42 |
进塔空气干球温度℃ | 30.01 |
进塔空气湿球温度℃ | 23.43 |
出塔循环水温度℃ | 30.97 |
进塔空气焓kJ/kg | 16.747449 |
冷却塔端差℃ | 3.34 |
进塔空气特征温度℃ | 27.63 |
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2008100553589A CN100565122C (zh) | 2008-07-08 | 2008-07-08 | 发电厂冷却塔端差计算方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2008100553589A CN100565122C (zh) | 2008-07-08 | 2008-07-08 | 发电厂冷却塔端差计算方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101303244A true CN101303244A (zh) | 2008-11-12 |
CN100565122C CN100565122C (zh) | 2009-12-02 |
Family
ID=40113254
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNB2008100553589A Active CN100565122C (zh) | 2008-07-08 | 2008-07-08 | 发电厂冷却塔端差计算方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN100565122C (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104361148A (zh) * | 2014-10-17 | 2015-02-18 | 广州市地下铁道总公司 | 一种横流式冷却塔的设计方法 |
CN108984948A (zh) * | 2018-08-07 | 2018-12-11 | 济南蓝辰能源技术有限公司 | 一种冷却塔出口雾羽状态评价方法 |
-
2008
- 2008-07-08 CN CNB2008100553589A patent/CN100565122C/zh active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104361148A (zh) * | 2014-10-17 | 2015-02-18 | 广州市地下铁道总公司 | 一种横流式冷却塔的设计方法 |
CN108984948A (zh) * | 2018-08-07 | 2018-12-11 | 济南蓝辰能源技术有限公司 | 一种冷却塔出口雾羽状态评价方法 |
CN108984948B (zh) * | 2018-08-07 | 2023-04-07 | 济南蓝辰能源技术有限公司 | 一种冷却塔出口雾羽状态评价方法 |
Also Published As
Publication number | Publication date |
---|---|
CN100565122C (zh) | 2009-12-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103293013B (zh) | 一种冷却塔热力性能评估方法及系统 | |
CN102494895B (zh) | 对电站汽轮机组节能及优化的分析方法 | |
Kraus et al. | Airtightness of energy efficient buildings | |
CN105654238B (zh) | 一种公共机构能耗监测平台数据管理方法及装置 | |
CN113723023B (zh) | 一种基于cfd的水电站地下厂房通风效果模拟分析方法 | |
CN100565122C (zh) | 发电厂冷却塔端差计算方法 | |
Wang et al. | Dynamic simulation of thermal load and energy efficiency in poultry buildings in the cold zone of China | |
Rietveld et al. | Realization of a smart grid metrology infrastructure in Europe | |
CN111815114A (zh) | 一种太阳能复合燃气供热采暖系统综合评价方法 | |
CN106096763B (zh) | 一种预测运行机组的燃煤发热值的方法 | |
CN104361148A (zh) | 一种横流式冷却塔的设计方法 | |
CN112381666A (zh) | 一种新能源发电消纳预警分析方法 | |
Dahlström et al. | Identification of representative building archetypes: A novel approach using multi-parameter cluster analysis applied to the Swedish residential building stock | |
CN104749203B (zh) | 用于测试和评估在高温操作下的传热元件的方法和系统 | |
CN107133468B (zh) | 一种间接空冷塔冷却扇段进风量的在线软测量方法 | |
Jiang et al. | Strategy of energy conservation and emission reduction in residential building sector: a case study of Jiangsu Province, China | |
CN101419457B (zh) | 电脑多点连续监测无线控制系统在烤烟烘烤中的应用 | |
CN112907028B (zh) | 一种基于工质能势的换热系统瞬态工况能耗分析方法 | |
CN204214841U (zh) | 核电站发电机氢气供应系统湿度探头的校准装置 | |
CN104459043B (zh) | 核电站发电机氢气供应系统湿度探头的校准方法 | |
CN109884426B (zh) | 获得环控系统冷却塔能效随运营年限演化特性的方法 | |
CN103166218A (zh) | Agc机组调节过程分段方法 | |
CN106296459A (zh) | 一种评估风电场运维水平的方法 | |
Xi et al. | An energy efficiency measurement and calculation method and its application in data center | |
CN111558278A (zh) | 一种面向变温吸附碳捕集技术热能利用效率的评价方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
ASS | Succession or assignment of patent right |
Owner name: STATE GRID CORPORATION OF CHINA HEBEI ELECTRIC POW Effective date: 20121219 Owner name: HEBEI ELECTRIC POWER CORPORATION ELECTRIC POWER RE Free format text: FORMER OWNER: HEBEI ELECTRIC POWER RESEARCH INSTITUTE Effective date: 20121219 |
|
C41 | Transfer of patent application or patent right or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20121219 Address after: 050021 No. 238 South Sports street, Yuhua Road, Hebei, Shijiazhuang Patentee after: Electric Power Research Institute of Hebei Electric Power Corporation Patentee after: State Grid Corporation of China Patentee after: Hebei Electric Power Construction & Adjustment Research Institute Address before: 050021 Hebei city of Shijiazhuang Province Sports South Street No. 238 Hebei Electric Power Research Institute Patentee before: Hebei Electric Power Research Institute |