CN101299537A - 大电网过载集中决策实时紧急控制方法 - Google Patents
大电网过载集中决策实时紧急控制方法 Download PDFInfo
- Publication number
- CN101299537A CN101299537A CNA2007101350962A CN200710135096A CN101299537A CN 101299537 A CN101299537 A CN 101299537A CN A2007101350962 A CNA2007101350962 A CN A2007101350962A CN 200710135096 A CN200710135096 A CN 200710135096A CN 101299537 A CN101299537 A CN 101299537A
- Authority
- CN
- China
- Prior art keywords
- overload
- control
- node
- control device
- real time
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 20
- 238000004891 communication Methods 0.000 claims abstract description 8
- 238000003379 elimination reaction Methods 0.000 claims abstract description 7
- 230000008030 elimination Effects 0.000 claims abstract description 4
- 238000005259 measurement Methods 0.000 claims abstract description 4
- 230000001105 regulatory effect Effects 0.000 claims description 29
- 230000035945 sensitivity Effects 0.000 claims description 7
- 230000001276 controlling effect Effects 0.000 claims description 6
- 238000004364 calculation method Methods 0.000 claims description 4
- 239000000243 solution Substances 0.000 claims description 4
- 241001269238 Data Species 0.000 claims description 3
- 238000002347 injection Methods 0.000 claims description 3
- 239000007924 injection Substances 0.000 claims description 3
- 238000005516 engineering process Methods 0.000 abstract description 3
- 230000005540 biological transmission Effects 0.000 description 4
- 238000003012 network analysis Methods 0.000 description 2
- 238000004458 analytical method Methods 0.000 description 1
- 238000013459 approach Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000007596 consolidation process Methods 0.000 description 1
- 238000010438 heat treatment Methods 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 238000002271 resection Methods 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
- 238000010977 unit operation Methods 0.000 description 1
Images
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
Abstract
Description
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2007101350962A CN100541964C (zh) | 2007-11-08 | 2007-11-08 | 大电网过载集中决策实时紧急控制方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2007101350962A CN100541964C (zh) | 2007-11-08 | 2007-11-08 | 大电网过载集中决策实时紧急控制方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101299537A true CN101299537A (zh) | 2008-11-05 |
CN100541964C CN100541964C (zh) | 2009-09-16 |
Family
ID=40079268
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNB2007101350962A Expired - Fee Related CN100541964C (zh) | 2007-11-08 | 2007-11-08 | 大电网过载集中决策实时紧急控制方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN100541964C (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102638036A (zh) * | 2012-03-12 | 2012-08-15 | 中国电力科学研究院 | 一种用于计划安全校核的快速支路过载辅助决策方法 |
CN106451475A (zh) * | 2016-11-30 | 2017-02-22 | 云南电网有限责任公司 | 一种切机量与切机范围搜索方法 |
CN106655154A (zh) * | 2016-10-12 | 2017-05-10 | 云南电力调度控制中心 | 电力系统设备过载的自适应紧急控制系统及方法 |
CN109347108A (zh) * | 2018-10-16 | 2019-02-15 | 云南电网有限责任公司 | 一种防连锁过载控制方法 |
-
2007
- 2007-11-08 CN CNB2007101350962A patent/CN100541964C/zh not_active Expired - Fee Related
