CN101294386A - 深基坑围护桩的支撑件 - Google Patents
深基坑围护桩的支撑件 Download PDFInfo
- Publication number
- CN101294386A CN101294386A CNA2008100593868A CN200810059386A CN101294386A CN 101294386 A CN101294386 A CN 101294386A CN A2008100593868 A CNA2008100593868 A CN A2008100593868A CN 200810059386 A CN200810059386 A CN 200810059386A CN 101294386 A CN101294386 A CN 101294386A
- Authority
- CN
- China
- Prior art keywords
- reinforced concrete
- block
- steel plate
- concrete hollow
- node
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 66
- 239000010959 steel Substances 0.000 claims abstract description 66
- 239000011150 reinforced concrete Substances 0.000 claims abstract description 64
- 238000003466 welding Methods 0.000 claims abstract description 4
- 239000004567 concrete Substances 0.000 claims description 8
- 239000003351 stiffener Substances 0.000 claims description 3
- 230000015572 biosynthetic process Effects 0.000 claims 1
- 238000011065 in-situ storage Methods 0.000 description 6
- 238000010276 construction Methods 0.000 description 5
- 238000010923 batch production Methods 0.000 description 2
- 230000005540 biological transmission Effects 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 238000005422 blasting Methods 0.000 description 1
- 238000004364 calculation method Methods 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000004880 explosion Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000004064 recycling Methods 0.000 description 1
- 230000007306 turnover Effects 0.000 description 1
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
Description
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200810059386A CN100591856C (zh) | 2008-01-31 | 2008-01-31 | 深基坑围护桩的支撑件 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200810059386A CN100591856C (zh) | 2008-01-31 | 2008-01-31 | 深基坑围护桩的支撑件 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101294386A true CN101294386A (zh) | 2008-10-29 |
CN100591856C CN100591856C (zh) | 2010-02-24 |
Family
ID=40064897
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN200810059386A Active CN100591856C (zh) | 2008-01-31 | 2008-01-31 | 深基坑围护桩的支撑件 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN100591856C (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103374919A (zh) * | 2013-07-29 | 2013-10-30 | 浙江博雷重型机床制造有限公司 | 一种支撑系统用的填充块 |
CN103397642A (zh) * | 2013-07-29 | 2013-11-20 | 浙江博雷重型机床制造有限公司 | 一种基坑支护内支撑系统用的调节块 |
CN111764401A (zh) * | 2020-07-10 | 2020-10-13 | 王冰璇 | 全装配组合板撑 |
CN112177012A (zh) * | 2020-09-23 | 2021-01-05 | 中铁第四勘察设计院集团有限公司 | 基坑工程带格构柱预制混凝土非首道支撑体系及施工方法 |
CN113047298A (zh) * | 2021-03-18 | 2021-06-29 | 河海大学 | 一种基坑支撑结构及其安装拆卸方法 |
-
2008
- 2008-01-31 CN CN200810059386A patent/CN100591856C/zh active Active
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103374919A (zh) * | 2013-07-29 | 2013-10-30 | 浙江博雷重型机床制造有限公司 | 一种支撑系统用的填充块 |
CN103397642A (zh) * | 2013-07-29 | 2013-11-20 | 浙江博雷重型机床制造有限公司 | 一种基坑支护内支撑系统用的调节块 |
CN111764401A (zh) * | 2020-07-10 | 2020-10-13 | 王冰璇 | 全装配组合板撑 |
CN111764401B (zh) * | 2020-07-10 | 2023-09-26 | 王冰璇 | 全装配组合板撑 |
CN112177012A (zh) * | 2020-09-23 | 2021-01-05 | 中铁第四勘察设计院集团有限公司 | 基坑工程带格构柱预制混凝土非首道支撑体系及施工方法 |
CN113047298A (zh) * | 2021-03-18 | 2021-06-29 | 河海大学 | 一种基坑支撑结构及其安装拆卸方法 |
CN113047298B (zh) * | 2021-03-18 | 2022-08-05 | 河海大学 | 一种基坑支撑结构 |
Also Published As
Publication number | Publication date |
---|---|
CN100591856C (zh) | 2010-02-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101725362B (zh) | 动压软岩巷道基于钢管混凝土支架的复合支护装置 | |
CN101967984A (zh) | 深井巷道锚网索刚柔耦合支护及围岩整体加固支护方法 | |
CN100591856C (zh) | 深基坑围护桩的支撑件 | |
CN102839675A (zh) | 一种基坑支护用大跨度预应力鱼腹梁及其安装方法 | |
CN102852528A (zh) | 一种反底拱锚固梁控制底鼓的方法 | |
CN205046677U (zh) | 一种装配式混凝土框架节点连接结构 | |
CN105401957A (zh) | 一种盾构隧道管片双向预应力加固装置及施工方法 | |
CN103527201A (zh) | 煤矿立井井筒钢管混凝土支架与混凝土管片支护装置 | |
CN202194129U (zh) | 复合预应力挡土桩 | |
CN201155106Y (zh) | 深基坑围护桩的支撑件 | |
CN107605510B (zh) | 一种拉索式钢格栅拱架及其施工方法 | |
CN101586466B (zh) | 压力型锚杆 | |
CN215441927U (zh) | 一种钢管与鱼腹梁组合式基坑支护结构 | |
CN102797480A (zh) | 非连续承压格栅砼墙控制高应力软岩巷道底鼓变形方法 | |
CN106640146B (zh) | 三维钢筋网架与混凝土组合衬砌结构 | |
CN114197511B (zh) | 一种装配式型钢混凝土轻质基础及其装配方法 | |
CN216194967U (zh) | 一种保护既有塔柱的挡土结构 | |
CN202767286U (zh) | 一种预制混凝土剪力墙与主体钢结构的连接节点 | |
CN113463656A (zh) | 一种钢管与鱼腹梁组合式基坑支护结构 | |
CN211523761U (zh) | 一种新型连接方式的加肋轻质钢梁 | |
CN204112858U (zh) | 一种预应力混凝土预制围墙 | |
CN210622821U (zh) | 一种偏压隧道拱架和偏压隧道拱架挑顶结构 | |
CN202023192U (zh) | 一种预应力方桩 | |
CN202000346U (zh) | 一种预应力混凝土方桩 | |
CN220645978U (zh) | 一种近距离煤层巷道顶板支护装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
ASS | Succession or assignment of patent right |
Owner name: ZHEJIANG GUOTAI CONSTRUCTION GROUP CO., LTD. Free format text: FORMER OWNER: YANG FENG Effective date: 20100618 |
|
C41 | Transfer of patent application or patent right or utility model | ||
COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: 315040 NINGBO FENGLING CONSTRUCTION TECHNOLOGY DEVELOPMENT CO., LTD., 28/F,TOWER A, CONVENTION CENTER BUILDING, NO.166, BAIZHANG ROAD, NINGBO CITY, ZHEJIANG PROVINCE TO: 311202 ZHEJIANG PROVINCE HANGZHOU CITY XIAOSHAN DISTRICT JINHUI ROAD NO.398 ZHEJIANG GUOTAI CONSTRUCTION GROUP CO., LTD. |
|
TR01 | Transfer of patent right |
Effective date of registration: 20100618 Address after: Hangzhou City, Zhejiang province Xiaoshan District Road 311202 gold No. 398 Zhejiang Cathay Pacific Construction Group Co. Ltd. Patentee after: Zhejiang Guotai Construction Group Co., Ltd. Address before: 315040, 28 floor, A building, conference and Exhibition Center building, No. 166 Lu Lu, Zhejiang, Ningbo, Ningbo Patentee before: Yang Feng |