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102638036A (zh) * | 2012-03-12 | 2012-08-15 | 中国电力科学研究院 | 一种用于计划安全校核的快速支路过载辅助决策方法 |
CN102638036B (zh) * | 2012-03-12 | 2015-04-08 | 中国电力科学研究院 | 一种用于计划安全校核的快速支路过载辅助决策方法 |
CN106655154A (zh) * | 2016-10-12 | 2017-05-10 | 云南电力调度控制中心 | 电力系统设备过载的自适应紧急控制系统及方法 |
CN106655154B (zh) * | 2016-10-12 | 2019-07-05 | 云南电力调度控制中心 | 电力系统设备过载的自适应紧急控制系统及方法 |
CN106451475A (zh) * | 2016-11-30 | 2017-02-22 | 云南电网有限责任公司 | 一种切机量与切机范围搜索方法 |
CN106451475B (zh) * | 2016-11-30 | 2019-09-03 | 云南电网有限责任公司 | 一种切机量与切机范围搜索方法 |
CN109347108A (zh) * | 2018-10-16 | 2019-02-15 | 云南电网有限责任公司 | 一种防连锁过载控制方法 |
Also Published As
Publication number | Publication date |
---|---|
CN100541964C (zh) | 2009-09-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101969202B (zh) | 电力系统暂态稳定输电断面功率极限区间的识别方法 | |
CN101640418B (zh) | 电力系统故障的暂态稳定关键输电断面识别方法 | |
CN201117610Y (zh) | 智能断路器 | |
CN103337904B (zh) | 基于多源数据的电网电压越限和设备过载紧急控制方法 | |
CN102214919B (zh) | 一种静态安全分析设备越限辅助决策方法 | |
CN106099906B (zh) | 一种电力系统安全稳定在线综合防御方法 | |
CN104934971B (zh) | 基于潮流转移比的动态断面控制方法 | |
CN103440401A (zh) | 提高电网输电能力的紧急控制措施风险量化评估方法 | |
CN101917006A (zh) | 电力系统频率安全性在线监视与评估方法 | |
CN106655123A (zh) | 一种次同步/超同步振荡监测保护装置及振荡监测保护方法 | |
CN103501007A (zh) | 一种计及负荷综合调节特性的低频低压减负荷控制方法 | |
CN100576680C (zh) | 大电网设备过载在线灵敏度的智能联切方法 | |
CN106771852A (zh) | 一种网源在线监测数据统一采集和分析处理方法 | |
CN100541964C (zh) | 大电网过载集中决策实时紧急控制方法 | |
CN109447441A (zh) | 一种考虑新能源机组不确定性的暂态稳定风险评估方法 | |
CN105514990A (zh) | 综合经济性与安全性的输电线路利用率提高平台及方法 | |
CN108389002A (zh) | 一种基于n-1严重故障集的多重故障生成方法 | |
CN105375453B (zh) | 一种基于连锁故障破坏程度指标的紧急控制方法 | |
CN102064524B (zh) | 一种电力系统失步快速解列判断方法 | |
CN104779608A (zh) | 基于离线策略的电力系统安全稳定在线附加紧急控制方法 | |
CN107067127A (zh) | 一种电力系统高风险连锁故障事故链搜索方法 | |
CN104484728B (zh) | 一种电网安全综合指标体系架构方法 | |
Dmitrova et al. | Early prevention method for power system instability | |
CN107292512A (zh) | 一种基于符号动力学和隐马尔科夫模型的电力设备时空多维安全评估方法 | |
CN106130002A (zh) | 一种考虑电力安全事故风险的切负荷与动态分区协调控制方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
ASS | Succession or assignment of patent right |
Owner name: NARI TECHNOLOGY DEVELOPMENT CO., LTD. Free format text: FORMER OWNER: STATE GRID ELECTRIC POWER RESEARCH INSITITUTE Effective date: 20140103 |
|
C41 | Transfer of patent application or patent right or utility model | ||
C56 | Change in the name or address of the patentee | ||
CP01 | Change in the name or title of a patent holder |
Address after: 210024 Shanghai Road, Jiangsu, China, No. 215, No. Patentee after: JIANGSU ELECTRIC POWER Co. Patentee after: STATE GRID ELECTRIC POWER Research Institute Address before: 210024 Shanghai Road, Jiangsu, China, No. 215, No. Patentee before: JIANGSU ELECTRIC POWER Co. Patentee before: Nanjing Automation Research Institute |
|
TR01 | Transfer of patent right |
Effective date of registration: 20140103 Address after: 210024 Shanghai Road, Jiangsu, China, No. 215, No. Patentee after: JIANGSU ELECTRIC POWER Co. Patentee after: NARI TECHNOLOGY Co.,Ltd. Address before: 210024 Shanghai Road, Jiangsu, China, No. 215, No. Patentee before: JIANGSU ELECTRIC POWER Co. Patentee before: STATE GRID ELECTRIC POWER Research Institute |
|
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20090916 Termination date: 20161108 |
|
CF01 | Termination of patent right due to non-payment of annual fee |